Amendment_0005.pdf

PDF 425 KB Posted

Attached to
Renovate Building 252 for Logistical Readiness (LRS) at Pease ANGB, NH
Solicitation number
W912WJ19B0007
Issued by

About this file

Amendment 0005

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to answ er additional RFIs. The specifications are updated. The bid opening date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19B0007

X 9B. DATED (SEE ITEM 11)

13-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Apr-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ19B0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

AMENDMENT 0005 OF SOLICIATION

1.1 CHANGES TO SPECIFICATIONS

1.1.1 Narrative Changes

1. Delete Specification Section 07 21 16, paragraph 3.3.1.4 Insulation

Blanket with Affixed Vapor Retarder and paragraph 3.3.2 Installation of Separate Vapor Retarder in its entirety.

2. Replace the second to last sentence of specification Section 31 00 00 paragraph 3.2.2 Dewatering with the following language, “See section 01 57 20 Environmental Protection and Management.”

3. Delete reference to “Minimum Antiterrorism Performance Criteria” of Spec section 08 51 13 paragraph 1.4.3 Design Data Requirements.

4. Delete Specification Section 07 22 00 paragraph 2.3.1 in its entirety.

End of Amendment 0005

Requests for Information

Amendment 0005

1. Spec section 07 22 00 paragraph 2.3.1 calls for ½” gyp cover to act as thermal barrier.

Drawings do not show. Please clarify.

Response: Section 2.3.1 of 07 22 00 is not applicable and is deleted.

2. Please explain what the scope of Bid Schedule Optional Item 006 Fire Alarm Contingency is.

All references in plans and specifications appear to indicate that complete replacement of fire alarm system is part of base bid, thus making it unclear what should be included in the Option 6 Fire Alarm Contingency price.

Response: Spec section 01 22 00, Price and Payment Procedures, Option Bid Item 0006 indicates that the Fire Alarm Contingency information is shown on FA-101 and ED-101.

Refer to Keyed Note #7 on FA-101 and Keyed Note #4 on ED-101.

(End of Summary of Changes)

File details come from the government source that posted it.