Clarification_30_Dec_15.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
NGB Facility Maintenance and Repair
Solicitation number
W9133L-16-R-0077
Issued by

About this file

Clarification responds from the government C1 C2 and C3.

View the file

Other files

File Type Posted
amendment__06_Jan_2016.pdf PDF
Final_clarification_6_Jan_2016.pdf PDF
Revised_CLIN_Description_06_Jan_16.pdf PDF
SOLICITATION_W9133L-16-R-0077-0003-06_JAN_2016.pdf PDF
DC_Chapter_NECA_Local_26_IBEW.pdf PDF
Revised_Pricing_Spreadsheet_Section_J.12_04_Jan_16.xlsx XLSX spreadsheet
Clarification_W9133L-16-R-0077_Facility_Maintenance_ _Repair_04_Jan_2016.docx DOCX document
W9133L16R0077-05JAN2016.pdf PDF
Service_Call_History.xlsx XLSX spreadsheet
DC_NECA_ _Local_26_IBEW_Wireman_Agreement.pdf PDF
SECTION_J_Appendix_I__AHS_Map.pdf PDF
SECTION_J_Attachment_05 _DD_254.pdf PDF
SECTION_J_Attachment_14 _Wage_Determination_WD_05-2104_Rev-18_14_Jul_2015.docx DOCX document
SECTION_J_Attachment_06 _DD1532-1.pdf PDF
SECTION_J_Attachment__02 _Performance_Req_Summary.docx DOCX document
SECTION_J_Attachment_10 _Past_Performance_Questionnaire.docx DOCX document
SECTION_J_Attachment_07 _AF_3000.pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_09_Nov_15.xlsx XLSX spreadsheet
DD_2772_-_Contract_Discrepancy_Report.pdf PDF
SECTION_J_Appendix_V _Snow_and_Ice_Removal_Priority_Map.pdf PDF
SECTION_J_Attachment_09 _QASP.docx DOCX document
SECTION_J_Appendix_IV _CDRLs_Cover.docx DOCX document
SECTION_J_Appendix_II-A-F_Building_and_Structures_Equipment.docx DOCX document
SECTION_J_Attachment_06 _DD1532.pdf PDF
DD1423.pdf PDF
SECTION_J_Appendix_V _Snow_and_Ice_Removal_Cover.docx DOCX document
SECTION_J_Attachment_03 _A-C _Gov_Furnished_Equip.docx DOCX document
SECTION_J_Appendix_II_Equipment.docx DOCX document
W9133L-16-R-0077.pdf PDF
EGS_IBEW_Local_26_CBA_Multiple_Sites_(eff_7-1-13_thru_6-30-16).pdf PDF
Revised_Pricing_Spreadsheet_16-R-0077_Facility_Maintenance_ _Repair_30_Dec_2015.xlsx XLSX spreadsheet
PART_6_IDIQ_Unit_Price_Book_ _Software_30_Dec_15_.docx DOCX document
NGB_Arlington_VA_Questions_Final.pdf PDF
FMO_Response_to_NG_Clarfication.xlsx XLSX spreadsheet
W9133L-16-R-0077-00001.pdf PDF
EGS_IBEW_Local_26_CBA_Multiple_Sites_(eff_7-1-13_thru_6-30-16).pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_21_Dec_15.xlsx XLSX spreadsheet
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_16_Dec_15.xlsx XLSX spreadsheet
Attachment_14-ANG_Local_99_CBA_(1-1-15_thru_12-31-17).pdf PDF
Revised_SECTION_J_Attachment_12 _Proposal_Pricing_Spreadsheet_08_Dec_15.xlsx XLSX spreadsheet
dd1423-1-A012.pdf PDF
dd1423-1-A013e.pdf PDF
dd1423-1-A013.pdf PDF
dd1423-1-A013d.pdf PDF
dd1423-1-A013b.pdf PDF
dd1423-1-A013f.pdf PDF
dd1423-1-A013c.pdf PDF
dd1423-1-A013a.pdf PDF
site_survey_orientation_info.pdf PDF
SECTION_J_Appendix_11 _Sample_Task_PWS.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1

No.Reference RFP Section ___, Paragraph(s) ____, Page(s) ____.QuestionGov AnswerClarification QuestionGovt Clarification AnswerGovt Clarification Answer Date
Solicitation
7 - Dec 24 releaseSection C.1.4.11.6.i

Paragraph 1

Page 31The 2-6 week wait times – are we allowed onboard and put to work an employee as long as they are escorted?Yes. Not in restricted areas.Can these personnel be un-escorted as long as it is not in a restricted area?Yes.29-Dec
8
- Dec 24 releaseSection C.1.4.11.7

Paragraph 1

Page 33The subcontractors that have to take this training is it full time subcontractors? How about landscapers, snow removal, pest control ect. How many hours does the training take?Yes, all need to take this training. Timing is unknown.This question deals with the Anti-terrorism (AT) Level I Training requirement - In reference to your response "all need to take this training" - We can understand all personnel who are assigned on a regular basis to the facility, however, our concern is with respect to personnel of vendors who would normally be on-site only when escorted, and who may only ever visit the site once for a service call. Please clarify whether or not, absolutely everybody (who ever services the facility, no matter if that is only one time), must take this training. Additionally, the Government should have a metric on how long it takes personnel to complete this training, please provide the average completion time so that this can be appropriately factored into pricing.Personnel assigned on site are subject to this training. Sub-Contactors not assigned to this site are not subject to this training. Training typically takes one (1) hour to complete.29-Dec
9
- Dec 24 releaseSection C.1.4.11.10

Paragraph 1 Page 34 The subcontractors that have to take this training is it full time subcontractors? How about landscapers, snow removal, pest control ect. How many hours does the training take? Yes, all need to take this training. Timing is unknown. This question deals with the iWatch Training requirement - In reference to your response "all need to take this training" - We can understand all personnel who are assigned on a regular basis to the facility, however, our concern is with respect to personnel of vendors who would normally be on-site only when escorted, and who may only ever visit the site once for a service call. Please clarify whether or not, absolutely everybody (who ever services the facility, no matter if that is only one time), must take this training. Also please see our clarification request for questions 12 and 13 below.

Further, the RFP states that "training standards provided by the requiring activity

ATO" - Should offerors assume that the "training standards" consists of the current briefing used for the local iWatch program, or should offerors assume that they will create a completely new iWatch briefing program for its personnel?Personnel assigned on site are subject to this training. Sub-Contactors not assigned to this site are not subject to this training. Training typically takes one (1) hour to complete.29-Dec
10
- Dec 24 releaseSection C.1.4.11.12

Paragraph 3

Page 34The subcontractors that have to take this training is it full time subcontractors? How about landscapers, snow removal, pest control ect. How many hours does the training take?Yes, all need to take this training. Timing is unknown.This question deals with the Information Assurance (IA)/Information Technology (IT) Training requirement - In reference to your response "all need to take this training" - the RFP states that this is a requirement for all personnel prior to being granted systems or network access. Our concern is that the Government's answer seems to include all personnel who service the site. Please confirm that this training is only required for personnel who actually require systems / network access at NGB. Additionally, the Government should have a metric on how long it takes personnel to complete this training, please provide the average completion time so that this can be appropriately factored into pricing.Personnel assigned on site are subject to this training. Sub-Contactors not assigned to this site are not subject to this training. Training typically takes one (1) hour to complete.29-Dec
11
- Dec 24 releaseSection C.1.4.11.13

Paragraph 4

Page 34The subcontractors that have to take this training is it full time subcontractors? How many hours does the training take?Yes, all need to take this training. Timing is unknown.This question deals with the Level I OPSEC Awareness Training requirement - In reference to your response "all need to take this training" - We can understand all personnel who are assigned on a regular basis to the facility, however, our concern is with respect to personnel of vendors who would normally be on-site only when escorted, and who may only ever visit the site once for a service call. Please clarify whether or not, absolutely everybody (who ever services the facility, no matter if that is only one time), must take this training. Additionally, the Government should have a metric on how long it takes personnel to complete this training, please provide the average completion time so that this can be appropriately factored into pricing.Personnel assigned on site are subject to this training. Sub-Contactors not assigned to this site are not subject to this training. Training typically takes one (1) hour to complete.29-Dec
19
- Dec 24 releaseSection C.4.6.D

Paragraph 5

Page 44What type of communication equipment is allowed in the building especially in secure areas? Does the Gov have a special radio or band for the building and secure areas?No communication equipment is allowed in the secure areas.What has been approved in the past, what is being used by the incumbent contractor now? We need to understand if there are expectations for the use of any existing bands used at the NGB so that we can appropriately price communications devices. Are radios currently used by the incumbent, or cell phones for operations in un-secured areas?Cellular telephones are used by the incumbant contractor in unsecured areas only. No the government has not designated a radio band for use in any area for the maintenance contractor.29-Dec
21
- Dec 24 releaseSection C.4.8

Paragraph 4

Page 45Which radios and how many are currently being used?If the contractor requests to use radios they must be approved by the COR.See the question above - what is the incumbent using now, e.g. what has been previously approved by the COR.No radios are currently in use by the incumbant contractor.29-Dec
27
- Dec 24 releaseSection C.5.4.2.1

Paragraph 2 Page 49 Will offerors lose points if their PM doesn’t have the non-mandatory FMA or BOMA designation but states they will have it in the first 12 months of the contract? Does eligible for clearance mean they don’t need to have an active clearance at this time but have no issues getting one? No, they do not need an active one but must be able to get one. The Government answered only part of this question. Offeror still seeks a response to the following:

Will offerors lose points if their PM doesn’t have the non-mandatory FMA or BOMA designation but states they will have it in the first 12 months of the contract?No, the offeror will not lose points if their PM doesn’t have the non-mandatory FMA or BOMA designation but states they will have it in the first 12 months of the contract.29-Dec
28
- Dec 24 releaseSection C.5.4.3.1

Paragraph 1 Page 50 Will offers lose points if their Asst. PM doesn’t have the non-mandatory FMA or BOMA designation but states they will have it in the first 12 months of the contract? Does eligible for clearance mean they don’t need to have an active clearance at this time but have no issues getting one? No, they do not need an active one but must be able to get one. The Government answered only part of this question. Offeror still seeks a response to the following:

Will offers lose points if their Asst. PM doesn’t have the non-mandatory FMA or BOMA designation but states they will have it in the first 12 months of the contract?No, the offeror will not lose points if their Assistant PM doesn’t have the non-mandatory FMA or BOMA designation but states they will have it in the first 12 months of the contract.29-Dec
40
- Dec 24 releaseSection C.5.17.1.5

Paragraph 6

Page 58Can we put the debris in the dumpster or does the current incumbent provide their own dumpster?Yes, they can put debris in the dumpsterPlease clarify who is to provide the dumpster, the contractor or the NGB?NGB provides the dumpster.29-Dec
45
- Dec 24 releaseSection C.5.18.6

Paragraph 7

Page 60Is it a requirement to get this permit since NG has never had this permit?Yes it is a requirementC.5.18.6.1.1 - described a broad array of responsibilities, then simply states "AHS currently has no EPA or Commonwealth of Virginia Permit", which is vague. First - What EPA or Commonwealth of Virginia Permit does the AHS not possess for which this is referenced? Is this a Hazardous Waste Disposal Permit? - Offeror is requesting that the Government be specific about what permits it requires the contractor to secure on behalf of the facility. Please clarify.The permitting requirements can be found in the CDRLs: A015 emission certification, A013 envisronmental management support plan A019 storm water inspection and compliance management plan29-Dec
46
- Dec 24 releaseSection C.5.18.6.1.1

Paragraph 1

Page 61Is there asbestos in the building since they are so new?There could be.Will be Government please clarify whether or not Asbestos is known to exist in the facilities. The Government either knows there is, or knows there is not, or does not know at all. Please specify which.The government does not know of any asbestos on the site. The discovery of asbestos would be an unforseen site condition.29-Dec
53
- Dec 24 releaseSection C.5.27.3

Paragraph 1

Page 66The outages could be numerous on a day when we are performing PM on a AHU or AC unit. Is this equipment only for a power outage or something that affects a floor or more?All outages shall be submitted to the COR for approval no later than 72 hours in advance.Please define an outage - in our example, we are inspecting or servicing an air handler unit, but HVAC service is maintained throughout the facility, is an offline air handler considered an outage in this scenario? Note that there are many examples of when specific pieces of equipment may be offline, but the service the building requires is online.All equipment off line is considered an outage and must be reported in the time period indicated.29-Dec
58
- Dec 24 releaseSection C.5.30.4

Paragraph 4

Page 68Please confirm that the 10 days rule applies.What 10 day rule are you referring to?4.7.3 of the PWS states that "The contractor shall retain the parts replaced, for at least ten (10) calendar days after completion of the job and make these parts readily available for inspection by the government upon request." - Our question is whether the requirement at 4.7.3 applies to the requirement at 5.40.7. Does it?Yes, 4.7.3 applies to 5.40.7.29-Dec
82
- Dec 24 releaseSection C.5.40.7

Paragraph 6

Page 94Does the $2,500 threshold apply to repairs? Can an afterhours walk-thru of the kitchen be given, as it wasn’t given on the site tour?Yes, the $2,500 applies to repairs; no a walk-thru will not be given.In reference to the site-visit, the RFP clearly states that "This will be the Offeror's pre-proposal opportunity to evaluate and examine everything required to address the requirements of the PWS and have the Government technical team provide clarification of any requirements the Offeror thinks need to be clarified. - This offeror Thinks that it is essential to see the cafeteria equipment and its condition as the offeror is obligated to make repairs under $2,500, and without the opportunity to see the equipment, cannot properly price this element. We are requesting an opportunity to see the cafeteria environment and its equipment for which we will be responsible.The offeror will have to used Section J, Attachment 1, Appendix II-F and the knowledge that the equipment is four (4) years old to base pricing on.29-Dec
101
- Dec 24 releaseSection C.5.74

Paragraph 5

Page 125How many users do we need for the UPB & software? Does Gov need access? If actual cost is more than 4clicks estimate does the contractor allowed to do a change order for actual cost?The number of users is up to the contractor. The Government needs access for 2 individuals. Change orders will not be allowed for actual costs.What version of 4Clicks is currently in use? Further, with respect to changes - what is the Government's process for when unforeseen circumstances beyond the contractors control are the reason for increased costs - for example, a discovery made during the repair that makes the job larger than that specified in the task order?Currently, the government is not using 4Clicks. The contractor should notify the Contracting Officer in writing within 24 hours of the discovery ofan unforseen site condition.29-Dec
107
- Dec 24 releaseSection L.3.4.2

Paragraph 2

Page 227The files require say to submit in native format but then says only PDF which one is it? Please confirm you also want the proposal emailed as the size may be too large for email.PDF format will be acceptable format.The Government is requesting Hard Copies as well as CD-ROM submissions for electronic files. Please answer if you want the proposals also emailed- if so, what are your size restrictions? Finally, do you also want electronic proposals submitted through FBO.gov?The government wants submission through the United States Postal System and e-mail. The size restriction for e-mail attachment is 17 Megabytes. Do not submit through FBO.gov.29-Dec
115
- Dec 24 releaseSection J attachment 12

Paragraph (n/a – XLSX)

Page (n/a – spreadsheet)Is there a sheet for the fixed price portion? What is the proposed hourly count we are to put down, as isn’t this to be used for additional work line items?Please show your firm’s approach toward this requirementThe Government's answer is vague and does not answer the question. The Government has issued a price spreadsheet and would like a price buildup with supporting documentation. Previously the Government has stated that the J.12 is for the IDIQ portion of the contract. We are confused by the reference to the CLIN's on the J.12, because it conflicts with the prior answer that J.12 is for IDIQ (reference Q&A release of 4 December - Question 196 - Government's response is "Section B is for Fixed Priced; J.12 is IDIQ" - If, as stated, J.12 is for IDIQ, why does J.12 try to total out the CLINS, this is confusing, and it is not possible to calculate the CLINS with J.12 because only one labor category can be added, there are no entries for ODC's, materials, etc, that are all part of the FFP build up, further, J.12 requests hours by labor category, which is not possible to forecast on the basis of task orders that are yet to be specified.The firm fixed price section includes CLINs 1 through 4. The IDIQ protion includes CLINs 5 through 7.29-Dec
201
- Dec 4th releaseReference PWS 5.75 COEFFICIENTS; 5.75.1 PREPRICED COEFFICIENT. PWS states “The

Contractor shall develop and bid a location-specific multiplier(s)….5.75.2 NON-PREPRICED COEFFICIENT. The Contractor shall develop and bid a multiplier to be applied against validated direct-price quotations for work not covered by the contract UPB.” Question: Where are bidders to

include the referenced coefficients?Contractor shall submit a coefficient in the format X.XXThe Government's response does not clarify where offerors should provide this coefficient, in price volume narrative? In technical or management plan narrative? See also below:The coefficient will be included in both the price volume narrative and J.12 will be revised to include the coefficient. The coefficient is applicable to CLINs 5 through 7 only.29-Dec
201
- Dec 21st releaseReference PWS 5.75 COEFFICIENTS; 5.75.1 PREPRICED COEFFICIENT. PWS states �the Contractor shall develop and bid a location-specific multiplier(s)�c.5.75.2 NON-PREPRICED COEFFICIENT. The Contractor shall develop and bid a multiplier to be applied against validated direct-price quotations for work not covered by the contract UPB.�h Question: Where are bidders to include the referenced coefficients?Contractor shall submit a coefficient in the format X.XXA clarification request was previously submitted and answered on the 21st - the question: "On J.12 there is no line item for coefficient % please include one for each period." Government's response was "CONTRACTING INPUT NEEDED - A Line item for the coefficient needs to be inserted"
What is the status of this insertion and when will a revised J.12 be released with the coefficient line item?The coefficient will be included in both the price volume narrative and J.12 will be revised to include the coefficient. The coefficient is applicable to CLINs 5 through 7 only.29-Dec
Page Count Instructions ConflictL.3.3 / L.4The table in L.3.3 specifies that Volume I - Technical Approach is limited to 90 pages, with a footnote that states "*Manpower charts and the Facility Maintenance Plan are excluded from the page count" - However, the instructions at L.4 state that "The Technical Approach shall be comprised of the Facilities Maintenance Plan", which based on the language of L.3.3 means that the Technical Approach (which is the Facilities Maintenance Plan) is excluded from page count, and therefore, Volume I has no page count limit as written per the instructions. Please clarify this discrepency.Volume 1 has no page count restriction.29-Dec

C2

Q #RFP QUESTIONS (Received Dec 29 2015)GOV'T RESPONSE (Dec 30 2015)
1Question 93: Please clarify if pricing for the bulbs and annual flowers should be included in the FFP or if these items shall be reimbursed? The cost will mostly likely exceed the $2,500.00 threshold.The cost of the bulbs will be part of the firm fixed price eventhough it exceeds the $2,500 threshold.
2Should any materials be included in the FFP if the price of the materials are expected to exceed $2,500.00 (examples mulch, fertilizer, chemicals for weed control turf)?Yes
3Question 95: Tree maintenance – please clarify what pricing you would like included in the FFP portion of the contract? What is determined to be ‘billable’ over $2,500.00 – is this an estimate for one tree?All tree maintenance should be included in the firm fixed price. The replacement of a trees would be considered maintenance. It would be considererd a repair.
4Question 97: Please clarify if pricing for the replacement of the rotations of interior plants as described in the PWS should be included in the FFP or if these items shall be reimbursed? The cost will mostly likely exceed the $2,500.00 threshold.Yes, the replacement of rotational plants are part of the firm fixed price.
5Question 98: Please clarify how the snow contractor is to respond for ice/icy conditions where there is no snow accumulation?Contractor is expected to respond to snow and ice conditions as part of the firm fisxed price.
6Question 98: Please clarify how the snow contractor is to respond if services are requested where the snow is less than 1.5”.Contractor is expected to respond to snow accumulations as part of the firm fisxed price.
7Question 98: The chemical application for sidewalks, parking decks, and roadways will most likely exceed $2,500.00. Please clarify, how the contractor will be reimbursed for the snow chemicals. Should the cost of snow chemicals be included in the FFP.Yes, the cost of chemicals are part of the firm fixed price.
8Pricing Clarification. Please clarify what is the difference between the MAINTENANCE – GROUNDS MAINTENANCE item vs. the REPAIR GROUNDS MAINTENANCE item. What specific items do you consider maintenance vs. repair?MAINTENANCE – GROUNDS MAINTENANCE is the routine upkeep of exisiting landscaped areas. REPAIR GROUNDS MAINTENANCE is the replacement of landscape plantings and trees.
9Same question as above for snow MAINTENANCE vs. REPAIR.Snow maintenance is clearing of snow and ice treatment. Snow repair is the hauling of snow from the site.

C3

Q #RFPQUESTIONSDATE RCVDGOV'TRESPONSEClarification RequestedGOV't clarificationNew Clarification Requested by Contractor (12-23-2015)Government Clarification (30 December 2015)
102Reference RFP Section B, CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE. In regards to the Minimum and Maximum quantity and order value for Delivery/Task Orders issued under CLINs, is the missing information provided by the Government to the Contractor? If not, please explain how the bidder would complete this table?3�-Dec�-15What is your proposed amount and please add optimal proposed amount from your firm.The question doesn't make sense as all section B has on it is Maximum. Please confirm that Section B is for our fixed price portion of the work and attachment J 12 is for IDIQ rates and doesn't have anything to do with Schedule B FFP rates.Section B is CLIN structures and Attachment J 12 is pricing spreadsheet.This response is still unclear. There are several fundamental, structural areas of the pricing that we are requesting be better clarified. Please see new question N1 below.J.12 Pricing Spreadsheet has been revised.
194Reference PWS Section L, L.7.2. PWS states �the proposal shall set forth a summary of the total prices that reflect CLIN structure in Section B. In order to maintain a minimum level of commonality between proposals, each offerors is required to complete (in entirety) three (3) summary spreadsheets provided in Section J, Attachment 12. The summary spreadsheets shall be provided for the base effort and each option year. All documentation furnished to support the summaries are to be provided in a format chosen by the offerors that is easily traceable to the summary sheets.�h Attachment 12 only shows columns for Proposed Labor Category, Proposed Rate, Proposed hours, and CLIN total for each CLIN listed in Attachment 12. We assume bidders are to add rows to accommodate multiple positions under a specific CLIN. However there is no indication where bidders would include other direct cost such as materials, tools, equipment, Miscellaneous ODC�fs, G&A, Fee, etc. Question: Where are bidders to include other than labor cost such as materials, tools equipment etc. in attachment 12? Question: Attachment 12 does not include a CLIN for 0002 MAINTENANCE-PUBLIC WORKS (BASE YR) FFP. Will the government please amend the Attachment 12 to include the CLIN accordingly?4�-Dec�-15We are requesting based on FFP contract requirement.Is attachment J 12 just requiring Hourly rates for IDIQ projects over $2,500 and all of the FFP is to be included on the schedule B sheet in the RFP?This should address Preventive Maintenance and Operations (essentially the Firm Fixed Price Portion of the effort). It would not apply to those efforts where a Unit Price Book would be used for repairs.This response is still unclear. There are several fundamental, structural areas of the pricing that we are requesting be better clarified. Please see new question N1 below.J.12 Pricing Spreadsheet has been revised.
196Reference PWS Section B Supplies or Services and Prices. CLIN and SubCLIN for Repair Services and Attachment 12 for the same CLINs and SubCLINs suggest the contract is to include pricing for undefined Repairs. Question: Please clarify how bidders are to propose labor and labor related Cost for Repairs for each CLIN and SubCLIN when the government has not provide any workload data for this services for each CLIN and Sub CLIN?4�-Dec�-15Sample task Attachment 11 is uploaded for sample repair and maintenance requirement.Is section B for just fixed price work under $2,5000 and J.12 for IDIQ rates for projects over $2,500?Section B is for Fixed Priced; J.12 is IDIQThis response is still unclear. There are several fundamental, structural areas of the pricing that we are requesting be better clarified. Please see new question N1 below.J.12 Pricing Spreadsheet has been revised.
Please ClarifyVol III is past performance and all that is required in section L is the past performance questionnaire for our customers we don’t have the completed questionnaire so what does the Government want to see please update section L based on what you want to see?The answer was not provided. Please confirm that all the Government intends to receive and evaluate for Past Performance is the returned surveys and POC list and nothing else. If the Government is expecting narrative or other information in response to this evaluation factor, please inform offeror's of such (Reference L.6)Please refer M.4.3. Factor 3 - Past Performance Factor.
N1 (New Question 1)Question N1 consolidates each of our questions related to pricing in order to receive clarification with respect to the separate elements of pricing submission. This is a multi-part question.

Background: Based on the Government's responses, we interpret that Schedule B, which is the CLIN structure represents the offerors price for the FFP portion of the contract, we further interperet that the J.12 pricing spreadsheet is limited to the additional IDIQ work for the contract (work that is seperate from the FFP and task order based). We request the following clarifications:

1. Reference Attachment J.12 - Confirm that J.12 covers only additional IDIQ work.

2. Reference Attachment J.12 - Assuming that J.12 covers only additional IDIQ work, e.g. Unit Price Book priced task orders, then why is the Government requesting offerors to provide Proposed Labor Hours? Hours cannot be known at this time for task orders that will be issued in the future. Please clarify.

3. There is confusion with respect to Schedule B. The term Maintenance, and the Term Repair are not defined in the RFP - further, in most locations the term is used as a combined term, for example; Maintenance and Repair. Specifically we request clarification on what is the difference between, and what is to be included in the following:

a. What is the differece between CLIN 2001AA Maintenance-Ground Maintenance Vs. CLIN 2004AA Repair-Ground Maintenance? Based on the PWS, what is the distinct scope of each to be included in the FFP?

b. What is the differece between CLIN 2001AB Maintenance-Pest Management Vs. CLIN 2004AB Repair-Pest Management? Based on the PWS, what is the distinct scope of each to be included in the FFP?

c. What is the differece between CLIN 2001AC Maintenance-Removal of Snow/Ice/Sand and Street Sweeping Vs. CLIN 2004AC Repair-Removal of Snow/Ice/Sand and Street Sweeping? Based on the PWS, what is the distinct scope of each to be included in the FFP?This is a new question set1. & 2. J.12 Covers both IDIQ and Firm Fixed Price. See revised Pricing Spreadsheet. 3a. MAINTENANCE – GROUNDS MAINTENANCE is the routine upkeep of exisiting landscaped areas. REPAIR GROUNDS MAINTENANCE is the replacement of landscape plantings and trees. 3b. MAINTENANCE – PEST MANAGEMENT is the routine treatment of areas for pest control. REPAIR PEST MANAGEMENT is the treatment of unforseen infestations. 3c. Snow maintenance is clearing of snow and ice treatment. Snow repair is the hauling of snow from the site.
N1 (New Question 1) Continued4. What is the relevance of the Sample Task Order to the preparation of offerors submissions. There are no instructions for the purpose of the Task Order in either Section L, Section M, or any amendments. Is the Sample Task Order for information only, or, does the Government intend another purpose for releasing the Sample Task Order? If for another purpose, the Government has not yet communicated that purpose to offerors. The Sample Task Order is referenced only two times in the RFP, the first instance is on the list of attachments, and the second instance is simply the title line of the attachment.This is a sample only to provide the offeror an idea of what type of work they will do.
N1 (New Question 1) Continued5. In section L.7.2, the Government states "each offeror is required to complete (in entirety) three (3) summary spreadsheets provided in Section J, Attachment 12. The summary spreadsheets shall be provided for the base effort and each

option year." This question relates to the Base Year - because in response to Question 196, the Government states "Section B is for Fixed Priced; J.12 is IDIQ" (reference also our question N1.1 and N1.2 above), as such, we are requesting the following clarifications:

a. J.12, is, or is not strictly for IDIQ work, and not for the FFP portion of the offer.

b. If it is the Government's intent that FFP work is summarized using J.12, then how will the Government reconcile the different amounts listed for each CLIN in J.12 vs. the price offerors enter in Schedule B - as they will naturally be different. This is because J.12 does not have fields for ODC's, Materials, and vendors which will all be calculated into the CLIN prices offered to the Government.

c. On the J.12 spreadsheet, columns D, E, and F, are denoted with an "*", yet there is no explanation of the denotation - Can the Government please clarify what the denote connotes?

d. Finally - Does the Government realize that on J.12, offerors can only enter one labor category and one rate per CLIN, but that based on the PWS these CLINs require the services of multiple labor categories? What is the Government's guidance to offerors so that they can overcome this restriction the Government built into the J.12 sheet? J.12 Pricing Spreadsheet has been revised.

File details come from the government source that posted it. Updated .