amendment__06_Jan_2016.pdf

PDF 32 KB Posted

Attached to
NGB Facility Maintenance and Repair
Solicitation number
W9133L-16-R-0077
Issued by

About this file

SF33 Amendment

View the file

Other files

File Type Posted
Final_clarification_6_Jan_2016.pdf PDF
Revised_CLIN_Description_06_Jan_16.pdf PDF
SOLICITATION_W9133L-16-R-0077-0003-06_JAN_2016.pdf PDF
DC_Chapter_NECA_Local_26_IBEW.pdf PDF
Revised_Pricing_Spreadsheet_Section_J.12_04_Jan_16.xlsx XLSX spreadsheet
Clarification_W9133L-16-R-0077_Facility_Maintenance_ _Repair_04_Jan_2016.docx DOCX document
W9133L16R0077-05JAN2016.pdf PDF
Service_Call_History.xlsx XLSX spreadsheet
DC_NECA_ _Local_26_IBEW_Wireman_Agreement.pdf PDF
SECTION_J_Appendix_I__AHS_Map.pdf PDF
SECTION_J_Attachment_05 _DD_254.pdf PDF
SECTION_J_Attachment_14 _Wage_Determination_WD_05-2104_Rev-18_14_Jul_2015.docx DOCX document
SECTION_J_Attachment_06 _DD1532-1.pdf PDF
SECTION_J_Attachment__02 _Performance_Req_Summary.docx DOCX document
SECTION_J_Attachment_10 _Past_Performance_Questionnaire.docx DOCX document
SECTION_J_Attachment_07 _AF_3000.pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_09_Nov_15.xlsx XLSX spreadsheet
DD_2772_-_Contract_Discrepancy_Report.pdf PDF
SECTION_J_Appendix_V _Snow_and_Ice_Removal_Priority_Map.pdf PDF
SECTION_J_Attachment_09 _QASP.docx DOCX document
SECTION_J_Appendix_IV _CDRLs_Cover.docx DOCX document
SECTION_J_Appendix_II-A-F_Building_and_Structures_Equipment.docx DOCX document
SECTION_J_Attachment_06 _DD1532.pdf PDF
DD1423.pdf PDF
SECTION_J_Appendix_V _Snow_and_Ice_Removal_Cover.docx DOCX document
SECTION_J_Attachment_03 _A-C _Gov_Furnished_Equip.docx DOCX document
SECTION_J_Appendix_II_Equipment.docx DOCX document
W9133L-16-R-0077.pdf PDF
Clarification_30_Dec_15.xlsx XLSX spreadsheet
EGS_IBEW_Local_26_CBA_Multiple_Sites_(eff_7-1-13_thru_6-30-16).pdf PDF
Revised_Pricing_Spreadsheet_16-R-0077_Facility_Maintenance_ _Repair_30_Dec_2015.xlsx XLSX spreadsheet
PART_6_IDIQ_Unit_Price_Book_ _Software_30_Dec_15_.docx DOCX document
NGB_Arlington_VA_Questions_Final.pdf PDF
FMO_Response_to_NG_Clarfication.xlsx XLSX spreadsheet
W9133L-16-R-0077-00001.pdf PDF
EGS_IBEW_Local_26_CBA_Multiple_Sites_(eff_7-1-13_thru_6-30-16).pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_21_Dec_15.xlsx XLSX spreadsheet
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_16_Dec_15.xlsx XLSX spreadsheet
Attachment_14-ANG_Local_99_CBA_(1-1-15_thru_12-31-17).pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_08_Dec_15.xlsx XLSX spreadsheet
dd1423-1-A012.pdf PDF
dd1423-1-A013e.pdf PDF
dd1423-1-A013.pdf PDF
dd1423-1-A013d.pdf PDF
dd1423-1-A013b.pdf PDF
dd1423-1-A013f.pdf PDF
dd1423-1-A013c.pdf PDF
dd1423-1-A013a.pdf PDF
site_survey_orientation_info.pdf PDF
SECTION_J_Appendix_11 _Sample_Task_PWS.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. This amendment is issued to revise description of CLINs (CLIN 0004, CLIN 0007, CLIN 1003, CLIN 1006, CLIN 2003, CLIN 2006) to clarify the definition of Maintenance and Repair. B. Signed SF33 w ill be submitted w ith Volume IV Cost/Price. C. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jan-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9133L-16-R-0077

X 9B. DATED (SEE ITEM 11)

18-Nov-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jan-2016

CODE

NGB-ZC-AQ - W9133L

111 SOUTH GEORGE MASON DR

BLDG. 2, 4TH FLOOR

ARLINGTON VA 22204-1373

W9133L 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9133L-16-R-0077

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0004

The CLIN extended description Includes – regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for electrical; refrigeration: heating, ventilation, & air conditioning; lighting; drainage; plumbing and sewage systems in accordance with the PWS. has been added.

CLIN 0007

The CLIN extended description has changed from:

Includes regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for minor repairs of electrical; refrigeration: heating, ventilation, & air conditioning; lighting;

drainage; plumbing and sewage systems in accordance with PWS.Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators; building automation systems; hardware; doors; garages; pavement; electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work in accordance with PWS.

To:

Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces;

repairing and replacing generators; elevators; building automation systems; hardware; doors; garages; pavement;

electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems;

replacing tile and carpeting; and similar types of work in accordance with PWS..

CLIN 1003

maintenance tasks and emergency response and service calls for electrical; refrigeration: heating, ventilation, & air conditioning; lighting; drainage; plumbing and sewage systems in accordance with the PWS. has been added.

CLIN 1006

Includes regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for minor repairs of electrical; refrigeration: heating, ventilation, & air conditioning; lighting;

drainage; plumbing and sewage systems in accordance with PWS.Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators; building automation systems; hardware; doors; garages; pavement; electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work in accordance with PWS.

To:

Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces;

repairing and replacing generators; elevators; building automation systems; hardware; doors; garages; pavement;

electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems;

CLIN 2003

maintenance tasks and emergency response and service calls for electrical; refrigeration: heating, ventilation, & air conditioning; lighting; drainage; plumbing and sewage systems in accordance with the PWS. has been added.

CLIN 2006

Includes regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for minor repairs of electrical; refrigeration: heating, ventilation, & air conditioning; lighting;

drainage; plumbing and sewage systems in accordance with PWS.Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators; building automation systems; hardware; doors; garages; pavement; electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work in accordance with PWS.

To:

Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces;

repairing and replacing generators; elevators; building automation systems; hardware; doors; garages; pavement;

electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems;

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

REVISED CLIN DESCRIPTION

1. CLIN 0004 – MAINTENANCE – Real Property Maintenance (Base Year) Includes – regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for electrical; refrigeration: heating, ventilation, & air conditioning; lighting; drainage; plumbing and sewage systems in accordance with the

PWS. (DESCRIPTION ADDED)

2. CLIN 0007 – REPAIR – Real Property (Base year)

Includes regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for minor repairs of electrical;

refrigeration: heating, ventilation, & air conditioning; lighting; drainage;

plumbing and sewage systems in accordance with PWS.

Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators; building automation systems; hardware; doors;

garages; pavement; electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work in accordance with PWS.

(DESCRIPTION CHANGED TO FOLLOWING – Deleted the 1st parargraph) Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators;

building automation systems; hardware; doors; garages; pavement; electrical; plumbing;

heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work.

3. CLIN 1003 – MAINTENANCE – Real Property Maintenance (Option Year 1)

Includes – regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for electrical; refrigeration: heating, ventilation, & air conditioning; lighting; drainage; plumbing and sewage systems in accordance with the PWS. (DESCRIPTION ADDED)

4. CLIN 1006 – REPAIR – Real Property (Option Year 1) tasks and emergency response and service calls for minor repairs of electrical;

refrigeration: heating, ventilation, & air conditioning; lighting; drainage;

plumbing and sewage systems in accordance with PWS.

Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators; building automation systems; hardware; doors;

garages; pavement; electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work in accordance with PWS.

(DESCRIPTION CHANGED TO FOLLOWING – Deleted the 1st parargraph) Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators;

building automation systems; hardware; doors; garages; pavement; electrical; plumbing;

5. CLIN 2003 – MAINTENANCE – Real Property Maintenance (Option Year 2)

Includes – regularly scheduled adjustments and inspections, preventive maintenance tasks and emergency response and service calls for electrical; refrigeration: heating, ventilation, & air conditioning; lighting; drainage; plumbing and sewage systems in accordance with the PWS. (DESCRIPTION ADDED)

6. CLIN 2006 – REPAIR – Real Property (Option Year 2) tasks and emergency response and service calls for minor repairs of electrical;

refrigeration: heating, ventilation, & air conditioning; lighting; drainage;

plumbing and sewage systems in accordance with PWS.

Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators; building automation systems; hardware; doors;

garages; pavement; electrical; plumbing; heating, ventilation, and air conditioning; lighting; drainage; plumbing and sewage systems; replacing tile and carpeting; and similar types of work in accordance with PWS.

(DESCRIPTION CHANGED TO FOLLOWING – Deleted the 1st parargraph) Includes – costs of major repairs or replacement of facility components that are expected to occur periodically throughout the expected service life. This work includes regular roof replacement; refinishing wall surfaces; repairing and replacing generators; elevators;

building automation systems; hardware; doors; garages; pavement; electrical; plumbing;

(End of Summary of Changes)

File details come from the government source that posted it. Updated .