Amend_0011_Seed_TO_PWS.pdf

PDF 693 KB Posted

Attached to
Raymark Remediation Services IDIQ
Solicitation number
W912WJ18R0003
Issued by

About this file

This document provides details for a forthcoming Request for Proposal for an Indefinite Delivery/Indefinite Quantity remediation services task order contract for the Raymark Superfund Site in Stratford, Connecticut. The contract value is not to exceed $99 million over five years, with a minimum guarantee of $100,000. The work includes project management, plans, studies, investigations, engineering support, removal and remedial actions, and operation and maintenance for Operable Units 3, 4, and 6. Excavated waste from OUs 3 and 6 will be consolidated at OU4 and capped, while waste exceeding limits will be transported off-site. The solicitation is expected in September 2018 on FBO.gov. This will be a small business set-aside best value tradeoff award.

Seed TO PWS

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement For Remedial Action Contract

Task Order No. 1 (Seed)

Raymark Superfund Site Stratford, Connecticut

September 2018

For Remedial Action Contract

Task Order No. 1 (Seed)

TABLE OF CONTENTS

1.0 Background

2.0 Contract Procurement Objectives and Overview

3.0 Contract Type

4.1 Task Order 1 - Seed Task Order

4.2 Seed Task Order Description & Design Documents

4.3 Seed Task Order Performance Objectives and Standards

5.1 Task Order Contract Requirements

5.2 Task 1 – General Conditions

5.2.1 Task 1.1 – Project Management/Project Controls

5.2.2 Task 1.2 – Prepare Plans

5.2.2.1 Task 1.2.1 – Project Management Plan

5.2.2.2 Task 1.2.2 – Construction Work Plan (CWP)

5.2.2.3 Task 1.2.3 – Health and Safety Documentation

5.2.2.4 Task 1.2.4 – Sampling and Analysis Plan and Quality Assurance Project Plan

5.2.3 Task 1.3 – Site Mobilization and Preparation

5.2.4 Task 1.4 – Temporary Facilities

5.2.5 Task 1.5 – Environmental Protection

5.3 Task 2 – Remediation & Restoration of OU#6 Properties

5.4 Task 3 - Completion of OU#4 Interim Cap

5.5 Task 4 – Prepare Completion Report

6.1 Additional Requirements

6.2 Environmental Protection Requirements

6.3 Sustainability Requirements

6.4 Protection of Property

6.5 Health and Safety Requirements

6.6 Sampling and Analysis Quality Control

6.6.1 Analytical Testing

6.6.2 Sample Data Review/Validation and Reporting

6.6.3 Data Management

6.6.4 Geotechnical Testing

6.7 Regulatory Involvement

6.8 Project Stakeholders

6.9 Deliverable Requirements

6.9.1 Mailing Requirements

6.9.2 Late Submittals

6.9.3 Submittal Format

6.9.4 Meeting Notes

6.10 Expertise and Related Personnel

6.11 Travel

6.12 Rights of Entry

6.13 Engineering Support

6.14 Contractor Furnished Resources

6.15 Government Rights

6.16 Stop Work Authority

6.17 Project Repository and Administrative Record

6.18 Government Furnished Resources

7.0 Travel and Meetings

8.0 Manifesting, Transportation, and Disposal Requirements

9.0 Public Relations

10.0 Physical Security

For Remediation Action Contract

1.0 Background

The Raymark Industries, Inc. Superfund Site (the “Site”) includes areas that have been contaminated as a result of manufacturing processes from the former Raymark Industries, Inc. facility. The former Raymark Facility, which was located at 75 East Main Street in Stratford, Connecticut, operated from 1919 to 1989. Known as Raybestos- Manhattan, Inc., Raymark manufactured gaskets, clutches and heavy brake friction components for the automotive industry. Raymark generated wastes containing asbestos, lead, copper, polychlorinated biphenyls (PCBs) and a variety of solvents, adhesives, and resins as byproducts of its manufacturing operations. This resultant byproduct was available as “free fill” to the Town and residents. The Raymark waste that remains in the town of Stratford presents a threat to human health that needs to be addressed. The conceptual approach is comprehensive in that it addresses all Raymark waste in residential, commercial, and recreational properties.

The U.S. Environmental Protection Agency (EPA) approved one Record of Decision (ROD) that specified the selected remedies for four operable units (OUs) of the Raymark Superfund Project. The specific OUs are OU2 (Groundwater Vapor Intrusion), OU3 (Upper Ferry Creek), OU4 (Raybestos Memorial Ballfield), and OU6 (Additional Properties). Although OU2 is part of the ROD, it is not included in this contract acquisition since Connecticut Department of Energy and Environmental Protection (CT DEEP) is responsible for the remedy at OU2.

The selected remedy incorporates the consolidation and capping of approximately 100,000 cubic yards of Raymark waste. Excavated Raymark waste from OUs 3 & 6 will be consolidated at the OU4 Memorial Ballfield and covered with a low-permeability cap.

Sediment and waste soil containing more heavily contaminated material that exceeds certain regulatory limits will be transported to a licensed out-of-town disposal facility.

Based on available data, approximately ten percent (10%) of the estimated volume (+/- 110,000 cubic yards (cy)) of excavated Raymark waste and sediment may exceed the regulatory Principal Hazardous Constituents (PHC) limits. Any Raymark waste that exceeds the PHC contamination threshold will be transported to an out-of-town licensed disposal facility. Refer to Figure 1 for site locations.

OU3 (Upper Ferry Creek) encompass approximately seven acres, including approximately one acre of wetlands and one acre of open water, and consists primarily of three different areas: the delineated wetlands, the Upper Ferry Creek channel, and all other soils (mainly bank soils). All of OU3 is located within the 100-year floodplain. OU3 requires excavation of the top two feet of channel sediment for the entire length of

Ferry Creek from the I-95 culvert down to the Broad Street Bridge. Upper Ferry Creek bank soil (above the mean high water line) and adjacent wetland soil containing Raymark waste will be excavated to a depth of four feet. The bottom of each soil excavation will be lined with a geotextile fabric to serve as a warning layer, then backfilled with clean material, followed by site restoration. Based on available data, excavation and consolidation of Raymark waste from OU3 is estimated at 34,850 cy (Sediment = 4,650 cy, Wetlands = 7,600 cy & Stream bank = 22,600 cy).

OU4 (Raybestos Memorial Ballfield) will be the consolidation of Raymark waste from OU3 and OU6 and eventually include the construction of a low-permeability cap. The cap will be constructed in a manner that will allow commercial redevelopment of the property while ensuring the continued containment of the underlying contamination.

OU4 has the capacity to receive approximately 100,000 cy of Raymark waste from OU3 and OU6.

OU6 (Additional Properties) is comprised of 22 non-contiguous commercial, recreational, and residential properties where Raymark waste was used to fill low-lying areas. OU6 requires excavation of the top four feet of soil areas containing Raymark waste from each property. The bottom of each soil excavation will be lined with a geotextile fabric to serve as a warning layer, then backfilled with clean material, followed by site restoration. Based on available data, excavation and consolidation of Raymark waste from OU6 is estimated at 71,000 cy.

Raymark waste-contaminated soil containing more heavily contaminated material that exceeds certain regulatory limits will be segregated during excavation and transported to a licensed out-of-town disposal facility. Based on available data, approximately ten percent (10%) of the estimated volume (+/-110,000 cubic yards (cy)) of excavated Raymark waste and sediment may exceed the regulatory Principal Hazardous Constituents (PHC) limits. Any Raymark waste that exceeds the PHC contamination threshold will be transported to an out-of-town licensed disposal facility. Refer to Figure 1 below for site locations.

FIGURE 1 – PROJECT LOCATION

2.0 Contract Procurement Objectives and Overview

No information for this task order.

3.0 Contract Type

tasks.

This task order is fixed price. All tasks on this task order are considered service

4.1 Task Order 1 - Seed Task Order

4.2 Seed Task Order Description & Design Documents

Work for the Seed Project shall include the limited clearing of OU4 for the consolidation and covering of Raymark Waste (RW), and the excavation and transportation of RW from four OU6 properties to OU4 for consolidation. Some RW from the vacant lot behind 326 Ferry Boulevard shall be transported to an off-site permitted facility. The four OU6 properties shall include:

• 380 East Main Street (commercial property)

• Wooster Park at the corner of Quail Street and Freeman Avenue (municipal recreation area)

• 200 Ferry Boulevard (commercial property), and

• the vacant lot behind 326 Ferry Boulevard (wooded vacant lot)

Details of the work on the Seed Project shall include, but are not limited to:

•Clearing and grubbing •Installation of erosion and sedimentation controls •Construction of laydown areas and decontamination pads •Excavation and fill •Confirmatory soil sampling •Transportation and disposal of hazardous materials •Topsoil and seed •Site restoration •Traffic Management and Air Monitoring •Monitoring well preservation and abandonment

All work under this Task Order shall be completed in accordance with this PWS and the Raymark Superfund Site Seed Project Remedial Design Drawings and Specifications. The Drawings and Specifications are attached to this PWS and are titled as follows:

•SEED Project, Raymark Superfund Site, Stratford, Connecticut, Construction Solicitation and Specifications, August 2018 (Specifications)

•REMEDIAL DESIGN DRAWINGS, RAYMARK SUPERFUND SITE –

SEED PROJECT, STRATFORD, CONNECTICUT, Issued for Bid, August 2018 prepared by AECOM (Drawings)

The Contractor shall perform all the necessary services required to successfully meet all performance objectives of this PWS. The Contractor shall comply with all applicable Federal, State, and local laws and regulations in order to successfully complete all performance objectives of this PWS in a manner that is consistent with any applicable orders and permits and relevant Department of Defense (DOD) and Army policies for the duration of this Task Order. The Contractor shall also use the references listed below (and default to most recent version if different) and references listed in the Specifications when preparing the proposal and executing the work:

□ EPA New England Region 1 – Raymark Industries, Inc. Superfund Site – Record of Decision, Stratford, Connecticut dated September 2016;

□ Raymark Superfund Site –Final OU3 Feasibility Study Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 29, 2016 – Nobis Engineering, Inc.

□ Raymark Superfund Site –Final OU4 Feasibility Study, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 30, 2016 – Nobis Engineering, Inc.

□ Raymark Superfund Site –Final OU6 Feasibility Study Addendum, Stratford, Connecticut - Remedial Investigation/Feasibility Study dated June 28, 2016 – Nobis Engineering, Inc.

□ Engineer Manual (EM) 1110-1-4007 Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies, USACE, 2003.

□ EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans, USACE, 01 Feb. 2001

□ ER 1110-1-263, Chemical Data Quality Management for Hazardous, Toxic, Radioactive Waste Remedial Activities, USACE, 30 Apr 1998

□ EM 200-1-6, Chemical Quality Assurance for HTRW Projects, USACE, 10 Oct. 1997

□ DOD Quality Systems Manual (QSM), for Environmental Laboratories, Revision 5.0 dated July 2013

□ Uniform Federal Policy for Quality Assurance Project Plans (UFP for QAPP), Evaluating, Assessing and Documenting Environmental Data Collection and Program Use, Part 1 and Part 2, Final version 1, March

□ Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Optimized UFP-QAPP Worksheets.

www.epa.gov/fedfac. DoD/EPA/DOE, March 2012

□ EPA New England Environmental Data Review Program Guidance.

Version 4-22-2013

□ DoD General Data Validation Guidelines Final Draft, Environmental Data Quality Workgroup, December 2016

□ National Functional Guidelines for Superfund Organic Methods Data Review. EPA-540-R-2016-002

□ National Functional Guidelines for Superfund Inorganic Methods Data Review. EPA-540-R-2016-001

□ ER1180-1-6, Construction Quality Management, USACE, 30 Sep 1995

□ EM 385-1-1 U.S. Army Corps of Engineers Safety and Health

Requirements Manual (2008)

□ EM 1110-1-4000, Monitoring Well Design, Installation, and

Documentation at Hazardous Toxic, and Radioactive Waste Sites, USACE, Dated November 1, 1998.

□ 42 U.S. Code Chapter 103 – Comprehensive Environmental Response, Compensation, and Liability.

□ EQASOP-GW 0001, Low Stress (low flow) Purging and Sampling Procedure for the Collection of Groundwater Samples from Monitoring Wells, prepared by USEPA Region 1, dated July 30, 1996, revised January 19, 2010.

□ ER 1110-1-8157, Engineering and Design Geotechnical Data Quality Management for Hazardous Waste Remedial Activities, 2002.

□ EM 1110-1-1804 Geotechnical Investigations, Engineering and Design, 2001.

□ EM 1110-1-1802 Geophysical Exploration for Engineering and Environmental Investigations, 1995.

□ EM 1110-2-1902, Slope Stability, USACE, 31 October 2003.

□ United States Environmental Protection Agency, 2006. Guidance on

Systematic Planning Using the Data Quality Objectives Process (EPA QA/G-4). Published by the Office of Environmental Information.

□ U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual, Second Edition, Volumes I and II, 1998, Reprinted 2001.

□ U.S. Department of the Interior, Bureau of Reclamation, Earth Manual, Third Edition, Volumes I and II, 1998.

□ Applicable ASTM Standards

4.3 Seed Task Order Performance Objectives and Standards

This Task Order PWS is for a results-based contract with intent to successfully complete all performance objectives shown in Table 1. All tasks will be Firm Fixed Price (FFP). The period of performance for this task order will be eight months from task order award. The Contractor shall furnish all labor, materials, and equipment necessary to successfully complete all performance objectives identified in this PWS and Table 1, Performance Requirements Summary.

Achievement of the performance objectives is successfully attained upon the finalization of appropriate documentation certifying that the documents have been accepted by the USACE. USACE approval of the Performance Standards will be by the KO or Contracting Officer’s Representative (COR).

Table 1 – Performance Requirements Summary Performance Objective/Task Performance Standard

Task 1 – General Conditions

Task 1.1 - Project Management/Project Controls

Submit Monthly Status Reports, including current schedule and Vouchers by 5th day of each month in accordance with program requirements and USACE acceptance

Task 1.2 – Prepare & Submit Plans Task 1.2.1 – Project Management Plan in accordance with Paragraph 5.1.2.1 including

USACE acceptance of Final Project Management Plan

Performance Objective/Task Performance Standard the Project Schedule required in Specification Sections 01 11 00 & 01 32 01.

Task 1.2.2 – Construction Work/Site Plan in accordance with Paragraph 5.1.2.2 and Specification Section 01 50 00.

USACE approval of Final Construction Work Plan

(CWP).

Task 1.2.3 – Health and Safety Documentation in accordance with Paragraph 5.1.2.3 and Specification Sections 01 35 26 and 01 35 29.

USACE approval of Final APP/SSHP

Task 1.2.4 – Sampling and Analysis Plan (SAP) and Quality Assurance Project Plan (QAPP) in accordance with Paragraph

5.1.2.4 and Specification Section 31 23 00.00 20.

USACE approval of Final SAP/QAPP

Task 1.2.5 – Other Major Plans in accordance with Specification Sections 01 45 00, 01 55 00, 01 57 20, 01 74 19, 02 11 14, & 31 23

00.00 20.

USACE approval of following Plans:

CQC

Traffic Management Plan Environmental Protection Waste Management/Transportation & Disposal Dewatering

Task 1.3 – Site Mobilization and Site Preparation – Establish Work Surfaces, Staging Areas, Ecological Resources Protection, Security, Dust Control, and Surface Water Management.

Complete Site Mobilization and Site Preparation in accordance with approved CWP to achieve stable, safe, and protective work areas and accurate horizontal and vertical control for future data collection.

Task 1.4 – Temporary Facilities – Provide project trailers, electrical and communication services, and portable toilets.

Provide temporary facilities necessary to execute the work in accordance with all approved plans.

Task 1.5 – Environmental Protection in accordance with Specification Section 01 57 20 Environmental Protection and Section 01 57 23 Temporary Storm Water Pollution Control including NHPA Compliance.

Establish and maintain sedimentation and erosion control measures and other environmental protection measures in accordance with all approved plans to achieve maximum protection of environmental resources and avoid disruption of work. USACE approval of Final Pre & Post- Construction Digital Photo Documentation.

Task 2 – Remediation & Restoration of OU#6 Properties – Completion of Remediation and Restoration at the four OU#6 properties in accordance with the Drawings, Specifications, and Approved Plans from Task 1.2.

USACE approval of remediation and restoration at the four OU#6 Properties:

- 380 East Main Street

- Wooster Park

- 200 Ferry Boulevard

- 326 Ferry Boulevard vacant lot

Task 3 – Completion of OU#4 Interim Cap – Completion of the Interim Cap at OU#4 in accordance with the Drawings, Specifications, and Approved Plans from Task 1.2.

USACE approval of Interim Cap.

Performance Objective/Task Performance Standard

Task 4 – Prepare Completion Report in accordance with Paragraph 5.4.

Report shall also include the Closeout Submittals required in Specification Sections 01 11 00, 01 35 29, & 01 78 00.

USACE approval of Final Completion Report.

In the event that there may be multiple milestones and/or deliverables for each of the performance objective tasks, partial payments will be based on the successful completion of milestones. Final decisions regarding the adequacy of milestone and deliverable completion resides with the KO or COR.

5.1 Task Order Contract Requirements

The Contractor shall furnish all necessary labor, equipment, materials, and supplies to complete the tasks listed in Table 1 above and defined in the following paragraphs. All work shall be conducted in a safe, secure, and environmentally acceptable manner in accordance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Record of Decision signed in September 2016, the Drawings and Specifications, and EPA green and sustainability principles. Work shall be completed correctly in a professional, workmanlike manner, in accordance with approved work plans. Work is to be performed commensurate with the level of effort and quality intended, with appropriately qualified quality control (QC) representation (as part of the contractors overall QC Program) controlling the work.

Contractor Quality Control (CQC) is the means by which the Contractor ensures that the work, to include that of subcontractors and suppliers, complies with the requirements of the contract. The control shall be adequate to cover all operations, including both on-site and off-site activities. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with governing regulations and contract task order requirements.

The Contractor's quality control program shall include inspections and tests as described in the task orders. CQC will be outlined and documented in the CQC Plan as required by Task 1.2.5 and Specification Section 01 45 00.

5.2 Task 1 – General Conditions

5.2.1 Task 1.1 – Project Management/Project Controls

This task provides for oversight of the below activities to include the Program Manager, Project Manager, Subcontracts Manager, Project Controls, Cost Scheduler, and Administrative staff when engaged in representative non-site specific activities.

□ Cost and schedule reporting and tracking.

□ Subcontractor cost and schedule reporting and tracking.

□ Program resource planning selection and resource conflict resolution.

□ Participation by the Project Manager and Site Superintendent in monthly conference calls with USACE, EPA, Town of Stratford Health Department, and subcontractors; and, weekly conference calls during field construction.

□ Contract basis review, verification, and tracking of invoices to ensure conformance to applicable contract requirements.

□ Preparation of monthly invoices.

□ Preparation of monthly status reports including current schedule.

□ Preparation of daily update on field activities via e-mail.

□ Preparation of weekly field update on field activities via e-mail.

5.2.2 Task 1.2 – Prepare Plans

The contractor shall prepare all plans as required by this PWS and the contract specifications. All DRAFT deliverables are to be submitted within 21 days of task order award unless otherwise specified by the contract. The Final deliverable(s) for USACE approval shall be submitted within 60 days of task order award unless otherwise specified by the contract. All draft deliverables are to be submitted within 21 calendar days of task order award unless otherwise specified by the contract. The final deliverable(s) for approval shall be submitted within 60 calendar days of task order award unless otherwise specified by the contract.

5.1.2.1 Task 1.2.1 – Project Management Plan

The Contractor shall develop and maintain a detailed Project Management Plan (PMP). The PMP will specify the schedule, execution, and completion of the performance objectives. The first draft PMP shall be submitted within 30 calendar days of contract award. The draft PMP and subsequent revisions will be subject to USACE review and approval through the COR. The final PMP will be due within fifteen (15) calendar days of comments received from the COR. Assume a Draft, Draft Final, and Final PMP. A payment milestone will be established for USACE’s approval of the final PMP through the COR.

As part of the PMP, the Contractor will develop and maintain an activity-based schedule that fully supports the technical approach and outlines the due dates for all milestones and payable deliverables. The schedule shall be prepared in accordance with Specification Section 01 32 01 Project Schedule.

It is the Army’s intent to make all payments after verification of progress in accordance with this schedule. As part of the PMP, the Contractor will identify and implement a means for providing project monthly status reports to the COR. The PMP will address the content of status reports.

The Final PMP for USACE approval shall be submitted within 60 days of task order award.

5.1.2.2 Task 1.2.2 – Construction Work Plan (CWP)

The Contractor shall prepare a draft, draft-final and final construction work plan prior to the commencement of any work on the project site. The Construction Work Plan (CWP) shall contain, but not be limited to, the following:

□ Statement of the work to be accomplished including a statement of Data Quality Objective(s).

□ Discussion on implementation of the project including the method of operation, type of equipment, personnel required, and other special considerations for the tasks required under the task order.

□ A copy of the schedule detailing the work to be performed with key project milestones as described under Task 1.2.1 Project Management Plan.

□ Permits, licenses, access agreements, and certificates required;

□ Key personnel to be used on the project along with their roles and responsibilities.

□ Site-specific assumptions and clarifications.

□ Logs, reports, and record keeping to be utilized.

□ Construction Site Plan as required by Specification Section 01 50 00

Temporary Construction Facilities and Controls.

Assume internal draft, draft final and final versions will be required with Response to Comments (RTCs) and response to comments letters (RCL) by the Contractor. Contractor shall assume a minimum of 5 10 business days for each Government review phase. Acceptance of the Contractor's work plan by the Government is required prior to any field mobilization. Acceptance is conditional and will be predicated on satisfactory performance during field activities. Deviations or proposed changes to the approved work plan shall be submitted to the USACE’s PM and COR for review, comment, and approval.

The Government reserves the right to require the Contractor to make changes in his work plan and operations as necessary. During execution of the task order, the Contractor shall follow the approved work plan.

The CWP for USACE approval shall be submitted within 60 days of task order award.

5.1.2.3 Task 1.2.3 – Health and Safety Documentation

The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities to be performed in accordance with this PWS and Specification Sections 01 35 26 and 01 35 29. The documentation shall include an Activity Hazard Analysis (AHA) for each phase of work as described below. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at

Headquarters USACE website under publications using the following link:

http://www.usace.army.mil/library/.

The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations. The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1-1, specifically Section 01.A.11 through 01.A.18, Figure 1-2 AHA, and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person. The contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.

The Contractor shall prepare a Site Health and Safety Plan (SSHP) that covers the 14 elements identified in EM385-1-1, Section 28.A.02.b. and in accordance with Specification Section 01 35 26 and 01 35 29. The SSHP shall be attached to the APP as an Appendix. SSHP elements adequately covered elsewhere in the APP need not be duplicated in the SSHP.

The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

The Contractor shall conduct a safety meeting at the project site on the first day of work, and whenever a new activity or phase of work begins. All safety meetings shall be documented. Records of the safety briefings shall be submitted to the GDA weekly.

Activity Hazard Analysis (AHA)

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the Contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime Contractor and shall include all subcontractors and Government on-site representatives. The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.

Accident Reporting

All accidents and near misses shall be investigated by the Contractor. All work-related injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $2,000.00, shall be verbally reported to the GDA within 24 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D.02 shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident.

The Contractor shall complete the “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 10th calendar day of the following month. The form shall be transmitted by the prime Contractor to the GDA electronically.

The APP for USACE’s approval shall be submitted within 60 days of task order award.

5.1.2.4 Task 1.2.4 – Sampling and Analysis Plan and Quality Assurance

Project Plan

A Sampling and Analysis Plan (SAP) shall be prepared in accordance with this paragraph, Specification Section 31 23 00.00 20 Excavation and Fill, and EM 200-1-3, dated February 1, 2001, or subsequent revision. In addition, the SAP will be required to include a Quality Assurance Project Plan (QAPP), prepared in accordance with Uniform Federal Policy for Quality Assurance Project Plans (DTIC ADA 427785), dated March 2005 or subsequent revision.

The Contractor shall also develop data quality objectives (DQOs) for all phases of required work from existing project documents, applicable state and federal guidance and directives, and own sources, and include them in the appropriate sections of the work plans. Copies of the Contractor’s SOPs and appropriate field forms shall be included as part of the SAP.

The SAP and QAPP for USACE approval shall be submitted within 60 days of task order award.

5.1.3 Task 1.3 – Site Mobilization and Preparation

The Contractor shall prepare the site for the remediation work in accordance with the approved Construction Work Plan required under Task 1.2.2, the Drawings and Specifications, and other approved Submittals. The following activities are included under this task:

□ Clearing and grubbing as required for staging and work areas.

□ Establishment of vehicular traffic pathways, staging areas, and lay-down areas.

□ Soil and sediment erosion controls.

□ Storm water controls and treatment

□ Stabilization measures, as necessary.

□ Installation of security fencing, and establishment of exclusion zones, reduction zones and support zones throughout the execution of remediation activities.

5.1.4 Task 1.4 – Temporary Facilities

The Contractor shall provide all necessary temporary facilities to perform the work in accordance with the approved Construction Work Plan required under Task 1.2.2, Drawings and Specifications, and other approved Submittals. The following activities are included under this task:

□ Trailer setup with temporary utilities, sewer, water, electrical and telephone.

5.1.5 Task 1.5 – Environmental Protection

The Contractor shall provide all necessary environmental protection measures to perform the work in accordance with Specification Section 01 57 20 Environmental Protection, the approved Contractor prepared Environmental Protection Plan, and the Drawings and Specifications.

5.2 Task 2 – Remediation & Restoration of OU#6 Properties.

The Contractor shall complete the remediation and restoration at the four OU#6 properties in accordance with the Drawings, Specifications, and Approved Plans from Task 1.2.

5.3 Task 3 - Completion of OU#4 Interim Cap

The Contractor shall complete the Interim Cap at OU#4 in accordance with the Drawings, Specifications, and Approved Plans from Task 1.2.

5.4 Task 4 – Prepare Completion Report

The Contractor shall prepare a Final Completion Report to summarize the work completed, air monitoring results, analytical results, as-built drawings and shall also include the Closeout Submittals required in Specification Sections 01 11 00, 01 35 29, & 01 78 00. Assume internal draft, regulatory draft, draft final, and final versions will be required with RTCs and RCL by the Contractor. The Final Completion Report shall be approved by USACE.

Draft Completion Report is due 60 days after services are completed.

6.1 Additional Requirements

6.2 Environmental Protection Requirements

The Contractor shall identify applicable Federal, State and Local laws, regulations, and Project specific orders or agreements and perform all work in accordance with said authorities. The Contractor shall ensure that all activities performed by its personnel, subcontractors and suppliers are executed in accordance with said authorities. Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the USACE’s KO, COR, and PM via telephone, followed by written notice. Nothing in this PWS shall relieve the Contractor of its responsibility to comply with applicable laws and regulations. The Contractor shall investigate the requirements for and obtain all permits, licenses, approvals, and/or certificates necessary to accomplish the work specified. When the work to be performed requires clearances, such as digging or drilling permits, the Contractor shall obtain such clearances and/or permits, with the assistance of the facilities/site point of contact, prior to initiation of any drilling or excavating operations. The Contractor shall coordinate all excavating with USACE prior to performing work. Contractors on environmental sites are required to perform their own utility checks. The Contractor shall comply with all USACE or site-specific time and procedural requirements (federal, state, and local) described in the permits obtained. The USACE will continue to independently review Contractor work to ensure compliance with all applicable requirements.

The Contractor shall perform all work in a manner that minimizes the pollution of air, water or land and develop contingency measures for cleanup of any spills that may occur during performance of this contract. The Contractor shall control noise and dust within reasonable limits or limits established by applicable federal, state, and local laws and regulations. A site survey may be required to identify any wetlands, endangered species, special habitat or other protected areas. Task Orders may include specific environmental protection requirements.

6.3 Sustainability Requirements

The Contractor shall review EO 13834 “Efficient Federal Operations” dated 17 May 2018.

The Contractor shall consider and implement green response/remediation strategies and applications to maximize sustainability, reduce energy and water usage, promote carbon neutrality, promote industrial materials reuse and recycling, and protect and preserve land resources, consistent with DOD and EPA Policies on Green and Sustainable Remediation Practices in the EPA Federal Superfund Program (https://www.epa.gov/superfund/superfund-green-remediation). The Contractor shall present green remediation options and approaches in its work plans, maintain records of “green-related” activities, and report this information to the COR in its project status reports.

EPA Superfund and Green Remediation guides, standards, and Policies include but are not limited to:

1. Superfund Green Remediation Strategy, Sep 2010, U.S.

Environmental Protection Agency, Office of Superfund Remediation and Technology Innovation.

2. Memorandum, U.S. Environmental Protection Agency, 02 August

2016, Consideration of Greener Cleanup Activities in the Superfund Cleanup Process.

3. Clean and Greener Policy for Contaminated Sites, EPA Region 1, Feb

2012, Office of Site Remediation and Restoration

The contractor shall meet the recycled content requirements set forth by EPA for the products identified in the Comprehensive Procurement Guideline (CPG) and at the following link: https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

The Contractor shall meet the Bio-Preferred Program requirements set forth by USDA for the products identified in the following link:

http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml)

All deliverables shall be printed double sided on post-consumer fiber paper.

6.4 Protection of Property

The Contractor shall be responsible for any damage that may be caused to property by the activities of the Contractor under this PWS. Additionally, the Contractor shall exercise due diligence in the protection of all property located on the premises against fire or damage from any and all other causes. Any property damaged or destroyed by the Contractor incident to the exercise of the privileges herein granted shall be promptly repaired or replaced by the Contractor to a condition satisfactory to the COR or reimbursement shall be made therefore by the Contractor in an amount necessary to restore or replace the property to a condition satisfactory to the COR in accordance with Federal Acquisition Regulation (FAR) Clause 52.237-2.

6.5 Health and Safety Requirements

The Contractor shall produce and implement a written Safety and Health Program meeting the requirements of all applicable federal, state, and local laws and regulations, and approved by the KO. The Contractor shall ensure that its subcontractors, suppliers and support personnel follow all safety and health provisions established in the approved Site Safety and Health Plan (SSHP), APP and/or AHA. The USACE reserves the right to stop work under this contract for any violations at no additional cost to the USACE. Once the USACE verifies that corrective action has been implemented, the Contractor will be able to continue performance under the contract. As a minimum, the SSHP shall contain the following elements: site description and contaminant characterization, safety and health hazard(s) assessment and risk analysis, safety and health staff organization and responsibilities, site specific training and medical surveillance parameters, personal protective equipment (PPE) and decontamination facilities with documented procedures to be used for same, monitoring and sampling requirements, safety and health work precautions and procedures, site control measures, on-site first aid and emergency equipment, emergency response plans and contingency procedures (on-site and off-site), logs, reports, and record keeping.

6.6 Sampling and Analysis Quality Control

Appropriate documentation of Quality Control shall be provided whenever sampling or analysis for chemical, geophysical, geotechnical, particulate, or soils parameters is required in order to meet the PWS objectives. The laboratory(ies) to be used by the Contractor shall be certified by the National Environmental Laboratory Accreditation Program (NELAP) or an equivalent agency. The Contractor may also establish an on-site testing laboratory at the project site if determined necessary by the Contractor.

However, this on-site testing shall meet the requirements of EPA and any specific state regulator requirements. The Contractor shall also comply with all requirements of the DoD Quality Systems Manual, Final Version 3, dated January 2006 or more recent version.

6.5.1 Analytical Testing

Environmental laboratory services are to be provided only by laboratories that have successfully passed the new Environmental Laboratory Accreditation Program (ELAP) audit implemented 1 October 2009, including being compliant with the most recently published version of the Department of Defense (DOD) Quality Systems Manual (QSM Version 5.1.1 and holding current NELAP accreditation for all the preparatory and analysis. The latest version of the DOD QSM is available at http://www.denix.osd.mil or http://navylabs.navy.com. As requested by the COR, the laboratory shall submit in a timely manner, their ELAP accreditation certificate (including supporting documentation). Before testing services can be performed by the laboratory, the COR will notify the candidate laboratory of the acceptability of their ELAP accreditation and supporting documentation. The ELAP accreditation certificate is to be provided upon each recertification while supporting USACE contracts.

An environmental laboratory, either participating, or engaged in support of USACE contracts, shall notify the prime contractor and COR, immediately of change in status of laboratory operations that may affect on-going compliance with these requirements. The COR may, at any time, conduct audits (including requests for pertinent data or information) that support an environmental laboratory's ELAP accreditation with this policy. If the COR finds the laboratory non-compliant; alternate, compliant laboratory services will be utilized, until such time as compliance is again demonstrated. Before performing environmental testing for the USACE, the laboratory shall have access to the agency approved Sampling and Analysis Plan (SAP) and/or QAPP, as the case may be.

The laboratory shall provide sample results in both paper copy and electronic data deliverable (EDD) format within the prescribed turnaround time (TAT) associated with any sampling event. The Contractor shall work closely with the analytical laboratories to schedule all sampling events in advance in order to meet the TAT requirements of the program. The laboratory report shall include:

a) Sample Results.

b) Dates of Extraction and Analysis.

c) Associated Quality Control including laboratory method blank, trip blanks, equipment blanks, Laboratory Control Sample (LCS), matrix spike and matrix spike duplicate (MS/MSD), surrogate recovery, and duplicate sample results.

d) Narrative describing any sample anomalies or quality control exceedance, and their impact on the analytical results.

e) Copies of Chain of Custody and Sample Receipt forms.

f) Electronic data deliverables.

g) All appropriate data required for a Tier III or CLP validation

All supporting data (i.e., calibration curves, instrument tuning information, etc.)

shall be stored at the laboratory and by the Contractor for future reference in accordance with the QAPP.

The Contractor shall provide laboratory analyses, data validation, and data management for all samples collected. Quality Assurance/Quality Control (QA/QC) samples shall be collected to monitor the sample collection, handling, and analysis procedures. QC samples shall be collected at the following frequency:

Field Duplicates 1 per 10 samples Equipment Rinsates 1 per day when using non-dedicated pumps Field Blanks 1 every 30 days Trip Blanks 1 per day if VOCs collected

When samples are received at the laboratory, the sample custodian will complete a Cooler Receipt form to document the condition of the samples upon arrival.

The Cooler Receipt form and the Chain of Custody form for the samples shall be kept on file for permanent record of all sampling.

6.5.2 Sample Data Review/Validation and Reporting

Data validation reports will be completed for each laboratory data package or sample delivery group (SDG) in accordance with the Quality Assurance Project Plan. The Contractor shall validate to the Tier 1/Stage 2A modified levels per the specification. Data validation may proceed using automated or semi-automated systems, and shall be performed in accordance with the EPA Data Validation Functional Guidelines (EPA 2016). Where specific guidance is not available, the data shall be evaluated in a conservative manner consistent with industry standards using professional judgment.

The Contractor shall provide the USACE with all laboratory data in a mutually agreed upon EDD format (as detailed in the approved QAPP). The final deliverables to USACE will include EDDS, final laboratory non-conformance report, validation memos, and validation reason codes associated with the final deliverable EDDs. Data from physical tests may be provided in simplified EDD formats. Final laboratory reports that include all raw data/supporting instrument calibration information are also to be provided to the USACE in portable document format. The Contractor shall also provide the USACE with generated relational MS Access database file(s) incorporating finalized laboratory and field data.

6.5.3 Data Management

The Contractor shall submit all project electronic files associated with all spatial data, geophysical testing data, modeling data, and electronic files corresponding to any graphic figures included in the hard copy report deliverables, and text files corresponding to the word processed portion of the hard copy deliverable. These files shall be submitted to the Project Manager or his designee. The Contractor may utilize whichever GIS or Computer Aided Design Drafting (CADD) based system they select to generate the files; however, the Contractor shall submit metadata identifying software type used, version, file format type, date, and other information required to catalog those files with sufficient specificity to allow satisfactory transfer to other users. All spatial data should be consistent with the most current installation map. Details about the current map and metadata guidelines may be obtained through the Project Manager. Electronic data files are used during the project to evaluate progress and quality in accordance with each task order PWS. When bringing a new subcontract laboratory on line, the Contractor shall check the contents of the data files to ensure that they accurately reflect the hard copy reports, report correct analyte lists, units, and other reporting requirements, and provide the complete set of QC sample results specified in the QAPP. The USACE Project Manager can assist Contractors who have concerns or questions about their electronic deliverables.

6.5.4 Geotechnical Testing

The laboratory to be used by the Contractor for geotechnical testing shall be Corps of Engineers approved in accordance with ER 1110-1-261 Validation of Geotechnical Laboratories. The types of laboratory services anticipated under this contract include, but are not limited to, mechanical analysis (sieve analysis), hydrometer analysis, Atterberg Limits, soils classifications, permeability, standard and modified proctor tests, and relative density tests. The Contractor shall identify the prime laboratory and secondary laboratory(ies) to be used for this type of Contract work.

6.6 Regulatory Involvement

With the direction and approval of the COR, the Contractor shall provide the necessary support to initiate, schedule, and address all regulatory involvement activities of the project (e.g., organizing discussions with regulators concerning site objectives and requirements, obtaining regulator comments on site documents and appropriately addressing them, and obtaining written documentation, as necessary, of product completion from the regulators for all of the sites identified in this PWS).

Generally, the COR, or other USACE designee, shall attend and represent the USACE at all meetings with the regulators. With the approval of the COR, the Contractor may also informally discuss remediation issues with regulators and provide an after-action report back to the COR and/or PM. The Contractor may not contact regulators without prior approval of the COR and/or PM. The USACE will be the signature authority for all regulatory agreements and remediation documentation.

6.7 Project Stakeholders

For the purposes of this PWS, project stakeholders include the EPA, USACE, Connecticut Department of Energy and Environmental Protection, Town of Stratford Health Department, and Raymark Community Advisory Group.

6.8 Deliverable Requirements

Reports: All documents, except where noted, shall be produced with a draft, final draft, and final versions. The COR will receive draft documents and will provide comments to the Contractor within fifteen (15) business days. The Contractor shall provide RTCs to USACE within ten (10) business days, unless otherwise noted. RTC packages shall include restating each comment and a detailed response. A comment resolution meeting, if necessary, will be held via telephone conference. If a comment resolution meeting is held, a Memorandum of Resolution (MOR) shall be written by the Contractor. Once the RTCs are approved, the Contractor shall prepare the final draft document. USACE will provide comments on the final draft within 10 business days of submittal. The Contractor shall submit the final document within 10 business days of receipt of comments. One copy of the final document will be placed in the project repositories. USACE will require a complete electronic copy of all final documents.

Unless otherwise directed by USACE the Contractor shall utilize Geographic Information Systems (GIS), to generate location maps, vicinity maps, and site maps.

Existing sources of information, shall be used to the extent practicable, especially for base map layers. Where more accurate data are readily available, those data shall be used. The Contractor will be required to create site-specific layers from various sources including, but not limited to: GPS coordinates; Excel spreadsheets, ASCII text files, and/or hard copy files listing coordinate locations and feature attributes;

scanning, geo-referencing, and digitizing existing figures; and converting from CADD.

All data layers created by the Contractor shall have meaningful, unique and consistent attributes. Metadata shall be provided for all data, to include: the process steps used to create the data; the horizontal and vertical data accuracy of the data;

horizontal projection, coordinate system, and units; and the vertical datums and units.

All data shall have a projection defined. Data layers shall be given meaningful names, and it is recommended that versions of data layers be named to include the date that they were created or modified.

The required deliverables shall be in mxd format, and shall include all site-specific data used in the mxd documents delivered as shp, geodatabase or raster files. The Contractor shall store site-specific data in one logical directory and sub-directory structure to ease data and mxd delivery to the Government. The Contractor will not be required to provide data obtained from sources such as State GIS Agencies.

GIS Data, mxd files, and figures shall be provided on CD and or DVD, unless otherwise specified.