- Solicitation number
- 69056724B000011
About this file
This is a detailed Request for Proposals (RFP) for the Gifford Pinchot National Forest Road Repairs Project located in Lewis, Pierce, and Skamania County, Washington. The U.S. Department of Transportation Federal Highway Administration's Western Federal Lands Highway Division is seeking road repair and maintenance services across 9 different locations, totaling 0.32 miles of roadway. The project involves asphalt concrete pavement patching, deep patch, culvert replacement, roadway aggregate work, and reinforced soil slope repairs at multiple forest service road segments (NF-2500, NF-2810, NF-5900, and NF-8500).
Key technical specifications include roadway aggregate method 2 with 6-8 inch compacted depth, asphalt concrete pavement type 1, culvert cleaning and relaying, spillway assemblies, and reinforced soil slope installations with welded wire face. The project encompasses various construction activities such as clearing and grubbing, excavation, riprap placement, geosynthetic stabilization, and turf establishment. The work will involve multiple roadway segments with specific mile post locations, and includes temporary traffic control, erosion control, and environmental protection measures. Construction is planned across different sections with varying slopes, grades, and existing ground conditions, requiring precise engineering and restoration techniques.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2025.06.13 16:07:35 -07'00'
A.2WA ERFO FS GIFPN603 2020-1(1)
N
N
N
)(Lat. 46°45'24.91"N, Long.121°57'36.73"W
Staging Area
SCALE IN MILES
0 0.5 1.0 1.50.5
SCALE IN MILES
0 0.5 1.0 1.50.5
SCALE IN MILES
0 0.5 1.00.5
SCALE IN MILES
0 0.5 1.00.5
C o p p e r
C r e e k
N is q u a ll y
River
Randle, WA
49 miles to
Cave
Creek
C a tt
C re e k
NF-8500
R a n d le , W
A m ile s to
Be nh am
Creek
N F
Ir o n
C re e k
NF-5900
NF-
Y e llo w ja c k e t
C re e k
R a n d le , W
A m ile s to
R a n d le
W A m il e s t o
M.P. 0.9
NF-2810
M.P. 1.3
NF-2810
M.P. 13.1
NF-2500
M.P. 3.3
NF-8500
M.P. 0.6
NF-5900
M.P. 1.0
NF-5900
M.P. 1.2
NF-5900
M.P. 0.9
NF-5900706
M.P. 1.1
NF-5900
:2
P
M
M a y
V ic in it y M a p s c p w w o r k \d
\w a e f g if p n g e n .d g n
VICINITY MAPS
PROJECT
NUMBER
SHEET
A.3
WA ERFO FS GIFPN603 2020-1(1)
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ORTHOMETRIC
ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
23101 522671.696 1275283.000 2052.384 46°45'26.537145"N 121°57'24.956926"W 1986.7166 0.999824203 5/8 IR W/FHWA ALUM CAP 1.
23102 522644.832 1275490.575 2077.936 46°45'26.309832"N 121°57'21.968807"W 2012.2793 0.999822978 5/8 IR W/FHWA ALUM CAP
23103 522684.550 1275685.828 2100.525 46°45'26.737415"N 121°57'19.175289"W 2034.8811 0.999821905 Spike
23104 522720.879 1275763.930 2107.795 46°45'27.110195"N 121°57'18.063273"W 2042.1571 0.999821563 Spike
23105 522759.202 1276110.845 2145.292 46°45'27.551570"N 121°57'13.091330"W 2079.6749 0.999819777 Spike
23106 522987.383 1276254.302 2173.421 46°45'29.829753"N 121°57'11.091498"W 2107.8207 0.999818466 5/8 IR W/FHWA ALUM CAP
23107 522973.165 1276598.680 2210.899 46°45'29.752016"N 121°57'06.142007"W 2145.3183 0.999816674 5/8 IR W/FHWA ALUM CAP
23108 523010.745 1276800.525 2230.701 46°45'30.159581"N 121°57'03.253162"W 2165.1339 0.999815733 Spike
23109 522953.011 1277094.466 2258.010 46°45'29.643105"N 121°56'59.016522"W 2192.4576 0.999814421 5/8 IR W/FHWA ALUM CAP
23110 523028.650 1277187.110 2271.284 46°45'30.406451"N 121°56'57.705993"W 2205.7402 0.999813797 5/8 IR W/FHWA ALUM CAP
23111 523135.100 1276929.719 2299.093 46°45'31.410392"N 121°57'01.430600"W 2233.5378 0.999812484 Hub & Tack
23112 523249.351 1276738.218 2323.903 46°45'32.503247"N 121°57'04.211036"W 2258.3403 0.999811316 Spike
23113 523315.929 1276548.386 2345.078 46°45'33.125874"N 121°57'06.954912"W 2279.5065 0.999810314 5/8 IR W/FHWA ALUM CAP
23114 523301.475 1276331.873 2365.739 46°45'32.943868"N 121°57'10.060553"W 2300.1546 0.999809325 5/8 IR W/FHWA ALUM CAP
COORDINATE SYSTEM : Washington South SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : WA83/2011-SIF NSRS11(NAD83/2011) Washington, South Zone, International foot
PROJECT : GP ERFO REPAIRS 2020, PHASE 1 Copper creek site
DATE OF FIELD WORK: 6/2023
DATE OF FINAL ADJUSTMENT : 6/2023
PROJECT UNITS : International foot
4- N ov -2
7:
A M
C
M yF ile s\
Pr oj ec ts
_2
4\ W as hi ng to n\ C op pe r_
C re ek _E
R
FO
co pp er
_c re ek _c on tr ol sh ee t_ ed it .x ls x]
S he et
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
A.4WA ERFO FS GifPn603 2020-1(1)
SHEET
NUMBER
SURVEY CONTROL
Sheet and Description
SECTION D SECTION E SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L SECTION M
NF-2500 MP
13.1
NF-2810 MP
0.9
NF-2810 MP
1.3
NF-5900 MP
0.6
NF-5900 MP
0.9
NF-5900 MP
1.0
NF-5900 MP
1.1
NF-5900 MP
1.2
NF-8500 MP
3.3 ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-6000 SOIL EROSION CONTROL,
TEMPORARY STREAM DIVERSION
(NF-2810 M.P. 0.9) LPSM All ALL
A0140 15702-6000 SOIL EROSION CONTROL,
TEMPORARY STREAM DIVERSION
(NF-2810 M.P. 1.3) LPSM All ALL
A0160 15702-6000 SOIL EROSION CONTROL,
TEMPORARY STREAM DIVERSION
(NF-5900 M.P. 0.6) LPSM All ALL
A0180 15702-6000 SOIL EROSION CONTROL,
TEMPORARY STREAM DIVERSION
(NF-5900 M.P. 0.9) LPSM All ALL
A0200 15702-6000 SOIL EROSION CONTROL,
TEMPORARY STREAM DIVERSION (
NF-5900 M.P. 1.0) LPSM All ALL
A0220 15702-6000 SOIL EROSION CONTROL,
TEMPORARY STREAM DIVERSION
(NF-5900 M.P. 1.2) LPSM All ALL
A0240 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 360 150 150 961 305 527 245 300 150 3,148
A0260 20103-0000 CLEARING AND GRUBBING SQYD 1,107 404 724 212 73 2,520
A0280 20301-0200 REMOVAL OF BOULDER EACH 1 1
A0300 20401-0000 ROADWAY EXCAVATION CUYD 1,013 77 587 30 93 1,800
A0320 20402-0000 SUBEXCAVATION CUYD 350 500 50 900
A0340 20403-0000 UNCLASSIFIED BORROW CUYD 107 605 1,259 29 2,000
A0360 20410-0000 SELECT BORROW CUYD 350 500 50 900
A0380 20421-0000 ROCK EXCAVATION CUYD 40 25 25 50 20 160
A0400 20701-0100 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE A
(NON-WOVEN) SQYD 260 280 20 560
A0420 20703-2000 GEOGRID, STABILIZATION
(BIAXIAL) SQYD 180 296 24 500
MileStone: 100% Date Completed: In Progress Report Date: 05/28/25
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-M ay
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 w a-ef
-g ifp n2
0- 1-
1_ S O
Q .x ls m
]S he et
PROJECT
B.1WA ERFO FS GIFPN603 2020-1(1)
NF-2500 MP
13.1
NF-2810 MP
0.9
NF-2810 MP
1.3
NF-5900 MP
0.6
NF-5900 MP
0.9
NF-5900 MP
1.0
NF-5900 MP
1.1
NF-5900 MP
1.2
NF-8500 MP
3.3 ALLOWANCE Bid
Schedule
A0440 20720-0200 REINFORCEMENT GEOSYNTHETIC,
TYPE 2 (GEOGRID) SQYD 1,040 1,430 30 2,500
A0460 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 33 33 33 33 8 140
A0480 26101-1000 REINFORCED SOIL SLOPE, WELDED
WIRE FACE SQFT 3,699 1,867 1,805 2,558 397 10,326
A0500 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 120 20 20 162 74 148 49 70 37 700
A0520 30302-1000 DITCH RECONDITIONING LNFT 350 50 400
A0540 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 120 50 5 175
A0560 41801-1000 ASPHALT CONCRETE PAVEMENT
PATCH, TYPE 1 SQYD 8 2 10
A0580 60201-0800 24-INCH PIPE CULVERT LNFT 40 5 45
A0600 60201-1000 36-INCH PIPE CULVERT LNFT 135 44 32 48 21 280
A0620 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 195 160 15 370
A0640 60601-0000 SPILLWAY ASSEMBLY EACH 1 1 1 1 4
A0660 60702-1000 REMOVING, CLEANING, AND
RELAYING CULVERT (96-INCH) LNFT 70 70
A0680 60702-1000 REMOVING, CLEANING, AND
RELAYING CULVERT (84-INCH) LNFT 62 62
A0700 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1 2
A0720 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 75 75
A0740 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 75 75
A0760 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 75 75
A0780 62301-0000 GENERAL LABOR HOUR 144
A0800 62502-0000 TURF ESTABLISHMENT Allowance includes an additional 1,000 SQYD
SQYD 889 66 90 1,110 410 730 220 355 1,200 5,070 for staging area
A0820 62901-1100 ROLLED EROSION CONTROL
PRODUCT, TYPE 4 SQYD 2,140 1,700 460 4,300
A0840 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 1 1 2 2 2 8
A0860 63502-1200 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 28-INCH EACH 50 10 60
1- Ju l-
:2
PM
MileStone: 100% Date Completed: In Progress Report Date: 06/09/25 c:
\p w -w or k\ d0 w a-ef
-g ifp n2
0- 1-
1_ S O
Q .x ls m
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.2WA ERFO FS GIFPN603 2020-1(1)
NF-2500 MP
13.1
NF-2810 MP
0.9
NF-2810 MP
1.3
NF-5900 MP
0.6
NF-5900 MP
0.9
NF-5900 MP
1.0
NF-5900 MP
1.1
NF-5900 MP
1.2
NF-8500 MP
3.3 ALLOWANCE Bid
Schedule
A0880 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 63 28 28 20 20 56 215
A0900 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 100 10 110
1- Ju l-
:2
PM
MileStone: 100% Date Completed: In Progress Report Date: 06/09/25 c:
\p w -w or k\ d0 w a-ef
-g ifp n2
0- 1-
1_ S O
Q .x ls m
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.3WA ERFO FS GIFPN603 2020-1(1)
LC
method 2, 8-inch compacted depth
Roadway aggregate, Finished grade (Match existing)
26'Turf establishment limits Turf estabishment limits equal lifts with tack coat between lifts
4-inch compacted depth, placed in two
Asphalt concrete pavement,Type 1
Existing ground see sheet D.2
Subexcavation (Half Width Deep Patch)
5'
Slope Stake limit
Slope Stake limit
Match existing
1:
1:
Traveled way
M.P. 13.1
NF-2500
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
:1
:5
A
M a y
T y p ic a l
S e c ti o n
F S
R
.1 p w w o r k \d
\w a e f g if p n ty p .d g n
M.P. 13.1
NF-2500
TYPICAL SECTION
PROJECT
C.1
6-inch compacted depth
Roadway aggregate, method 2, (Match existing)
Finished grade
Existing ground
Slope stake limit Slope stake limit
Match existing Match existing
Turf establishment limits Turf establishment limits
1:
1:2
M.P. 0.9
NF-2810
C o n s tr u c ti o n l im it
Traveled Way
C o n s tr u c ti o n l im it
:0
M a y
T y p ic a l
S e c ti o n
.9 p w w o r k \d
\w a e f g if p n ty p .d g n
M.P. 0.9
NF-2810
TYPICAL SECTION
PROJECT
C.2
6-inch compacted depth
Roadway aggregate, method 2, Existing ground
(Match existing)
Finished grade
Slope stake limit Slope stake limit limits
Turf establishment limits
Turf establishment
1:2 C o n s tr u c ti o n l im itTraveled way
C o n s tr u c ti o n l im it
M.P. 1.3
NF-2810
:0
M a y
T y p ic a l
S e c ti n
F
S
.3 p w w o r k \d
\w a e f g if p n ty p .d g n
M.P. 1.3
NF-2810
TYPICAL SECTION
PROJECT
C.3
Existing ground
6-inch compacted depth
Roadway aggregate, method 2, Profile grade
M in
Slope stake limit
Slope stake limit
2% Crown
2% Crown
18' Turf establishment limitsTurf establishment limits
Traveleld Way
2 1:2
63+65 to 65+05 M.P. 1.2
51+00 to 55+20 M.P. 1.0
45+00 to 47+00 M.P. 0.9
33+00 to 37+30 M.P. 0.6
NF-5900
"MAIN 01"
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
(1 :1 to :2
V ar ies
Varies
Varies
:0
M a y
T y p ic a l
S e c ti o n
F S
R p w w o r k \d
\w a e f g if p n ty p .d g n
NF-5900
TYPICAL SECTION
PROJECT
C.4
Roadway aggregate, method 2, 8-inch compacted depth equal lifts with tack coat between lifts
4-inch compacted depth, placed in two
Asphalt concrete pavement,Type 1 crown
Turf stablishment limits
Turf stablishment limits see sheet M.2
Subexcavation (Full Width Deep Patch)
Profile grade (Match existing) crown
Existing ground
19'
5'
5'
Traveled way
M.P. 3.3
NF-8500
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
1:
:0
M a y
T y p ic a l
S e c ti o n F
S R
M
.P p w w o r k \d
\w a e f g if p n ty p .d g n
M.P. 3.3
NF-8500
TYPICAL SECTION
PROJECT
C.5
:3
M a y
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
IE
p w w o r k
\d
\w a e f g if p n p ln
.d g n
EARTHWORK SUMMARY
PROJECT
C.6
Apparent centerline
Edges of existing road Existing culvert fiber roll
Soil erosion control, pavement patch, type 1
Asphalt concrete
V a r ie s pavement
Existing to Subsection 418.04(b)
Remove pavement according
PAVEMENT PATCH, TYPE 1
ASPHALT CONCRETE
Top of existing pavement to a depth of 4-inches base and subgrade material
Remove damaged pavement, Existing base course around patch perimeter
Tack coat according to Section 412
Asphalt concrete, Type 1, 4-inch depth
180'
BEGIN CONSTRUCTION END CONSTRUCTION
DEEP PATCH
END HALF WIDTH
DEEP PATCH
BEGIN HALF WIDTH
Construction limit
Cleaning culvert in place
1. No survey was collected at this site. Linework shown is a graphical representation.
2. See Deep Patch detail in sheet D.2.
50 10002550
Scale in feet
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
NOTE:
r o a d w id th e x is ti n g
10'
200'
(place in two lifts)
N
NF-2500
:0
M a y
N
F -2
M
P p w w o r k
\d
\w a e f g if p n p ln
.d g n
NF-2500 MP 13.1
PROJECT
NUMBER
WA ERFO FS GIFPN603 2020-1(1) D.1
10 200510
Scale in feet
REMOVING, CLEANING, AND RELAYING CULVERT ( 84-INCH)
Edges of existing road
LC
Existing ground ditch flowline
Match existing ditch flowline
Match existing
REMOVING, CLEANING, AND RELAYING CULVERT ( 84-INCH)
6-inch compacted depth
Roadway aggregate, method 2, Match existing Match existing
SECTION A-A
Soil erosion control, fiber roll
:FOOTNOTE
[1] This work to be performed according to standard drawing 602-3 (see Sheet N.4)
NOTE:
1.No survey was collected at this site. Linework shown is a graphical representation.
3.Hydraulic information only : Q = 70.1 cfs
2.Soil erosion control is placed 5' beyond limits of soil disturbance.
END CONSTRUCTION
BEGIN CONSTRUCTION
Construction limit
Construction limit
30'
1:2
Ordinary High Water,stream F
Finished grade (match existing)
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
A
A
N
NF-2
e x is ti n g r o a d w id th
:2
M a y
N
F -2
M
P
.9 p w w o r k
\d
\w a e f g if p n p ln
.d g n
NF-2810 M.P. 0.9
PROJECT
E.1
Edges of existing road
LC
REMOVING, CLEANING, AND RELAYING CULVERT ( 96-INCH)
Existing ground ditch flowline
Match existing ditch flowline
Match existing
Existing ground
6-inch compacted depth
Roadway aggregate, method 2, SECTION A-A
A
FOOTNOTE:
[1] This work to be performed according to standard drawing 602-3 (see Sheet N.4)
Match existing Match existing
Finished grade (match existing)
NOTE:
END CONSTRUCTION
BEGIN CONSTRUCTION
Soil erosion control, fiber roll
Construction limit A
Ordinary High Water,Stream K
10 20010
Scale in feet
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
REMOVING, CLEANING, AND RELAYING CULVERT ( 96-INCH)
e x is ti n g r o a d w id th
3.Hydraulic information only : Q = 98.0 cfs
2.Soil erosion control is placed 5' beyond limits of soil disturbance.
1.No survey was collected at this site. Linework shown is a graphical representation.Site not surveyed.
40'
1:2
N
NF-2810
:2
M a y
N
F -2
M
P p w w o r k
\d
\w a e f g if p n p ln
.d g n
NF-2810 M.P. 1.3
PROJECT
NUMBER
WA ERFO FS GIFPN603 2020-1(1) G.1
PI 35+31.27
Δ = 19°00'50" (RT)
R = 300.00' T = 50.24' L = 99.56' e = NC
PI 37+58.03
Δ = 61°54'25" (LT)
R = 130.00' T = 77.97' L = 140.46' e = NC
P C
.0
3 3
N72°19'25"E
S88°39'45"E
N29 °2
5' "E
P T
.6
PT 38+
20.52
P C
.0
P T
.5
4 3
N
BEGIN CONSTRUCTION
"MAIN 01" Line to be constructed
Slope stake limits fiber roll Soil erosion control, Soil erosion control, fiber roll
Profile grade
Existing ground
36-inch pipe culvert 38+41
36-inch pipe culvert, 33+97 method A,class 3 laced riprap,and p
Slope stake limit
Construction limit
Construction limits
COMPACTED DEPTH, STA 38+60
END ROADWAY AGGREGATE, METHOD 2, 6-INCH
control,fiber roll Soil erosion
Spillway assembly
STA 38+25
6-INCH COMPACTED DEPTH,
BEGIN ROADWAY AGGREGATE, METHOD 2,
32+80 33+00 33+20 33+40 33+60 33+80 34+00 34+20 34+40 34+60 34+80 35+00 35+20 35+40 35+60 35+80 36+00 36+20 36+40 36+60 36+80 37+00 37+20 37+40 37+60 37+80 38+00 38+20 38+40 38+60
2,080 2,080
2,090 2,090
2,100 2,100
2,110 2,110
2,120 2,120
2,130 2,130
2,140 2,140
2,150 2,150
2,160 2,160
,0
.7
+13.2 1%
+8.05%
+11.6 1%
.0
.7
.0
.2
SSD = 234'
K = 10
50' VC
HLSD = 209'
K = 28
100' VC
.0
.5
E=1275659.17 N=522682.69
"MAIN 01" 33+00
NF-5900 M.P. 0.6 PLAN-PROFILE
33+15 to 35+15 RSS Wall (RT)
:1
M a y
N
F -5
M
P
.6 P
L A
N -P
R O
F
IL
E p w
-w o rk \d
\w a -f s -g if p n
-1
-1 p ln p p .d g n
PROJECT
H.1
PI 40+17.86
Δ = 62°29'07" (RT)
R = 110.00' T = 66.73' L = 119.96' e = NC
P C
.1
PT 40+
71.10
0 40
N29° 25'
50" E
CP
5/8" IR W
/FH
W
A ALUM
CAP
23106
N
Soil erosion control, fiber roll
36-inch pipe culvert 40+10
END CONSTRUCTION
COMPACTED DEPTH, STA 40+28
END ROADWAY AGGREGATE, METHOD 2, 6-INCH
Construction limit
Existing ground.
COMPACTED DEPTH, STA 40+00
BEGIN ROADWAY AGGREGATE, METHOD 2, 6-INCH
38+60 38+80 39+00 39+20 39+40 39+60 39+80 40+00 40+20 40+40 40+60 40+80
2,130 2,130
2,140 2,140
2,150 2,150
2,160 2,160
2,170 2,170
2,180 2,180
2,190 2,190
2,200 2,200
NF-5900 M.P. 0.6 PLAN-PROFILE
E=1276278.24 N=522981.79
"Main 01" 40+40
:3
M a y
N
F -5
M
P
.6 C
O N
T D
P
L A
N -P
R O
F p w
-w o rk \d
\w a -f s -g if p n
-1
-1 p ln p p .d g n
PROJECT
H.2
GPS
SPIKE
23103
GPS
SPIKE
23104
P. C.
P. C.
N
El. 2096.60'
0+80, 1.5' Rt.
El. 2097.72'
0+90, 1.5' Rt.
El. 2074.26'
1+30, 15.0' Rt.
El. 2075.87'
1+50, 15.0' Rt.
El. 2080.37'
1+50, 12.8' Rt.
El. 2081.18'
1+60, 12.8' Rt.
El. 2084.18'
1+60, 11.3' Rt.
El. 2085.79'
1+80, 11.3' Rt.
El. 2088.79'
1+80, 9.8' Rt.
El. 2091.20'
2+10, 9.8' Rt.
El. 2098.01'
2+20, 6.8' Rt. El. 2099.64'
2+40, 6.8' Rt.
El. 2108.83'
2+60, 3.0' Rt.
El. 2109.75'
2+70, 3.0' Rt.
El. 2112.06'
2+78.86, 2.3' Rt.
Top of wall
Bottom of wall
Existing ground at face of wall
NF-5900 M.P. 0.6
PLAN AND PROFILE WALL 01
"MAIN 01" line to be constructed
"WALL 01"
Proposed edge of road
Slope stake limit
Construction limit
Spillway assembly
PI 2+62.47
Δ = 06°29'15" (RT)
R = 289.96' T = 16.43' L = 32.83'
P C
C
.8
N72°19'25"E
P C
.0
P O
B
.0
P O
E
.8
2+80 2+900+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70
2,050 2,050
2,060 2,060
2,070 2,070
2,080 2,080
2,090 2,090
2,100 2,100
2,110 2,110
2,120 2,120
+11.19%
+8.05%
+8.20% +9.18%
.8
.0
.9
.0
.3
.0
' VC30
10K =
'359SSD =
' VC40
263K =
'INFHLSD =
' VC10
10K =
'INFHLSD =
,0
.6
,1
.5
BEGIN WALL
"MAIN 01" 33+15.00, 10.04' Rt.
"WALL 01" 0+80.00=
E= 1275676.5135 N= 522677.6823
END WALL
"MAIN 01" 35+15.00, 10.04' Rt
"WALL 01" 2+78.86=
1275866.4845E= 522736.2748N=
:0
M a y
W a ll M
P .6
P la n
S h e e t] p w
-w o rk \d
\w a -e f-g if p n
-1
-1
A L
I W a ll s .d g n
PROJECT
H.3
PI
Δ =
96.22' PI
Δ =
P C
.6
P T
.8
P T
.2
P T
.3
N79°45 '25"E
S72°40'43"E
P C
.6
CP
5/8" IR W/FHWA ALUM CAP
23107
P. C.
CP
SPIKE
23108
P. C.
N
Existing ground
Profile grade be constructed "MAIN 01" Line to
Slope stake limits class3 laced riprap,method A,p spillway assembly,and 36-inch pipe culvert,and 46+30
END CONSTRUCTION
BEGIN CONSTRUCTION
Construction limits
Soil erosion control,fiber roll
Spillway assembly e = NC '96.22L = '49.06T = '200.00R =
(RT)27°33'52"Δ =
45+99.73PI
44+00 45+00 46+00 47+00
2,200 2,200
2,210 2,210
2,220 2,220
2,230 2,230
2,240 2,240
2,250 2,250
2,260 2,260
,2
.5
+8.81%
,2
.5
E= 1276735.6 N= 523008.2
"MAIN 01" 45+00
E= 1276931.1 N= 522995.5
"MAIN 01" 47+00
45+30 to 46+60 RSS Wall (RT)
:0
M a y
N
F -5
M
P
.9 P
L A
N -P
R O
F p w
-w o rk \d
\w a -f s -g if p n
-1
-1 p ln p p .d g n
PROFILE
NF-5900 M.P. 0.9 PLAN
PROJECT
I.1
CP
SPIKE
23108
P. C.
N
El. 2224.51'
5+00, 1.5' Rt.
El. 2225.39'
5+10, 1.5' Rt.
El. 2220.27'
5+20, 4.5' Rt.
El. 2222.92'
5+48.53, 4.5' Rt.
El. 2204.56'
5+77, 15.0' Rt.
El. 2205.44'
5+86.5, 15.0' Rt.
El. 2225.20'
6+05.5, 6.0' Rt.
El. 2233.58'
6+15, 2.3' Rt.
El. 2234.46'
6+25, 2.3' Rt.
Existing ground at face of wall
Bottom of wall
Top of wall
NF-5900 M.P. 0.9
PLAN AND PROFILE WALL 02
"WALL 02"
line to be constucted
"MAIN 01"
Slope stake limit
Construction limit
Spillway assembly
PI 5+67.27
Δ = 27°33'52" (RT)
R = 189.96' T = 46.60' L = 91.39'
P O
B
.0
P O
E
.1
N79°4 5'25
"E
S72°40'43"E
P C
.6
P T
.0
4+70 6+30 6+404+80 4+90 5+00 5+10 5+20 5+30 5+40 5+50 5+60 5+70 5+80 5+90 6+00 6+10 6+20
2,170 2,170
2,180 2,180
2,190 2,190
2,200 2,200
2,210 2,210
2,220 2,220
2,230 2,230
2,240 2,240
2,250 2,250
+9.08%
+9.20%
.0
.0
' VC60
488K =
'INFHLSD =
,2
.5
"MAIN 01" 45+30.00, 10.04' Rt.
"WALL 02" 5+00.00=
BEGIN WALL
1276766.7658E= 523003.6430N=
END WALL
"MAIN 01" 46+60.00, 10.04' Rt.
"WALL 01" 6+25.17=
1276889.9595E= 522997.8298N=
:0
M a y
W a ll M
P .9
P la n
S h e p w
-w o rk \d
\w a -e f-g if p n
-1
-1
A L
I W a ll s .d g n
PROJECT
I.2
C
.6
P T
.5
P C
.9
P T
.5
P C
.6
P T
.1
N41°27'39"W
N78°5 0'21"
W
N65°48'01"W
S8 1°
'1 4"
W
.1
MILE1
18" OUTLET
CP
HUB & TACK
23111
P. C.
CP
SPIKE
23112
BEGIN CONSTRUCTION
END CONSTRUCTION
Soil erosion control, fiber roll
Slope stake limits
"MAIN 01" Line to be constructed
Profile grade
36-inch pipe culvert 52+50 class3 laced riprap,method A,p spillway assembly,and
Begin special ditch
El.2303.45
52+20, 10.7' RT
End special ditch
El.2305.92
52+47, 21.4' RT
El.2303.26
52+33, 21.7' RT
El.2304.45
52+42, 24.0' RT
N Construction limits
Spillway assembly
PI 52+48.39
Δ = 37°22'42" (LT)
R = 150.00' T = 50.74' L = 97.86' e = NC
PI 51+10.48
Δ = 35°35'47" (RT)
R = 110.00' T = 35.31' L = 68.34' e = NC
PI 53+92.47
Δ = 13°02'20" (RT)
R = 200.00' T = 22.86' L = 45.51' e = NC
51+40 51+80 52+20 52+60 53+00 53+40 53+80 54+20 54+60 55+00 55+40 55+80
2,290 2,290
2,300 2,300
2,310 2,310
2,320 2,320
2,330 2,330
2,340 2,340
2,350 2,350
2,360 2,360
51+00
.9
.4
SSD = 1100'
K = 97
100' VC
+11.5 4%
+10.51
NF-5900 M.P. 1.0 PLAN-PROFILE
E=1276979.78 N=523105.97
"MAIN 01" 51+00
E=1276614.21 N=523291.64
"MAIN 01" 55+20
52+05 to 53+10 RSS Wall (LT)
:0
M a y
N
F -5
M
P
.0 P
L A
N -P
R O
F p w
-w o rk \d
\w a -f s -g if p n
-1
-1 p ln p p .d g n
PROJECT
J.1
NF-5900 M.P. 1.0
:5
N o v e m b e r
N F
-5
M P
.0 p w w o r k \d
\w a f s g if p n p ln p p .d g n
PROJECT
J.2
" O
UTL
ET
P.
C
N
El. 2311.72'
10+00, 1.5' Rt.
El. 2310.89'
10+08, 1.5' Rt.
El. 2302.34'
10+17.8, 5.3' Rt.
El. 2281.61'
10+55, 13.5' Rt.
El. 2278.61'
10+55, 15.0' Rt.
El. 2277.54'
10+64.5, 15.0' Rt.
El. 2279.48'
10+73.75, 13.5' Rt.
El. 2285.92'
10+83, 9.8' Rt.
El. 2301.32'
10+92.5, 1.5' Rt.
El. 2300.55'
10+99, 1.5' Rt.
Existing ground at face of wall
Bottom of wall
Top of wall
NF-5900 M.P. 1.0
PLAN AND PROFILE WALL 03
"MAIN 01" line to be constructed
"WALL 03"Slope stake limit
Construction limit
Spillway assembly
S78 °50 '21
"E
PI 10+58.05
Δ = 34°33'11" (RT)
R = 140.02' T = 43.55' L = 84.44'
P C
.5
P C
C
.9
P O
B
.0
9+80 9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90
2,250 2,250
2,260 2,260
2,270 2,270
2,280 2,280
2,290 2,290
2,300 2,300
2,310 2,310
2,320 2,320
2,330 2,330
-10.37%
-11.38%
-11.79%
.0
.1
.5
.3
20' VC
20' VC
,3
.7
,3
.5
9+70 11+00 11+10 11+20 11+30
"MAIN 01" 53+10.00, 10.04' Rt.
"WALL 03" 10+00.00=
BEGIN WALL
1276809.8701E= 523213.5444N=
END WALL
"MAIN 01" 52+05.00, 10.04' Lt.
"WALL 03" 10+98.94=
1276897.2209E= 523171.1224N=
:0
M a y
W a ll M
P .1
P la n
S h e p w
-w o rk \d
\w a -e f-g if p n
-1
-1
A L
I W a ll s .d g n
PROJECT
J.3
PI 58+70.84
Δ = 23°29'06" (LT)
R = 200.00' T = 41.57' L = 81.98' e = NC
PT 59+
11.25
P C
.5
0PI 60+22.44
Δ = 67°59'59" (RT)
R = 110.00' T = 74.20' L = 130.55' e = NC
N64°3 6'47
"W
P C
.2
P T
.7
PC
59+
48.24
P T
.8
P T
.8
N88 °0
5' "W
N20°05'53"W
N51°14'10"W
N26°33'42"W
P C
.6
P T
.1
CP
5/8" IR W
/FHW
A ALUM
CAP
23114
N
Construction limit
Cleaning culverts in place
NF-5900 M.P. 1.1 PLAN-PROFILE1
:1
M a y
N
F -5
M
P p w
-w o rk \d
\w a -f s -g if p n
-1
-1 p ln p p .d g
PROJECT
K.1
T
.3
P C
.5
P C
.0
P C
.8
P T
.8
N51°14 '10"W
N26°33'42"W N63
°1 0'5
9"W
N43°31'19"W
P C
.6
P T
.3
N
"MAIN 01" Line to be constructed
Profile grade
Existing ground
BEGIN CONSTRUCTION
END CONSTRUCTION
class3 laced riprap,method A,p spillway assembly,and
36-inch pipe culvert
64+48 fiber roll
Soil erosion control, Slope stake limit
Construction limit
Construction limit
Spillway assembly e = NC
'70.31L =
'36.40T =
'110.00R =
(LT)36°37'17"Δ =
64+44.41PI
e = NC '84.38L = '43.34T = '150.00R =
(LT)32°13'47"Δ =
66+61.21PI
e = NC '47.37L = '24.06T = '110.00R =
(RT)24°40'28"Δ =
62+99.56PI
e =NC '37.75L = '19.06T = '110.00R =
(RT)19°39'40"Δ =
65+39.68PI
SSD = 987'
K = 87
101' VC
,4
.5
62+90 63+10 63+30 63+50 63+70 63+90 64+10 64+30 64+50 64+70 65+90
2,380 2,380
2,390 2,390
2,400 2,400
2,410 2,410
2,420 2,420
2,430
2,430
2,440
2,440
2,450 2,450
2,460 2,460
66+10 ,4
.6
+11.2 6%
+10.11
.9
.6
E= 1275962.7583
N= 523597.98 63+65 E= 1275767.2375
N= 523817.1727 65+05
63+70 to 65+00 RSS Wall (LT)
:2
M a y
N
F -5
M
P
.2 P
L A
N -P
R O
F p w
-w o rk \d
\w a -f s -g if p n
-1
-1 p ln p p .d g n
NF-5900 M.P. 1.2 PLAN-PROFILE
PROJECT
L.1
N
El. 2437.37'
15+00, 1.5' Rt.
El. 2436.36'
15+10, 1.50' Rt.
15+20, 4.5' Rt. El. 2429.32'
15+29.5, 8.3' Rt. El. 2420.70'
15+47.5, 14.3' Rt. El. 2406.50'
15+56.5, 18.8' Rt. El. 2396.37'
15+65.5, 18.8' Rt. El. 2395.31'
15+65.5, 18.3' Rt. El. 2396.81'
15+72.8, 18.3' Rt. El. 2395.98'
15+83.75, 12.8' Rt. El. 2405.28'
15+93.5, 12.8' Rt. El. 2404.18'
16+13.5, 1.5' Rt. El. 2424.61'
16+23.5, 1.5' Rt. El. 2423.48'
Bottom of wall Existing ground at face of wall
Top of wall
15+29.3, 7.8' Lt. El. 2428.84
15+47.4, 3.3' Lt. El. 2417.76'
15+56.5, 0.8' Lt. El. 2411.48'
15+65.6, 0.8' Lt. El. 2410.42'
15+65.6, 1.5' Lt. El. 2411.93' 15+72.9, 1.5' Lt. El. 2411.08'
15+83.8, 6.8' Lt. El. 2420.38'
15+93.6, 6.8' Lt. El. 2419.28'
16+03.6, 8.8' Lt. El. 2422.69' Bottom of wall step
15+38.4, 4.6' Lt. El.2421.80'
NF-5900 M.P. 1.2
PLAN AND PROFILE WALL 04
line to be constructed
"MAIN 01"
"WALL 04"
Slope stake limit construction limit
Spillway assembly
S6 3°
'59
"E S26°33'42"E
PI 15+54.76
Δ = 36°37'17" (RT)
R = 99.96' T = 33.08' L = 63.89'
P C
.6
P T
.5
P O
B
.0
P O
E
.5
-10.13%
-11.67%
-11.19%
,4
.3
,4
.4
14+7014+60 16+30 16+40
.6
.1
.5
.7
14+80 14+90 15+00 15+10 15+20 15+30 15+40 15+50 15+60 15+70 15+80 15+90 16+00 16+10 16+20
2,380 2,380
2,390 2,390
2,400 2,400
2,410 2,410
2,420 2,420
2,430 2,430
2,440 2,440
2,450 2,450
2,460 2,460
BEGIN WALL
"MAIN 01" 65+00.00, 10.04' Lt.
"WALL 04" 15+00.00=
1275843.1143E= 523741.0134N=
END WALL
"MAIN 01" 63+70.00, 10.04' Lt.
"WALL 04" 16+23.58=
1275923.7727E= 523652.7219N=
:1
M a y
W a ll M
P .2
P la n
S h e p w
-w o rk \d
\w a -e f-g if p n
-1
-1
A L
I W a ll s .d g n
PROJECT
L.2
Edges of existing road
24-inch pipe culvert
Soil erosion control, fiber roll
END CONSTRUCTION BEGIN CONSTRUCTION
END FULL WIDTH DEEP PATCH
BEGIN FULL WIDTH DEEP PATCH
Construction limits
1. No survey was collected at this site. Linework shown is a graphical representation.
10 200510
Scale in feet
2. See Deep Patch detail in M.2.
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS e x is ti n g r o a d w id th
NOTE
NF-8500
:2
M a y
N
F -8
M
P p w w o r k
\d
\w a e f g if p n p ln
.d g n
NF-8500 M.P. 3.3
PROJECT
NUMBER
M.1
10.4 x 16 25101 -0300
60201 -0800
60201 -1000
60601 -0000
60702 -1000
60702 -1000
60703 -0000
Location
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S
PI
LL
W
A Y
A S S
EM
B
LY
R
EM
O V
IN
G
C
LE
A N
IN
G
A
D
EL
A
YI
N G
C U
LV
ER
T (9
6-
IN
C H
R
EM
O V
IN
G
C
LE
A N
IN
G
A
D
EL
A
YI
N G
C U
LV
ER
T (8
4-
IN
C H
C
LE
A N
IN
G
C U
LV
ER
TS
I
N P
LA
C E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD LNFT LNFT EACH LNFT LNFT LNFT Lt Rt
"MAIN 01" 33+97 NF-5900 M.P. 0.6 1 0 33 30 1 0 A/AS
"MAIN 01" 38+41 NF-5900 M.P. 0.6 1 40 55 33° A/AS
"MAIN 01" 40+10 NF-5900 M.P. 0.6 1 40 33 50 22° A/AS
"MAIN 01" 46+30 NF-5900 M.P. 0.9 6 0 33 44 1 10° A/AS
"MAIN 01" 52+50 NF-5900 M.P. 1.0 1 0 32 1 17° A/AS
"MAIN 01" 58+56 NF-5900 M.P. 1.1 0 1 N/A N/A
"MAIN 01" 64+48 NF-5900 M.P. 1.2 6 0 33 48 1 31° A/AS
NF-2500 M.P. 13.1 6 20 1 N/A A/AS
NF-8500 M.P. 3.3 6 20 40 N/A A/AS
NF-2810 M.P. 0.9 30 62
NF-2810 M.P. 1.3 30 70
PROJECT TOTAL 180 132 40 259 4 70 62 2
Allowable Pipe Material
NOTE: A Aluminum
1. Aluminized steel pipe culvert minimum wall thickness is the 4. Structural excavation quantity based on material excavated inside the vertical planes located AS Aluminized steel thickness required by the Std. 602-1 fill height table (steel). 18 inches outside and parallel to the limits of footings or foundations. C Concrete
2. Aluminum pipe culvert minimum wall thickness is the GS Galvanized steel thickness required by the Std. 602-1 fill height table. P Plastic
3. See Std. 602-7 for acceptable concrete cell class. (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
-M ay -2
:3
A M c:
\p w
-w or k\ d0 w a-fs -g ifp n2
0-
1- 1_ dr ai na ge
-t ab
.x ls x] Sh ee t
TABULATION OF DRAINAGE QUANTITIES
PROJECT
N.1WA ERFO FS GIFPN603 2020-1(1)
SHEET
NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.
WA ERFO FS GIFPN603 2020-1(1) N.2
WA ERFO FS GIFPN603 2020-1(1) N.3
WA ERFO FS GIFPN603 2020-1(1) N.4
WA ERFO FS GIFPN603 2020-1(1) N.5
36" half-round down drain
" x 6' steel posts4
2" x 2" x
36" half-round pipe
6' steel posts
" x4
2" x 2" x
1'
2" ov er la p
4" m in
DETAIL A
BOLT DETAIL
4. Approved alternate designs may be used.
factory annular or flanged reformed ends.
pipe, or from helically corrugated pipe with
3. Construct down drain from annular corrugated for protective apron.
2. Place Class 3 riprap conforming to Section 251 thick galvanized steel or 0.060 inch aluminum.
1. Fabricate spillway assembly from 0.064 inch
D o w n d ra in S e c ti o n
NOTE:
Face of the RSS
See Detail A outlet protection detail
See Sheet N.8, riprap
Protective apron
Section 606
Spillway assembly side (See Bolt Detail) with 3 washers each bolt " x 2" 2
Galvanized pillway assemblyS
Bolt
Pipe
Washers
Nut
Variable
3 loops of No.9
" x 6' steel posts4
2" x 2" x
ANCHOR ASSEMBLY
galvanized wire twisted
(See Bolt Detail) with 3 washers
" x 2" bolt16
Face of the wall plumb on 10' ± centers (typ.)
Install anchor assembly
36" Pipe
Overlap 4" ± at all joints
2'
NO SCALE
:2
S e p te m b e r
B a s e .B
.U
C
U s e rs
\S te p h e n
.C h a p m a n
\O n e D ri v e
D O
T O
S T
\C A
D D
\c e ll s \F
L H
-C e ll s .c e l
HALF-ROUND DOWN DRAIN
SPILLWAY ASSEMBLY WITH
PROJECT
NUMBER
WA ERFO GIFPN603 2020-1(1) N.6
18"
NOTE:
WELDED WIRE FORM DETAIL
NO SCALE
8'± and 3 inches topsoil unless indicated otherwise.
Welded wire form faced wall toe treatment to be embankment not exceeded.
investigation to determine that the safe bearing pressure is increase in wall heights over those shown on the plans require
The heights and quantities are subject to field adjustment. Any
2.
1.
NO SCALE
of adjoining wire form for support
Place edge of wire form inside
2.
1.
[1]
FOOTNOTE:
return wrap).
~5.5 feet length for wrapping at face (1.5 feet vertical + 4 feet
Grid length, "L" is bottom horizontal length only. Add additional
Gabion rock per section 705.01.
RSS backfill material per section 704.03(b).
18"
[2]
TYPICAL CONNECTION DETAIL
geogrid type III
Reinforcement
[3]
Welded wire form (typ.)
V a ri e s
H
RSS backfill material geogrid, type III
Reinforcement this sheet and Connection Details, for clarity. See Forming
Gabion rock not shown
Existing ground b e lo w contractor.
Temporary cut slope varies per
Limit of structure excavation.
9"
4'-0" Return form facing
Welded wire
3"
[1]
1:2
Embankment
See Gabion Rock Facing Detail, this sheet.
NOTE: Gabion rock and backfill not shown for clarity.
[3]
24" C to C or more as needed
Galvanized support struts spaced galvanized
4" x 4" - W4 x W4
See Typical Section 9"
RSS backfill material form facing
Welded wire
Gabion rock
4'-0" Return
FACING DETAIL
GABION ROCK
3"
[1]
[2] type A, non-woven geotextile class 2, Separation Separation geotextile class 2, type A, non-woven
12" Leveling pad
(Bedding Material) Reinforcement length, L
Soil conditions: Use 8-ft min. or 80% of H Rock conditions: Use 4-ft minimum until above rock
Top of Wall (TW)
12"
WIRE FACE (GABION ROCK FACE)
REINFORCED SOIL SLOPE, WELDED
:0
M a y p w
-w o rk
\d \W
A E
R F
O F
S G
IF
P
N
R S
S d e ta il w it h S
R E
.d g n
FORM FACE DETAILS
WITH WELDED WIRE
REINFORCED SOIL SLOPE
PROJECT
N.9
NF-
M.P. 0.9
NF-2810
N F -2
R an d le, W
A m iles to
N
WORK
ROAD
AHEAD
CLOSED
ROAD
AHEAD
ROAD
CLOSED
W20-1
W20-3
Barricade Typ3
R11-2Barricade Typ3
R11-2
ROAD
CLOSED
W20-3CLOSED
ROAD
AHEAD
WORK
ROAD
AHEAD
W20-1
NO SCALE
2. Place barricades at approved location.
1. Provide minimum 100' spacing between advanced warning signs and barricades.
NOTE:
M.P. 1.3
NF-2810
:4
M a r c h
T e m p o ra ry
T ra ff ic
C o n tr o l
P la n p w w o r k \d
\w a f s g if p n tt c .d g n
LAYOUT NF-2810
CONTROL ROAD CLOSURE
TEMPORARY TRAFFIC
PROJECT
O.2
ROAD
CLOSED
Barricade Typ3
R11-2
R11-2
ROAD
CLOSED
Barricade Typ3
ROAD
CLOSED
R11-2
Barricade Typ3
Barricade Typ3
R11-2
ROAD
CLOSED
NF-5900
M.P. 0.6
NF-5900
M.P. 1.0
NF-5900
M.P. 1.2
NF-5900
M.P. 0.9
NF-5900
M.P. 1.1
NF-5900
NO SCALE
NOTE: Place barricades at approved location.
Randle, WA
45 miles to
:4
M a r c h
T e m p o r a r y
T r a f f ic m a p p w w o r k \d
\w a f s g if p n tt c .d g n
LAYOUT NF-5900
CONTROL ROAD CLOSURE
TEMPORARY TRAFFIC
PROJECT
O.3
WORK
ROAD
AHEAD
CLOSED
ROAD
AHEAD
ROAD
CLOSED
W20-1
W20-3
Barricade Typ3
R11-2
Barricade Typ3
R11-2
ROAD
CLOSED
W20-3
CLOSED
ROAD
AHEAD
WORK
ROAD
AHEAD
W20-1
N
Cave
Creek
C a tt
C re e k
NF-8500
R a n d le , W
A m ile s to
M.P. 3.3
NF-8500
NO SCALE
2. Place barricades at approved location.
1. Provide minimum 100' spacing between advanced warning signs and barricades.
NOTE:
:3
M a y
T e m p o ra ry T ra ff ic C o n tr o l
P la n
M
P p w w o r k \d
\w a f s g if p n tt c .d g n
LAYOUT NF-8500
CONTROL ROAD CLOSURE
TEMPORARY TRAFFIC
:3
M a y
T e m p o ra ry T ra ff ic C o n tr o l
P la n
M
P p w w o r k \d
\w a f s g if p n tt c .d g
O.4
See " SINGLE LANE CLOSURE LAYOUT (WITH FLAGGERS)
SCALE IN MILES
0 0.5 1.0 1.50.5
Be nh am Creek
N F
Ir o n
C re e k
M.P. 13.1
NF-2500
R a n d le
W A m il e s t
:4
M a y
T e m p o r a r y
T r a f f ic
C o n tr o l
P la n o n e l a p w w o r k \d
\w a f s g if p n tt c .d g n
CONTROL PLAN - ONE LANE
TEMPORARY TRAFFIC
PROJECT
O.5
O.6WA ERFO FS GIFPN603 2020-1(1)
WA ERFO FS GIFPN603 2020-1(1) O.7
WA ERFO FS GIFPN603 2020-1(1) P.1
| A.2 |
| a3,4 |
| c.1 |
| c.2 |
| c.3 |
| c.4 |
| c.5 |
| c.6 |
| d1 |
| d2.2 |
| e.1 |
| G.1 |
| H1 |
| H.2 |
| h.3 |
| I.1 |
| I.2 |
| j.1 |
| j.2 |
| J.3 |
| k.1 |
| l.1 |
| L2 |
| m1 |
| m.2 |
| n.1 |
| n2,5 |
| N6 |
| n7,10 |
| n.8 |
| n.-9 |
| n11 |
| o1 |
| o2 |
| o3 |
| o.4 |
| o5 |
| o.6 |
| o7 |
| o8 |
| p1 |