7._Amendment_Four_Cost_Workbook.xlsx
XLSX spreadsheet 445 KB Posted
- Attached to
- Amendment 10
- Solicitation number
- W91RUS-18-R-DA04
About this file
7. Amendment Four_Cost Workbook
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| General |
| Reference the RFP for complete Instructions. |
| Optional Work within the PWS is subject to the Changes Clause and shall not be priced (PWS 1.2) and is included in the WBS to keep the PWS formatting intact. This work shall not be included in the proposal. |
| The Offeror shall submit the cost proposal spreadsheets by major cost element: direct labor (hours and rates), indirect costs/overhead, general and administrative expenses, facilities capital cost of money, and profit/fee using the format within this cost workbook. |
| Worksheets for Cost Build, WBS and BOE shall be completed for each performance period: Phase-in, Base, Option One and Option Two. |
| Offerors shall submit both “Sanitized” and “Unsanitized” cost/price proposals. “Unsanitized” cost proposals are complete cost proposals that include all required information. |
| “Sanitized” cost proposals shall exclude all company proprietary or sensitive data, including cost and price information, but must include a breakdown of the total labor hours and categories proposed by task and a breakout of the types of all proposed Other Direct Costs (ODCs). |
| Both “Sanitized” and “Unsanitized” files shall contain all formulas, calculations, and worksheet/workbook links used to compute the proposed amounts; the formulas, calculations, and links shall not be hidden, nor path preferences used to higher directories on the Offeror’s system that “breaks” the links when files are copied to the submitted electronic media. |
| All linked spreadsheets shall be provided. |
| The proposal cost breakdowns should follow the cost accounting and estimating practices of the Offeror. |
| All amounts in the Cost/Price Volume shall be shown to the second decimal place. Print image is not acceptable. |
| All calculations shall be fully disclosed with explanations for how the amounts were derived. The proposal data shall allow for replication and validation of the calculations, with clear tracking of key figures among the support schedules. |
| Offerors shall provide a separate Cost Notes page for any written explanation of the cost, to include any exceptions, deviations and/or assumptions. |
| The proposal shall identify any judgmental factors applied and the nature of any contingencies included in the proposed costs. |
| All ODCs will be proposed without Fee. |
| If Teaming Partner data is considered proprietary, it may be sent directly to the Government. However, the Prime Contractor will still have the responsibility to consolidate the overall labor cost totals and include them in the cost breakdowns within the worksheets contained in this Cost workbook: SUMMARY, CLIN TOTALS, COST BUILD, WBS, and BOE tabs. |
| ►All subcontractor cost proposals that are provided directly to the Government shall conform to the proposal requirements within this Cost Workbook, except for the Government provided estimates for Overtime and ODCs that will be handled by the Prime. |
| For proposal purposes, the Government estimates for overtime and ODCs shall be burdened at the Prime Offeror's indirect rates. |
| Additional worksheets may be provided as necessary to support the proposed costs, such as to show shift schedules, the build up of costs for Government provided estimates for Overtime and ODCs or to provide subcontract price analysis information. |
| Workbook Format Instructions. |
| Bid codes (applicable codes used to identify a labor category in the Offerors accounting system), employee names and/or other documentation (such as assigned letter of commitment for key personnel not currently employed by the Offeror) to support the rates proposed shall be provided in the UNSANITIZED Cost Workbook, only. |
| Group by labor category and provide in addition to the hourly rate, an average labor rate whenever there are many rates for the same labor category. |
| Labor costs shall be separated by team member (i.e. Prime, Subcontractor, etc.). |
| Worksheets (ex. Cost Build, WBS, BOE) are to be duplicated as needed to propose costs for each performance period (Phase-in, Base period, Option Period One and Option Period Two). |
| Cost Build Tab. Group costs by team members (Prime/Subcontractor/Teaming Partner). The format is mandatory. Do not alter column placement in any way. |
| WBS Tab. The WBS format should be used to the greatest extent possible. Adjustments to the format may be made as required by the Offeror’s specific technical approach and content. |
| - Cost information shall be provided within this WBS to assist cost analysis and most probable cost adjustments, if necessary. |
| BOE Tab. Provide a basis of estimate (BOE) to support all cost elements. All BOEs shall include documentation of all assumptions, qualitative methods employed, and Basis of Data or information. |
| - The BOE template is provided as a guideline for expected content. The Offeror is free to develop and propose the BOE format that best explains the Offeror’s specific technical approach and content. |
| Zero shall be entered for all cells with no amount. |
| ►All cost elements within the workbook shall be formulated to accurately populate the Summary tab with totals for each cost elements so that any cost adjustments within the cost workbook will accurately update the totals on the Summary page. |
Summary_All Perform. Periods
| Company Name: |
| Solicitation Number: W91RUS-18-R-DA04 |
| Proposal No: |
| Date: |
| COST PROPOSAL FOR |
| USARCC-C IT Support Services |
| W91RUS-18-R-DA04 |
SUMMARY SHEET
| Cost Category | Amount |
| Direct Labor | |
| Overtime | |
| ODCs (Travel/Training) |
| Subcontract(s): |
| Direct Labor |
| Overtime |
| ODCs (Travel/Training) |
| Indirects: |
| Fringe Benefits |
| Overhead |
| Facility |
| M&H |
| G&A |
| PMO |
| FCCM |
| Fee |
Total CPFF
Amount of Work Subcontracted Amount
| Total Contract Value |
| Amount Subcontracted (in Dollars) |
| Amount Subcontracted (in Percentage) |
Type of Subcontract (FFP, T&M, COST)
Schedule B-CLINs
| CLIN STRUCTURE | |||||||||||
| Phase-in | CLIN | Description | PWS Paragraph | CLIN Type | Quantity | Unit | Unit Price | CLIN DOLLAR TOTAL | Cost | Fee | |
| 0001 | Phase-in USARCC-C IT Support Services (INFO CLIN) | ||||||||||
| 0002 | Phase-in Labor (INFO CLIN) | ||||||||||
| 0002AA | Phase-in Labor | CPFF | 1 | Job | |||||||
| 0003 | Phase-in Overtime (OT) (INFO CLIN) | ||||||||||
| 0003AA | Phase-in Overtime (OT) | CPFF | 1 | Job | Plug Number | $ 15,210.00 | Offeror shall break out Cost from Fee for Government provided Overtime amount. | ||||
| 0004 | Phase-in Other Direct Costs (ODC) (INFO CLIN) | ||||||||||
| 0004AA | Phase-in Other Direct Costs (ODC) | COST | 1 | Job | Plug Number | $ 33,333.33 | |||||
| 0005 | Phase-in Deliverables (INFO CLIN) | NSP | 1 | NSP | |||||||
| 0006 | Phase-in Contractor Manpower Reporting (INFO CLIN) | NSP | 1 | NSP |
| Base | CLIN | Description | PWS Paragraph | CLIN Type | Quantity | Unit | Unit Price | CLIN DOLLAR TOTAL | Cost | Fee |
| 1001 | Base Period USARCC-C IT Support Services (INFO CLIN) | 1 | Job | $ 366,666.67 | $ - 0 | $ - 0 | ||||
| 1002 | Base Period Labor (INFO CLIN) | |||||||||
| 1002AA | Base Period Labor | CPFF | 1 | Job | ||||||
| 1003 | Base Period Overtime (OT) (INFO CLIN) | |||||||||
| 1003AA | Base Period Overtime (OT) | CPFF | 1 | Job | Plug Number | $167,310.00 | ||||
| 1004 | Base Period Other Direct Costs (ODC) (INFO CLIN) | |||||||||
| 1004AA | Base Period Other Direct Costs (ODC) | COST | 1 | Job | Plug Number | $ 366,666.67 | ||||
| 1005 | Base Period Deliverables (INFO CLIN) | NSP | 1 | NSP | ||||||
| 1006 | Base Period Contractor Manpower Reporting (INFO CLIN) | NSP | 1 | NSP |
| OP1 | CLIN | Description | PWS Paragraph | CLIN Type | Quantity | Unit | Unit Price | CLIN DOLLAR TOTAL | Cost | Fee |
| 2001 | Option Period One USARCC-C IT Support Services (INFO CLIN) | 1 | Job | $ 400,000.00 | $ - 0 | $ - 0 | ||||
| 2002 | Option Period One Labor (INFO CLIN) | |||||||||
| 2002AA | Option Period One Labor | CPFF | 1 | Job | ||||||
| 2003 | Option Period One Overtime (OT) (INFO CLIN) | |||||||||
| 2003AA | Option Period One Overtime (OT) | CPFF | 1 | Job | Plug Number | $ 188,543.00 | ||||
| 2004 | Option Period One Other Direct Costs (ODC) (INFO CLIN) | |||||||||
| 2004AA | Option Period One Other Direct Costs (ODC) | COST | 1 | Job | Plug Number | $ 400,000.00 | ||||
| 2005 | Option Period One Deliverables (INFO CLIN) | NSP | 1 | NSP | ||||||
| 2006 | Option Period One Contractor Manpower Reporting (INFO CLIN) | NSP | 1 | NSP |
| OP2 | CLIN | Description | PWS Paragraph | CLIN Type | Quantity | Unit | Unit Price | CLIN DOLLAR TOTAL | Cost | Fee |
| 3001 | Option Period Two USARCC-C IT Support Services (INFO CLIN) | 1 | Job | $ 400,000.00 | $ - 0 | $ - 0 | ||||
| 3002 | Option Period Tw (INFO CLIN) | |||||||||
| 3002AA | Option Period Two Labor | CPFF | 1 | Job | ||||||
| 3003 | Option Period Two Overtime (OT) (INFO CLIN) | |||||||||
| 3003AA | Option Period Two Overtime (OT) | CPFF | 1 | Job | Plug Number | $ 194,765.00 | ||||
| 3004 | Option Period Two Other Direct Costs (ODC) (INFO CLIN) | |||||||||
| 3004AA | Option Period Two Other Direct Costs (ODC) | COST | 1 | Job | Plug Number | $ 400,000.00 | ||||
| 3005 | Option Period Two Deliverables (INFO CLIN) | NSP | 1 | NSP | ||||||
| 3006 | Option Period Two Contractor Manpower Reporting (INFO CLIN) | NSP | 1 | NSP | ||||||
| Totals |
Totals $ 2,883,951.34 $ - 0 $ - 0
SCA Mapping
| Proposed Rates | Department of Labor, Service Contract Act, Wage Determination (WD) Rates | ||
| Labor Category | Wage Rate | H&W Paid | SCA Occupation Code and Position Title |
| WD Wage Rate | WD H&W Rate |
Cost Build
| This worksheet shall be duplicated for each performance period: Phase-in, Base Period, Option Period One, and Option Period Two. |
| Cost Build Tab. Group costs by team members (Prime/Subcontractor/Teaming Partner). The content is mandatory. Do not alter column header placement in any way. Subtotal and total column information that belong at the end of a listing of costs may be populated within the body of the proposal, rahter than at the top. |
| % | % | Other Direct Costs | % | % | % | % | % | % | % | |||||||||||||
| CLIN/SLIN | WBS/PWS Elements | Task Description | Company/Team Member | Site/Facility | Labor Category/ | |||||||||||||||||
| Position Title | FTE | |||||||||||||||||||||
| ( Full Time or Part Time) | Shift Work (May add separate worksheet(s)) | Unloaded Direct Labor Hours/ | ||||||||||||||||||||
| Productive Hours | Unloaded Hourly Direct Labor Rate | Unloaded Annual Salary | Escalated Direct Labor Rate | |||||||||||||||||||
| Composite Direct Labor Rate, if applicable | Total Hourly Direct Labor Rate | Total Labor | ||||||||||||||||||||
| Fringe | SCA Applicable? (Y/N) | |||||||||||||||||||||
| Overtime Hourly Direct Labor Rate | Other Pay Hourly Direct Labor Rate, if applicable | Total Annual Employee Compensation | Total Direct Labor, all Labor Categories | Overtime | ||||||||||||||||||
| ( Government Value Less Indirects and Fee) | Other Direct Costs (Government Value Less Indirects) | Offeror Proposed ODCs, if any | Subtotal ODCs | Overhead | M&H | G&A | FCCM | Subtotal Indirect Rates | Total Cost | Total Fixed Fee | Total Cost Plus Fixed Fee | Hourly CPFF Labor Rate | Hourly CPFF Overtime |
Labor Rate
| If yes, include within SCA Mapping Tab. | |
| For example only: | |
| Prime | |
| Labor Category | |
| Labor Category | |
| Labor Category | |
| Labor Category |
Subtotals
| Subcontractor A |
| Labor Category |
| Labor Category |
| Labor Category |
| Labor Category |
Subtotal
| Subcontractor B |
| Labor Category |
| Labor Category |
| Labor Category |
| Labor Category |
Subtotoal
Totals
WBS
This worksheet shall be duplicated for each performance period: Phase-in, Base Period, Option Period One, and Option Period Two.
A Work Breakdown Structure (WBS) is a tool that represents an organized list of tasks and subtasks in an appropriate sequence. For cost-type contracts, you want to create enough clarity for the Government to be able to substantiate each task and subtask and assign resources to each. The WBS should mirror the tasks and task numbers in the corresponding PWS. The Work Breakdown Structure (WBS) shall be at a minimum of the third level as illustrated in the Notional WBS sample below. All hours shall be sub-totaled at each WBS element level and then totaled at each of the next highest levels. Many times, the WBS is a compilation of tasks from various functional areas, resulting in input from several people who are considered experts. If this is the case, then one person responsible for compiling the WBS should ensure there is no duplication and that all work for the requirement is included.
The following WBS format shall be used to the greatest extent possible. Adjustments to the format may be made as required by the Offeror’s specific technical approach and content.
Notional Work Breakdown Structure
PWS Level I (PWS 5.0) PWS Level II (Task 5.1) PWS Level III (Subtask 5.1.1 ) 1. Main Task A. Supporting task
1. Subtask
2. Subtask
Period of Performance ((Phase-in, Base, OP1, OP2) WBS Minimum Level 3 - Break-Out Major Performance Elements in Section 5.0 of PWS.
This worksheet may be tailored to capture WBS elements for other PWS sections as needed.
WBS PWS PWS Requirements/ Work Description/
| Deliverable | Labor Categories | FTE, Including Shift Work | Hours per Shift | Total Hours | ||||||||
| 5.0 | 5.0 | IT Support Services (Entire Program) | Level 1 Roll-up | |||||||||
| (Add PWS sections 1.0-9.0 as necessary) | 5 | 3800 | 9520 | 5.1.1 NIPRNet/SIPRNet Network Management. | 5.1.2 Enterprise Protected Domain Name Service (EP-DNS). | 5.1.3 Web Proxy Operation. | 5.1.4 Virtual Private Network Operation. | 5.1.5 (Optional Work) Army Public Key Infrastructure for Equipment (PKI-E). | ||||
| 5.1 | 5.1 | Main Task/ Perform Network Services | Level 2 Roll-Up | 5 | 3800 | 9520 | Option Work is not to be included in the proposal | |||||
| 5.1.1 | 5.1.1 - 5.1.5 | Supporting Tasks Subtotal | Roll-Up | 5 | 3800 | 9520 | ||||||
| * Task | Labor Cat 1 | 3 | 1920 | 5760 | ||||||||
| * Task | Labor Cat 2 | 2 | 1880 | 3760 | ||||||||
| * Task | Labor Cat 3 | 0 | ||||||||||
| * Deliverable | ||||||||||||
| 5.1.1.1 | 5.1.1.1 - 5.1.5.4 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.1.1.1 - 5.1.1.9 | 5.1.2.1 - 5.1.2.11 | 5.1.3.1 - 5.1.3.7 | 5.1.4.1 - 5.1.4.5 | ||
| * Subtask | Labor Cat 1 | 0 | ||||||||||
| * Subtask | Labor Cat 2 | 0 | ||||||||||
| * Subtask | Labor Cat 3 | 0 | ||||||||||
| * Deliverable | ||||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.2.1 Area Processing Center (APC) Operations. | 5.2.2 Active Directory. | 5.2.3 Web Site Development and Maintenance. | 5.2.4 Global Network Enterprise (GNE) Tools Support. | 5.2.5 Joint Regional Security Stack (JRSS) Migration. | |||
| 5.2 | 5.2 | Main Task/Perform Enterprise Services. | Level 2 Roll-Up | 0 | 0 | 0 | ||||||
| 5.2.1 | 5.2.1 - 5.2.5 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | ||||||
| * Task | Labor Cat 1 | 0 | ||||||||||
| * Task | Labor Cat 2 | 0 | ||||||||||
| * Task | Labor Cat 3 | 0 | ||||||||||
| * Deliverable | ||||||||||||
| 5.2.1.1 | 5.2.1.1 - 5.2.5.13 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.2.1.1 - 5.2.1.5 | 5.2.2.1 - 5.2.2.9 | 5.2.3.1 - 5.2.3.8 | 5.2.4.1 - 5.2.4.7 | 5.2.5.1 - 5.2.5.13 | |
| * Subtask | Labor Cat 1 | 0 | ||||||||||
| * Subtask | Labor Cat 2 | 0 | ||||||||||
| * Subtask | Labor Cat 3 | 0 | ||||||||||
| * Deliverable | ||||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/ Work Description Labor Cats FTE Hours Hours 5.3.1 Enterprise Telephony Firewall Management (ETFM). 5.3.2 Enterprise Voice Over Internet Protocol (VOIP).
5.3.3 Enterprise Internet Protocol Video Teleconference (IP VTC) NIPRNET and SIPRNET.
5.3.4 Enterprise Instant Messaging (IM) and Collaborative Services over IP on NIPRNET and SIPRNET.
| 5.3 | 5.3 | Main Task/Perform Unified Capabilities. | Level 2 Roll-Up | 0 | 0 | 0 | ||||
| 5.3.1 | 5.3.1 - 5.3.4 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | ||||
| * Task | Labor Cat 1 | 0 | ||||||||
| * Task | Labor Cat 2 | 0 | ||||||||
| * Task | Labor Cat 3 | 0 | ||||||||
| * Deliverable | ||||||||||
| 5.3.1.1 | 5.3.1.1 - 5.3.2.5 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.3.1.1 - 5.3.1.17 | 5.3.2.1 - 5.3.2.5 | - | - |
| * Subtask | Labor Cat 1 | 0 | ||||||||
| * Subtask | Labor Cat 2 | 0 | ||||||||
| * Subtask | Labor Cat 3 | 0 | ||||||||
| * Deliverable | ||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.4.1 Army NIPRNet and SIPRNet CND services | |||
| 5.4 | 5.4 | Main Task/Perform Computer Network Defense (CND) Services. | Level 2 Roll-Up | 0 | 0 | 0 | ||
| 5.4.1 | 5.4.1 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | ||
| * Task | Labor Cat 1 | 0 | ||||||
| * Task | Labor Cat 2 | 0 | ||||||
| * Task | Labor Cat 3 | 0 | ||||||
| * Deliverable | ||||||||
| 5.4.1.1 | 5.4.1.1 - 5.4.1.16 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.4.1.1 - 5.4.1.16 | |
| * Subtask | Labor Cat 1 | 0 | ||||||
| * Subtask | Labor Cat 2 | 0 | ||||||
| * Subtask | Labor Cat 3 | 0 | ||||||
| * Deliverable | ||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.5.1 CONUS DoDIN-A Operations | 5.5.2 Operations Bridge Council. | 5.5.3 Web Site Security. | |||
| 5.5 | 5.5 | Main Task/Perform CONUS DoDIN-Army Operations. | Level 2 Roll-Up | 0 | 0 | 0 | ||||
| 5.4.1 | 5.5.1 - 5.5.3 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | ||||
| * Task | Labor Cat 1 | 0 | ||||||||
| * Task | Labor Cat 2 | 0 | ||||||||
| * Task | Labor Cat 3 | 0 | ||||||||
| * Deliverable | ||||||||||
| 5.5.1.1 | 5.5.1.1 - 5.5.3.5 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.5.1.1 - 5.5.1.3 | 5.5.2.1 - 5.5.2.8 | 5.5.3.1 - 5.5.3.5 | |
| * Subtask | Labor Cat 1 | 0 | ||||||||
| * Subtask | Labor Cat 2 | 0 | ||||||||
| * Subtask | Labor Cat 3 | 0 | ||||||||
| * Deliverable | ||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.6.1 Defensive Cyberspace Operations (DCO) | 5.6.2. Defensive Cyberspace Operations Application Development and Support | 5.6.3 Network Defense Penetration Testing and Evaluation | 5.6.4 Computer Network Defense Architecture and Development | 5.6.5 Exercises | 5.6.6 Reporting | 5.6.7 Network Security Monitoring, Detection, and Analysis | 5.6.8 Incident Response and Mitigation | |||
| 5.6 | 5.6 | Main Task/Perform (Option) Defensive Cyberspace Operations (DCO) Support Services. | Level 2 Roll-Up | 0 | 0 | 0 | |||||||||
| 5.6.1 | 5.6.1 - 5.6.8 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | |||||||||
| * Task | Labor Cat 1 | 0 | |||||||||||||
| * Task | Labor Cat 2 | 0 | |||||||||||||
| * Task | Labor Cat 3 | 0 | |||||||||||||
| * Deliverable | |||||||||||||||
| 5.6.1.1 | 5.6.1.1 - 5.6.8.4 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.6.1.1 - 5.6.1.2 | 5.6.2.1 - 5.6.2.4 | 5.6.3.1 - 5.6.3.2 | 5.6.4.1 - 5.6.4.3 | 5.6.5.1 - 5.6.5.2 | 5.6.6.1 - 5.6.6.3 | 5.6.7.1 - 5.6.7.3 | 5.6.8.1 - 5.6.8.4 | |
| * Subtask | Labor Cat 1 | 0 | |||||||||||||
| * Subtask | Labor Cat 2 | 0 | |||||||||||||
| * Subtask | Labor Cat 3 | 0 | |||||||||||||
| * Deliverable | |||||||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.7.1 Server and Workstation Support. | 5.7.2 Security and Information Assurance. | 5.7.3 Infrastructure Support. | 5.7.4 SAN/Virtual Machine (VM)/Backup Support. | 5.7.5 Internal Tools Support. | 5.7.6 Logistics Support. | |||
| 7 | 5.7 | Main Task/Perform Mission Support Services. | Level 2 Roll-Up | 0 | 0 | 0 | |||||||
| 5.7.1 | 5.7.1 - 5.7.6 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | |||||||
| * Task | Labor Cat 1 | 0 | |||||||||||
| * Task | Labor Cat 2 | 0 | |||||||||||
| * Task | Labor Cat 3 | 0 | |||||||||||
| * Deliverable | |||||||||||||
| 5.7.1.1 | 5.7.1.1 - 5.7.6.12 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.7.1.1 - 5.7.1.7 | 5.7.2.1 - 5.7.2.16 | 5.7.3.1 - 5.7.3.21 | 5.7.4.1 - 5.7.4.7 | - | 5.7.6.1 - 5.7.6..12 | |
| * Subtask | Labor Cat 1 | 0 | |||||||||||
| * Subtask | Labor Cat 2 | 0 | |||||||||||
| * Subtask | Labor Cat 3 | 0 | |||||||||||
| * Deliverable | |||||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.8.1 ITIL Transformation. | 5.8.2 Service Design. | 5.8.3 Service Transition. | 5.8.4 Service Operation. | 5.8.5 Continual Service Improvement. | |||
| 5.8 | 5.8 | Main TaskPerform Information Technology Infrastructure Library (ITIL). | Level 2 Roll-Up | 0 | 0 | 0 | ||||||
| 5.8.1 | 5.8.1 - 5.8.5 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | ||||||
| * Task | Labor Cat 1 | 0 | ||||||||||
| * Task | Labor Cat 2 | 0 | ||||||||||
| * Task | Labor Cat 3 | 0 | ||||||||||
| * Deliverable | ||||||||||||
| 5.781.1 | 5.8.1.1 - 5.8.5.4 | *� Supporting Subtask Subtotal | Roll-up | 0 | 0 | 0 | 5.8.1.1 - 5.8.1.3 | 5.8.2.1 - 5.8.2.3 | 5.8.3.1 - 5.8.3.4 | 5.8.4.1 - 5.8.4.4 | 5.8.5.1 - 5.8.5.4 | |
| * Subtask | Labor Cat 1 | 0 | ||||||||||
| * Subtask | Labor Cat 2 | 0 | ||||||||||
| * Subtask | Labor Cat 3 | 0 | ||||||||||
| * Deliverable | ||||||||||||
| WBS | PWS | PWS Requirements/ |
Deliverable/
| Work Description | Labor Cats | FTE | Hours | Hours | 5.9 Administrative/Technical Tasks. | ||
| 5.9 | 5.9 | Main Task/Administrative/Technical Tasks. | Level 2 Roll-Up | 0 | 0 | 0 | |
| 5.9.1 | 5.9.1 - 5.9.16 | Supporting Tasks Subtotal | Roll-Up | 0 | 0 | 0 | |
| * Task | Labor Cat 1 | 0 | |||||
| * Task | Labor Cat 2 | 0 | |||||
| * Task | Labor Cat 3 | 0 | |||||
| * Deliverable |
BOE
| This worksheet shall be duplicated for each performance period: Phase-in, Base Period, Option Period One, and Option Period Two. | ||
| The BOE is to document the rationale for the labor hours, labor categories, travel, and ODC estimates that are used in developing the overall expected cost of a contract. Offerors shall prepare the BOE to explain the resources that will be required to accomplish their technical approach. The BOE shall be reflective of the breakdown of tasks within the WBS of the technical volume and shall be provided at the third level. The following is an example of a BOE format that may be used. This template is provided as a guideline for expected content and is not required to be strictly adhered to. Adjustments to the format should be made as required by the Offeror’s specific technical approach and content. Cost information is allowed to be provided within this BOE. | ||
| Labor Category | Hours | Role/Task |
| TOTAL WBS Level Proposed Hours |
| WBS Element | |||
| Describe the role for this labor category for this specific task | |||
| Proposed Labor Category | Proposed Hrs. | ||
| Describe the role for this labor category for this specific task | |||
| Proposed Labor Category | Proposed Hrs. | ||
| Describe the role for this labor category for this specific task | |||
| Proposed Labor Category | Proposed Hrs. | ||
| Describe the role for this labor category for this specific task | |||
| Proposed Labor Category | Proposed Hrs. | ||
| Activity Descriptions: | |||
| Describe the activities that will be performed. | |||
| � | |||
| Planned Deliverables: |
| Basis of Estimate: |
| Describe how the estimates for these activities were developed. |