Amendment 01.pdf

PDF 4 MB Posted

Attached to
Replace Building 7 Boilers - Stratton Air National Guard Base
Solicitation number
W50S8J26QA017
Issued by

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the W76NR United States Air Force Activity NYANG 109, located at Ko For NYANG in Scotia, New York. The amendment is numbered 0001, with an effective date of 26 June 2026, and modifies solicitation W50S8J26QA017 dated 16 June 2026. The contracting officer is Nicholas Bastiani at the W50S8J facility code.

The amendment adds Option Line Item 0002 for a water softener system to be procured and installed as a Firm Fixed Price job. The contractor must provide all materials, labor, supervision, and expertise necessary to procure and install a water softener system appropriately sized and integrated to maximize the efficiency and longevity of the chosen boiler system. Additionally, the amendment updates the contract documents by replacing the original Statement of Work with Statement of Work Amendment 01, adding Q&A 1 (Specification) dated 29 June 2026, and revising the wage determination attachment. The evaluation criteria are modified to include four factors: Price, Experience (demonstrated experience on similar boiler replacement projects with one-page project description), Past Performance (verified point of contact for reference checks), and Technical (technical data sheets and manufacturer specifications for the specific boiler make, model, and physical specifications). The Government reserves the right to evaluate quotes and make award decisions based on initial submissions without further exchanges.

View the file

Other files

File Type Posted
Vent pipe tag picture.jpg JPG image
Water test results.pdf PDF
QandA 2.pdf PDF
QandA 1.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
Revised Solicitation (Amendment 01).pdf PDF
Statement of Work Amendment 01.docx DOCX document
Wage Determination.txt TXT text file
Statement of Work.docx DOCX document
Solicitation - W50S8J26QA017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item

OPTION 1 - Water softener:

The contractor shall provide all materials, labor, supervision and expertise necessary to procure and install a water softener system appropriately sized and integrated to maximize the efficiency and longevity of the chosen boiler system.

Product Type Code: Z1BZ Product Service Code: Z1BZ Signal Code: A Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price

1 Job

W50S8J26QA0170001

Section J - List of Attachments

The attachments table has changed from:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 Wage Determination

Wage Determination 02 Jun 2026 Attach ment

No

0002 Statement of Work

Statement of Work 16 Jun 2026 8 Attach ment

No

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 Wage Determination

Wage Determination 02 Jun 2026 Attach ment

No

0002 Statement of Work Amendment 01

Statement of Work 16 Jun 2026 8 Attach ment

No

0003 Q&A 1 Specification 29 Jun 2026 1 Attach ment

No

The following contract documents were added:

Q&A 1 Statement of Work Amendment 01

The following contract documents were deleted:

Statement of Work

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

Q&A 1 none 1

Miscellaneous text in this section has been modified to:

The attachments listed in this Section are incorporated by reference and made part of this contract with the same force and effect as if included in full text.

Wage Determination

Section M - Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

Quotes will be evaluated in accordance with FAR 12.203. Evaluation Factors are as follows: Price, Technical, Experience and Past Performance. The Government reserves the right to evaluate quotes and make an award based on initial submissions without further exchanges. However, the Government also reserves the right to request additional or missing information if the Contracting Officer determines it to be in the Government's best interest.

Ev al ua tio n Fa ct or

Definition Requested Submission

1.

Ex pe

Demonstrated experience performing a project of similar scope, magnitude, and

A brief description (maximum of one page) of a single completed project that clearly demonstrates the required experience.

rie nc e complexity to the boiler replacement required by this solicitation.

2.

Pa st Pe rfo rm an ce

An assessment of how well the offeror executed and completed the project submitted under the Experience factor.

A current, verified Point of Contact (POC)--including name, title, phone number, and email address--for the project submitted under the Experience factor. The Government will contact this POC to gather past performance information.

3.

Te ch ni ca l

An evaluation of the proposed equipment to verify it meets the minimum technical specifications of the Statement of Work (SOW).

Technical data sheets or manufacturer specification sheets identifying the specific boiler make, model, and physical specifications the contractor will utilize. The agreed-upon unit shall become a binding contract requirement upon award.

Note: The Past Performance evaluation is directly tied to the project submitted for the Experience evaluation. While the Government may request missing information, offerors are strongly encouraged to provide a complete submission, including a verifiable POC, to avoid negatively impacting their evaluation.

IDCode: J
Page: 1
Pages: 5
AmendNo: 0001
EffDate: 26 JUN 2026
ReqNo:
ProjNo: VBDZ262108
IssCode: W50S8J
AdmCode:
IssuedBy: W7NR USPFO ACTIVITY NYANG 109

KO FOR NYANG DO NOT DELETE, 1 AIR NATIONAL GUARD RD

SCOTIA, NY 12302-9572

UNITED STATES

NICHOLAS BASTIANI, EMAIL: NICHOLAS.BASTIANI.2@US.AF.MIL TELEPHONE: 518-344-2513

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W50S8J26QA017
SolDate: 16 JUN 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to make the following changes:

1. To answer questions which were raised in response to the site visit. See attached "Q&A 1" for complete details.

2. To add option CLIN 0002 for a water softener. Subsequent to this change, the SOW has been updated as well.

3. To revise the evaluation criteria to require a material submittal for the boiler the contractor intends to install as part of this project. See revised Section M.

ContNameTitle:
CoNameTitle: JOSHUA KING
ContDate:
CODate: 29 JUN 2026