This document is a Plan Approval letter from the Massachusetts Department of Environmental Protection (MassDEP) for a tight tank system installation project at Race Point Beach in Cape Cod National Seashore. The approval is for a project submitted by Goldsmith, Prest, & Ringwall, Inc., which involves installing a tight tank system in a National Seashore parking lot. The approval includes specific conditions such as strict conformance with submitted application materials, obtaining a Certificate of Compliance prior to system operation, conducting an inspection and operational test, submitting as-built plans within 30 days of the clear water test, and maintaining the system in accordance with the approved plan. The project location is 0 Race Point Road in Provincetown, and the approval was issued on June 5, 2025, by Andrew Osei, Chief of the Wastewater Management Program at the Bureau of Water Resources.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

File details come from the government source that posted it. Updated .