WD-MA20250008_mod3_3_21_25.pdf
PDF 5 MB Posted
- Solicitation number
- 140P4325R0017
About this file
This document is a U.S. Department of Labor Wage Determination for Heavy and Marine Construction Projects in Massachusetts, dated 03/21/2025. The wage determination covers multiple counties including Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, Plymouth, and Suffolk, and provides detailed wage rates and fringe benefits for various construction trade classifications.
Key details include minimum hourly wage rates for different worker groups, with specific provisions for contracts entered into on or after January 30, 2022. The document outlines wage rates for trades such as boilermakers, bricklayers, cement masons, carpenters, electricians, ironworkers, laborers, painters, pipefitters, and truck drivers across different geographic areas within Massachusetts. Wage rates range from $32.13 to $69.84 per hour, with corresponding fringe benefits. The determination is subject to annual adjustments and applies to federal contracts covered by the Davis-Bacon Act, with specific instructions for contractors regarding minimum wage requirements and worker classifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4325R0017_Amd_0004.pdf | ||
| B09_Amnd0004_RFI_26-30_0004.pdf | ||
| Sol_140P4325R0017_Amd_0003.pdf | ||
| B09-Amnd0002-RFI_6-25_0002.docx | DOCX document | |
| Sol_140P4325R0017_Amd_0002.pdf | ||
| Sol_140P4325R0017_Amd_0001.pdf | ||
| B09-SUMMARY_OF_WORK_JUNE18_2025_0001.docx | DOCX document | |
| B09-Amed0001_RFIs_1-5_0001.docx | DOCX document | |
| B09-SECTION_01_27_00_dated_June_18_2025_0001.docx | DOCX document | |
| B09-MassDEP_Plan_Approval_Race_Point_Rd_0001.pdf | ||
| A04-SOW_RP_Facility_Improvements-Final_CDs_Specs.pdf | ||
| A06-RP_Improvements_S5-8.pdf | ||
| B08-Attachment_4_-Construction_Contract_Administration.pdf | ||
| Sol_140P4325R0017.pdf | ||
| A06-RP_Improvements_S1-4.pdf | ||
| A06-RP_Improvements_D-1-3_E-1.pdf | ||
| A06-RP_Improvements_S9-11.pdf | ||
| A06-RP_Improvements_T1_A2-4.pdf | ||
| B08-Attachment_7_-_RP-Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08-Attachment_5_-_Subcontracting_Percentage_Worksheet.xlsx | XLSX spreadsheet | |
| B08-Attachment_6-Past_Performance_Questionnaire.doc | DOC document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .