SECTION_J_Attachment_09 _QASP.docx

DOCX document 264 KB Posted

Attached to
NGB Facility Maintenance and Repair
Solicitation number
W9133L-16-R-0077
Issued by

About this file

Quality Assurance Surveillance Plan

View the file

Other files

File Type Posted
amendment__06_Jan_2016.pdf PDF
Final_clarification_6_Jan_2016.pdf PDF
Revised_CLIN_Description_06_Jan_16.pdf PDF
SOLICITATION_W9133L-16-R-0077-0003-06_JAN_2016.pdf PDF
DC_Chapter_NECA_Local_26_IBEW.pdf PDF
Revised_Pricing_Spreadsheet_Section_J.12_04_Jan_16.xlsx XLSX spreadsheet
Clarification_W9133L-16-R-0077_Facility_Maintenance_ _Repair_04_Jan_2016.docx DOCX document
W9133L16R0077-05JAN2016.pdf PDF
Service_Call_History.xlsx XLSX spreadsheet
DC_NECA_ _Local_26_IBEW_Wireman_Agreement.pdf PDF
SECTION_J_Appendix_I__AHS_Map.pdf PDF
SECTION_J_Attachment_05 _DD_254.pdf PDF
SECTION_J_Attachment_14 _Wage_Determination_WD_05-2104_Rev-18_14_Jul_2015.docx DOCX document
SECTION_J_Attachment_06 _DD1532-1.pdf PDF
SECTION_J_Attachment__02 _Performance_Req_Summary.docx DOCX document
SECTION_J_Attachment_10 _Past_Performance_Questionnaire.docx DOCX document
SECTION_J_Attachment_07 _AF_3000.pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_09_Nov_15.xlsx XLSX spreadsheet
DD_2772_-_Contract_Discrepancy_Report.pdf PDF
SECTION_J_Appendix_V _Snow_and_Ice_Removal_Priority_Map.pdf PDF
SECTION_J_Appendix_IV _CDRLs_Cover.docx DOCX document
SECTION_J_Appendix_II-A-F_Building_and_Structures_Equipment.docx DOCX document
SECTION_J_Attachment_06 _DD1532.pdf PDF
DD1423.pdf PDF
SECTION_J_Appendix_V _Snow_and_Ice_Removal_Cover.docx DOCX document
SECTION_J_Attachment_03 _A-C _Gov_Furnished_Equip.docx DOCX document
SECTION_J_Appendix_II_Equipment.docx DOCX document
W9133L-16-R-0077.pdf PDF
Clarification_30_Dec_15.xlsx XLSX spreadsheet
EGS_IBEW_Local_26_CBA_Multiple_Sites_(eff_7-1-13_thru_6-30-16).pdf PDF
Revised_Pricing_Spreadsheet_16-R-0077_Facility_Maintenance_ _Repair_30_Dec_2015.xlsx XLSX spreadsheet
PART_6_IDIQ_Unit_Price_Book_ _Software_30_Dec_15_.docx DOCX document
NGB_Arlington_VA_Questions_Final.pdf PDF
FMO_Response_to_NG_Clarfication.xlsx XLSX spreadsheet
W9133L-16-R-0077-00001.pdf PDF
EGS_IBEW_Local_26_CBA_Multiple_Sites_(eff_7-1-13_thru_6-30-16).pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_21_Dec_15.xlsx XLSX spreadsheet
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_16_Dec_15.xlsx XLSX spreadsheet
Attachment_14-ANG_Local_99_CBA_(1-1-15_thru_12-31-17).pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_08_Dec_15.xlsx XLSX spreadsheet
dd1423-1-A012.pdf PDF
dd1423-1-A013e.pdf PDF
dd1423-1-A013.pdf PDF
dd1423-1-A013d.pdf PDF
dd1423-1-A013b.pdf PDF
dd1423-1-A013f.pdf PDF
dd1423-1-A013c.pdf PDF
dd1423-1-A013a.pdf PDF
site_survey_orientation_info.pdf PDF
SECTION_J_Appendix_11 _Sample_Task_PWS.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

ATTACHMENT 09

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Department of the Army, National Guard Bureau

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

ARLINGTON HALL STATION

Issued 03 November 2014

NATIONAL GUARD BUREAU

111 SOUTH GEORGE MASON DRIVE

ARLINGTON VA 22204-1382

(Ver Jun 2014) ii

TABLE OF CONTENTS

1INTRODUCTION1
1.1Purpose1
1.2Performance Management Approach1
1.3Performance Management Strategy1
2ROLES AND RESPONSIBILITIES2
2.1The Contracting Officer2
2.2The Contracting Officer’s Technical Representative2
3IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS2
4METHODOLOGIES TO MONITOR PERFORMANCE2
4.1Surveillance Techniques2
4.2Customer Feedback3
4.3Acceptable Quality Levels3
5QUALITY ASSURANCE DOCUMENTATION3
5.1The Performance Management Feedback Loop3
5.2Monitoring Forms3
6ANALYSIS OF QUALITY ASSURANCE ASSESSMENT3
6.1Determining Performance4
6.2Reporting4
6.3Reviews and Resolution4
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY5
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM6

ii

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Facility Maintenance Services. This plan sets forth the procedures and guidelines the Arlington Hall Station - Facility Management Office (FMO) will use in ensuring the required performance standards or services levels are achieved by the contractor.

Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Arlington Hall Station - Facility Management Office (FMO) to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

ROLES AND RESPONSIBILITIES

The Contracting Officer The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Arlington Hall Station - Facility Management Office (FMO): "contracting officer's representative (COR)," and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

The Contracting Officer’s Technical Representative The contracting officer’s technical representative (COTR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COTR limitations are contained in the written appointment letter. The COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” [Adjust the following sentences to reflect the instant acquisition.] If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

· 100% Inspection – Each month, the COTR/COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

· Random monitoring of recurring service outputs, which shall be performed by the COTR/COR designated inspector.

· Periodic Inspection – COTR/COR typically performs the periodic inspection on a monthly basis.

· Customer Complaints Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving HVAC/R Cooling/Heating Systems, Fire Alarm Systems, Emergency Power System, UPS System, etc. the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at Arlington Hall Station.

QUALITY ASSURANCE DOCUMENTATION

The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

Monitoring Forms The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required quality levels are being achieved.

The COR will retain a copy of all completed QA surveillance forms.

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

Reporting At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

Reviews and Resolution The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR, as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes

The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
C.5
Personnel
Each employee shall demonstrate the capability to satisfactorily perform all assigned responsibilities. All employees shall comply with NGB clearance, building pass and access to government premises requirements. All personnel shall wear required uniforms.
All personnel are cleared and have the required access within 30 days of the date an employee(s) begins duty. Employees are in uniform no later than ten working days from the date an employee(s) begins duty.
Random Monitoring - Review of records by COR or designee.
C.5.6
Project Manager
The contractor provides a full time project manager to ensure the requirements of the contract are completed satisfactorily.
The COR is kept informed on the status of complete contract performance.
100% Inspection – COR will review monthly reports
C.5.6.2
Project Manager’s Monthly Report
Monthly report(s) are timely, accurate, complete and provide the required information.
90% of reports are turned in to the COR within 5 working days following the end of the month.
100% Inspection – COR will review monthly reports

C.5.7 C.5.8 C.5.9 C.5.10 C.5.11 C.5.12 C.5.13 C.5.14 Assistant Project Manager, HVAC/R Manager, HVAC/R Technician(s), Utility Mechanic(s), Maintenance Helper(s), Set-up Helper(s), Administrative Assistant(s), Electrician(s)

The contractor provides a full time personnel meeting the described qualifications, certifications, and licensure described in the PWS to ensure the requirements of the contract are completed satisfactorily.
90% of the time, the contractor performs work in accordance with the designated timeframes listed in the PWS or timeframes directed by the COR.
Random Monitoring - Review of performance by COR or designee.
C.7
Training and Certification
The contractor provides trained personnel to satisfactorily perform all contract requirements. Employee Training Reports and Certificates are submitted as required.
100% of the employees complete the mandatory training on time.
Random Monitoring - Review of records by COR or designee.
C.8
Security Clearance
The contractor provides cleared and certified personnel to satisfactorily perform all contract requirements. Employee certificates are submitted as required.
100% of the employees are certified to perform designated duties in this section as required by Federal, State and Local laws. 0 Defects.
100% Inspection – COR will review monthly reports
C.9
Physical Security
The contractor performs key control, lock combination control, and conservation of utilities as required.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.10
Drug and Alcohol Testing / Collective Bargaining Agreement
The contractor shall establish and perform in accordance with the contract requirements.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.11
Administrative Support / Personnel Support
The contractor provides trained and qualified personnel to accomplish contract requirements.
Material and personnel paperwork is maintained and 100% of service calls are entered into the CMMS. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.12
Subcontract Administration & Purchasing Support
All purchasing and subcontracting meet federal procurement requirements. Subcontractor performance and material and supply purchases are effectively managed by the contractor. Material and supplies are purchased in sufficient quantity to support the requirements of this contract. All reporting is accurate, complete, concise, timely and provides sufficient detail to allow the government to confirm that all subcontracting is being accomplished properly.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.13
Maintenance Engineering Services
Maintenance engineering services are timely and responsive to the requirements.
98% of the time, the contractor performs work in accordance with the designated timeframes listed in the PWS or timeframes directed by the COR.
100% Inspection - Review of performance by COR or designee.
C.13
Maintenance Engineering Services Report
Report is timely, accurate, complete and provide the required information.
100% performance as outlined. 0 Defects.
100% Inspection – CO and COR will review report
C.14
Design Engineering Services
Contractor developed designs, specifications and cost estimates are accurate and complete; as built drawings are accurate and up to date; drafting support work is provided on schedule and accurately; project planning and scheduling minimizes the impact of renovation or alteration projects on AHS operations.
98% of the time, the contractor performs work in accordance with the designated timeframes listed in the PWS or timeframes directed by the COR.
100% Inspection - Review of performance by COR or designee.
C.14.3.4
Air Quality Report
Report(s) is/are timely, accurate, complete and provide the required information. If additional testing or laboratory analysis is warranted, report shall contain a recommendation outlining scope of the additional work.
100% of the report is provided within fifteen (15) calendar days of completion, five (5) copies of the report is provided documenting the complete test and the results, to the CO. 100% of additional testing is reported as required.
100% Inspection - Review of performance by COR or designee.
C.15
Safety
There are no accidents that result in injury, loss of work or damage to property. All OSHA, Army, EPA and Commonwealth of Virginia safety requirements are met.
100% performance as outlined. 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.16
Environmental Compliance and Hazardous Materials
All laws and regulations are followed. Hazardous Material Spills are promptly reported to the COR. Materials are stored in accordance with manufacturer’s guidance and professional recommendations. MSDS documentation is maintained. All environmental responsibilities are followed as outlined in the PWS.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.16.5.1
Environmental Management Support Plan
Plan is timely, accurate, complete and provide the required information.
The 100% of the plan is submitted to the COR within forty-five (45) days after the contract start date, and be maintained for the duration of the contract.
100% Inspection – COR will review plan
C.17.1
Disaster, Emergency, Strike Contingency, and Continuity of Operations
Designated personnel are trained and available to support disasters and emergencies when called upon. Emergency Call Back, Snow Emergency, and Strike Contingency Plans are available and maintained on-site.
100% performance as outlined to meet mission. 0 Defects.
100% Inspection – COR will review plan
C.17.1.2
Hazardous Management Plan
Plan is timely, accurate, complete and provide the required information.
100% of the plan is submitted to the COR within forty-five (45) calendar days after the contract start date, and be maintained for the duration of the contract.
100% Inspection – COR will review plan
C.18
Quality Control Plan
The QC Plan is available to the government on-site and maintained by the contractor. Contractor’s personnel conduct the QC program in accordance with the contractor's QC plan. QC inspections are completed as scheduled and are comprehensive enough to ensure contract requirements are met. QC program takes corrective action to prevent recurrence of unacceptable performance and recognizes valid customer complaints regarding lack of quality service performance.
100% of the plan is submitted to the COR within forty-five (45) calendar days after the contract start date, and be maintained for the duration of the contract.
100% Inspection – COR will review plan
C.19
Quality Assurance
Contractor maintains files and records in accordance with the Inspection Clause. Contractor re-performs work identified by the COR.
The contractor re-performs 100% of work identified by the COR, with 0 Defects.
Random Monitoring - Review of workspace and equipment records by COR or designee
C.20
Government Furnished Property
The contractor properly accounts for government furnished workspace and government furnished equipment. The contractor provides proper care and maintenance of the government furnished workspace and government furnished equipment. The contractor obtained written approval from the CO prior to making any modifications or alterations to the government furnished property. At the completion of the contract, all government furnished property is returned to the government in the same condition as received, except for reasonable wear and tear, and alterations requested or authorized by the government.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of workspace and equipment records by COR or designee.
C.21
Contractor Furnished Property
The contractor furnished all labor, tools, equipment, supplies, parts and materials necessary for acceptable performance of this contract except as specified in para C.20.
The contractor supplies equipment and tools required to perform work with 5 Defects Lot is number of service calls/ PMs performed during the month.
Periodic Inspection - Review of performed work by COR or designee.
C.22
Technical Reference Library (TRL)
The contractor satisfactory maintains and updates the technical reference library.
The contractor maintains the required information with 5 Defects Lot is total count of equipment.
Random Monitoring - Review of workspace and equipment records by COR or designee.
C.23
Pre-existing Deficiency Inspection
The contractor shall conduct a Pre-Existing Deficiency Inspection to determine if any preventive maintenance deficiencies exist and report same to the CO
Within fifteen days (15) after effective date of the contract 100% of report is submitted to CO.
100% Inspection – CO and COR will review report
C.24
Warranty Library
The contractor satisfactory maintains and updates the warranty library and appropriate equipment tags. Contractor submits all warranty claims for manufacturer/ installer reimbursement.
Within thirty days (30) after effective date of the contract, the contractor shall create a list of the existing warranties. The list shall be updated on a quarterly basis. 2 Defects Lot is total count of equipment.
Random Monitoring - Review of records by COR or designee.
C.27
Operational Requirements
There are no unplanned system interruptions, breakdowns, major equipment failures, nor failures of the backup equipment components, to operate as designed, that could be attributed to circumstances within the control of the contractor. The Operational Requirements are maintained continuously.
100% performance as outlined. 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.29
Performing Maintenance/ Repair Work
The contractor shall ensure all maintenance and routine repair work in the general work areas occurs prior to or after site operating hours. Surrounding work area is protected from damage during the repair.
Work is completed 30 minutes prior to the opening hours and started 30 minutes after the closing hours listed in paragraph C.1.7. with 2 Defects. Lot is number of repairs performed during the month. Exceptions to the non-interference schedule or maintenance/repair work that disrupt the conduct of normal government business must be submitted to the COR for approval as least two working days in advance of such work.
Random Monitoring - Review of records by COR or designee.
C.29.3
Itemized Cost Report
Monthly report(s) are timely, accurate, complete and provide the required information.
90% of reports are turned in to the COR within 15 working days following the end of the month.
100% Inspection – COR will review monthly reports
C.30
Repairs
The contractor shall have sufficient qualified staffing, either on-site at the facility or employed elsewhere in the Washington D.C. Area, to accomplish the majority of maintenance and repairs that will be required to be performed. Contractor performs the required notification and cost estimating as outlined.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C30.1
On-Call Service
The contractor shall provide twenty-four hour a day on-call service for emergency or other repair requirements not covered under preventive maintenance and equipment warranties
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.30.4
Replaced Equipment or Components
The contractor shall not dispose of any functional equipment or components replaced, without government approval. Contractor updates the TRL as required.
100% performance as outlined. 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.31
Maintenance Control
The maintenance control system operates effectively and economically. Trades are provided schedules and directions on time, and feedback data is entered into the CMMS correctly and within five (5) working days. Reports are clear, concise and accurate. Service calls are received promptly and efficiently.

Operations and Maintenance Manuals are current and accurate, and reflect in a clear, concise, comprehensive summary, the precise opersting instructions for all systems’ operations and maintenance.

100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.32
Service Calls
Service calls shall be resolved quickly, and customers treated professionally, particularly when the nature of a problem cannot be resolved with service call procedures. Damage control is conducted promptly to arrest the emergency situation and establish safe system, facility and site conditions to minimize personnel injury and material and property damage. Service calls are completed properly and within the required response time.
Performance as outlined with 2 Defects. Lot is the number of service calls performed during the month.
Random Monitoring - Review of records by COR or designee.
C.33
Daily Inspections
Completing the daily tasks as scheduled. There are no equipment breakdowns attributable to lack of observation. The building standards and services provided by the contractor, particularly temperature and humidity, are maintained at all times.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.34
Preventative Maintenance
Preventive maintenance is completed as scheduled. PM is performed properly and in a timely manner. There are no system interruptions, breakdowns, or equipment failures due to a lack of maintenance, poor planning or maintenance procedures.
Performance as outlined with 2 Defects. Lot is the number of preventative maintenance tasks performed during the month.
Random Monitoring - Review of records by COR or designee.

C.35.5 C.35.5.1 C.35.5.2 C.35.5.3 C.35.5.4 C.35.5.5

Water Analysis Reports- Initial, Monthly, and Annual
Report(s) is/are timely, accurate, complete and provide the required information.
Initial – 100% of the report shall be submitted to the government for review within thirty (30) calendar days after the contract start date. If immediate remedial actions are required as determined by the initial water analysis, the contractor must take such remedial action within fifteen (15) calendar days after receiving notification from the CO, to proceed.

Monthly -100% of the report shall be submitted to the government for review within ten (10) calendar days after the end of the month Annual/ Supplemental as required/ requested by the COR.

100% Inspection – CO and COR will review report

C.37
Elevators
PM work is satisfactorily performed in accordance with the CMMS. Schedule changes are made in advance and with prior approval of the COR. PM work records and reports are prepared, maintained and submitted in accordance with the CMMS. All internal and external components, parts, assemblies and subassemblies forming a part of each elevator system or necessary for its safe operation, are inspected, adjusted, lubricated, repaired or replaced as necessary to ensure the system is functioning as designed. Daily operation checks are performed and necessary corrective action is taken for any discrepancies found.There are no unusual or objectionable machinery wear, noises or vibrations. All car speeds meet the manufacturer’s rated speeds. Car movement is smooth, with no unusual or objectionable noise or vibration. All leveling devices are maintained and adjusted to permit cars to stop level with all floors. All doors and safety edges are maintained and adjusted to operate at rated speeds and as per original equipment specifications. All normal and emergency operating controls are maintained and adjusted to be fully operational. All lights and indicator lamps are operational. All elevators maintain their certification by a GSA certified inspector. All safety systems and mechanisms are maintained in safe, operational condition. All cables are properly interlubricated and maintained within allowable ranges of wear. Systems are “shut down” and the COR notified when worn or damaged cables are found. A qualified elevator mechanic is onsite within one hour after notification or discovery of an elevator emergency.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.38.2.4
Triennial Preventative Maintenance and Testing Report
Report is timely, accurate, complete and provide the required information.
100% performance as outlined. 0 Defects.
100% Inspection – CO and COR will review report

C.38.5 C.38.6

Fire Detection and Alarm System, Emergency Lighting and Egress Marking Systems
Fire alarm systems, emergency lighting and egress marking systems are maintained in accordance with the specified criteria. The systems are operable 100% of the time.
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.38.5.1
Fire Detection and Alarm System Report
Report is timely, accurate, complete and provide the required information.
100% of the report shall be submitted to the government for review within thirty (30) calendar days after the completion of the work.
100% Inspection – CO and COR will review report
C.39
Exterior
The exterior presents a clean and attractive appearance. The facility is structurally sound, safe for occupancy and weather tight.
Performance as outlined with 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.39.1.1
Structural Inspection Report
Report is timely, accurate, complete and provide the required information.
100% of the report shall be submitted to the government for review within thirty (30) calendar days after the completion of the work.
100% Inspection – CO and COR will review report
C.39.7.1
Roof Inspection Report
Report is timely, accurate, complete and provide the required information.
100% of the report shall be submitted to the government for review within fifteen (15) calendar days after the completion of the work.
100% Inspection – CO and COR will review report
C.40
Interior
The interior presents a clean and attractive appearance. The facility is structurally sound and safe for occupancy.
Performance as outlined with 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.41
Ground Structures
Ground structures are in good material condition.
Performance as outlined with 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.42
Grounds Maintenance and Interior Plant Maintenance
Grass cutting is neat and clean, maintained at a height between two and three inches, with all trimming accomplished. Grass clippings and trimmings are removed from sidewalks and other paved areas when the grass is cut. The plantings provide an attractive, interesting, colorful display throughout the seasons. Trees and hedges are sheared or pruned to maintain their established shape and appearance. All edges are worked to a neat and true line. Dead, damaged or diseased wood and branches that extend over buildings, into power lines or obstruct clearances along streets, are removed.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.43
Snow and Ice Removal
The contractor is properly organized, staffed and has the appropriate materials, equipment, trained staff and other resources to meet snow and ice emergencies. When the snow emergency plan is implemented, the site is cleared quickly and efficiently.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.45
Irrigation System
There are no system interruptions, breakdowns, or major equipment failures due to faulty operating procedures or errors by personnel. The lawns and other improved areas receive the appropriate amounts of water without excessive erosion and runoff. The equipment operates as designed, safely and without breakdown due to lack of maintenance.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.46
Site Utilities
Sanitary and storm water facilities within the site function properly and all required environmental reporting is done on time. Exterior lights are operational.
Performance as outlined with 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.47
Security Systems
All physical security devices are operational at all times.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.48
Gym Equipment
All gym equipment is operational at all times.
Performance as outlined with 2 Defects. Lot is the number of equipment maintained during the month.
Random Monitoring - Review of records by COR or designee.
C.50
Pest Control
The contractor uses only properly registered pesticides and/or uses approved devices at scheduled times and at pre-planned intervals to provide adequate and acceptable levels of insect, arachnid, rodent, and other pest population suppression. Contractor complies with all Federal, Commonwealth of Virginia or local laws or regulations; pest control personnel are certified, trained, qualified; an effective Pest Control Plan has been prepared, approved by the government and is being followed by the contractor. The contractor performs work in accordance with the Integrated Pest Management Plan. The contractor performs updates to the IPM Plan as required. Interior and exterior pests are controlled and all pest control applications are documented. Only safe, proper and approved pesticides are used.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.
C.50.4
Integrated Pest Management (IPM) Plan
Plan is timely, accurate, complete and provide the required information.
100% of the plan is submitted to the COR within thirty (30) calendar days after the contract start date, and be maintained for the duration of the contract.
100% Inspection – CO and COR will review report
C.51
Hazardous Waste Collection and Disposal
The contractor is in compliance with all environmental regulations. Hazardous waste is disposed of properly, safely and quickly.
Performance as outlined with 0 Defects.
Periodic Inspection - Review of performed work by COR or designee.
C.51.1
Hazardous Waste Collection and Disposal Plan
Plan is timely, accurate, complete and provide the required information.
100% of the plan is submitted to the COR within thirty (30) calendar days after the contract start date, and be maintained for the duration of the contract.
100% Inspection – CO and COR will review report
C.51.5
Hazardous Waste Disposal Reports
Reports are timely, accurate, complete and provide the required information. Reports are organized and accessible.
100% of the records are maintained for a period of three (3) years
Random Monitoring - Review of records by COR or designee.
C.55
Utility Labor Support
All requested utility tasks are performed in timely and acceptable manner. All with-in house moves are supported in a timely and satisfactory manner.
Performance as outlined with 2 Defects. Lot is the number of tasks performed during the month.
Random Monitoring - Review of records by COR or designee.
C.56
Conference/ Multipurpose Room Set-ups
All requested set-up and take down tasks are performed in a timely and acceptable manner.
Performance as outlined with 2 Defects. Lot is the number of tasks performed during the month.
Periodic Inspection - Review of performed work by COR or designee.
C.57
Holiday Decorations
All requested decoration set-up and take down tasks are performed in a timely and acceptable manner.
Performance as outlined with 1 Defects. Lot is the number of tasks performed during the month.
Periodic Inspection - Review of performed work by COR or designee.
C.73
Work Orders
Projects are completed within their schedule. The quality of the finished repair/ alteration meets or exceeds the criteria established in the Work Order. As-built drawings are professionally and completely revised. Additional performance standards will be specified in the Work Order.
Performance as outlined with 0 Defects.
100% Inspection – CO and COR will review report
C.76
Overall Responsibility
The contractor satisfactorily follows the requirements identified.
Performance as outlined with 0 Defects.
100% Inspection – CO and COR will review report
C.77
Contractor Transition
The contractor satisfactorily assumes full contact performance responsibility on the contract effective date. The contractor satisfactorily supports the phase out transition to the follow-on contractor.
Performance as outlined with 0 Defects.
Random Monitoring - Review of records by COR or designee.

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):

MonthlyQuarterlyAs needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):Meets Standards
Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

ATTACHMENT 3: CONTRACT DISCREPANCY REPORT (CDR)

DD Form 2772 (See Attachment)

J-09-19 (Ver. Jun 2014) image1.png

File details come from the government source that posted it. Updated .