QandA 1.docx

DOCX document 15 KB Posted

Attached to
Replace Building 7 Boilers - Stratton Air National Guard Base
Solicitation number
W50S8J26QA017
Issued by

About this file

This is a Questions and Answers document addressing clarifications submitted by potential contractors regarding the replacement of Building 7 boilers at Stratton Air National Guard Base. The Q&A resolves six key inquiries that impact project scope and pricing. Existing expansion tanks must be removed and replaced per the Statement of Work paragraph 1.5, while existing circulation pumps and pot feeder systems are to remain and be reconnected to the new boiler installation. The contractor is expected to complete all work before the heating season begins, eliminating the need for temporary heating during construction. Regarding submissions, contractors must provide a submittal of the proposed boiler equipment with their quote for evaluation purposes, as specified in the revised Section M Evaluation Criteria and updated SOW. No as-built or Metasys control drawings are available from the base; contractors requiring control-related technical information should contact Energy Management Technologies LLC at 518-783-7810 or Johnson Controls at 866-227-2750.

An optional water softener system (CLIN 0002) has been added to the solicitation due to water quality conditions at the base, requiring contractors to include properly sized equipment in their proposals if selected. This Questions and Answers document serves as an amendment to solicitation W50S8J26QA017 issued by the Department of the Army New York Army National Guard for Building 7 boiler replacement at Stratton Air National Guard Base, with quotes to be submitted via email to 109.aw.fal.msc.contracting@us.af.mil. The original site visit was scheduled for Tuesday, June 23, 2026 at 10:00 AM.

View the file

Other files

File Type Posted
Vent pipe tag picture.jpg JPG image
Water test results.pdf PDF
QandA 2.pdf PDF
Revised Solicitation (Amendment 01).pdf PDF
Site Visit Sign In Sheet.pdf PDF
Statement of Work Amendment 01.docx DOCX document
Amendment 01.pdf PDF
Wage Determination.txt TXT text file
Statement of Work.docx DOCX document
Solicitation - W50S8J26QA017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A 1 The purpose of this update is to answer questions which have been raised in response to the solicitation:

Q1: 1. Are the existing expansion tanks intended to remain in service, or should they be removed as part of this project?

A1: Remove and install new per para 1.5 of the SOW.

Q2: Will temporary heating be required during boiler replacement, or can the building heating system be taken out of service during construction?

A2: The expectation is the contractor will complete work before the beginning of the heating season therefore temporary heat should not be required.

Q3: Are any as-built drawings or Metasys control drawings available for contractor reference?

A3: No. Recommend contacting Energy Management Technologies LLC (EMTech) phone: 518-783-7810 OR Johnson Controls phone: 866-227-2750 for control-related questions.

Q4: Are the existing circulation pumps and pot feeder intended to remain and be reconnected to the new boiler system?

A4: Yes, to both.

Q5: Does the base require a submittal of the boiler the contractor intends to install to evaluate along with the quote?

A5: Yes, see revised Section M “Evaluation Criteria” as well as revised SOW.

Q6: Would the installation like us to include the cost of a water softener system due to conditions on the base?

A6: Yes, the system will need to be adequately sized. See new CLIN 0002 that has been added as an option as well as revised SOW.

- END Q&A -