wa-ef-gifpn2020-1-1_XS_culverts.pdf

PDF 993 KB Posted

Attached to
WA ERFO FS GIFPN603 2020-1(1), Gifford Pinchot Repairs 2020, Phase 1
Solicitation number
69056724B000011
Issued by

About this file

These are culvert cross-section engineering design drawings for the Federal Highway Administration's Western Federal Lands Highway Division, specifically for the Gifford Pinchot 2020 Repairs, Phase 1 project (WA ERFO FS GIFPN603 2020-1(1)). The technical drawings detail five separate culvert locations (labeled as Main 01, 40+10, 46+30, 52+50, and 64+48) with detailed cross-sectional views showing existing ground elevations, 36-inch pipe culverts, spillway assemblies, and placed riprap using Method A, Class 3 with 30" compacted depth. Each location features specific engineering specifications including slope gradients (ranging from 6% to -4.5%), elevation changes, culvert positioning, and designed grade elevations, with drawings providing precise measurements and geographical positioning for each culvert installation site.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Culverts Cross Section for

MAIN 01

for

FEDERAL HIGHWAY

ADMINISTRATION

WESTERN FEDERAL LANDS

HIGHWAY DIVISION PROJECT

WA ERFO FS GIFPN603 2020-1(1)

2020, PHASE 1

Spillway assembly

30" compacted depth method A, class 3

Placed riprap, 36-inch pipe culvert

Existing ground

El.2103.95

33+99, 26.0'

El.2100.83

33+98, 26.00' 6%

LC

33+97.00

0 10 20 30 40 50

2,080 2,080

2,090 2,090

2,100 2,100

2,110 2,110

:1

1:

9.

+2.0% -2.0%

2,107.61 Des Grade =

.2

.0

CULVERTS

GIFFORD PINCHOT 2020 REPAIRS, PHASE 1

FHWA, Office of Federal Lands Highway

:2

A

M

M a r c h

.6 f ir s t

.0

S h e e t] c p w w o r k

\d

\c u lv e r t.

d g n

NUMBER

SHEET

PROJECT

6%

Existing ground

El.2141.47

46+35, 32.03

20'

36-inch pipe culvert

Spillway assembly

30" compacted depth method A, cLass 3

Placed riprap, El.2141.47

46+25, 21.21

LC

46+30.00

0 10 20 30 40 50 60

2,200 2,200

2,210 2,210

2,220 2,220

2,230 2,230

2,240 2,240

1:

2.

+0.5% -3.6%

:1

1:1.7

2,236.98 Des Grade =

.6

.3

.8

.7

FHWA, Office of Federal Lands Highway

:2

M a r c h

.9 n e w

.0

S h e p w w o r k

\d

\c u lv e r t.

d g

6%

LC

El.2303.67

52+47,13.7'

20'30" compacted depth method A, cLass 3

Placed riprap, Spillway assembly

Existing ground

36-inch pipe culvert

El.2305.48

52+58,17.3'

52+50

0 10 20 30 40 50 60

2,260 2,260

2,270 2,270

2,280 2,280

2,290 2,290

2,300 2,300

2,310 2,310

2,320 2,320

1:

2.

-4.5%

:1

2,309.12 Des Grade =

.8

.5

FHWA, Office of Federal Lands Highway

:1

M a r c h

.0

.0

S h e p w w o r k

\d

\c u lv e r t.

d g

Cxs
wa-ef-gifpn2020-1-1_XS_culverts
culvert-0.6first - 0+00.00 [Sheet]
Pages from wa-ef-gifpn2020-1-1_100%_XS_culvert
0.9
1.0
Pages from wa-ef-gifpn2020-1-1_100%_XS_culvert-2

File details come from the government source that posted it. Updated .