Wage Determination.txt

TXT text file 70 KB Posted

Attached to
Replace Building 7 Boilers - Stratton Air National Guard Base
Solicitation number
W50S8J26QA017
Issued by

About this file

This is a Wage Determination document (General Decision Number: NY20260002) issued on May 18, 2026, establishing prevailing wage rates for federal construction contracts in New York State, specifically for Building, Heavy and Highway construction in ten counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie, and Washington (excluding Building Construction in Columbia, Fulton, Greene, and Montgomery counties).

The document provides comprehensive wage and fringe benefit rates for approximately 40 construction trade classifications, including hourly wage rates and corresponding fringe benefit amounts. Representative rates include: Boilermakers at $43.34/hour with $27.66 fringes; Electricians at $48.00/hour with $32.09 fringes; Carpenters ranging from $36.38 to $44.72/hour depending on county and construction type; Operating Engineers from $51.01 to $63.30/hour based on equipment classification; Plumbers/Pipefitters from $44.88 to $55.26/hour; and Laborers ranging from $22.50 to $44.19/hour depending on classification and hazard level. The rates are organized by union identifier codes (such as PLUM0007-001 for Plumbers or ELEC0236-001 for Electricians), with effective dates ranging from July 2019 through January 2026. The determination includes specific footnotes regarding paid holidays, vacation accrual, and special conditions such as paid sick leave requirements under Executive Order 13706 (one hour per 30 hours worked) and applicable federal minimum wage requirements under Executive Order 13658 ($13.65/hour through December 31, 2026).

Text of this file

"General Decision Number: NY20260002 05/18/2026

State: New York

Construction Types: Building, Heavy and Highway

Counties: New York Counties of Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington

Excludes Building Construction in COLUMBIA, FULTON, GREENE & MONTGOMERY Counties

Modification Number Publication Date 1 01/30/2026 2 05/18/2026

ASBE0040-002 05/01/2025

Rates Fringes

HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO

PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING;

VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION

MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT

FROM MECHANCIAL SYSTEMS)............................$ 41.74 27.58

ASBESTOS/INSULATOR WORKER (SCOPE OF WORK: INCLUDES

APPLICATION OF ALL INSULATING MATERIALS,

PROTECTIVE, COVERINGS, COATING AND FINISHING TO

ALL TYPES OF MECHANICAL SYSTEMS.)...................$ 41.74 27.58

BOIL0197-002 01/01/2025

Rates Fringes

BOILERMAKER.........................................$ 43.34 27.66

BRNY0002-019 12/03/2025

Rates Fringes

BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT

MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS)..$ 41.79 22.33

CARP0279-006 07/01/2025

Rates Fringes

CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS

(HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND

GREENE COUNTIES))...................................$ 44.72 31.23

CARP0291-005 07/01/2025

Rates Fringes

CARPENTERS: (WASHINGTON COUNTY BUILDING)...........$ 36.38 24.65

CARPENTERS: (SARATOGA COUNTY BUILDING).............$ 36.38 24.65

CARP0291-008 07/01/2025

Rates Fringes

CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY,

FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES).................................$ 44.28 24.50

CARPENTERS & SOFT FLOOR LAYERS: BUILDING

CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY,

FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES).................................$ 36.38 24.65

CARP0291-010 07/01/2024

Rates Fringes

CARPENTERS: DIVERS..................................$ 69.28 24.50

CARPENTERS: (DIVERS (DRY DAY))......................$ 45.28 24.50

CARPENTERS: (CARPENTERS)............................$ 44.28 24.50

ELEC0236-001 06/01/2024

Rates Fringes

ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT

PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS

OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER,

SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON).......$ 48.00 32.09

ELEC0363-004 04/01/2024

Rates Fringes

ELECTRICIAN (GREENE COUNTY (PORTION OF)) FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S

DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY,

PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,

THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS

DAY.................................................$ 46.50 40.57

ELEC1249-003 05/05/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER

UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF

THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR

OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE

WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 31.72 29.87

ELEC1249-004 05/05/2025

Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC

(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Substation:)............................$ 61.56 36.21

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installat............................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cab........................................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Substation:)......................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN

(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installation)........................$ 64.59 42.92

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Substation:).......................................$ 63.14 33.82

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;

RAILROAD CATENARY INSTALLATION AND MAINTENANCE,

THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED

TRANSMISSION CONDUIT AND CABLE INSTALLATIONS

(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES), PIPETYPE CABLE INSTALLATION AND

MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE

BONDING OF RAILS; PIPETYPE CABLE INSTALLATION

GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND

MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD

FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING

DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE

PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR

THE GOVERNOR OF NEW YORK STATE, PROVIDED THE

EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER

THE HOLIDAY.........................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND

UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND

ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK

INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,

FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,

MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21

ELEC1249-007 05/05/2025

Rates Fringes

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING

ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION SYSTEMS: MECHANIC

(COLUMBIA COUNTY). PAID HOLIDAYS: A. MEMORIAL

DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY

FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION

DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED

THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS

AFTER THE HOLIDAY...................................$ 43.35 30.73

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING

ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND

TECHNICIAN (COLUMBIA COUNTY). PAID HOLIDAYS: A.

MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 54.19 35.69

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING

ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN

TRUCK DRIVER (TRACTOR-TRAILER UNIT). PAID HOLIDAYS:

A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK

STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE

OR TWO DAYS AFTER THE HOLIDAY. (COLUMBIA COUNTY)....$ 43.53 30.75

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING

ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN

TRUCK DRIVER (COLUMBIA COUNTY). PAID HOLIDAYS: A.

MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY,

GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK

STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE

OR TWO DAYS AFTER THE HOLIDAY.......................$ 49.25 31.15

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING

ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN

DIGGING MACHINE OPERATOR (COLUMBIA COUNTY)..........$ 48.77 31.31

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING

ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN

(COLUMBIA COUNTY). PAID HOLIDAYS: A. MEMORIAL

DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY

FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION

DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED

THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS

AFTER THE HOLIDAY...................................$ 32.51 29.93

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT INSTALLER

REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT

OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW

YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.

NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99

ELEV0035-001 01/01/2025

Rates Fringes

ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF

CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ,

CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT

AND GREENPORT); FULTON; GREENE (TOWNS OF DURHAM,

GREENVILLE, NEW BALTIMORE, COXCSACKIE AND ATHENS);

MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY,

SCHOHARIE AND WASHINGTON COUNTIES). FOOTNOTE:

A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR

HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS

BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.

B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

DAY; AND CHRISTMAS DAY..............................$ 57.73 38.44

ELEV0138-004 01/01/2026

Rates Fringes

ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF

ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN,

LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS

OF HUNTER AND CATSKILL)) FOOTNOTE: A.VACATION:

6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR

ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR

HOURLY RATE FOR ALL HOURS WORKED. B. PAID

HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

DAY; AND CHRISTMAS DAY..............................$ 76.12 38.98

ENGI0158-008 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH

LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER,

BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR,

MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR,

WELDING MACHINE, WELL POINT, MECHANICAL HEATER,

GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS,

ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE

DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE

MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM),

SEEDING, AND MULCHING MACHINES, PUMPS (EXCLUDING

MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME

OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR

ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE:

A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY.......................................$ 51.01 33.20

POWER EQUIPMENT OPERATOR: GROUP A(1) CRANE,

HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE,

PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE,

BOOM TRUCK (OVER 5 TONS) EXCLUDING MONTGOMERY

COUNTY GROUP A(1): CRANE PREMIUMS: 1 OVER

150'- $1.00 2 OVER 200'- $2.00 HAZARDOUS WORK

- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH

LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY.....................$ 55.42 33.20

POWER EQUIPMENT OPERATOR (BUILDING): GROUP B

BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION),

BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER,

LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER,

BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS,

SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER,

SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER,

CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER

HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE,

THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND

OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM

SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD

AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER,

MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN

AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER

LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER

(EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK -

ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL

C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY.....................$ 53.91 33.20

POWER EQUIPMENT OPERATOR (BUILDING): GROUP A

SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL

SWING), GRADALLS, POWER ROAD GRADER, ALL CMI

EQUIPMENT, FRONT-END RUBBER TIRE LOADER,

TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING

MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP,

BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT

AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND

UNDER), MAINTENANCE ENGINEER, SELF CONTAINED

CRAWLER, DRILL-HYDRAULIC ROCK DRILL. (EXCLUDING

MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME

OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR

ABOVE, $2.50 PER HOUR OVER REGULAR RATE. FOOTNOTE:

A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY.......................................$ 54.93 33.20

ENGI0158-026 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATORS: GROUP 3..................$ 53.82 33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP

7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91 33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP

6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY.......................................$ 60.30 33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP

5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY.......................................$ 61.80 33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP

4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, AND CHRISTMAS DAY............$ 63.30 33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP

2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER

TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS

SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),

BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),

BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT

(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,

CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE

PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,

CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR

MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),

GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER

(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,

KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,

L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR

STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,

PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),

GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER

BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,

REVINIUS WIDENER, ROLLER (GRADE AND FILL),

SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER

(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM

CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE

PLANT REFRIGERATION EQUIPMENT (FOR SOIL

STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE

SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK

DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,

TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER

HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),

WINCH, WINCH CAT FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39 33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP

1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM,

AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC

FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED,

RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT

212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT

PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM

TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX

CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE,

SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE,

CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE,

OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE

DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE,

DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE

HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT

END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER

(SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM),

HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST,

MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP)

WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER,

PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR

EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT

PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC

SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC

PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER),

MULCHING MACHINE, OILER, PARAPET CONCRETE OR

PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER,

TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER

MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR

(MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 57.30 33.55

IRON0012-011 07/01/2024

Rates Fringes

IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN,

MACHINERY MOVER, RIGGER, FENCE ERECTOR,

REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA;

FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN,

MAYFIELD, NORTHAMPTON AND PERTH); GREENE,

MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN,

MOHAWK AND ROOT); RENSSELAER, SARATOGA;

SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)...$ 38.50 25.48

IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA;

FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN,

MAYFIELD, NORTHAMPTON AND PERTH); GREENE,

MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN,

MOHAWK AND ROOT); RENSSELAER, SARATOGA;

SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)...$ 38.75 25.48

IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON

(ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD,

NORTHAMPTON AND PERTH); GREENE, MONTGOMERY

(AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND

ROOT); RENSSELAER, SARATOGA; SCHENECTADY;

SCHOHARIE; AND WASHINGTON COUNTIES:)................$ 38.75 25.48

IRON0440-007 07/01/2025

Rates Fringes

IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN,

MACHINERY MOVER, RIGGER, FENCE ERECTOR,

REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS.

OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN, PALATINE,

ST. JOHNSVILLE):)...................................$ 35.50 31.39

LABO0017-001 07/01/2019

Rates Fringes

LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS

MATERIAL ABATEMENT FOREMAN (GREENE COUNTY

(TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE:

A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S

BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE

EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE

SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY

FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING

SO FOR LEGITIMATE REASONS...........................$ 48.00 27.15

LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman

GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY &

HIGHWAY FOOTNOTE: a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.............................................$ 43.15 27.15

LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER,

HANDLING AND DISTRIBUTING DRINKING WATER,

DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS,

NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE

LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER,

MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF

CONCRETE FOR CURING AND PRESERVATIVE PURPOSES,

TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CURB

AND SIDEWALK FORM SETTER; PERMANENT TRAFFIC

STRIPING AND REFLECTIVE DEVICES, PLACING AND

MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS,

BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY

REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL,

CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT

OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN,

PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH,

ASPHALT MAN, JOINT SETTER, SIGNAL PERSON,

PIPELAYER, PIPE LINING AND RELINING, WELLPOINTS,

CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND

DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL,

ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC,

JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING

HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL,

GUNITE AND SAND BLASTING, COAL PASSER AND OTHER

MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND

NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL

GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING,

ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK,

WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER,

GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER

AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING,

WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN,

CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING

COMING UNDER LABORERS JURISDICTION, BIT GRINDER,

OPERATOR OF FORM PIN PULLER AND DRIVERS,

SANDBLASTING, JOINT AND JET SEALER, FILLING AND

WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN

MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE

PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK

LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST

CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS

USED TO PERFORM WORK USUALLY DONE BY LABORERS,

POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF,

PLASTER AND CAUSTIC PUMP, ASBESTOS, TOXIC,

BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR

HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE

CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH

CUTTER, RETENTION LINERS, ARTIFICIAL TURF,

RETAINING WALLS, WALK BEHIND SURFACE PLANER,

WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED

EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL

TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO

STITCHING, SEAMING, HEAT WELDING, FIREPROOF

SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM

SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE

NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER,

MANHOLE, CATCH BASIN OR INLET INSTALLING, LASER

MEN. GROUND MAN ON MILLING MACHINE (GREENE COUNTY

(TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY) FOOTNOTE:

A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S

BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE

EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE

SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY

FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING

SO FOR LEGITIMATE REASONS...........................$ 38.90 27.15

LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE

COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY,

VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY,

PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY

PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK

THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS

PREVENTED FROM DOING SO FOR LEGITIMATE REASONS......$ 34.15 27.15

LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE

ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK)

HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC,

BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR

HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE

CLOTHING AND EQUIPMENT IS REQUIRED (COLUMBIA

COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK,

CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE,

TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND

THE CITY OF HUDSON) ..............................$ 43.15 27.15

LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE

ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK)

HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC,

BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR

HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE

EQUIPMENT AND CLOTHING ARE NOT REQUIRED (COLUMBIA

COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK,

CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE,

TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND

THE CITY OF HUDSON) HEAVY & HIGHWAY ...............$ 38.90 27.15

LABO0035-001 07/01/2017

Rates Fringes

LABORERS BUILDING CONSTRUCTION, WAGON DRILL

OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA,

OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF

CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST.

JOHNSVILLE)) FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 22.90 20.64

LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR

MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER

LIFT (WALK BEHIND) (FULTON (TWPS OF CAROGA,

EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS

OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST.

JOHNSVILLE)). FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 22.65 20.64

LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON

(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND

PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY.......................................$ 22.50 20.64

LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE

REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL,

SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL

INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS

OR NOT, FROM MECHANICAL SYSTEMS (FULTON (TWPS OF

CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND

PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY. ..................................$ 24.00 20.64

LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM

SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE) (FULTON

(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND

PALATINE, ROOT AND ST. JOHNSVILLE)). PAID HOLIDAYS:

A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK

STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE

OR TWO DAYS AFTER THE HOLIDAY.......................$ 23.00 20.64

LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL

(FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND

STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN

AND PALATINE, ROOT AND ST. JOHNSVILLE)) FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY.......................................$ 24.00 20.64

LABORERS (HEAVY & HIGHWAY) GROUP 4: BLASTERERS,

FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON

(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND

PALATINE, ROOT AND ST. JOHNSVILLE FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY.......................................$ 28.65 23.74

LABORERS (HEAVY & HIGHWAY) GROUP 3: ALL ROCK OR

DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER

AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND

ASPHALT PAVER, POWDERMAN FULTON (TWPS OF CAROGA,

EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS

OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST.

JOHNSVILLE) FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 28.45 23.74

LABORERS (HEAVY & HIGHWAY) GROUP 2: BULL FLOAT,

CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE

BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR,

JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT

BREAKER, HANDLERS OF ALL STEEL MESH, SMALL

GENERATORS FOR LABORER'S TOOLS, INSTALLATION OF

BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS,

TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON

ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND

SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE,

SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK

FENCE ERECTION, ROCK SPLITTER AND POWER UNIT,

PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS,

ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING

LABORERS FULTON (TWPS OF CAROGA, EPHRATA,

OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF

CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST.

JOHNSVILLE) FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY.............$ 28.25 23.74

LABORERS (HEAVY & HIGHWAY) GROUP 1: COMMON

LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON

(TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND

PALATINE, ROOT AND ST. JOHNSVILLE) FOOTNOTE: A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY.......................................$ 28.05 23.74

LABO0157-001 07/01/2023

Rates Fringes

LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE

REMOVAL FULTON (TWPS. OF BLEEKER, MAYFIELD,

NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH);

MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON,

AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY,

HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS

FALLS, PROVIDENCE, GREENFIELD, WILTON,

NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS,

CHARLTON, BALLSTON, MALTA AND CLIFTON PARK);

SCHENECTADY AND SCHOHARIE COUNTIES..................$ 41.69 26.75

LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM

SETTERS, STONE OR GRANITE CURB SETTERS FULTON

(TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON,

JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS.

OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND

FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG,

CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE,

GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY,

MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA

AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE

COUNTIES............................................$ 39.79 26.75

LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING

MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR

TYPE), ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER,

POWDERMAN FULTON (TWPS. OF BLEEKER, MAYFIELD,

NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH);

MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON,

AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY,

HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS

FALLS, PROVIDENCE, GREENFIELD, WILTON,

NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS,

CHARLTON, BALLSTON, MALTA AND CLIFTON PARK);

SCHENECTADY AND SCHOHARIE COUNTIES..................$ 39.59 26.75

LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN

SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN

BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON

TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF

ALL STEEL MESH, SMALL GENERATORS FOR LABORERS'

TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS,

VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL

OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP

OPERATOR (1 1/2"") AND SINGLE DIAPHRAGM), NOZZLE

(ASPHALT, GUNNITE, SEEDING, AND SAND BLASTING),

LABORERS ON CHAIN FENCE ERECTION, ROCK SPLITTER AND

POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER

GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS,

WRECKING LABORERS FULTON (TWPS. OF BLEEKER,

MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND

PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN,

CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA

(TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU,

SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON,

NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS,

CHARLTON, BALLSTON, MALTA AND CLIFTON PARK);

SCHENECTADY AND SCHOHARIE COUNTIES. ...............$ 39.39 26.75

LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON (TWPS. OF

BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN,

BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK,

GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA

(TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU,

SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON,

NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS,

CHARLTON, BALLSTON, MALTA AND CLIFTON PARK);

SCHENECTADY AND SCHOHARIE COUNTIES..................$ 39.19 26.75

LABO0190-001 07/01/2024

Rates Fringes

LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL

COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS

AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR

LESS EXCLUDING DEMOLITION WORK, (COMPLETE RAZING OF

STRUCTURES) WILL RECEIVE 75% OF BASIC WAGE SCALE

WITH FULL FRINGES WILL APPLY ALBANY; GREEN;

RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA

COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON,

SARATOGA)...........................................$ 37.51 26.68

LABORERS: BUILDING: GROUP 1 COMMON LABORERS

ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON

COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER,

HALFMOON, SARATOGA).................................$ 36.16 26.68

LABO0190-002 07/01/2024

Rates Fringes

LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE

REMOVAL ALBANY; RENSSELAER; COLUMBIA (TWPS. OF

STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON,

CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT

CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO

COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY

AND CHRISTMAS DAY...................................$ 44.19 27.65

LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS,

FORM SETTERS, STONE OR GRANITE CURB SETTERS

ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT,

STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT,

CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL

TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY

(TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY

AND CHRISTMAS DAY...................................$ 42.29 27.65

LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR

DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER

AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND

ASPHALT PAVER, POWDERMAN ALBANY; RENSSELAER;

COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT,

KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM,

AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP).

WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF

STILLWATER, HALFMOON SARATOGA) FOOTNOTE: PAID

HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE

DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY..$ 42.09 27.65

LABORERS: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT,

CHAIN SAW, CONCRETE AGGREGATED BIN, CONCRETE

BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR,

JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT

BREAKER, HANDLERS OF ALL STEEL MESH, SMALL

GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF

BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS,

TAMPERS, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON

ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND

SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE,

SEEDING, AND SAND BLASTING) LABORERS ON CHAIN LINK

FENCE ERECTION, ROCK SPLITTER AND POWER UNIT,

PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS,

ELECTRIC, OIL, AIR TOOL OPERATORS, AND WRECKING

ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT,

STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT,

CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL

TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY

(TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY

AND CHRISTMAS DAY...................................$ 41.89 27.65

LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON

LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY;

RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT,

STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT,

CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL

TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY

(TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY

AND CHRISTMAS DAY...................................$ 41.69 27.65

LABO0235-006 05/01/2023

Rates Fringes

LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER;

ASPHALT SCREEDMAN; DRILLERS (ALL); LASER BEAM

OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA

(TWPS. OF GREENPORT, CLAVERACK, HILLSDALE,

LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE,

CLERMONT, GALLATIN, ANCRAM) FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD

FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY,

THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 43.90 27.80

LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS,

DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN;

PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER;

POWDERMAN; HIGHSCALERS POWER BUGGY OPERATOR; STEEL

ROD CARRIER; VIBRATORY OPERATOR; OTHER MACHINE

OPERATOR; WRECKING; VIBRATOR OPERATOR-COMPACTOR;

GUNITE AND SANDBLASTING; WATER PUMP 2"" OR UNDER;

NIPPER; CHUCKER; ASPHALT WORKERS COLUMBIA (TWPS.

OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON,

GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN,

ANCRAM) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS

DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS

DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY.......................................$ 42.80 27.80

LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON;

PLACING AND MAINTENANCE OF ALL FLARES, CONES,

LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL

CUSTODIAL WORK; TRAFFIC DIRECTORS; TEMPORARY HEAT

OR LIGHT TENDERS; TOOL ROOMS COLUMBIA (TWPS. OF

GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON,

GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN,

ANCRAM) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS

DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS

DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND

CHRISTMAS DAY.......................................$ 36.45 27.80

PAIN0009-013 05/01/2025

Rates Fringes

GLAZIER.............................................$ 37.25 33.54

PAIN0155-002 05/01/2021

Rates Fringes

PAINTERS:: SPRAY RATE (COLUMBIA AND GREENE

COUNTIES)...........................................$ 36.94 24.66

PAINTERS: PAINTER/PAPERHANGER (COLUMBIA AND GREENE

COUNTIES)...........................................$ 35.94 24.66

PAINTERS: LEAD ABATEMENT WORK (COLUMBIA AND GREENE

COUNTIES)...........................................$ 35.94 24.66

PAINTERS: DRYWALL FINISHER (COLUMBIA AND GREENE

COUNTIES)...........................................$ 35.94 24.66

PAIN0201-001 05/01/2025

Rates Fringes

PAINTERS: ZONE 2 (PAINTERS, DRYWALL FINISHERS,

SPRAY) ZONE #2 ALL OF WASHINGTON COUNTY...........$ 33.50 21.69

PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS,

STRUCTURAL STEEL) ZONE #2 ALL OF WASHINGTON

COUNTY..............................................$ 34.50 21.69

PAINTERS: ZONE 1 (PAINTERS, DRYWALL FINISHERS,

SPRAY) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON,

MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND

SARATOGA............................................$ 33.50 21.69

PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS,

STRUCTURAL STEEL) ZONE #1 ENTIRE COUNTIES OF

ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE,

SCHENECTADY AND SARATOGA............................$ 34.50 21.69

PAIN0806-002 10/01/2024

Rates Fringes

PAINTERS: STRUCTURAL STEEL AND BRIDGE (ALBANY,

COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,

SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON)....$ 56.25 55.14

PLUM0007-001 05/01/2025

Rates Fringes

PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON;

GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY;

SARATOGA (TOWNS OF CHARLTON, CLIFTON PARK, GALWAY,

HALFMOON, MILTON, STILLWATER AND WATERFORD))........$ 55.26 29.12

PLUM0112-019 05/01/2023

Rates Fringes

PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF

CANAJOHARIE AND MINDEN).............................$ 31.40 31.70

PLUM0773-002 05/01/2025

Rates Fringes

PLUMBER/PIPEFITTER (SARATOGA (REMAINDER OF COUNTY);

WASHINGTON COUNTY:).................................$ 44.88 33.60

ROOF0203-003 06/01/2023

Rates Fringes

ROOFER (SCHOHARIE COUNTY:)..........................$ 30.50 19.84

ROOF0241-001 07/01/2025

Rates Fringes

ROOFER..............................................$ 38.05 24.27

SFNY0669-001 01/01/2026

Rates Fringes

SPRINKLER FITTER....................................$ 47.85 28.94

SHEE0083-001 06/01/2019

Rates Fringes

SHEET METAL WORKER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. IF ANY

OF THESE HOLIDAYS FALL ON A…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
QandA 2.pdf PDF
Vent pipe tag picture.jpg JPG image
Water test results.pdf PDF
QandA 1.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
Revised Solicitation (Amendment 01).pdf PDF
Statement of Work Amendment 01.docx DOCX document
Amendment 01.pdf PDF
Solicitation - W50S8J26QA017.pdf PDF
Statement of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .