This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the W76NR United States Air Force Activity NYANG 109, located at Ko For NYANG in Scotia, New York. The amendment is numbered 0001, with an effective date of 26 June 2026, and modifies solicitation W50S8J26QA017 dated 16 June 2026. The contracting officer is Nicholas Bastiani at the W50S8J facility code.
The amendment adds Option Line Item 0002 for a water softener system to be procured and installed as a Firm Fixed Price job. The contractor must provide all materials, labor, supervision, and expertise necessary to procure and install a water softener system appropriately sized and integrated to maximize the efficiency and longevity of the chosen boiler system. Additionally, the amendment updates the contract documents by replacing the original Statement of Work with Statement of Work Amendment 01, adding Q&A 1 (Specification) dated 29 June 2026, and revising the wage determination attachment. The evaluation criteria are modified to include four factors: Price, Experience (demonstrated experience on similar boiler replacement projects with one-page project description), Past Performance (verified point of contact for reference checks), and Technical (technical data sheets and manufacturer specifications for the specific boiler make, model, and physical specifications). The Government reserves the right to evaluate quotes and make award decisions based on initial submissions without further exchanges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vent pipe tag picture.jpg | JPG image | |
| Water test results.pdf | ||
| QandA 2.pdf | ||
| QandA 1.docx | DOCX document | |
| Site Visit Sign In Sheet.pdf | ||
| Revised Solicitation (Amendment 01).pdf | ||
| Statement of Work Amendment 01.docx | DOCX document | |
| Wage Determination.txt | TXT text file | |
| Statement of Work.docx | DOCX document | |
| Solicitation - W50S8J26QA017.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
OPTION 1 - Water softener:
The contractor shall provide all materials, labor, supervision and expertise necessary to procure and install a water softener system appropriately sized and integrated to maximize the efficiency and longevity of the chosen boiler system.
Product Type Code: Z1BZ Product Service Code: Z1BZ Signal Code: A Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Job
W50S8J26QA0170001
Section J - List of Attachments
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 Wage Determination
Wage Determination 02 Jun 2026 Attach ment
No
0002 Statement of Work
Statement of Work 16 Jun 2026 8 Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 Wage Determination
Wage Determination 02 Jun 2026 Attach ment
No
0002 Statement of Work Amendment 01
Statement of Work 16 Jun 2026 8 Attach ment
No
0003 Q&A 1 Specification 29 Jun 2026 1 Attach ment
No
The following contract documents were added:
Q&A 1 Statement of Work Amendment 01
The following contract documents were deleted:
Statement of Work
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Q&A 1 none 1
Miscellaneous text in this section has been modified to:
The attachments listed in this Section are incorporated by reference and made part of this contract with the same force and effect as if included in full text.
Wage Determination
Section M - Evaluation Factors for Award
Miscellaneous text in this section has been modified to:
Quotes will be evaluated in accordance with FAR 12.203. Evaluation Factors are as follows: Price, Technical, Experience and Past Performance. The Government reserves the right to evaluate quotes and make an award based on initial submissions without further exchanges. However, the Government also reserves the right to request additional or missing information if the Contracting Officer determines it to be in the Government's best interest.
Ev al ua tio n Fa ct or
Definition Requested Submission
1.
Ex pe
Demonstrated experience performing a project of similar scope, magnitude, and
A brief description (maximum of one page) of a single completed project that clearly demonstrates the required experience.
rie nc e complexity to the boiler replacement required by this solicitation.
2.
Pa st Pe rfo rm an ce
An assessment of how well the offeror executed and completed the project submitted under the Experience factor.
A current, verified Point of Contact (POC)--including name, title, phone number, and email address--for the project submitted under the Experience factor. The Government will contact this POC to gather past performance information.
3.
Te ch ni ca l
An evaluation of the proposed equipment to verify it meets the minimum technical specifications of the Statement of Work (SOW).
Technical data sheets or manufacturer specification sheets identifying the specific boiler make, model, and physical specifications the contractor will utilize. The agreed-upon unit shall become a binding contract requirement upon award.
Note: The Past Performance evaluation is directly tied to the project submitted for the Experience evaluation. While the Government may request missing information, offerors are strongly encouraged to provide a complete submission, including a verifiable POC, to avoid negatively impacting their evaluation.
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0001 |
| EffDate: 26 JUN 2026 |
| ReqNo: |
| ProjNo: VBDZ262108 |
| IssCode: W50S8J |
| AdmCode: |
| IssuedBy: W7NR USPFO ACTIVITY NYANG 109 |
KO FOR NYANG DO NOT DELETE, 1 AIR NATIONAL GUARD RD
SCOTIA, NY 12302-9572
UNITED STATES
NICHOLAS BASTIANI, EMAIL: NICHOLAS.BASTIANI.2@US.AF.MIL TELEPHONE: 518-344-2513
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W50S8J26QA017 |
| SolDate: 16 JUN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to make the following changes: |
1. To answer questions which were raised in response to the site visit. See attached "Q&A 1" for complete details.
2. To add option CLIN 0002 for a water softener. Subsequent to this change, the SOW has been updated as well.
3. To revise the evaluation criteria to require a material submittal for the boiler the contractor intends to install as part of this project. See revised Section M.
| ContNameTitle: |
| CoNameTitle: JOSHUA KING |
| ContDate: |
| CODate: 29 JUN 2026 |
File details come from the government source that posted it. Updated .