AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to answ er additional RFIs. The Specifications and Draw ings are updated, Clause 52.211-6 is added to the contract, and a note is added to the bid schedule. The bid opening date/time remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19B0007
X 9B. DATED (SEE ITEM 11)
13-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2019
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ19B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following have been modified:
BID SCHEDULE
Refer to Section 01 22 00 Price and Payment Procedures.
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
BASE BID
0001 Building 252 Renovation 1 Job Job $
0002 Communications System 1 Job Job $
0003 Advantor Fiber 1 Job Job $
0004 Contaminated Ground Water
0004A First 5000 Gallons 5000 Gallons $ $
0004B Over 5000 Gallons 200 Gallons $ $
TOTAL ESTIMATED AMOUNT, BASE BID ITEMS $
OPTIONAL ITEMS
0005 Metal Locker 1 Job Job $
0006 Fire Alarm Contingency 1 Job Job $
TOTAL ESTIMATED AMOUNT, BASE BID AND OPTIONAL ITEMS $
Note 1: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0006 including the Base Bid Items and the Optional Items. The minimum work awarded will be the Base Bid work.
Note 2: All work shall be completed within the time period specified in Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart "COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10."
Note 3: Line Item Numbers 0005 and 0006 above are Optional Line Items that may, at the option of the Government, be exercised at any time within 120 calendar days after receipt by the Contractor of the Notice to Proceed. If one or more Optional Line Items are awarded, no extension of time will be added to the contract period of performance.
Note 4: Item Number 0004 are subdivided into two estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of the total price of its sub-items.
Note 5: As per FAR 4.1102(a), all Offerors MUST be registered and active in SAM.GOV at the time a bid is submitted. Offerors not registered and active in SAM at time of submission will be rejected.
Note 6: The Bidder’s Point of Contact (POC) email is as follows:
Note 7: Per FAR Clause 52.211-6, all of the Brand-Name or Equal salient features can be found in the specifications.
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
AMENDMENT 0004 OF SOLICIATION
1.1 CHANGES TO SPECIFICATIONS
1.1.1 Narrative Changes
1. Delete Specification Section 07 21 16, paragraph 3.3.1.4 Insulation
Blanket with Affixed Vapor Retarder and paragraph 3.3.2 Installation of Separate Vapor Retarder in its entirety.
2. Replace the second to last sentence of specification Section 31 00 00 paragraph 3.2.2 Dewatering with the following language, “See section 01 57 20 Environmental Protection and Management.”
3. Delete reference to “Minimum Antiterrorism Performance Criteria” of Spec section 08 51 13 paragraph 1.4.3 Design Data Requirements.
End of Amendment 0004
Requests for Information
Amendment 0004
1. Electrical - The Type A1 and B light fixtures are shown in some rooms with a dimming control switch, however, these fixtures are not specified with a dimming driver. Please advise if dimming driver should be added to these fixtures (there are 3 dimming options that can be selected on these fixture models).
Response: Refer to spec section 26 51 00, paragraph 2.5.2. Provide Lutron 5% Eco- Dimming LDE5 option or equal. FAR clause 52.211-6 is added to the contract in full text.
2. Architectural - According to AD-201 the existing hangar doors are schedule to be removed. Please provide details on hangar doors’ weight and size of each section.
Response: Refer to the Building 252 As-Built drawings located at the end of specification section 01 11 00. Use the as-builts to estimate size and weight of hanger doors.
3. Specification does not restrict superintendent to act as SSHO, please confirm the superintendent can act as SSHO.
Response: There must be a dedicated superintendent, SSHO and QC assigned to this project. Refer to Amendment 0002, #12.
4. Please confirm the requirement for a full time Project Manager onsite.
Response: A fulltime Project Manager is not required. Refer to Amendment 0002, #16.
5. Drawing E-502: Notes: #5: Please confirm fiber optic cable type and strand count of the fiber optic cables from Bldg. 257 to Bldg. 252. (Currently my assumption is two (2) feeds. Each feed will consist of 24-strands, 50micron, multimode type fiber and 24-strands, 9micron, singlemode type fiber)
Response: Per E-502, Note 5, “Fiber optic cable to be 50 micron, single mode, Indoor/outdoor rated, 24 strand minimum. Provide a total of (2) fiber optic feeds from building 257 to 252.”
6. Drawing ES-101: Keyed Notes #10: Please confirm the two (2) fiber feeds will be routing from MH #10 into building 243, back to MH #10 and routing into building 252 and that no fiber optic terminations are required in building 243 (that building 243 is merely a “pass-through”).
Response: Correct, there are no fiber optic terminations required in Building 243.
7. Drawing ES-101: Manholes #1-10: Please confirm if any work in the manholes will require a police detail.
Response: No, this will not require a police detail, as none of the manholes are in the road. They are all located off the road ways.
8. Drawing E-001: Communications Symbols: CATV: Please confirm if CATV locations are to consist of one (1) RG-6 coaxial cable originating from Telecom Room 48 and per Drawing EY-101, Keyed Note #7, will also consist of one (1) HDMI cable as detailed and originating per the detail on drawing EY-101.
Response: Cables consist of HDMI, VGA and Audio to CATV. Refer to revised sheet EY-101 per Amendment 0002.
9. Drawing A-110, Keyed Note 6 references to provide and install Staining system to existing concrete. Please confirm specification on Stain for existing concrete?
Response: Stain for concrete floor to adhere to spec 09 90 00 section 3.15.2 Division 3B.
Color to be selected by the owner. Refer to the updated spec 09 90 00 from Amendment 0002.
10. Drawing M-102 identifies three gas fired unit heaters in rooms 36, 45 and 46. Assuming that these unit heaters will be mounted approximately 10-12’ AFF, that would suggest that the venting for these units will penetrate the “East Platform” decking at 21’4” and travel vertically another 25’-30’ until it penetrates the hanger roof without any structural support.
A: If the government at any time should decide to use the East Platform as storage, the venting duct could very well be damaged leading to a dangerous condition in any of the rooms served by this equipment.
Response: The east platform is for mechanical equipment only. Storage will not be allowed.
B: If the venting duct to be used is to be what’s commonly known as B-vent, this duct will never look ascetically pleasing as it is difficult to plumb without significant support.
Would it be better to use electric unit heaters for this application? Please advise.
Response: The existing heaters are in good condition and can be reused.
11. Keyed Note #5 of drawings A-201 and A-202 is a requirement to “Paint all exterior siding and associated components per spec section 09 90 00”. After reviewing the 07 42 13 Metal Wall Panel specifications, paragraph 2.8 Finishes implies that all new panels are required to be pre-finished with a color already matching the existing building. If all new metal panels are to be painted in the field anyway, why would a pre-finished panel be required? May the metal wall panels be furnished with a shop applied primer if the finish coats are applied in the field? Please clarify.
Response: Yes, that is acceptable. Refer to revised spec section 07 42 13 from Amendment 0002.
12. Paragraph 3.2.2 Dewatering of specification section 31 00 00 references a 01 35 40
Environmental Management spec that has not been included with the RFP. Note #2 of drawings CD-101 and C-101 also states that “the contractor must dewater in accordance with dewatering procedures listed in section 01 35 40 of the project specifications”.
Please provide specification 01 35 40 Environmental Management or please further clarify.
Response: Refer to Specification 01 57 20 Environmental Protection and Management.
13. Please confirm that the development and submittal of the Erosion & Sediment Control plan will be the responsibility of the contractor prior to commencing construction.
General descriptions and details of erosion control measures were provided in the drawings, but no locations of these measures were indicated on the site plans.
Response: Correct. Erosion and Sediment Control is the Contractor’s responsibility.
14. Please clarify for bidding purposes if the contractor will be required to provide full containment around the exterior envelope of the building due to paint overspray while painting all metal siding and associated components.
Response: The Contractor shall perform work so as not to overspray adjacent areas.
15. Reference the “Government Furnished and Installed Storage Racks” drawing included at the end of specification section 01 11 00. This drawing depicts a ‘wire mesh fence line and gates’ along column line D that is not shown in the contract drawings. Please confirm that the wire mesh fence line and gates shown in the reference drawing is part of the GF&I items and is not required to be installed by the contractor as part of this project.
Response: Wire mesh fence line and gates are not included in this contract.
16. Note #2 of drawing A-109 indicates that “New roofing system shall be installed in 2 weeks”. We’re not quite sure of the reasoning behind this general, restrictive requirement as there are no other work restrictions detailed in the specifications or other notes relating to this roof install. Please clarify if this note may be omitted and that the scheduling of the roofing activities is at the discretion of the contractor.
Response: The contractor shall adhere to Section 01 14 00, para 1.12 for execution of the roof/envelope installation.
17. The Structural Steel Specification 05 12 00 implies to "conform" or "in accordance with" AISC requirements. Drawing S-001 Structural Steel Note #1 also indicates to "Conform to AISC's." Please clarify if the structural steel contractors are to only "conform" or will they be required to be "certified" in AISC requirements. With the small amount of structural steel on the project is it necessary to have a "certified" AISC contractor as long as we conform only.
Response: Correct, they should conform but are not required to be certified.
18. Are the CAD drawings available to be used for bid purposes for the contract drawings?
Response: No, bidders shall price the job based on the contract documents.
19. Drawing ES-101, notes 5 and 6 imply that work under those notes are an option. Please clarify if the contractor has the option to run the fiber using these notes and these are not suppose to be a bid schedule option. The bid schedule does not show an option for those notes. If this is a contactors option to decide which path to follow why wouldn't the direct route be taken from Manhole 5 to Manhole 7, bypassing manhole 6. What is the reason to have this option to go from Manhole 5 then to manhole 6 and back to manhole
7. Please clarify the notes on ES101.
Response: ES-101 notes 5 and 6 provides the contractor with the option to run the fiber optic cable through manhole 6 or to run the fiber optic cable directly from manhole 5 to manhole 7. This is not a bid option. It is the contractor’s option to decide which path to follow after verifying existing condition conduit. The notes on ES-101 will not be revised.
20. Is there a telephone system required as part of this project, and, if so, is there a particular brand required? How many telephone numbers will be required for this building?
Response: There is an existing telephone line to the building that will be salvaged (ED-
101) and reused (EY-101) for the Fire Alarm Control Panel auto-dialer located in Mechanical/Sprinkler Room 15.
21. Is it the intent to provide all new pathways for the communications cabling or can we utilize any existing pathways?
Response: The Contractor will provide new communication pathways in accordance with the contract documents.
22. Was a geotechnical study completed for this project? Are there any borings available completed within the project construction limits or nearby?
Response: A Geotechnical report was developed for adjacent building 247. The geotech report is included within this amendment.
23. For bidding purposes, should the contractor assume that no rock excavation is required?
Response: The contractor shall bid the project based on the information in the contract documents.
24. Is it the government’s intent to abate ALL identified lead paint on the project, or will abatement only be required in areas that will be impacted by construction (cutting, drilling, etc)?
Response: Refer to Revised Sheet H-101 per Amendment 0002, the Contractor shall address surfaces containing lead based paints that are impacted by the project in accordance with spec section 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead.
25. Will interior vertical wall surfaces such as exposed GWB, block masonry, and wall liner panels be required to be wiped down and cleaned prior to demolition?
Response: No, the intent is for the contractor to wipe down all horizontal surfaces that will be impacted by the project including all horizontal components of the steel beams and the floor.
26. Is there an existing 1/0 bare copper grounding conductor existing in the electric room to connect to the new building ground ring and the concrete encased electrode or is the intent to excavate, find the existing ground ring and encase a new grounding electrode in concrete?
Response: The contractor shall connect to the existing building ground system.
27. The disconnects in the ATGL Cleaning and Servicing area need to be Stainless Steel Nema 4X per the drawings and notes but what about the ATGL Storage and ATGL Vehicle Storage, the disconnects are listed as Nema 4X but is this a miss-print, should they be Nema 1?
Response: These disconnects are to remain NEMA 4X to provide the owner the most amount of flexibility with usage of the space.
28. Reference detail A2 of drawing A-302 for the plan north wall being infilled. Detail A2 contains a “3 5/8” Metal Stud Wall” note and a “10” Metal Stud Wall” note on the same wall section. The section of wall scales to be a 10” stud and the structural drawings depict this north infill wall with 10” metal studs, not 3-5/8” metal studs. Please clarify if the “3- 5/8” Metal Stud Wall” note is an error and should be ignored.
Response: Note on A2-A-302 should read “10” Metal Stud wall, see structural.” 3 5/8” Metal stud wall note is in error. Refer to revised sheet A-302.
29. Reference detail A2/A-302, is the 3” batt insulation shown in the wall section only required between the floor and the metal deck? Is any batt insulation required above the metal deck extending to the old hangar door header or is only the 2” rigid insulation required? Please clarify the extent of batt insulation at wall locations outside the mezzanine area i.e. above deck elevation.
Response: As per detail A2/A-302, the batt insulation is only required between the floor and metal deck. Only the 2” rigid insulation is required to extend to the underside of the roof.
30. Reference detail A1/A-302, is the 3” batt insulation required to extend above the metal decking in this area or does it only extend from the floor to the metal deck? Will the wall space from the metal decking to the roof in existing wall sections remain as the exposed rigid insulation that is currently visible now?
Response: As per detail A1/A-302, the 3” batt insulation is required to extend from the floor to the metal deck only. The wall space above the metal decking is remain as is.
31. Details C3 & B3 of drawing A-303 show batt insulation on the underside of the roof but the details do not indicate the extent of the batt insulation. Detail B1 of drawing A-301 seems to show two bold lines on the underside of the roof structure on the pitch ends that we’re assuming to be this batt insulation but the drawings do not state that. Please confirm that the batt insulation is only required on the pitch ends of the roof to the extent show by the bold lines on B1/A-301 and not on the gable ends.
Response: Batt insulation is to be continuous for the underside of the full roof footprint to meet the designed R-value.
32. Specification section 07 21 16, Sound Batt Insulation, specs a 6 mil thick vapor retarder product in para. 2.4 and specs installs under para. 3.3.1.4 & 3.3.2. Paragraph 3.3.1.4 states “Locate vapor retarder as indicated” but the drawing details do not indicate a vapor retarder on the batt insulation at all. Please clarify all areas of new batt insulation that will require a vapor retarder. Please also clarify if this insulation that requires a vapor barrier will require an insulation blanket with affixed vapor retarder or if the vapor retarder is installed after the insulation is installed.
Response: No vapor barrier is required.
33. Reference the room finish schedule on drawing A-601. Please clarify what the “Exposed
Insul Wrap Above” is for a wall finish for rooms 16, 33, 34, 35, & 38. Would this be the face of the new/existing rigid insulation around the building or would this be the face of batt insulation if that is required for all walls?
Response: The “exposed insul wrap above” references both existing and new insulation above the interior metal wall panel at the walls. This would be the layer of batt insulation to the interior spaces as designed in the wall sections.
34. Reference the room finish schedule on drawing A-601. Rooms 16, 33, 34, 35, & 38 require a “10’-0” Metal Liner Panel” but there doesn’t appear to be any detail for these new interior metal liner panels was included with the architectural or the structural drawings. Detail A1/A-302 shows an existing metal liner panel but doesn’t provide specifics. Please provide/clarify the following:
a. Provide a detail for the new desired interior “metal liner panel” indicated by the room finish schedule.
Response: The intent is to match existing as both the interior and exterior metal wall and liner panels are the same product.
b. What is the gauge of the liner panel?
Response: The interior metal liner panel is the same product as the existing exterior metal siding panels.
c. What type of framing is required for the liner panel?
Response: The intent would be to reuse the existing girts. Any damaged girts should be replaced in kind.
d. Is insulation required behind the liner panel?
Response: Yes, insulation is required behind the interior metal liner panels to meet the designed R-value as shown in the wall sections.
e. After inspecting the building after the site visit, it appears any existing exterior walls already have this metal liner panel in place. Please confirm that the only new metal liner panel would be required for the north infill wall and areas of wall patch for doors in the existing south and east walls.
Response: The intent is to have new interior metal liner panel at the interior of the North façade unless designated otherwise.
35. Specification section 01 11 00, Summary of Work, paragraph 1.18.4.2 Guard Rails states
“Perimeter guard rails shall be installed at floor, roof, or wall openings more than six feet above an adjoining surface and on roof perimeters” and “Rails shall be designed by a licensed engineer to provide adequate stability under any anticipated impact loading”.
The drawings do not depict a temporary guard rail during construction. Please confirm if a guard rail is required to be designed and installed around the ENTIRE perimeter of the roof while work is occurring and then removed after work is complete.
Response: The contractor must install temporary guard rails during construction as appropriate based on the roof installation means and methods. The Contractor shall take all necessary precautions in observing safety regulations in accordance with Section 01 35 26 Governmental Safety Requirements and EM 385-1-1. The temporary guard rails shall be removed after the work is complete.
36. Reference detail C2/A-503 for the solar panel mounting on the roof. The solar panel itself, wood blocking, misc flashing, and misc caulking is noted but the framing underneath the standing seam metal roof is not noted. Is this framing new that has to be installed or is it existing? Please clarify what the frame is.
Response: Refer to sheet AD-109 Note 3, “Remove and salvage existing solar panels and support frame for reinstallation.”
37. Reference detail A4/A-504 for a penetration closure. This detail shows the full wall assembly and what appears to be horizontal hat channels mounted to the rigid insulation to provide support for the metal paneling. These hat channels are not shown in any other detail; however, we would recommend that hat channels be installed for all new areas of metal paneling as they greatly simplify the install of the panels afterwards. Please clarify if all the new areas of metal paneling require hat channels, and if so what spacing.
Response: Refer to Amendment 0002 revised spec section 04 42 13 Metal Wall Panels
38. Reference the roof plan on drawing A-109. Are the two low roofs over the rooms on the east and west side of the new weapons vault a SSMR or an EPDM flat roof? We’re assuming they would be SSMR but would like to clarify.
Response: Correct. The new roof is d SSMR.
39. There doesn’t appear to be a detail of the salvaged antenna reinstallation on the roof.
Demo plan AD-109 demo keyed note #5 refers you to the electrical drawings and the new roof plan A-109 keyed note #4 refers you to the fire protection drawings. Neither the electrical nor the fire protection series of drawings seem to show the reinstallation of the antenna, please clarify.
Response: The existing antenna will not be reinstalled. A new antenna is required. See sheet A-109, note 4.
40. Reference drawing M-510 for the exterior condensing unit piping. A note states “siding contractor to enclose horizontal sections of PVC pipe jacket with metal panels on all sides for security purposes”. Please confirm that the siding enclosure will terminate at the 90 degree bend where the piping goes vertical at the building wall. Please confirm that the government will require all framing and trim to support the fully enclosed metal panel system.
Response: The siding enclosure will terminate at the 90-degree bend to vertical at the building wall. Framing and trim are required to support the fully enclosed metal panel system. Provide enclosure such that the metal panel on the underside of the piping is shorter than the metal panel on the top of the piping such that any precipitation or water coming down the face of the building or PVC pipe jacket does not accumulate in the bottom pan.
41. Reference detail C3/C-502 for the ATGL Dump Station lid. Section A-A shows a
“fiberglass pit, 0.25” thick with steel flange @ top & open bottom” and a “3” fiberglass flange” at the base. Is this “fiberglass pit” more of a fiberglass sleeve that would come with the cast aluminum hatch and would sit between the top of the precast manhole structure (bottom of apron pavement elevation) and the top of the apron paving elevation?
Response: The ATGL dump station is the same cast structure as shown on sewer manhole detail (Detail A3 on sheet C-502), but with a different hatch as shown on Detail C3 on sheet C-502. The intent is for the frame to be flush with the apron pavement.
42. Please confirm that the ATGL Dump Station structure is a precast concrete manhole per A3/C-502 and not a fiberglass pit with concrete encasement.
Response: The ATGL dump station is the same cast structure as shown on sewer manhole detail (Detail A3 on sheet C-502), but with a different hatch as shown on Detail C3 on sheet C-502. The intent is for the frame to be flush with the apron pavement.
43. What's the thickness of the existing floor slab called out to be removed on AD-101?
Response: Refer to the B252 As-builts, which are found at the end of Spec section 01 11 00.
44. Detail C4/S-501 is not clear whether the infill indicated is for highlighted areas on S-101 or along the whole length of the existing rails, please clarify.
Response: This replaces Amendment 0002, RFI # 35 response with this language: The
(3) rail infills are the whole length, the trench infills occur at 18 locations.
45. Please clarify whether Section B5/S-502 is typical or not along the whole North exterior wall (Elevations B3 & D3/S-201).
Response: B5/S-502 is typical along the entire north wall
46. Please provide the missing detail A3/S-501 called out on S-202.
Response: Detail should be called out at A1/S-501. Refer to revised sheet S-202
47. Section B4/S-502 is calling for stud wall and referring to the framing plan for size and spacing, however the framing plan doesn't depict such info, please provide missing info.
Response: Refer to elevation D4/S-502
48. What's the stud size and spacing for walls on Elevation D1/S-202?
Response: Same as D4/S-502
49. Please indicate where details A2 & A4/S-505 are applicable?
Response: A2/S-505 occurs perpendicular to detail A1/S-505, so it occurs everywhere detail A1 is called out on sheet S-103. Detail A4/S-505 is no longer applicable. Refer to revised sheet S-505.
50. Please clarify whether General Note #9 on A-001 is applicable for new construction only or does it cover existing construction also?
Response: General Note #9 on A-001 covers all paint scope, new and existing.
51. On drawing AD-203, Key notes # 3 & 4 are referring to structural plans for removal of structural members, please indicate which structural drawings depict such removals.
Response: The architectural drawings show the removal scope.
52. Section A2/A-302 is calling for 10" stud wall at the bottom of the section and 3-5/8" stud wall at top! Please clarify.
Response: Note on A2-A-302 should read “10” Metal Stud wall, see structural.” 3 5/8” Metal stud wall note is in error. Refer to revised sheet A-302.
53. Sections A1 & A2/A-302 are calling for furring the interior face of the new and existing
North & South exterior walls with gypsum board and insulation over metal studs, please clarify whether existing East & West exterior walls to be treated with the same furring or not? please provide sections for the later walls.
Response: The intent is to have the East and West walls furred with gypsum where applicable per the finish schedule and sections.
54. Details B3 & C3/A-303 call for 3" Batt insulation attached to the underside of the existing metal decking, please provide the extent of this insulation.
Response: As per detail A1/A-302, the 3” batt insulation is required to extend from the floor to the metal deck only. The wall space above the metal decking is remain as is. Batt insulation is to be continuous for the underside of the full roof footprint to meet the designed R-value.
55. The finish Schedule is not clear whether exposed structures are to be painted or not, please clarify.
Response: Per A-601, the Finish Schedule, only room 46 ATGL Cleaning/Service is to receive painting of the exposed structural steel.
56. Is there a certain manufacturer we should use for the carpet? Please advise.
Response: A specific manufacturer has not been identified.
57. For doors # 101A, 101B, 113A and 116A:
Confirm the frame is type 2 and not 4.
Confirm the door and frame material are Insulated Hollow Metal and not Aluminum.
Confirm the door finish are Aluminum and not Anodized.
Confirm the frame finish are Anodized.
Provide each door slab(s) width
Response: Refer to revised Sheet A-602 provided in Amendment 0002.
58. For doors #134A:
Confirm the frame is type 4 and not 1.
Confirm the door and frame material are Insulated Hollow Metal and not Aluminum.
Confirm the door is double and not single as the plan depict
Response: Door 134A is a single door, with frame type 1, door type A, and door and frame material being Insulated Hollow Metal.
59. For doors #116B:
Confirm the frame is type 1 and not 3.
Confirm the door and frame material are Insulated.
Response: Door 116B: Door and frame material to be insulated Hollow Metal with the frame being type 3. Refer to revised sheet A-602
60. Provide the room & door # for the space to the right of the Weapons Vault 43 or drawings A102, also advise if this space requires any finishes.
Response: Refer to sheet AD-102 and AD-201. Exiting doors and walls to remain.
61. The room finish schedule is calling for “10’-00’’ Metal Liner Panel”, please provide specification and the bases of design for this panel. Also Room #35 calls for “and Gypsum/Paint” along the metal liner panel, please provide the extents of the metal liner panel as plans and elevations doesn’t depict any separation or extents.
Response: The interior metal liner panel and gypsum/paint designations are shown both in the finish schedule and sections. Room #35 will have metal liner panel to the interior of the exterior walls while there will be gypsum painted at the interior wall partitions.
62. Sheet EY-101 shows two telecommunications racks and EP-101 shows one rack. Clarify that two telecommunication racks are required.
Response: Two telecommunication racks are desired. Refer to revised sheets EP-101 and EY-102. It is intended for the owner to provide their own rack mounted UPS system.
63. Spec section 07 22 00 paragraph 2.3.1 calls for ½” gyp cover to act as thermal barrier.
Drawings do not show. Please clarify.
Response: This will be answered in a following Amendment.
64. After award will a tax exempt certificate be issued to the Awardee for use on this project?
Response: The Awardee may submit a tax exempt request to the Contracting Officer after award. Please note, tax exemptions are determined under applicable state law. The Contracting Officer will provide an appropriate certificate but the tax exemption needs to be submitted by the Contractor to the appropriate state authority, which will then determine whether to allow an exemption.
65. We have an additional antiterrorism concern with one of the provided specifications for the Aluminum Windows, 08 51 13. Submittal section 1.3 is requiring a design analysis that shows the windows meet “the minimum antiterrorism standards required by paragraph Minimum Antiterrorism Performance” and standard airblast test reports, but the paragraph titled “Minimum Antiterrorism Performance” was not included in the specifications at all. The Glazing specifications, 08 81 00, call out an Impact-Protective System (para 2.2.3) with specific design requirements but doesn’t mention anything about antiterrorism requirements. We believe the Antiterrorism requirements in the Aluminum Windows spec may be an error and should not have been included, and it appears the Impact-Protective System requirements in the Glazing spec is the real requirement for the window system. We were wondering if you could confirm what the real design requirements are for the windows, if they should be designed for impact or if they should be designed for antiterrorism. We haven’t seen any other mention of antiterrorism or ATFP requirements in the specs or drawings for the new North infill wall or doors so that’s why I’m thinking it was a potential error.
Response: The antiterrorism reference in specification section 08 51 13 is an error.
Please disregard.
SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS
The following have been added by full text:
52.211-6 BRAND NAME OR EQUAL (AUG 1999)
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must--
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by--
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.
(End of provision)