Wage Determinations Zone 1.pdf
PDF 917 KB Posted
- Attached to
- Construction Services Indefinite Delivery Indefinite Quantity Contract Federal contract opportunity
- Solicitation number
- 47PK0120R0003
About this file
This is a solicitation for multiple award indefinite delivery indefinite quantity contracts for construction services in four geographic zones. The solicitation seeks proposals for construction services for federal buildings in zones covering Arizona/Nevada, northern California, Hawaii, and southern California. The solicitation is a total small business set-aside. Proposers should submit responses in accordance with the instructions and deadlines provided in the attached solicitation documents. Services required include general construction, repair, alteration, modernization or demolition of buildings. The federal agency issuing this solicitation is the General Services Administration Public Buildings Service Region 9.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Zone 1 Wage Determinations:
Arizona and Nevada except
Reno/Washoe County
5/19/2020 beta.SAM.gov https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 1/9
"General Decision Number: AZ20200007 05/15/2020
Superseded General Decision Number: AZ20190007
State: Arizona
Construction Type: Heavy Dams
Counties: Apache, Cochise, Coconino, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz and Yavapai Counties in Arizona.
DAM CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020 3 01/31/2020 4 05/15/2020
BOIL0627-003 10/01/2017
Rates Fringes
BOILERMAKER......................$ 35.30 28.41
BRAZ0003-005 07/01/2019
Rates Fringes
BRICKLAYER.......................$ 25.31 8.13
ZONE PAY:
(Radius miles from the intersection of Central Ave. and Washington St., Phoenix, AZ) https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 2/9
Zone A: 0-60 miles- Base Rate Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
BRAZ0003-013 07/01/2019
COCHISE and SANTA CRUZ COUNTIES; and the area of GRAHAM and GREENLEE COUNTIES located East and South of the San Francisco River to the Gila River
Rates Fringes
BRICKLAYER.......................$ 25.31 8.13
ZONE PAY:
(Radius miles from the intersection of Central Ave. and Washington St., Phoenix, AZ)
Zone A: 0-60 miles- Base Rate Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
CARP0408-004 07/01/2019
Rates Fringes
CARPENTER (Including Form Work)............................$ 28.08 12.74
PILEDRIVERMAN....................$ 27.38 12.44
CARP1914-001 09/01/2019
Rates Fringes
MILLWRIGHT.......................$ 40.61 17.53
ZONE DEFINITIONS FOR MILLWRIGHTS: Mileage shall be calculated from the construction site to the City Hall in Phoenix or Tucson, or to the workmen's residence, whichever is less:
Zone 1: 0-30 miles Zone 2: 31-49 miles Zone 3: 50 miles and over
CARP1914-002 09/01/2003
Rates Fringes
DIVER (Standby) Zone 1......................$ 22.98 8.93 Zone 2......................$ 25.37 8.93 Zone 3......................$ 28.49 8.93 DIVER (Wet) Zone 1......................$ 43.79 8.93 Zone 2......................$ 45.17 8.93 https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 3/9
Zone 3......................$ 48.29 8.93
ZONE DEFINITIONS:
Mileage shall be calculated from the construction site to the City Hall in Phoenix or Tucson, or to the workmen's residence, whichever is less:
Zone 1: 0-30 miles Zone 2: 31-49 miles Zone 3: 50 miles and over
ELEC0518-001 08/01/2018
APACHE COUNTY [South of Highway 66]; All of GILA COUNTY; NAVAJO COUNTY [South and East of boundary beginning at a point where Clear Creek crosses the Coconino-Navajo County line, extending Northeasterly along Clear Creek and Northeasterly to Cottonwood Wash, along Cottonwood Wash North easterly to where it intersects the Navajo Indian Reservation, then East along the Navajo Indian Reservation Boundary line to a point where it intersects the Navajo-Apache County Line]; and PINAL COUNTY [North of the line, ""First Standard Parallel South"" and East of the line, ""Second Guide Meridian East""]
ELECTRICIAN......................$ 28.60 11.36
ELEC0570-004 12/01/2019
COCHISE, GRAHAM, LA PAZ, AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN......................$ 27.78 18% + 5.60
ZONE DEFINITIONS-
Zone A: the area within a twenty-nine (29) mile radius from a basing point at the Tucson Town Hall.
Zone B: 29 to 46 mile radius from the town hall in Tucson- an additional $ 1.25 per hour Zone C: 47 mile radius from the town hall in Tucson to the outer limits of the geographic jurisdiction- an additional $ 3.75 per hour
ELEC0611-005 01/01/2020
APACHE COUNTY [Area North of Highway 66]
Rates Fringes
Electrician/Wireman Zone 1......................$ 32.70 11.67
ZONE 1: 0 to 10 miles from Gallup, NM ZONE 2: 10 to 30 miles from Gallup - Add 9% ZONE 3: 30 to 40 miles from Gallup - Add 15% ZONE 4: Over 40 miles from Gallup - Add 26%
ELEC0640-003 01/01/2020
https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 4/9
COCONINO and YAVAPAI COUNTIES; and the following portions of Counties: NAVAJO COUNTY (North and West of a boundary beginning at a point where Clear Creek crosses the Coconino-Navajo County line, Northeasterly along Clear Creek and Northeasterly to Cottonwood Wash, along Cottonwood Wash Northeasterly to where it intersects the Navajo Indian Reservation then Easterly along the Navajo Indian Reservation Boundary line to a point where it intersects the Navajo-Apache County line); PINAL COUNTY (area lying North and West of the boundary line beginning at a point where Papago Indian Reservation Road No. 15 crosses the Pima-Pinal County line, then extending in a Northeasterly direction on Papago Indian Reservation Road No.15 to the intersection with Highway FAS-267, extending North on Highway FAS-267 to the intersection with the Florence Canal, North and East on the Florence Canal to the intersection of the line ""Second Guide Meridian East"" then North to the Pinal-Maricopa County lines)
ELECTRICIAN......................$ 30.00 11.05
ENGI0428-002 07/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR
Group 1.....................$ 25.94 11.04 Group 2.....................$ 29.21 11.04 Group 3.....................$ 30.29 11.04 Group 4.....................$ 31.32 11.04
POWER EQUIPMENT OPERATORS CLASSIFICATIONS:
GROUP 1: A-frame boom truck, winch truck, air compressor, Beltcrete, boring bridge and texture, concrete mixer (skip type), conductor, brakeman, handler, conveyor, cross timing and pipe float, curing machine, dinky (under 20 tons), elevator hoist (Husky and similar), firemen (all), forklift and Ross carrier, generator (all), highline cableway signalman, hydrographic mulcher, hydrographic seeder, joint inserter, jumbo finishing machine, Kolman belt loader, machine conveyor, multiple power concrete saw, oiler, pavement breaker, power grizzly, power sweeper, pressure grout machine, pump, roller (except as otherwise classified), self-propelled chip spreading machine, skiploader (3 cu. yd. and less), slurry seal machine (Moto paver driver), small self-propelled compactor (with blade)-backfill, ditch operation, straw blower, tractor (D-5 and under), tripper, tugger, welding machine, wheel-type tractor (Ford, Ferguson type with attachments, Bee Gee etc.)
GROUP 2: Aggregate plant (including crushing, screening and sand plants, etc.), asphalt plant mixer, asphalt laydown machine, backhoe (rubber tired or track, less than 1 cu.
yd. MRC), Bee Gee operator boring machine, concrete batch plant (all types and sizes), concrete mechanical tamping, spreading or finishing machine (including Clary, Johnson or similar types), concrete mixer (paving type and mobile mixers), concrete pump, crane (crawler and pneumatic less than 15 ton capacity MRC), drilling machine (including water wells), elevating grader (all types and sizes except https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 5/9 as otherwise classified), field equipment serviceman, paver and similar type equipment, motor grader (any type power blade-rough), oiler driver, operating engineer rigger, pneumatic tired scraper (all sizes and types), power jumbo form setter, road oil mixing machine, roller (on all types asphalt pavement), screed, self-propelled compactor (with blade, 815, 825 or equivalent-grade operation), skip loader (all types with a rated capacity over 3 but less than 6 cu.
yd.), slip form (power driven lifting device for concrete forms), soil cement road mixingmachine (single pass type), heater and planer, tractor (dozer, pusher-all), traveling pipe-wrapping machine, trenching machine, tugger (two or more)
GROUP 3: Asphalt or concrete planing, rotomill and milling machine, auto grade machine (CMI and similar equipment), boring machine (including mole, badger and similar type), concrete pump (truck mounted with boom), crane (crawler and pneumatic over 15 tons but less than 100 tons capacity MRC), crawler type tractor with boom attachment and slope bar, derrick, Gradall, heavy duty mechanic/welder, helicopter hoist operator or pilot, highline cableway, mass excavator (150 Bucyrus, Erie and similar type), mechanical hoist (two or more drums), motor grader (any type power blade-finish), mucking machine, overhead crane, Grade Checker, piledriver engineer (portable, stationary or skid rig), power driven ditch lining or ditch trimming machine, remote control earth moving machine, skip loader (all types with rated capacity 6 cu. yd. but less than 10 cu. yd.), slip form paving machine (including Gunnert, Zimmerman and similar types), tower crane or similar type, universal equipment operator (backhoe, clamshell, dragline, shovel etc., up to 10 cu. yd.); Operating Engineers Electrician including Tower Erector, Lineman & Cable Splicer (load side of main disconnect).
GROUP 4: Crane operator (pneumatic or crawler-100 tons hoisting capacity and over, MRC rating), skip loader (all types with rated capacity of 10 cu. yd. or more), universal equipment operator (backhoe, clamshell, dragline, shovel, etc., 10 cu. yd. and over)
Multiple-Unit Earth Equipment (Holland Loader etc.), Tractor operator, Pneumatic-Tired or Track type, Two Units-$0.50 per hour over base rate; and $1.00 per hour for each additional unit
All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including Jibs, shall receive $0.01 per hour per foot over 80 ft in addition to regular rate of pay
Premium pay for performing hazardous waste removal $0.50 per hour over base rate.
IRON0075-001 08/01/2019
Rates Fringes
IRONWORKER.......................$ 27.80 19.05
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 6/9
Zone 4: 150 miles & over - Add $6.50
PAIN0086-004 04/01/2014
Rates Fringes
PAINTER..........................$ 22.42 4.85
PLAS0394-005 07/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.08 8.57
* PLUM0469-006 07/01/2019
Rates Fringes
PLUMBER/PIPEFITTER
Apache, Coconino,Gila, Greenlee, La Paz, Navajo, and Yavapai.................$ 44.00 17.15 Cochise and Santa Cruz......$ 38.65 17.15
TEAM0104-002 09/01/2019
Rates Fringes
TRUCK DRIVER
Group 2.....................$ 18.57 1.50+a Group 3.....................$ 19.03 1.50+a Group 4.....................$ 20.28 1.50+a Group 5.....................$ 19.40 1.50+a Group 6.....................$ 21.07 1.50+a A. Health & Welfare $1,053.46 per month.
FOOTNOTE:
a. Health & Welfare $984.26 per month.
TRUCK DRIVER CLASSIFICATIONS:
GROUP 2: 2 or 3 axle Dump , Water Truck under 2500 gal.
GROUP 3: 4 axle Dump, Water Truck Drive- (2500 gal but less than 4000 gal) GROUP 4: 5 axle Dump, Water Truck 4000 gal and over GROUP 5: 6-axle Dump GROUP 6: 7-axle Dump, 8-axle Dump
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 7/9 preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 8/9 new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, https://beta.sam.gov/wage-determination/AZ20200007/4?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&con… 9/9 etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 1/7
"General Decision Number: AZ20200017 05/15/2020
Superseded General Decision Number: AZ20190017
State: Arizona
Construction Type: Heavy HEAVY CONSTRUCTION, Includes Water and Sewer Lines, Heavy Construction on Treatment Plant Sites and Pipeline Construction
County: Maricopa County in Arizona.
HEAVY CONSTRUCTION PROJECTS (DOES NOT INCLUDE DAM CONSTRUCTION)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor
1 01/31/2020 2 05/15/2020
BOIL0627-004 10/01/2017
Rates Fringes
BOILERMAKER......................$ 35.30 28.41
BRAZ0003-010 07/01/2019
Rates Fringes
BRICKLAYER.......................$ 25.31 8.13
ZONE PAY:
(Radius miles from the intersection of Central Ave. and
Zone A: 0-60 miles- Base Rate https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 2/7
Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
ELEC0640-006 01/01/2020
Rates Fringes
ELECTRICIAN......................$ 30.00 11.05
ELEC0769-002 08/05/2019
Rates Fringes
Line Construction:
Lineman.....................$ 48.72 21.5%+6.89
ENGI0428-008 07/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR
Group 1.....................$ 25.94 11.04 Group 2.....................$ 29.21 11.04 Group 3.....................$ 30.29 11.04 Group 4.....................$ 31.32 11.04
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Small Self-Propelled Compactor (with blade), Bobcat/Skidsteer/Skid Loader, Oiler
GROUP 2: Self-Propelled Compactor (with blade), Grader/Blade (rough), Scraper, Tractor, Crane (less than 15 tons)
GROUP 3: Grade/Blade (Finish),Crawler-Type Tractor, Crane (over 15 tons & less than 100 ton), Tower Crane
GROUP 4: Crane (100 ton)
ENGI0428-015 07/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR:
(PIPELINE)
Group 1.....................$ 25.94 11.04 Group 3.....................$ 30.29 11.04
Group 1: Backhoe, Boring Machine, Boom Operator, Bulldozer, Trackhoe
Group 3: Oiler
IRON0075-009 08/01/2019
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 27.80 19.05
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 3/7
Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50
PAIN0086-002 04/01/2017
Rates Fringes
PAINTER (Brush Only).............$ 19.58 6.40
* PLUM0469-004 07/01/2019
Rates Fringes
PLUMBER..........................$ 44.00 17.15
SUAZ2012-006 05/17/2012
Rates Fringes
CARPENTER (Form Work Only).......$ 20.80 4.07
CARPENTER, Excludes Form Work....$ 21.98 5.38
CEMENT MASON/CONCRETE FINISHER...$ 18.76 2.12
INSTALLER - SIGN.................$ 25.42 0.00
IRONWORKER, REINFORCING..........$ 20.66 13.59
LABORER: Asphalt Raker/Shoveler/Spreader..........$ 15.76 4.42
LABORER: Common or General......$ 14.36 3.97
LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 17.00 4.55
LABORER: Fence Erection.........$ 10.32 2.24
LABORER: Grade Checker..........$ 18.14 4.55
LABORER: Landscape & Irrigation.......................$ 11.01 0.37
LABORER: Mason Tender - Brick...$ 14.55 4.20
LABORER: Mason Tender - Cement/Concrete..................$ 15.34 4.20
LABORER: Pipelayer..............$ 14.94 3.51
LABORER: Power Tool Operator....$ 16.57 4.20
LABORER: Railroad Construction Laborer.............$ 16.80 4.20
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.37 3.59
OPERATOR: Bulldozer.............$ 20.57 6.16
OPERATOR: Drill.................$ 20.57 4.78 https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 4/7
OPERATOR: Forklift..............$ 20.38 4.75
OPERATOR: Grade Checker.........$ 21.68 6.31
OPERATOR: Loader (Front End)....$ 20.31 3.84
OPERATOR: Mechanic..............$ 22.23 5.78
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 17.07 3.20
OPERATOR: Roller................$ 21.34 8.36
OPERATOR: Rotomill..............$ 21.88 6.39
OPERATOR: Screed................$ 16.82 2.52
OPERATOR: Trencher..............$ 14.21 0.94
OPERATOR: Broom/Sweeper..........$ 15.40 2.45
PAINTER: Pavement Marking/Parking Lot Striping.....$ 19.94 4.10
PAINTER: Roller and Spray.......$ 20.65 4.45
PIPEFITTER.......................$ 23.97 6.78
TRUCK DRIVER: 3 Axle Truck......$ 27.53 1.16
TRUCK DRIVER: Dump Truck........$ 14.37 1.16
TRUCK DRIVER: Flatbed Truck.....$ 12.50 1.48
TRUCK DRIVER: Hydroseeder.......$ 17.32 0.00
TRUCK DRIVER: Water Truck.......$ 16.46 3.42
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 5/7 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 6/7 for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
https://beta.sam.gov/wage-determination/AZ20200017/2?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 7/7 https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 1/9
"General Decision Number: AZ20200006 05/15/2020
Superseded General Decision Number: AZ20190006
State: Arizona
Construction Type: Heavy Dams
Counties: Maricopa, Mohave, Pima, Pinal and Yuma Counties in Arizona.
DAM CONSTRUCTION PROJECTS
of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor
1 05/15/2020
BOIL0627-003 10/01/2017
Rates Fringes
BOILERMAKER......................$ 35.30 28.41
BRAZ0003-006 07/01/2019
MARICOPA, MOHAVE, PINAL, AND YUMA COUNTIES
Rates Fringes
BRICKLAYER.......................$ 25.31 8.13
ZONE PAY:
(Radius miles from the intersection of Central Ave. and
Zone A: 0-60 miles- Base Rate https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 2/9
Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
BRAZ0003-012 07/01/2019
PIMA COUNTY
Rates Fringes
BRICKLAYER.......................$ 25.31 8.13
ZONE PAY:
(Radius miles from the intersection of Central Ave. and Washington St., Phoenix, AZ)
Zone A: 0-60 miles- Base Rate Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
CARP0408-004 07/01/2019
Rates Fringes
CARPENTER (Including Form Work)............................$ 28.08 12.74
PILEDRIVERMAN....................$ 27.38 12.44
CARP1914-001 09/01/2019
Rates Fringes
MILLWRIGHT.......................$ 40.61 17.53
ZONE DEFINITIONS FOR MILLWRIGHTS: Mileage shall be calculated from the construction site to the City Hall in Phoenix or Tucson, or to the workmen's residence, whichever is less:
Zone 1: 0-30 miles Zone 2: 31-49 miles Zone 3: 50 miles and over
CARP1914-002 09/01/2003
Rates Fringes
DIVER (Standby) Zone 1......................$ 22.98 8.93 Zone 2......................$ 25.37 8.93 Zone 3......................$ 28.49 8.93 DIVER (Wet) Zone 1......................$ 43.79 8.93 Zone 2......................$ 45.17 8.93 Zone 3......................$ 48.29 8.93
ZONE DEFINITIONS:
Mileage shall be calculated from the construction site to the https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 3/9
City Hall in Phoenix or Tucson, or to the workmen's residence, whichever is less:
Zone 1: 0-30 miles Zone 2: 31-49 miles Zone 3: 50 miles and over
ENGI0428-002 07/01/2019
Rates Fringes
POWER EQUIPMENT OPERATOR
Group 1.....................$ 25.94 11.04 Group 2.....................$ 29.21 11.04 Group 3.....................$ 30.29 11.04 Group 4.....................$ 31.32 11.04
POWER EQUIPMENT OPERATORS CLASSIFICATIONS:
GROUP 1: A-frame boom truck, winch truck, air compressor, Beltcrete, boring bridge and texture, concrete mixer (skip type), conductor, brakeman, handler, conveyor, cross timing and pipe float, curing machine, dinky (under 20 tons), elevator hoist (Husky and similar), firemen (all), forklift and Ross carrier, generator (all), highline cableway signalman, hydrographic mulcher, hydrographic seeder, joint inserter, jumbo finishing machine, Kolman belt loader, machine conveyor, multiple power concrete saw, oiler, pavement breaker, power grizzly, power sweeper, pressure grout machine, pump, roller (except as otherwise classified), self-propelled chip spreading machine, skiploader (3 cu. yd. and less), slurry seal machine (Moto paver driver), small self-propelled compactor (with blade)-backfill, ditch operation, straw blower, tractor (D-5 and under), tripper, tugger, welding machine, wheel-type tractor (Ford, Ferguson type with attachments, Bee Gee etc.)
GROUP 2: Aggregate plant (including crushing, screening and sand plants, etc.), asphalt plant mixer, asphalt laydown machine, backhoe (rubber tired or track, less than 1 cu.
yd. MRC), Bee Gee operator boring machine, concrete batch plant (all types and sizes), concrete mechanical tamping, spreading or finishing machine (including Clary, Johnson or similar types), concrete mixer (paving type and mobile mixers), concrete pump, crane (crawler and pneumatic less than 15 ton capacity MRC), drilling machine (including water wells), elevating grader (all types and sizes except as otherwise classified), field equipment serviceman, paver and similar type equipment, motor grader (any type power blade-rough), oiler driver, operating engineer rigger, pneumatic tired scraper (all sizes and types), power jumbo form setter, road oil mixing machine, roller (on all types asphalt pavement), screed, self-propelled compactor (with blade, 815, 825 or equivalent-grade operation), skip loader (all types with a rated capacity over 3 but less than 6 cu.
yd.), slip form (power driven lifting device for concrete forms), soil cement road mixingmachine (single pass type), heater and planer, tractor (dozer, pusher-all), traveling pipe-wrapping machine, trenching machine, tugger (two or more)
GROUP 3: Asphalt or concrete planing, rotomill and milling machine, auto grade machine (CMI and similar equipment), https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 4/9 boring machine (including mole, badger and similar type), concrete pump (truck mounted with boom), crane (crawler and pneumatic over 15 tons but less than 100 tons capacity MRC), crawler type tractor with boom attachment and slope bar, derrick, Gradall, heavy duty mechanic/welder, helicopter hoist operator or pilot, highline cableway, mass excavator (150 Bucyrus, Erie and similar type), mechanical hoist (two or more drums), motor grader (any type power blade-finish), mucking machine, overhead crane, Grade Checker, piledriver engineer (portable, stationary or skid rig), power driven ditch lining or ditch trimming machine, remote control earth moving machine, skip loader (all types with rated capacity 6 cu. yd. but less than 10 cu. yd.), slip form paving machine (including Gunnert, Zimmerman and similar types), tower crane or similar type, universal equipment operator (backhoe, clamshell, dragline, shovel etc., up to 10 cu. yd.); Operating Engineers Electrician including Tower Erector, Lineman & Cable Splicer (load side of main disconnect).
GROUP 4: Crane operator (pneumatic or crawler-100 tons hoisting capacity and over, MRC rating), skip loader (all types with rated capacity of 10 cu. yd. or more), universal equipment operator (backhoe, clamshell, dragline, shovel, etc., 10 cu. yd. and over)
Multiple-Unit Earth Equipment (Holland Loader etc.), Tractor operator, Pneumatic-Tired or Track type, Two Units-$0.50 per hour over base rate; and $1.00 per hour for each additional unit
All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including Jibs, shall receive $0.01 per hour per foot over 80 ft in addition to regular rate of pay
Premium pay for performing hazardous waste removal $0.50 per hour over base rate.
IRON0075-001 08/01/2019
Rates Fringes
IRONWORKER.......................$ 27.80 19.05
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50
LABO1184-006 06/01/2019
Rates Fringes
Laborers:
Group 1.....................$ 20.18 5.71 Group 2.....................$ 20.18 5.71 Group 3.....................$ 20.88 5.71 Group 4.....................$ 21.82 5.71 Group 5.....................$ 22.68 5.71
LABORERS CLASSIFICATIONS:
https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 5/9
GROUP 1: Laborer, general or construction; tool dispatcher or checker; manually controlled signal operator; fence builder, guard rail builder-highway; chat box man; dumpman and/or spotter; rip rap stone man; rock slinger; form stripper; packing rod steel and pans; cesspool diggers and installers; astro turf layer; clean up-bull gang trackman, railroad; chipper (clearing and grubbing);
kettleman-tarman; spikers, wrenchers-creosote tieman; floor sanders-concrete; sandblaster (pot tender); powderman tender; fine grader; all tenders not herein separately classified; window cleaner; flagger
GROUP 2: Concrete laborer (belt, pipe and/or hoseman);
cement mason tender; cutting torch operator; power type concrete buggy; bander; guinea chaser
GROUP 3: Operator and tender of pneumatic and electric tools; concrete vibrating machines, chain saw (on clearing and grubbing); hydraulic jacks and similar mechanical tools not separately herein classified; pipe caulker and/or backup man-pipeline; riggers and signal man-pipeline; pipe wrapper; cribber & shorer (except tunnel); pneumatic gopher; pre-cast manhole erector
GROUP 4: Asphalt raker and ironer; air and water washout nozzleman (low and high pressure); scaler (using bos'n's chair or safety belt); tamper (mechanical-all types);
sandblaster (nozzleman); concrete saw (hand-guided);
concrete cutting torch; gunite (gunman, mixerman, rodman);
bio-filer, pressman, installer, operator; hand-guided trencher and similarly operated equipment; driller (jackhammer and/or pavement breaker); grade setter (pipeline); pipe layer including but not limited to non-metallic transite and plastic pipe, water pipe, sewer pipe, drain pipe, and underground tile pipe and conduit);
chuck tender (except tunnel)
GROUP 5: Drill doctor and/or air tool repairman; scaler (driller); form setter and/or builder; welder and/or pipelayer installing process piping; driller-core, diamond, wagon, air track, Joy, Mustang, PR-143, 220 Gardner-Denver, Hydrasonic, powderman; water blaster operator
NOTE: $0.50 per hour premium for performing hazardous waste removal
PAIN0086-004 04/01/2014
Rates Fringes
PAINTER..........................$ 22.42 4.85
PLAS0394-004 07/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.08 8.57
* PLUM0469-005 07/01/2019
Rates Fringes
PLUMBER/PIPEFITTER
Maricopa, Mohave, Pinal, https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 6/9 and Yuma....................$ 44.00 17.15 Pima........................$ 38.65 17.15
TEAM0104-002 09/01/2019
Rates Fringes
TRUCK DRIVER
Group 2.....................$ 18.57 1.50+a Group 3.....................$ 19.03 1.50+a Group 4.....................$ 20.28 1.50+a Group 5.....................$ 19.40 1.50+a Group 6.....................$ 21.07 1.50+a A. Health & Welfare $1,053.46 per month.
FOOTNOTE:
a. Health & Welfare $984.26 per month.
TRUCK DRIVER CLASSIFICATIONS:
GROUP 2: 2 or 3 axle Dump , Water Truck under 2500 gal.
GROUP 3: 4 axle Dump, Water Truck Drive- (2500 gal but less than 4000 gal) GROUP 4: 5 axle Dump, Water Truck 4000 gal and over GROUP 5: 6-axle Dump GROUP 6: 7-axle Dump, 8-axle Dump
SUAZ1994-012 02/01/1994
Rates Fringes
ELECTRICIAN......................$ 16.00 2.84
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 7/9 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current https://beta.sam.gov/wage-determination/AZ20200006/1?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_s… 8/9
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .