(NMCP) ATT 4-INITIAL MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf

PDF 132 KB Posted

Attached to
Y1PZ--PSD SHRINES - NMCP and Willamette National Multiple Award
Solicitation number
36C78623B50261
Issued by

About this file

This document is an attachment to a solicitation for cemetery renovation and headstone raising services at the National Memorial Cemetery of the Pacific in Hawaii. The attachment provides instructions for an initial verification survey of all headstones and markers included in the scope of work, to be completed by the Contracting Officer's Representative or cemetery staff before any renovation work begins. It specifies using the Burial Register Report and Gravesite Layout Map to identify any discrepancies between the planned scope of work and actual conditions in the cemetery. Contractors must resolve any issues found before starting renovation work, and cemetery staff must complete a daily verification survey of completed work utilizing the same records. The related federal contract opportunity is a multiple award solicitation from the Department of Veterans Affairs National Cemetery Administration seeking cemetery renovation and shrine maintenance services at the National Memorial Cemetery of the Pacific in Hawaii and Willamette National Cemetery in Oregon.

View the file

Other files

File Type Posted
(WNC) Attachment 8 - Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Attachment 2 - Contract Performance _ Quality Assurance Report.pdf PDF
(NMCP) ATT 3-CONTRACT DISCREPANCY REPORT (CDR).pdf PDF
(NMCP) ATT 8-Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Exhibit A - Work Areas_L-1.pdf PDF
(NMCP) ATT 5-DAILY MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf PDF
(WNC) Attachment 7 - Contractors Daily Log of Construction.pdf PDF
(NMCP) EXHIBIT C-FLAT MARKER REALIGNMENT DIAGRAMS.pdf PDF
(NMCP) ATT 7-CONTRACTOR_S DAILY LOG OF CONSTRUCTION.pdf PDF
(WNC) Attachment 1 - Work Summary _ Progress Report (Flats).pdf PDF
36C78623B50261_1.docx DOCX document
899-NMCP-Mill-FY23-002_SOW_6.2.2023.docx DOCX document
(NMCP) EXHIBIT B-WORK AREA ENLARGEMENTS _ DETAILS-18x24.pdf PDF
WD - Honolulu.txt TXT text file
WD - Multnomah County.txt TXT text file
(NMCP) ATT 6-HERBICIDE APPLICATION DATA SHEET.pdf PDF
(WNC) Exhibit D - Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
907-Willamette NC-MILL-23-001_SOW_6.2.2023.docx DOCX document
Copy of IFB Lump Sum Division Spreadsheet - Shrine.xlsx XLSX spreadsheet
(NMCP) ATT 2-CONTRACT PERFORMANCE _ QUALITY ASSURANCE REPORT.pdf PDF
(WNC) Exhibit B - Flat Marker Details_L-2.pdf PDF
(WNC) Attachment 4 - Initial Headstone-Marker Raise and Realign Verification Survey.pdf PDF
(WNC) Exhibit C - Flat Marker Realignment Diagrams.pdf PDF
(WNC) Attachment 5 - Daily Headstone-Marker Raise _ Realign Verification Survey.pdf PDF
(WNC) Attachment 6 - Herbicide Application Data Sheet.pdf PDF
(NMCP) EXHIBIT A-WORK AREAS-11x17.pdf PDF
(WNC) Attachment 3 - Contract Discrepancy Report.pdf PDF
(NMCP) EXHIBIT D-Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
(NMCP) ATT 1-WORK SUMMARY _ PROGRESS REPORT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Memorial Cemetery of the Pacific National Shrine Project – FY23 Cemetery Section Renovation - Phase V Project No.: 899-Mill-FY23-002

ATTACHMENT 4

INITIAL HEADSTONE/MARKER RAISE & REALIGN VERIFICATION SURVEY

Station Number: __________ Date: __________________________

Cemetery: _______________ Cemetery Director: _______________

Contracting Officers Representative: ______________________________________

Instructions: The Contracting Officer’s Representative (COR) /Cemetery Director/Cemetery Foreman/ Work Leader/designee MUST conduct an initial survey of ALL headstones/markers included in the scope of work (SOW) before any work is performed. The COR/Cemetery Director/Cemetery Foreman/Cemetery Work Leader/designee will use the Burial Register Report and the Gravesite Layout Map(s) for the initial survey.

Discrepancy/Issue Identified: Y/N_______ Date: ____________________

All discrepancies/issues resolved Y/N ________ Date: ____________________

I certify that the Initial Headstone/Marker verification survey was completed by the COR/Cemetery Director/Foreman or Work Leader/designee. The Burial Register Report and the Gravesite Layout Map for the Cemetery and sections listed in the SOW were used to complete the survey.

COR/Director/Foreman/Work Leader/designee Signature: ______________________

Date: _________________

Prior to the completion of the workday, a Daily Headstone/Marker R&R Verification Survey MUST be completed by the COR/Cemetery Director/Cemetery Foreman/Work Leader/designee utilizing the same Burial Register Report and Gravesite Layout Map as used in the initial survey for ALL completed work.