This document is a work summary and progress report template for a renovation project at the National Memorial Cemetery of the Pacific. The project involves raising and realigning flat granite markers, soil and base compaction testing, removing and replacing flat markers, cleaning markers, turf renovation, and agricultural soil testing and recommendations. The report requires the contractor to provide details of work completed such as the number of markers raised and aligned by cemetery section, number of compaction tests performed, square footage of turf renovated, and any circumstances affecting progress. The contractor and cemetery director must both sign upon report submission to acknowledge completed work.
The related federal contract opportunity is a multiple award for shrine renovations at the National Memorial Cemetery of the Pacific and Willamette National Cemetery. Solicitation number 36C78623B50261 was issued by the Department of Veterans Affairs National Cemetery Administration for an unknown period of performance. No further details are provided on award amounts, response dates, set-asides, or incumbent contractors.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Memorial Cemetery of the Pacific National Shrine Project – FY23 Cemetery Section Renovation - Phase V Project No.: 899-Mill-FY23-002
ATTACHMENT 1
WORK SUMMARY & PROGRESS REPORT
BASE BID and OPTIONS 1,2, 3, 4, 5 and 6 FLAT MARKER RAISE & REALIGNMENT and TURF RENOVATION
WORK SUMMARY & PROGRESS REPORT Period
Covered:
From:
To:
Cemetery Location: Contractor:
National Memorial Cemetery of the Pacific 2177 Puowaina Drive Honolulu, HI 96813
Project Title:
National Shrine – Phase V
Flat Marker Raise and Re-alignment and Turf Renovation
Inspection / Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights—
1. Within a reasonable time after the defect was discovered or should have been discovered; and
2. Before any substantial change occurs in the condition of the item unless the change is due to the defect in the item.
Work Completed & Submitted for Acceptance (This form is not to be used as an Invoice)
BASE BID and OPTIONS 2, 3, 5 and 6
1. Compaction Testing
Total number of compaction tests ► _________/ EA
Cemetery Section(s) ► __________
2.
Flat Granite Marker Setting, Alignment & Backfill onto Headstone Support System
Total # Flat Markers: ► _________/ EA
Cemetery Section(s) ► ____________
3. Soil Compaction Testing
Total number of compaction tests ► _________/ EA
Cemetery Section(s) ► __________
4. Base Compaction Testing
Total number of compaction tests ► _________/ EA
Cemetery Section(s) ► __________
5. R&R Flat Marker Headstones
Total # Flat Markers: ► _________/ EA
Cemetery Section(s) ► ____________
6. Clean Flat Markers
Markers cleaned ► ___________/ EA
Cemetery Section(s) ► ___________
7. Agricultural Soil Testing and Recommendations
Total number of soil tests ► _________/ EA
Cemetery Section(s) ► __________
8. Turf Renovation
Total Square Feet of Turf Area. ► ___________ SF
Cemetery Section(s): ► ____________
Report below any circumstances which may have adversely affected work progress such as weather, turf conditions, strikes, delays by the Government, etc.
Signature of Contractor: Date Signed
Signature of Cemetery Director /
COR
Date Signed
Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.
Duplicate Form as Necessary