Amend_0010_Seed_Task_Order_Rates.xlsx

XLSX spreadsheet 816 KB Posted

Attached to
Raymark Remediation Services IDIQ
Solicitation number
W912WJ18R0003
Issued by

About this file

This notice announces an upcoming request for proposal for remediation services at the Raymark Superfund Site in Stratford, Connecticut. The U.S. Army Corps of Engineers, New England District will issue an RFP for a single-award task order contract with a total value not to exceed $99 million over five years. The work will involve remediation of Operable Units 3, 4 and 6, including excavation and disposal of approximately 110,000 cubic yards of contaminated soil and sediment. Ten percent of excavated material exceeding regulatory limits for principal hazardous constituents will require off-site disposal. An estimated 10,000-25,000 cubic yards of waste at Operable Unit 4 will also require off-site disposal. The closing date for proposals will be in September 2018. The contract has a small business set-aside and will be awarded on a best value tradeoff basis.

Seed Task Order Rates

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SUMMARY for the PRIME on the SEED TASK ORDER
Prime Contractor:
Document:Appendix I-3/Summary
Summary
Bid ItemLaborEquipmentSubcontractsODCsSubtotalFee%FeeTravelTotal
0001Task One - Prepare and Submit Plans$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0002Task Four - Completion Report$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0003380 E. Main - Site Prep$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0004380 E. Main - Excavation Transport and Dispose of Contaminated Soil to OU4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0005380 E. Main - Site Restoration$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0006Wooster Park (WP) Site Prep$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0007AWP - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 1,600 CY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0007BWP - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 1,600 CY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0008AWP - Landscape Restoration - First 1,300 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0008BWP - Landscape Restoration - FOver 1,300 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0009AWP - Plantings - First 950 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0009BWP - Plantings - Over 950 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0010200 Ferry Boulevard (200 FB) - Site Prep$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0011A200 FB - Excavation, Transport and Dispose of Contraminated Soil to OU4 - First 300 CY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0011B200 FB - Excavation, Transport and Dispose of Contraminated Soil to OU4 - Over 300 CY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0012A200 FB - Mulch Restoration - First 80 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0012B200 FB - Mulch Restoration - Over 80 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0013A200 FB - Plantings - First 30 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0013B200 FB - Plantings - Over 30 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0014A200 FB - Pavement Restoration - First 200 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0014B200 FB - Pavement Restoration - First 200 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0015Vacant Lots Behind 326 Ferry Boulevard (326 FB) - Site Prep$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0016A326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 4,400 CY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0016B326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 4,400 CY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0017326 FB - Excavation, Transport and Dispose of PHC Contaminated Soil Off-Site$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0018326 FB - Monitoring Well Decommissioning$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0019A326 FB - Pavement Restoration - First 390 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0019B326 FB - Pavement Restoration - Over 390 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0020A326 FB - Landscaping - First 3,700 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0020B326 FB - Landscaping - Over 3,700 SY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0021OU4 - Site Prep$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0022OU4 - Excavation and Disposal of Contaminated Soil at OU4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0023OU4 - Site Restoration$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0024OPTION - Construction Trailer Rental (6 MO)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0025OPTION - Contaminated Water Disposal (1000 gal)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
EquipmentSubcontractsODCs
w-out/ 3% G&A$ - 0$ - 0$ - 0
w/ 3% G&A$ - 0(equip, sub, odc)
w-out/ 3% G&A$ - 0
G&A Amount$ - 0

&G &"Arial,Italic"Remedial Action Contract New Bedford Harbor Superfund Site Solicitation Number: W912WJ-14-R-0003 &D

Labor

LABOR for the PRIME on the SEED TASK ORDER
Prime Contractor:
Document:
Hours
Bid Item0001000200030004000500060007A0007B0008A0008B0009A0009B00100011A0011B0012A0012B0013A0013B0014A0014B00150016A0016B001700180019A0019B0020A0020B002100220023002400250001000200030004000500060007A0007B0008A0008B0009A0009B
Government Job TitleContractor Job TitleFully Burdened RateTask 1 - Prepare and Submit PlansTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY200 Ferry Boulevart (200 FB) - Site Prep200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 300 CY200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 300 CY200 FB - Mulch Restoration - First 80 SY200 FB - Mulch Restoration - Over 80 SY200 FB - Plantings - First 30 SY200 FB - Plantings - Over 30 SY200 FB - Pavement Restoration - First 200 SY200 FB - Pavement Restoration - Over 200 SYVacant Lots Behind 326 Ferry Boulevart (326 FB) - Site Prep326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 4,400 CY326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 4,400 CY326 FB - Excavation, Transport and Dispose of PHC Contaminated Soil Off-Site326 FB - Monitoring Well Decommission326 FB - Pavement Restoration - First 390 SY326 FB - Pavement Restoration - Over 390 SY326 FB - Landscaping - First 3,700 SY326 FB - Landscaping - Over 3,700 SYOU4 - Site PrepOU4 - Excavation and Disposal of Contaminated Soil at OU4OU4 - Site RestorationOPTION - Construction Trailer RentalOPTION - Contaminated Water DisposalTask 1 - Prepare and Submit PlansTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY
Principal$ - 0-------------------------------
Program Manager$ - 0-----------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager*------------
Site Superintendent*------------
Site Safety & Health Officer------------
Contractor Quality Control System Manager------------
Project Chemist------------
Junior Chemist
Senior Environmental Scientist
Mid-Level Environmental Scientist
Junior Environmental Scientist
Process Engineer*Lead Treatment Plant Operator
Senior Engineer
Mid Level Engineer
Junior Engineer
Senior Geologist
Mid Level Geologist
Junior Geologist
Senior HydrogeologistHydrogeologist
Mid Level Hydrogeologist
Junior Hydrogeologist
Field Operations Leader*Field Lead
Senior Scientist
Mid Level Scientist
Junior ScientistJunior Chemist
QCS ManagerContractor Quality Control Supervisor
Site Superintendent*
Site Safety & Health Officer
Treatment Plant Operator*
Senior Technician
Mid-Level TechnicianEnvironmental Technician
Junior Technician
Geochemist
Regulatory Specialist
Senior Contracts Manager
Contracts Manager
Senior CADD Operator
Mid-Level CADD Operator
Junior CADD Operator
Senior GIS Technician
Mid-Level GIS Technician
Junior GIS Technician
Administrative Staff
Word Processor
Cost Reporter
Estimator
Total Home Office-------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FIELD OFFICE
Project Manager*$ - 0-------------------------------
Certified Industrial Hygienist$ - 0-------------------------------
Chemist*$ - 0-------------------------------
Senior Chemist$ - 0-------------------------------
Mid-Level Chemist$ - 0-------------------------------
Junior Chemist$ - 0-------------------------------
Senior Environmental Scientist$ - 0-------------------------------
Mid-Level Environmental Scientist$ - 0-------------------------------
Junior Environmental Scientist$ - 0-------------------------------
Process Engineer*$ - 0-------------------------------
Senior Engineer$ - 0-------------------------------
Mid Level Engineer$ - 0-------------------------------
Junior Engineer$ - 0-------------------------------
Senior Geologist$ - 0-------------------------------
Mid Level Geologist$ - 0-------------------------------
Junior Geologist$ - 0-------------------------------
Senior Hydrogeologist$ - 0-------------------------------
Mid Level Hydrogeologist$ - 0-------------------------------
Junior Hydrogeologist$ - 0-------------------------------
Field Operations Leader*$ - 0-------------------------------
Senior Scientist$ - 0-------------------------------
Mid Level Scientist$ - 0-------------------------------
Junior Scientist$ - 0-------------------------------
QCS Manager$ - 0-------------------------------
Site Superintendent*$ - 0-------------------------------
Site Safety & Health Officer$ - 0-------------------------------
Treatment Plant Operator*$ - 0-------------------------------
Senior Technician$ - 0-------------------------------
Mid-Level Technician$ - 0-------------------------------
Junior Technician$ - 0-------------------------------
Geochemist$ - 0-------------------------------
Regulatory Specialist$ - 0-------------------------------
Senior Contracts Manager$ - 0-------------------------------
Contracts Manager$ - 0-------------------------------
Senior CADD Operator$ - 0-------------------------------
Mid-Level CADD Operator$ - 0-------------------------------
Junior CADD Operator$ - 0-------------------------------
Senior GIS Technician$ - 0-------------------------------
Mid-Level GIS Technician$ - 0-------------------------------
Junior GIS Technician$ - 0-------------------------------
Administrative Staff$ - 0-------------------------------
Word Processor$ - 0-------------------------------
Cost Reporter$ - 0-------------------------------
Estimator$ - 0-------------------------------
$ - 0-------------------------------
$ - 0-------------------------------
$ - 0-------------------------------
$ - 0-------------------------------
$ - 0-------------------------------
Total Field Office-------------------------------
Total Labor-------------------------------

&G &"Arial,Italic"Remedial Action Contract New Bedford Harbor Superfund Site

Equipment

EQUIPMENT for the PRIME on the SEED TASK ORDER
Prime Contractor:
Document:Appendix I-3/Equipment
Addition MarkupQuantityCOST
Prime G&ABid Item0001000200030004000500060007A0007B0008A0008B0009A0009B00100011A0011B0012A0012B0013A0013B0014A0014B00150016A0016B001700180019A0019B0020A0020B002100220023002400250001000200030004000500060007A0007B0008A0008B0009A
IDEquipment TypeUnitUnit CostTask 1 - Prepare and Submit PlansTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY200 Ferry Boulevart (200 FB) - Site Prep200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 300 CY200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 300 CY200 FB - Mulch Restoration - First 80 SY200 FB - Mulch Restoration - Over 80 SY200 FB - Plantings - First 30 SY200 FB - Plantings - Over 30 SY200 FB - Pavement Restoration - First 200 SY200 FB - Pavement Restoration - Over 200 SYVacant Lots Behind 326 Ferry Boulevart (326 FB) - Site Prep326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 4,400 CY326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 4,400 CY326 FB - Excavation, Transport and Dispose of PHC Contaminated Soil Off-Site326 FB - Monitoring Well Decommission326 FB - Pavement Restoration - First 390 SY326 FB - Pavement Restoration - Over 390 SY326 FB - Landscaping - First 3,700 SY326 FB - Landscaping - Over 3,700 SYOU4 - Site PrepOU4 - Excavation and Disposal of Contaminated Soil at OU4OU4 - Site RestorationOPTION - Construction Trailer RentalOPTION - Contaminated Water DisposalTask 1 - Prepare and Submit PlansTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0-----------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0---------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
-----------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0--------------------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal-------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Markup-------------------$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

&G &"Arial,Italic"Remedial Action Contract New Bedford Harbor Superfund Site

Subcontracts

SUBCONTRACTS for the PRIME on the SEED TASK ORDER
Prime Contractor:
Document:Appendix I-3/SubcontractsAppendix I-3/Subcontracts
Addition MarkupQuantityCOST
Prime G&A0001000200030004000500060007A0007B0008A0008B0009A0009B00100011A0011B0012A0012B0013A0013B0014A0014B00150016A0016B001700180019A0019B0020A0020B002100220023002400250001000200030004000500060007A0007B0008A0008B0009A0009B
DescriptionRateUnitTask 1 - General ConditionsTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY200 Ferry Boulevart (200 FB) - Site Prep200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 300 CY200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 300 CY200 FB - Mulch Restoration - First 80 SY200 FB - Mulch Restoration - Over 80 SY200 FB - Plantings - First 30 SY200 FB - Plantings - Over 30 SY200 FB - Pavement Restoration - First 200 SY200 FB - Pavement Restoration - Over 200 SYVacant Lots Behind 326 Ferry Boulevart (326 FB) - Site Prep326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 4,400 CY326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 4,400 CY326 FB - Excavation, Transport and Dispose of PHC Contaminated Soil Off-Site326 FB - Monitoring Well Decommission326 FB - Pavement Restoration - First 390 SY326 FB - Pavement Restoration - Over 390 SY326 FB - Landscaping - First 3,700 SY326 FB - Landscaping - Over 3,700 SYOU4 - Site PrepOU4 - Excavation and Disposal of Contaminated Soil at OU4OU4 - Site RestorationOPTION - Construction Trailer RentalOPTION - Contaminated Water DisposalTask 1 - General ConditionsTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY
Granular Activated Carbon Units$ - 0
1000-lb Vessels$ 2.12LB3000400080004000$ - 0
2000-lb Vessels$ 2.01LB40004000$ - 0
2200-lb Vessels$ 2.22LB2200$ - 0
3000-lb Vessels$ 1.96LB18000$ - 0
20,000-lb Vessels$ 1.91LB40000$ - 0
$ - 0
Ion Exchange Units$ - 0
29-cf Vessels$ 338.40CF87116$ - 0
58-cf Vessels$ 315.25CF60116116116$ - 0
400-cf Vessels$ 201.43CF800$ - 0
$ - 0
Treatment Unit Maintenance SubContractors$ - 0
Pump & Motor Replacement (Maher)$ 3,486.37Each523$ - 0
Satuit Automation Group (Todd Farmer)$ 1,446.20Day2111111$ - 0
FPR Reprogramming$ 10,330.00LS1$ - 0
VFD Troublshooting (R.E. Erickson)$ 98.13HR16888888$ - 0
Electrical Services (BETCO)$ 2,375.90Day211111$ - 0
$ - 0
Contaminant Testing$ - 0
Ethylene Dibromide (14 Day TAT)$ 46.49Sample8$ - 0
Explosives (14 Day TAT)$ 90.90Sample216361208436361448$ - 0
Explosives (21 Day TAT)$ 86.77Sample952$ - 0
Perchlorate (14 Day TAT)$ 72.31Sample2161208436361448$ - 0
Perchlorate (21 Day TAT)$ 68.18Sample768$ - 0
Geochemical$ 237.59Sample211$ - 0
Metals (21 Day TAT)$ 90.90Sample41$ - 0
W (Tungsten) (21 Day TAT)$ 46.49Sample37$ - 0
VOC (14 Day TAT)$ 67.15Sample12$ - 0
VOC (SPM)(21 Day TAT)$ 67.15Sample4$ - 0
SVOC (SPM)(21 Day TAT)$ 144.62Sample3$ - 0
$ - 0
Police Detail$ 475.18Day10$ - 0
QED Sample Controller Rental$ 103.30Day1$ - 0
YSI Rental$ 413.20Week3$ - 0
Peristalic Pump Rental$ 36.15Day15$ - 0
$ - 0
Small Electrical Equipment$ - 0
Radios$ 878.05Each15$ 13,170.75
Radio Maintenance$ 92.97Each15$ 1,394.55
Camera Maintenance$ 898.71Mo.12$ 10,784.52
$ - 0
Building Management$ - 0
General Building Maintenance$ 6,198.00LS1$ 6,198.00
Natural Gas Heating$ 6,198.00LS1$ 6,198.00
Cleaning Services (Bi-weekly)$ 268.58Each26$ 6,983.08
Fire Safety Inspections$ 361.55LS1$ 361.55
GFE Maintenance$ 8,264.00LS1$ 8,264.00
$ - 0
Site Management$ - 0
Brush Clearing$ 15,000.00LS1$ - 0
Maintenance Mowing$ 4,000.00LS1$ - 0
Snow Removal$ 10,000.00LS1$ - 0
Gravel Road Repair$ 2,500.00LS1$ - 0
DigSafe Admin Fee$ 387.37Quarter4$ 1,549.50
CSA Conex Rentals$ 2,582.50Year1$ - 0
$ - 0
Vacuum Truck$ 8,109.05LS1$ - 0
$ - 0
$ - 0
$ - 0
Subtotal$ 54,903.95
Markup$ - 0
Total$ 54,903.95

&G &"Arial,Italic"Remedial Action Contract New Bedford Harbor Superfund Site

Subcontracts LS per Bid Item

SUBCONTRACTS for the PRIME on the SEED TASK ORDER
Prime Contractor:
Document:Appendix I-3/Subcontracts
Addition MarkupSubcontracts - LS per Bid ItemCOST
Prime G&A0001000200030004000500060007A0007B0008A0008B0009A0009B00100011A0011B0012A0012B0013A0013B0014A0014B00150016A0016B001700180019A0019B0020A0020B002100220023002400250001000200030004000500060007A0007B0008A0008B0009A0009B00100011A
Subcontractor:Task 1 - General ConditionsTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY200 Ferry Boulevart (200 FB) - Site Prep200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 300 CY200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 300 CY200 FB - Mulch Restoration - First 80 SY200 FB - Mulch Restoration - Over 80 SY200 FB - Plantings - First 30 SY200 FB - Plantings - Over 30 SY200 FB - Pavement Restoration - First 200 SY200 FB - Pavement Restoration - Over 200 SYVacant Lots Behind 326 Ferry Boulevart (326 FB) - Site Prep326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 4,400 CY326 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - Over 4,400 CY326 FB - Excavation, Transport and Dispose of PHC Contaminated Soil Off-Site326 FB - Monitoring Well Decommission326 FB - Pavement Restoration - First 390 SY326 FB - Pavement Restoration - Over 390 SY326 FB - Landscaping - First 3,700 SY326 FB - Landscaping - Over 3,700 SYOU4 - Site PrepOU4 - Excavation and Disposal of Contaminated Soil at OU4OU4 - Site RestorationOPTION - Construction Trailer RentalOPTION - Contaminated Water DisposalTask 1 - Prepare and Submit PlansTask 4 - Completion Report380 E Main - Site Prep380 E Main - Excava, Transp and Disp of Cont Soil to OU4380 E Main - Site RestorationWooster Park (WP) Site Prep(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - First 1,600 CY(WP) Excavation, Transport and Dispose of Contaminated Soild to OU4 - Over 1,600 CY(WP) Landscape Restoration - First 1,300 SY(WP) Landscape Restoration - Over 1,300 SY(WP) Plantings - First 950 SY(WP) Plantings - First 950 SY200 Ferry Boulevart (200 FB) - Site Prep200 FB - Excavation, Transport and Dispose of Contaminated Soil to OU4 - First 300 CY
$ 3,000.00$ 4,000.00$ 8,000.00$ 4,000.00
$ 4,000.00$ 4,000.00
$ 2,200.00
$ 18,000.00
$ 40,000.00
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .