wa-ef-gifpn2020-1-1_controlsheet.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
WA ERFO FS GIFPN603 2020-1(1), Gifford Pinchot Repairs 2020, Phase 1
Solicitation number
69056724B000011
Issued by

About this file

This file is a Survey Control point list Excel spreadsheet for the Gifford Pinchot National Forest road repair project. The document details precise geospatial survey information for a road repair project in Washington State, specifically the GP ERFO Repairs 2020, Phase 1 at the Copper Creek site. The survey was conducted in June 2023 using the Washington South State Plane Coordinate System (NAD83 2011) with orthometric elevations based on NAVD88 GEOID18, and uses international foot units for measurements.

The spreadsheet contains 14 survey points (numbered 23101-23114) with detailed coordinate data, including state plane coordinates, geographic coordinates, elevation, latitude/longitude, ellipsoid height, and combined factor. Each point is marked with a specific description such as "5/8 IR W/FHWA ALUM CAP" or "Spike", indicating the type of survey marker used. The project is associated with a Federal Highway Administration solicitation (69056724B000011) for road repairs in the Gifford Pinchot National Forest, with survey data collected to support infrastructure rehabilitation efforts.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information

Survey Control Sheet
Information
1.This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear.
2.If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location.
Common Sheet Information
Insert the following values. They will appear on every sheet.
Project:WA ERFO FS GifPn603 2020-1(1)Note: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines.
NPS PMIS No.NPS PMIS No.Note: NPS fields do not appear on the sheet unless additional text is added.
NPS Drwg No.NPS Drwg No.
First sheet #:D.11.0
Title block text:SURVEY CONTROL
Show Totals?TRUE
Data location:Page 1Worksheet found
Data begins in col:A
Min. rows/table53.0
Base sheet name:Sheet14rows w/dataOK - no spaces in data
Max. row/table3514data rowsWarnings:
35rows/table
PROJECT : GP ERFO REPAIRS 2020, PHASE 1 Copper creek site

DATE OF FIELD WORK: 6/2023

DATE OF FINAL ADJUSTMENT : 6/2023

COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : WA83/2011-SIF NSRS11(NAD83/2011) Washington, South Zone, International foot

PROJECT UNITS : International foot

Sheet Names
Input the names of the worksheets in the order you would like the sheets numbered.
WorksheetSheetHeaderNumberNotes
SheetD.131OK
Sheet (2)UndefinedFALSE1
Sheet (3)UndefinedFALSE1
Sheet (4)UndefinedFALSE1
Sheet (5)UndefinedFALSE1
Sheet (6)UndefinedFALSE1
Sheet (7)UndefinedFALSE1
Sheet (8)UndefinedFALSE1
Sheet (9)UndefinedFALSE1
Sheet (10)UndefinedFALSE1
Sheet (11)UndefinedFALSE1
Sheet (12)UndefinedFALSE1
Sheet (13)UndefinedFALSE1
Sheet (14)UndefinedFALSE1
Sheet (15)UndefinedFALSE1
Sheet (16)UndefinedFALSE1
Sheet (17)UndefinedFALSE1
Sheet (18)UndefinedFALSE1
Sheet (19)UndefinedFALSE1
Sheet (20)UndefinedFALSE1
Total Sheets:10sheets missing

Revised: 20 September 2023

Sheet

Sheet Information
Sheet num:D.1Filename0
Sheet name:SheetC:\MyFiles\Projects_2024\Washington\Copper_Creek_ERFO\[copper_creek_controlsheet_edit.xlsx]Sheet
Reference:Time
4-Nov-2024 7:46 AM
Begin Column:ABCDEFGHI
C:\MyFiles\Projects_2024\Washington\Copper_Creek_ERFO\[copper_creek_controlsheet_edit.xlsx]Sheet
PROJECT : GP ERFO REPAIRS 2020, PHASE 1 Copper creek site

DATE OF FIELD WORK: 6/2023

DATE OF FINAL ADJUSTMENT : 6/2023

PROJECT UNITS : International foot COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : WA83/2011-SIF NSRS11(NAD83/2011) Washington, South Zone, International foot

STATE PLANE COORDINATESGEO COORDINATES
3.0POINT
NUMBERNORTHEASTORTHOMETRIC ELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
23101522671.6961275283.0002052.38446°45'26.537145"N121°57'24.956926"W1986.71660.99982420275/8 IR W/FHWA ALUM CAP1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
23102522644.8321275490.5752077.93646°45'26.309832"N121°57'21.968807"W2012.27930.99982297845/8 IR W/FHWA ALUM CAP
23103522684.5501275685.8282100.52546°45'26.737415"N121°57'19.175289"W2034.88110.999821905Spike
23104522720.8791275763.9302107.79546°45'27.110195"N121°57'18.063273"W2042.15710.9998215629Spike
23105522759.2021276110.8452145.29246°45'27.551570"N121°57'13.091330"W2079.67490.9998197773Spike
23106522987.3831276254.3022173.42146°45'29.829753"N121°57'11.091498"W2107.82070.99981846625/8 IR W/FHWA ALUM CAP
23107522973.1651276598.6802210.89946°45'29.752016"N121°57'06.142007"W2145.31830.99981667395/8 IR W/FHWA ALUM CAP
23108523010.7451276800.5252230.70146°45'30.159581"N121°57'03.253162"W2165.13390.9998157334Spike
23109522953.0111277094.4662258.01046°45'29.643105"N121°56'59.016522"W2192.45760.99981442075/8 IR W/FHWA ALUM CAP
23110523028.6501277187.1102271.28446°45'30.406451"N121°56'57.705993"W2205.74020.99981379755/8 IR W/FHWA ALUM CAP
23111523135.1001276929.7192299.09346°45'31.410392"N121°57'01.430600"W2233.53780.9998124845Hub & Tack
23112523249.3511276738.2182323.90346°45'32.503247"N121°57'04.211036"W2258.34030.9998113158Spike
23113523315.9291276548.3862345.07846°45'33.125874"N121°57'06.954912"W2279.50650.9998103145/8 IR W/FHWA ALUM CAP
23114523301.4751276331.8732365.73946°45'32.943868"N121°57'10.060553"W2300.15460.99980932515/8 IR W/FHWA ALUM CAP
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.00000000
00.0000.0000.000000
00.0000.0000.000000

4-Nov-2024 7:46 AM

PROJECT : GP ERFO REPAIRS 2020, PHASE 1 Copper creek site

DATE OF FIELD WORK: 6/2023

DATE OF FINAL ADJUSTMENT : 6/2023

COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : WA83/2011-SIF NSRS11(NAD83/2011) Washington, South Zone, International foot

PROJECT UNITS : International foot

STATE PLANE COORDINATESGEO COORDINATES
POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTION
23101522671.6961275283.0002052.38446°45'26.537145"N121°57'24.956926"W1986.7170.999824205/8 IR W/FHWA ALUM CAP
23102522644.8321275490.5752077.93646°45'26.309832"N121°57'21.968807"W2012.2790.999822985/8 IR W/FHWA ALUM CAP
23103522684.5501275685.8282100.52546°45'26.737415"N121°57'19.175289"W2034.8810.99982191Spike
23104522720.8791275763.9302107.79546°45'27.110195"N121°57'18.063273"W2042.1570.99982156Spike
23105522759.2021276110.8452145.29246°45'27.551570"N121°57'13.091330"W2079.6750.99981978Spike
23106522987.3831276254.3022173.42146°45'29.829753"N121°57'11.091498"W2107.8210.999818475/8 IR W/FHWA ALUM CAP
23107522973.1651276598.6802210.89946°45'29.752016"N121°57'06.142007"W2145.3180.999816675/8 IR W/FHWA ALUM CAP
23108523010.7451276800.5252230.70146°45'30.159581"N121°57'03.253162"W2165.1340.99981573Spike
23109522953.01051277094.46612258.0146°45'29.643105"N121°56'59.016522"W2192.45760.99981442075/8 IR W/FHWA ALUM CAP
23110523028.64971277187.11012271.284346°45'30.406451"N121°56'57.705993"W2205.74020.99981379755/8 IR W/FHWA ALUM CAP
23111523135.10031276929.71922299.093146°45'31.410392"N121°57'01.430600"W2233.53780.9998124845Hub & Tack
23112523249.35061276738.21752323.902646°45'32.503247"N121°57'04.211036"W2258.34030.9998113158Spike
23113523315.92881276548.3862345.077546°45'33.125874"N121°57'06.954912"W2279.50650.9998103145/8 IR W/FHWA ALUM CAP
23114523301.47511276331.87342365.738946°45'32.943868"N121°57'10.060553"W2300.15460.99980932515/8 IR W/FHWA ALUM CAP

File details come from the government source that posted it. Updated .