This document is a template for a Contract Discrepancy Report (CDR) to be used for contract number 36C78623B50261 between the Department of Veterans Affairs National Cemetery Administration and an awarded contractor. The CDR template requires information including a description of any discrepancies or problems with work performed, the contractor's response and proposed corrective actions, and the government's evaluation and any resulting actions. The related federal contract opportunity is a multiple award solicitation for cemetery section renovation and shrine maintenance services at the National Memorial Cemetery of the Pacific and Willamette National Cemeteries. Contractors are to provide responses within the timeframes specified by the contracting officer or contracting officer representative as noted on the CDR form.

View the file

Other files

File Type Posted
(WNC) Attachment 8 - Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Attachment 2 - Contract Performance _ Quality Assurance Report.pdf PDF
(NMCP) ATT 8-Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Exhibit A - Work Areas_L-1.pdf PDF
(NMCP) ATT 5-DAILY MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf PDF
(WNC) Attachment 7 - Contractors Daily Log of Construction.pdf PDF
(NMCP) EXHIBIT C-FLAT MARKER REALIGNMENT DIAGRAMS.pdf PDF
(NMCP) ATT 7-CONTRACTOR_S DAILY LOG OF CONSTRUCTION.pdf PDF
(WNC) Attachment 1 - Work Summary _ Progress Report (Flats).pdf PDF
36C78623B50261_1.docx DOCX document
899-NMCP-Mill-FY23-002_SOW_6.2.2023.docx DOCX document
(NMCP) ATT 4-INITIAL MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf PDF
(NMCP) EXHIBIT B-WORK AREA ENLARGEMENTS _ DETAILS-18x24.pdf PDF
WD - Honolulu.txt TXT text file
WD - Multnomah County.txt TXT text file
(NMCP) ATT 6-HERBICIDE APPLICATION DATA SHEET.pdf PDF
(WNC) Exhibit D - Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
907-Willamette NC-MILL-23-001_SOW_6.2.2023.docx DOCX document
Copy of IFB Lump Sum Division Spreadsheet - Shrine.xlsx XLSX spreadsheet
(NMCP) ATT 2-CONTRACT PERFORMANCE _ QUALITY ASSURANCE REPORT.pdf PDF
(WNC) Exhibit B - Flat Marker Details_L-2.pdf PDF
(WNC) Attachment 4 - Initial Headstone-Marker Raise and Realign Verification Survey.pdf PDF
(WNC) Exhibit C - Flat Marker Realignment Diagrams.pdf PDF
(WNC) Attachment 5 - Daily Headstone-Marker Raise _ Realign Verification Survey.pdf PDF
(WNC) Attachment 6 - Herbicide Application Data Sheet.pdf PDF
(NMCP) EXHIBIT A-WORK AREAS-11x17.pdf PDF
(WNC) Attachment 3 - Contract Discrepancy Report.pdf PDF
(NMCP) EXHIBIT D-Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
(NMCP) ATT 1-WORK SUMMARY _ PROGRESS REPORT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Memorial Cemetery of the Pacific National Shrine Project – FY23 Cemetery Section Renovation - Phase V Project No.: 899-Mill-FY23-002

ATTACHMENT 3

CONTRACT DISCREPANCY REPORT (CDR)

CONTRACT DISCREPANCY REPORT

Contract Number:

Report No. for this Discrepancy:

To: (Contractor/Manager’s Name) From: (Name of COR)

5. Dates 5a. Prepared: 5b. Returned by Contractor:

5c. Action Complete:

Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)

Signature of Contracting Officer or COR:

8a. To: (Contracting Officer and/or COR)

8b. From: (Contractor)

9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence: (attach additional sheet if necessary.)

10a. Signature of Contractor Representative:

10b. Date:

11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)

12. Government Actions: (Reduced payment, cure notice, show cause, other)