This document provides an advance notice for a future Request for Proposal for remediation services at the Raymark Superfund Site in Stratford, Connecticut. The U.S. Army Corps of Engineers, New England District will issue a solicitation for a single-award Indefinite Delivery/Indefinite Quantity task order contract with a value not to exceed $99 million over five years. The work includes remediation of Operable Units 3, 4 and 6, and will involve excavating contaminated soils, consolidating and capping materials, and transporting highly contaminated soils to an off-site disposal facility. Task orders may include project management, engineering, sampling and analysis, remedial design and implementation, and operation and maintenance. The solicitation is designated as a small business set-aside and will utilize best value tradeoff source selection. The NAICS code is 562910 and size standard is 750 employees. A minimum guarantee of $100,000 will be included. The anticipated release date for the solicitation is September 2018.
Amendment 0011
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912WJ18R0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended to address the remaining Requests for Information. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18R0003
X 9B. DATED (SEE ITEM 11)
25-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Dec-2018
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
AMEND 0011 SPEC CHANGE
AMENDMENT 0011 OF SOLICITATION
1. NARRATIVE CHANGES TO THE SPECIFICATION
1.1 SECTION 01 35 29, HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES
FOR CONTAMINATED SITES - Replace this specification section in its entirety with a replacement SECTION 01 35 29, which accompanies this amendment.
END OF AMENDMENT 0010
RFI AMEND 0011
1. There is a discrepancy regarding document submittal and review times. The response to Amendment 9 Question 11 states that the table in PWS section 6.8.3 references initial (draft) submittal times. The table in the PWS Section 6.8.3 indicates 60 days. However, the response to Question 38 indicates that Drafts are due in 21 days and Finals are due in 60 days. Additionally, Section 6.8 indicates a 15-day government review time for draft deliverables, but section 5.1.2.2 indicates a 10-day minimum government review time for each government review phase. With the requirement for three review phases (draft, draft final, and final), the schedule for document finalization within 60 days does not give us adequate time to prepare the documents and incorporate government review times. Please confirm the duration we should schedule for each review phase, and whether drafts are due in 21 days or 60 days.
RESPONSE: Please see the edited Seed Task Order Performance Work Statement and edited IDIQ Performance Work Statement posted with Amendment 0011.
2. We are submitting on the Raymark RAC as part of a joint venture (JV), and the Seed
Task Order Rate spreadsheet is not setup for multiple markups associated with a JV submittal. For example, some subcontractors will be procured by the JV and the rest will be procured by one of the JV member firms. As a result, our bid will have 3 different markups on subcontractors. Can we submit our JV spreadsheet that handles the different markups very easily to provide the required backup detail?
RESPONSE: Please see the response to Amendment 0005, RFI #6. The offeror shall submit blended rates.
3. The Labor tab on the Seed Task Order Rate spreadsheet has hidden rows for labor categories beyond the 6 Key Personnel positions. Please clarify if the Labor backup is limited to the 6 Key Personnel or needs to be expanded to include other labor categories required including craft labor for self-performed work.
RESPONSE: Hidden rows do not need to be completed by offerors. The requirements for the six Key Personnel positions remain unchanged.
4. The Summary tab on the Seed Task Order Rate spreadsheet is set up to exclude fee on travel. We have had a clause in several of our USACE IDIQs prohibiting fee on travel. I did not see this clause in the Raymark RFP nor did I see any mention of fee on travel in the RFI. Will fee be prohibited on travel under the Raymark RAC?
RESPONSE: Yes.
5. The Travel tab on the Seed Task Order Rate spreadsheet is setup to not include markup on travel costs. Both members of the JV have accounting practices audited by DCAA that allow G&A on travel as part of our total cost input account systems. Will the Raymark RAC not allow markup on travel or is the Travel Tab in error?
RESPONSE: The Raymark RAC will not allow markup on travel.
6. Previous requirements for the contractor to have a website were listed in AECOM
Ambient Air Monitoring Plan. It appears that USACE has eliminated the entire AECOM Air Monitoring Plan requirements based on Amendment 9 Section 01 35 29, as it was not referenced or attached to the revised specification. Please confirm the AECOM Air Monitoring Plan requirements are not applicable to the seed TO and confirm if the contractor is required to “Develop a public website where the results of the air monitoring and sampling are viewable on a daily basis.”
RESPONSE: The AECOM Air Monitoring Plan requirements ARE applicable to the project.
Section 01 35 29 has been updated and the AECOM Air Monitoring Plan is provided. A public website where the results of the air monitoring and sampling results are viewable is part of this requirement. Instructions and a standard template will be provided to the selected contractor for data reporting and procedures.
The following have been modified:
PWS
Performance Work Statement For Indefinite Delivery/Indefinite Quantity
Remedial Services Contract
Raymark Superfund Site
Stratford, Connecticut
28 AUGUST 2018
Performance Work Statement For Remediation Action Contract
Raymark Superfund Site Stratford, Connecticut
Scope
The Raymark Industries, Inc. Superfund Site (the “Site”) includes areas that have been contaminated as a result of manufacturing processes from the former Raymark Industries, Inc. facility. The former Raymark Facility, which was located at 75 East Main Street in Stratford, Connecticut, operated from 1919 to 1989. Known as Raybestos- Manhattan, Inc., Raymark manufactured gaskets, clutches and heavy brake friction components for the automotive industry. Raymark generated wastes containing asbestos, lead, copper, polychlorinated biphenyls (PCBs) and a variety of solvents, adhesives, and resins as byproducts of its manufacturing operations. This resultant byproduct were available as “free fill” to the Town and residents. The Raymark waste that remains in the town of Stratford presents a threat to human health that needs to be addressed. The conceptual approach is comprehensive in that it addresses all Raymark waste in residential, commercial, and recreational properties.
The U.S. Environmental Protection Agency (EPA) approved one Record of Decision (ROD) that specified the selected remedies for four operable units (OUs) of the Raymark Superfund Project. The specific OUs are OU2 (Groundwater Vapor Intrusion), OU3 (Upper Ferry Creek), OU4 (Raybestos Memorial Ballfield), and OU6 (Additional Properties). Although OU2 is part of the ROD, it is not included in this contract since Connecticut Department of Energy and Environmental Protection (CT DEEP) is responsible for the remedy at OU2.
The selected remedy incorporates the consolidation and capping of approximately 100,000 cubic yards of Raymark waste. Excavated Raymark waste from OUs 3 & 6 will be consolidated at the OU4 Memorial Ballfield and covered with a low-permeability cap.
Sediment and waste soil containing more heavily contaminated material that exceeds certain regulatory limits will be transported to a licensed out-of-town disposal facility.
Based on available data, approximately ten percent (10%) of the estimated volume (+/- 110,000 cubic yards (cy)) of excavated Raymark waste and sediment may exceed the regulatory Principal Hazardous Constituents (PHC) limits. Any Raymark waste that exceeds the PHC contamination threshold will be transported to a licensed out-of-town disposal facility. Refer to Figure 1 Attachment for site locations where Raymark waste is located.
OU3 (Upper Ferry Creek) encompass approximately seven acres, including approximately one acre of wetlands and one acre of open water, and consists primarily of three different areas: the delineated wetlands, the Upper Ferry Creek channel, and all ther soils (mainly bank soils). All of OU3 is located within the 100-year floodplain. OU3 requires excavation of the top two feet of channel sediment from the entire length of
Upper Ferry Creek from the I-95 culvert down to the Broad Street Bridge. Upper Ferry Creek bank soil (above the mean high water line) and adjacent wetland soil containing Raymark waste will be excavated to a depth of four feet. The bottom of each soil excavation will be lined with a geotextile fabric to serve as a warning layer, then backfilled with clean material, followed by site restoration. Based on available data, excavation and consolidation of Raymark waste from OU3 is estimated at 34,850 cy (Sediment = 4,650 cy, Wetlands = 7,600 cy & Streambank = 22,600 cy).
OU4 (Raybestos Memorial Ballfield) will be the consolidation of Raymark waste from OU3 and OU6 and eventually include the construction of a low-permeability cap. The cap will be constructed in a manner that will allow commercial redevelopment of the property while ensuring the continued containment of the underlying contamination.
OU4 has the capacity to receive approximately 100,000 cy of Raymark waste from OU3 and OU6.
OU6 (Additional Properties) is comprised of 22 non-contiguous commercial, recreational, and residential properties where Raymark waste was used to fill low-lying areas. OU6 requires excavation of the top four feet of soil areas containing Raymark waste from each property. The bottom of each soil excavation will be lined with a geotextile fabric to serve as a warning layer, then backfilled with clean material, followed by site restoration. Based on available data, excavation and consolidation of Raymark waste from OU6 is estimated at 71,000 cy.
Raymark waste-contaminated soil containing more heavily contaminated material that exceeds certain regulatory limits will be segregated during excavation and transported to a licensed out-of-town disposal facility. Based on available data, approximately ten percent (10%) of the estimated volume (+/-110,000 cubic yards (cy)) of excavated Raymark waste and sediment may exceed the regulatory Principal Hazardous Constituents (PHC) limits. Any Raymark waste that exceeds the PHC contamination threshold will be transported to an out-of-town licensed disposal facility. Refer to Figure 1 for site locations.
Contract Procurement Objectives and Overview
The contract is an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract for various Environmental Remediation Action Services in support of the US Army Corps of Engineers New England District (USACE) at the Raymark Superfund Site, Stratford, Connecticut. The USACE has been retained by EPA through Interagency Agreement Nos. DW-096-95909701-0 (OU3 Upper Ferry Creek), DW-096-95908901-0 (OU4 Memorial Ballfield) and DW-096-95910101-0 (OU6 Additional Properties) to implement the cleanup actions for the Raymark Superfund Site. Project specific task orders will be issued under the base ID/IQ contract. The USACE Contracting Officer (KO) or Project Manager (PM) will provide the Contractor with site-specific information in the USACE's possession upon issuance of each task order. Each task order will define the scope of work for the Contractor. Task orders may include, but will not be limited to, any combination of the following work:
Project Management; Management Plans; Work Plans; Accident Prevention and Site Safety Plan: Health Plans; Sampling and Analysis and Quality Assurance Project Plans; studies with associated reports; multiple phases of field investigations;
optimization of existing remedies; compliance support; data management; data interpretation; hydrological and geochemical studies; project reports; engineering support and/or design; geotechnical studies; geotechnical monitoring; removal action plans, removal action, remedial action plans; remedial action; establishing safety zones and procedures near open cuts; protection of existing environmental resources; water management and treatment; clearing of vegetation; temporary and permanent surface water diversions; installation of horizontal drains and/or lined french drains; dewatering; slope stabilization; excavation and consolidation of Raymark waste, excavation, transportation and off-site disposal of PHC; significant earthwork requiring appropriate erosion and sediment control best management practices (BMPs); impermeable cap installation; constructing storm-water conveyance & pumping station; installation of mitigation wetlands and passive treatment wetlands; site-wide inspection and maintenance including but not limited to caps, roads, wetlands, and invasive species; operation and maintenance; sediment excavation; stream channel restoration; wetlands restoration; management of investigative derived waste; implementation of institutional controls; preparation of as-built drawings; site closeout/decision documents; project team and public meetings;
public relations and community outreach support; Commercial Lease for Project Informational Center during the duration of this contract; and future project programming and scheduling support.
Work will generally fall under task orders using Performance Work Statements (PWS).
The description of work stated herein provides a general understanding of the Contractor functions to be performed; individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract. Exclusive of the program and/or project management functions, the Contractor may utilize sub-contractors or consultants identified in the accepted proposal or subsequently approved by the KO to perform any of the functions required within the specific task orders.
The Contractor shall perform all the necessary services required to successfully meet all performance objectives of this PWS. The Contractor shall comply with all applicable Federal, State, and local laws and regulations in order to successfully complete all performance objectives of this PWS in a manner that is consistent with any applicable orders and permits and relevant Department of Defense (DOD) and Army policies for the duration of this Task Order. The Contractor shall also use the references listed below (and default to most recent version if different) when preparing the proposal and executing the work:
EPA New England Region 1 – Raymark Industries, Inc. Superfund Site – Record of Decision, Stratford, Connecticut dated September 2016;
Raymark Superfund Site –Final OU3 Feasibility Study Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 29, 2016 – Nobis Engineering, Inc.
Raymark Superfund Site –Final OU4 Feasibility Study, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 30, 2016 – Nobis Engineering, Inc.
Raymark Superfund Site –Final OU6 Feasibility Study Addendum, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 28, 2016 – Nobis Engineering, Inc.
Engineer Manual (EM) 1110-1-4007 Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies, USACE, 2003.
EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans, USACE, 01 Feb. 2001
ER 1110-1-263, Chemical Data Quality Management for Hazardous, Toxic, Radioactive Waste Remedial Activities, USACE, 30 Apr 1998
EM 200-1-6, Chemical Quality Assurance for HTRW Projects, USACE, 10 Oct.
DOD Quality Systems Manual (QSM), for Environmental Laboratories, Revision
5.0 dated July 2013
Uniform Federal Policy for Quality Assurance Project Plans (UFP for QAPP), Evaluating, Assessing and Documenting Environmental Data Collection and Program Use, Part 1 and Part 2, Final version 1, March 2005
Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Optimized UFP-QAPP Worksheets.
www.epa.gov/fedfac. DoD/EPA/DOE, March 2012
EPA New England Environmental Data Review Program Guidance. Version 4- 22-2013
DoD General Data Validation Guidelines Final Draft, Environmental Data Quality Workgroup, December 2016
National Functional Guidelines for Superfund Organic Methods Data Review.
EPA-540-R-2016-002
National Functional Guidelines for Superfund Inorganic Methods Data Review.
EPA-540-R-2016-001
ER1180-1-6, Construction Quality Management, USACE, 30 Sep 1995 EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
Manual (2008) 42 U.S. Code Chapter 103 – Comprehensive Environmental Response, Compensation, and Liability.
ER 1110-1-8157, Engineering and Design Geotechnical Data Quality
Management for Hazardous Waste Remedial Activities, 2002.
EM 1110-1-1804 Geotechnical Investigations, Engineering and Design, 2001.
EM 1110-1-1802 Geophysical Exploration for Engineering and Environmental
Investigations, 1995.
EM 1110-2-1902, Slope Stability, USACE, 31 October 2003.
United States Environmental Protection Agency, 2006. Guidance on Systematic
Planning Using the Data Quality Objectives Process (EPA QA/G-4). Published by the Office of Environmental Information.
U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual, Second Edition, Volumes I and II, 1998, Reprinted 2001.
U.S. Department of the Interior, Bureau of Reclamation, Earth Manual, Third Edition, Volumes I and II, 1998.
Applicable ASTM Standards
Types of Services Required
This contract includes the following types of environmental services as authorized under the basic contract:
Site Characterization/Investigation Studies and Reports Monitoring and Interim Operations Engineering for Remediation Remedial Action
Contract Type
_X_ Firm-Fixed Price (FFP)
Performance Objectives and Standards for All Task Orders
Performance objectives and standards shall be met for all executed task orders under this IDIQ contract. All future task orders will be Firm Fixed Price (FFP). The Contractor shall furnish all labor, materials and equipment necessary to successfully complete all performance objectives identified in this PWS and Table 1, Performance Requirements Summary. Achievement of the performance objectives is successfully attained upon the finalization of appropriate documentation certifying that the documents have been accepted by the USACE. USACE approval of the Performance Standards will be by the KO or Contracting Officer’s Representative (COR). Table 1 identifies tasks that may be required for all Task Orders. Additional tasks and associated Performance Standards may be added to the table based on the scope of the work to be completed under the individual future Task Orders.
Table 1 – Performance Requirements Summary Performance Objective/Task Performance Standard
Task 1 – General Conditions
Task 1.1 - Project Management/Project Controls
Submit Monthly Status Reports and Vouchers by 5th day of each month in accordance with program requirements and USACE acceptance
Task 1.2 – Prepare & Submit Plans
Table 1 – Performance Requirements Summary Performance Objective/Task Performance Standard
Task 1.2.1 –Project Management Plan in accordance with Paragraph 6.1.2.1.
Task Order Requirements
USACE acceptance of Final Project Management Plan (PMP).
Task 1.2.2 –Construction Work Plan in accordance with Paragraph 6.1.2.2.
Task Order Requirements
USACE approval of Final Construction Work Plan
(CWP).
Task 1.2.3 – Health & Safety Documentation in accordance with Paragraph 6.1.2.3. Task Order Requirements
USACE approval of Final APP/SSHP
Task 1.2.4 – Quality Control Plan Sampling and Analysis Plan and Quality Assurance Project Plan in accordance with Paragraph 6.1.2.4.Task Order Requirements
USACE approval of Final Sampling and Analysis Plan and Quality Assurance Project Plan Quality Control Plan
In the event that there may be multiple milestones and/or deliverables for each of the performance objective tasks, partial payments will be based on the successful completion of milestones. Final decisions regarding the adequacy of milestone and deliverable completion resides with the KO or COR.
Task Order Contract Requirements
The Contractor shall furnish all necessary labor, equipment, materials, and supplies to complete the tasks listed in Table 1 above and defined in the following paragraphs. All work shall be conducted in a safe, secure, cost efficient, and environmentally acceptable manner in accordance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Record of Decision signed in September 2016, and EPA green and sustainability principles. Work shall be completed correctly in a professional, workmanlike manner, in accordance with approved work plans. Work is to be performed commensurate with the level of effort and quality intended, with appropriately qualified quality control (QC) representation (as part of the contractors overall QC Program) controlling the work.
Contractor Quality Control (CQC) is the means by which the Contractor ensures that the work, to include that of subcontractors and suppliers, complies with the requirements of the contract. The control shall be adequate to cover all operations, including both on-site and off-site activities. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with governing regulations and contract task order requirements.
The Contractor's quality control program shall include inspections and tests as described in the task orders.
The IDIQ contract duration is five (5) years.
Task 1 – General Conditions
Task 1.1 – Project Management/Project Controls
This task provides for oversight of the below activities to include the Program Manager, Project Manager, Subcontracts Manager, Project Controls, Cost Scheduler, and Administrative staff when engaged in representative non-site specific activities.
Cost and schedule reporting and tracking.
Sub-contractor cost and schedule reporting and tracking.
Program resource planning selection and resource conflict resolution.
Participation by the Project Manager and Site Superintendent in monthly conference calls with USACE, EPA, Town of Stratford Health Department, and subcontractors; and weekly conference calls during field construction.
Contract basis review, verification, and tracking of invoices to ensure conformance to applicable contract requirements.
Preparation of monthly invoices.
Preparation of monthly status reports including current schedule.
Preparation of daily update on field activities via e-mail.
Preparation of weekly field update on field activities via e-mail.
Task 1.2 – Prepare and Submit Plans
The Contractor shall prepare all plans as required by this PWS and the contract specifications.
Task 1.2.1 – Project Management Plan
The Contractor shall develop and maintain a detailed Project Management Plan (PMP). The PMP will specify the schedule, execution, and completion of the performance objectives. The first draft PMP shall be submitted within 30 calendar days of contract award. The draft PMP and subsequent revisions will be subject to USACE review and approval through the COR. The final PMP will be due within fifteen (15) calendar days of comments received from the COR. Assume a Draft, Draft Final, and Final PMP. A payment milestone will be established for USACE’s approval of the final PMP through the COR.
As part of the PMP, the Contractor will develop and maintain an activity-based schedule that fully supports the technical approach and outlines the due dates for all milestones and payable deliverables. The schedule shall be in Gantt format created using MS Project or similar scheduling software. The comprehensive Gantt schedule shall begin with one Project Start milestone, end with one Project Finish milestone, and predecessors and successors for each activity (including milestones) shall be clearly identified via relationship arrows. The schedule shall include Government review periods. Critical path activities shall be displayed in red. Displayed activity data shall include Activity ID, Activity Description, Start, Duration, Finish and Total Float. A payment plan will be included with the schedule that allows for payments to the Contractor based on successful completion of interim milestones proposed by the Contractor. It is the Army’s intent to make all payments after verification of progress in accordance with this schedule. As part of the PMP, the Contractor will identify and implement a means for providing project monthly status reports to the COR. The PMP will address the content of status reports.
The individual task order’s Final PMP for USACE approval shall be submitted within 60 days of NTP or task award award as applicable.
Task 1.2.2 – Construction Work Plan (CWP)
The Contractor shall prepare a draft, draft-final and final construction work plan prior to the commencement of any work on the project site. The CWP shall contain, but not be limited to, the following:
Statement of the work to be accomplished including a statement of
Data Quality Objective(s);
Discussion on implementation of the project including the method of operation, type of equipment, personnel required, and other special considerations for the tasks required under the task order.
A copy of the schedule detailing the work to be performed with key project milestones as described under Section 6.2.1 Task 2.1 Project Management Plan.
Permits, licenses, access agreements, and certificates required;
Key personnel to be used on the project along with their roles and responsibilities;
Site-specific assumptions and clarifications;
Logs, reports, and record keeping to be utilized.
Assume Internal Draft, regulatory Draft, Draft-Final and Final versions will be required with Response to Comments (RTCs) and response to comments letters (RCL) by the Contractor. Contractor shall assume a minimum of 5 10 business days for each Government review phase. Acceptance of the Contractor's work plan by the Government is required prior to any field mobilization. Acceptance is conditional and will be predicated on satisfactory performance during field activities. Deviations or proposed changes to the approved work plan shall be submitted to the USACE’s PM and COR for review, comment, and approval. The Government reserves the right to require the Contractor to make changes in his work plan and operations as necessary. During execution of the task order, the Contractor shall follow the approved work plan.
The individual task order’s CWP for USACE approval shall be submitted within 60 days of Notice to Proceed or task order award, as applicable.
Task 1.2.3 – Health and Safety Documentation
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities to be performed. The documentation shall include an Activity Hazard Analysis (AHA) for each phase of work as described below. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at Headquarters USACE website under publications using the following link:
http://www.usace.army.mil/library/.
The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations. The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1-1, specifically Section 01.A.11 through 01.A.18, Figure 1-2 AHA, and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person. The Contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.
The Contractor shall prepare a Site Health and Safety Plan (SSHP) that covers the 14 elements identified in EM385-1-1, Section 28.A.02.b. The SSHP shall be attached to the APP as an Appendix. SSHP elements adequately covered elsewhere in the APP need not be duplicated in the
SSHP.
The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their sub-contractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting sub-contractor operations to ensure that accident prevention responsibilities are being carried out.
The Contractor shall conduct a safety meeting at the project site on the first day of work, and whenever a new activity or phase of work begins. All safety meetings shall be documented. Records of the safety briefings shall be submitted to the GDA weekly.
Activity Hazard Analysis (AHA)
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the Contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the Prime Contractor and shall include all subcontractors and Government on-site representatives. The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.
Accident Reporting
All accidents and near misses shall be investigated by the Contractor. All work-related injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $2,000.00, shall be verbally reported to the GDA within 24 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D.02 shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident.
The Contractor shall complete the “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 10th calendar day of the following month. The form shall be transmitted by the Prime Contractor to the GDA electronically.
The individual task order’s APP for USACE’s approval shall be submitted within 60 days of NTP or task award award, as applicable.
1.1.1.1 Task 1.2.4 – Quality Control Plan
The contractor shall submit a Quality Control Plan. Contractor Quality Control (CQC) is the means by which the Contractor ensures that the work, to include that of subcontractors and suppliers, complies with the requirements of the contract. The control shall be adequate to cover all operations, including both on-site and off-site activities. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with governing regulations and contract task order requirements. The Contractor’s quality control program shall include inspections and tests as described in the task orders.
The Quality Control Plan shall be submitted within 60 days of NTP of the Seed Task Order or task award award, as applicable. The Quality Control Plan must be updated (if necessary) for each subsequent Task Order, and submitted within 60 days of the NTP for the Task Order.
Additional Requirements
Key Personnel
Key Personnel identified for this contract include Program Manager, Project Manager, Site Superintendent, Site Safety & Health Officer, Contractor Quality Control (CQC) System Manager, and Project Chemist. The following lists qualifications for each Key Personnel.
Program Manager
The Program Manager (PgM) shall be responsible for the overall management of the contract including cost, schedule, and technical quality. The Program Manager shall be competent, experienced, and knowledgeable in a full range of Hazardous, Toxic, and Radiological Waste (HTRW) activities from investigations, to studies, designs, remediation, short-term operations and maintenance, and with the specific activities identified in this contract. The Contractor shall designate a Program Manager to act as a single point of contact for coordination of program issues with USACE. The Contractor shall hold periodic status meetings and manage the implementation of all policy and procedures and take immediate corrective action when performance is not acceptable to USACE.
The Contractor shall oversee the management and coordination between Contractor staff, subcontractors, and the USACE; development and implementation of record keeping; administrative and quality control; and projects. The Program Manager shall have, as a minimum, the following qualifications:
a. A college degree from an accredited school in engineering, construction management, geology, chemistry, or a related field;
b. A minimum of eight (8) years Program Management experience, with a minimum of five (5) years experience on HTRW investigation, study, design, and remedial action Project Management;
c. Working knowledge of applicable federal, state, and local laws, regulations, and guidance as they apply to the region specified in this solicitation.
Project Manager
For each task order, the Contractor shall designate a Project Manager (PM). The Program Manager may act as the Project Manager, with approval of USACE, if execution is sufficiently limited. The Contractor shall identify the PM before issuance of the task order and the PM qualifications, experience and performance history shall be satisfactory to the Contracting Officer or COR. The PM shall be the single point of contact for the installation, and shall be responsible for the management and execution of the task order in accordance with the approved statement of work, approved work plans, and all federal, state, and local laws and regulations. The Contractor shall ensure coordination between the Safety and Health Manager (SHM) and the Site Safety and Health Officer (SSHO) to ensure that all site activities are performed in a safe manner.
The Contractor shall also maintain close communication and coordination with USACE for the duration of the project, including weekly and/or monthly progress and detailed cost reporting. The Project Manager shall have, as a minimum, the following qualifications:
a. A college degree from an accredited school in engineering, construction management, geology, chemistry, or related field.
b. A minimum of five (5) years Project Management experience, with a minimum of three (3) years experience on HTRW investigation, study, design, and remedial action.
c. Working knowledge of applicable federal, state, and local laws, regulations, and guidance as they apply to the region specified in this solicitation.
Site Superintendent
The Contractor shall utilize experienced Site Superintendents to direct work performed under this contract and verify compliance with all regulatory and contractual requirements. The minimum qualifications of the Site Superintendent should include:
a. A minimum of three (3) years project superintendent experience in environmental remediations/HTRW remedial actions.
b. In addition to the required 40-hour hazardous waste training, onsite supervisors shall have completed an additional 8 hours of specialized training covering at least the following topics: the employer's safety and health program, personal protective equipment program, spill containment program, and health hazard monitoring procedures and techniques. The On-site Supervisor shall have a working knowledge of applicable federal, state, and local laws, regulations, and guidance.
Site Safety & Health Officer (SSHO)
The Contractor shall utilize a trained, experienced SSHO to ensure that all elements of the approved SSHP are implemented and enforced onsite. The
SSHO shall be assigned to the site on a full time basis for the entire duration of field activities. The SSHO shall have the authority to stop work if unacceptable health or safety conditions exist. The SSHO shall have the following qualifications:
a. A minimum of 2 years’ experience in implementing safety and health programs at hazardous waste sites where level C personal protective equipment was required.
b. Documented experience in construction techniques and construction safety procedures.
c. Working knowledge of Federal and State occupational safety and health regulations.
d. Specific training in personal and respiratory protective equipment program implementation, confined space program oversight, and in the proper use of air monitoring instruments, and air sampling methods.
Contractor Quality Control (CQC) System Manager
For each task order issued to the Contractor, the Contractor shall designate a CQC System Manager. The CQC System Manager shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC shall be the single point of contact responsible for ensuring compliance with the requirements identified in the task orders for the Contractor Quality Control Plan. This person, or designated representative, shall be physically at the project site whenever work is in progress. The minimum qualifications of the CQC System Manager shall include:
a. A graduate engineer or a graduate of construction management, with a minimum of 4 years environmental engineering experience; or an experienced construction person with a minimum of 8 years experience in related work.
b. The CQC System Manager shall have 9 semester hours, 12 continuing education units (or combination thereof) education in an area relevant to HTRW remediation; and two years experience in specialized areas, e.g., Remedial Investigation, Remedial Design & Remedial Action.
c. Working knowledge of applicable federal, state, and local laws, regulations, and guidance.
d. Formal education and training in field sampling at HTRW sites.
Project Chemist
The Contractor shall utilize a Project Chemist who shall ensure that all chemistry related goals of the task order are attained. The Project Chemist should have general knowledge of remedial process chemistry, fate and transport of organics and inorganics contamination in environmental matrices. The Project Chemist will be required to have advanced expertise in PCB contamination and chemical data quality management of environmental analytical data. The Chemist shall conduct or oversee all onsite analytical testing including field analysis tests. The Project Chemist shall review all off-site Contractor analytical testing, and coordinate
Government Quality Assurance testing that verifies the Contractor chemical data.
The Chemist shall review and verify all chemical data for hazardous waste manifests. The Chemist shall also prepare all data validation reports or review for accuracy all data validation reports prepared by subcontractors. The Project Chemist shall have, as a minimum, the following qualifications:
a. A minimum of a 4-year college degree in Chemistry or a related field from an accredited postsecondary institution with 16 semester hours in chemistry and 3 years of analytical chemistry experience.
b. A minimum of four years of combined professional experience at the level of a commercial environmental analytical laboratory or working as a part of a Contractor project management team of which a minimum of 1-2 years must be directly related to environmental investigations and/or remedial actions as a part of a Contractor management team (i.e. not primarily employed at a laboratory).
Environmental Protection Requirements
The Contractor shall identify applicable Federal, State and Local laws, regulations, and Project specific orders or agreements and perform all work in accordance with said authorities. The Contractor shall ensure that all activities performed by its personnel, subcontractors and suppliers are executed in accordance with said authorities. Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the USACE’s KO, COR, and PM via telephone, followed by written notice. Nothing in this PWS shall relieve the Contractor of its responsibility to comply with applicable laws and regulations. The Contractor shall investigate the requirements for and obtain all permits, licenses, approvals, and/or certificates necessary to accomplish the work specified. When the work to be performed requires clearances, such as digging or drilling permits, the Contractor shall obtain such clearances and/or permits, with the assistance of the facilities/site point of contact, prior to initiation of any drilling or excavating operations. The Contractor shall coordinate all excavating with USACE prior to performing work. Contractors on environmental sites are required to perform their own utility checks. The Contractor shall comply with all USACE or site-specific time and procedural requirements (federal, state, and local) described in the permits obtained. The USACE will continue to independently review Contractor work to ensure compliance with all applicable requirements.
The Contractor shall perform all work in a manner that minimizes the pollution of air, water or land and develop contingency measures for cleanup of any spills that may occur during performance of this contract. The Contractor shall control noise and dust within reasonable limits or limits established by applicable federal, state, and local laws and regulations. A site survey may be required to identify any wetlands, endangered species, special habitat or other protected areas. Task Orders may include specific environmental protection requirements.
Sustainability Requirements
The Contractor shall review EO 13834 “Efficient Federal Operations” dated 17 May 2018.
The Contractor shall consider and implement green response/remediation strategies and applications to maximize sustainability, reduce energy and water usage, promote carbon neutrality, promote industrial materials reuse and recycling, and protect and preserve land resources, consistent with DOD and EPA Policies on Green and Sustainable Remediation Practices in the EPA Federal Superfund Program
(https://www.epa.gov/superfund/superfund-green-remediation). The Contractor shall present green remediation options and approaches in its work plans, maintain records of “green-related” activities, and report this information to the COR in its project status reports.
EPA Superfund and Green Remediation guides, standards, and Policies include but are not limited to:
1. Superfund Green Remediation Strategy, Sep 2010, U.S.
Environmental Protection Agency, Office of Superfund Remediation and Technology Innovation.
2. Memorandum, U.S. Environmental Protection Agency, 02 August
2016, Consideration of Greener Cleanup Activities in the Superfund Cleanup Process.
3. Clean and Greener Policy for Contaminated Sites, EPA Region 1, Feb
2012, Office of Site Remediation and Restoration
The contractor shall meet the recycled content requirements set forth by EPA for the products identified in the Comprehensive Procurement Guideline (CPG) and at the following link: https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program
The Contractor shall meet the Bio-Preferred Program requirements set forth by USDA for the products identified in the following link:
http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml)
All deliverables shall be printed double sided on post-consumer fiber paper.
Protection of Property
The Contractor shall be responsible for any damage that may be caused to property by the activities of the Contractor under this PWS. Additionally, the Contractor shall exercise due diligence in the protection of all property located on the premises against fire or damage from any and all other causes. Any property damaged or destroyed by the Contractor incident to the exercise of the privileges herein granted shall be promptly repaired or replaced by the Contractor to a condition satisfactory to the COR necessary to restore or replace the property to a condition satisfactory to the COR.
Health and Safety Requirements
The Contractor shall produce and implement a written Safety and Health Program meeting the requirements of all applicable federal, state, and local laws and regulations, and approved by the KO. The Contractor shall ensure that its sub-contractors, suppliers and support personnel follow all safety and health provisions established in the approved Site Safety and Health Plan (SSHP), APP and/or AHA.
The USACE reserves the right to stop work under this contract for any violations at no additional cost to the USACE. Once the USACE verifies that corrective action has been implemented, the Contractor will be able to continue performance under the contract. As a minimum, the SSHP shall contain the following elements: site description and contaminant characterization, safety and health hazard(s) assessment and risk analysis, safety and health staff organization and responsibilities, site specific training and medical surveillance parameters, personal protective equipment (PPE) and decontamination facilities with documented procedures to be used for same, monitoring and sampling requirements, safety and health work precautions and procedures, site control measures, on-site first aid and emergency equipment, emergency response plans and contingency procedures (on-site and off-site), logs, reports, and record keeping.
Sampling and Analysis Quality Control
Appropriate documentation of Quality Control shall be provided whenever sampling or analysis for chemical, geophysical, geotechnical, particulate, or soils parameters is required in order to meet the PWS objectives as specified in for each Task Order.
The laboratory(ies) to be used by the Contractor shall be certified by the National Environmental Laboratory Accreditation Program (NELAP) or an equivalent agency.
The Contractor may also establish an on-site testing laboratory at the project site if determined necessary by the Contractor. However, this on-site testing shall meet the requirements of EPA and any specific state regulator requirements. The Contractor shall also comply with all requirements of the DoD Quality Systems Manual, Final Version 3, dated January 2006 or more recent version.
Analytical Testing
Environmental laboratory services are to be provided only by laboratories that have successfully passed the new Environmental Laboratory Accreditation Program (ELAP) audit implemented 1 October 2009, including being compliant with the most recently published version of the Department of Defense (DOD) Quality Systems Manual (QSM Version 5.1.1 and holding current…