APRIL 6TH, 2018
READY TO ADVERTISE
Bldg 132
South Burlington, Vermont
158th Fighter Wing Vermont Air National Guard
CURZ152804 - F-35 LOW OBSERVABLE COMPOSIT REPAIR FACILITY ADD/ALTER B 132
F-35 JSF BEDDOWN - PHASE 1
NOT FOR
CONSTRUCTION
92654
S c a le
F o r M ic ro fi lm in g
In c h e s
M il li m e te rs date detailed checkeddesigned project contract rev.drawing fileC O
PY
R
IG
H
T
B
U R
N S
AN
D
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
DG-001
SHEET INDEX
01/05/17
RTHOMPSON PCONSTANZO
RTHOMPSON
CIVIL SHEET INDEX
SHEET NUMBER SHEET NAME
GC101 LOCATION & VACINITY MAP
GC102 ACCESS & SAFETY PLAN
GC103 ACCESS & SAFETY NOTES
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS500 SITE DETAILS
CU101 UTILITY PLAN
CU500 UTILITY DETAILS
STRUCTURAL SHEET INDEX
SHEET NUMBER SHEET NAME
S-001 GENERAL NOTES
S-002 LEGEND & ABBREVIATIONS
S-100 PAD PLAN AND ROOF FRAMING PLAN
S-300 MECHANICAL ROOF TOP UNIT DETAILS
S-301 STEEL SECTIONS AND DETAILS
ARCHITECTURAL SHEET INDEX
SHEET NUMBER SHEET NAME
AG001 ARCHITECTURAL LEGEND & ABBREVIATIONS
AD001 DEMOLITION NOTES
AD101 DEMOLITION FLOOR & ROOF PLAN
AD201 DEMOLITION EXTERIOR BUILDING ELEVATIONS
A-001 OVERALL STRIPING PLAN & SIGN DETAILS
A-101 FLOOR & ROOF PLAN
A-201 EXTERIOR BUILDING ELEVATIONS
A-301 BUILDING AND WALL SECTIONS
A-501 SECTION DETAILS
A-502 MISCELLANEOUS DETIALS
A-601 LOUVER DETAILS
MECHANICAL SHEET INDEX
SHEET NUMBER SHEET NAME
MP001 LEGEND & ABBREVIATIONS
MD101 MECHANICAL AND PLUMBING DEMOLITION PLAN
MP101 MECHANICAL AND PLUMBING PIPING PLAN
MP102 MECHANICAL DUCTWORK PLAN
MP501 MECHANICAL DETAILS
MP502 MECHANICAL DETAILS
MP601 MECHANICAL AND PLUMBING SCHEDULES
MP701 MECHANICAL CONTROLS
MP702 MECHANICAL CONTROLS
MP703 MECHANICAL CONTROLS
MP704 MECHANICAL CONTROLS
MP705 MECHANICAL CONTROLS
MP706 MECHANICAL CONTROLS
ELECTRICAL SHEET INDEX
SHEET NUMBER SHEET NAME
T-100 COMMUNICATIONS NEW WORK PLAN
E-001 ELECTRICAL SYMBOLS LEGEND AND ABBREVIATIONS
ED100 OVERALL POWER DEMOLITION PLAN
EG101 OVERALL GROUNDING PLAN
EG102 OVERALL LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
E-010 OVERALL HAZARDOUS LOCATION PLAN
E-100 OVERALL POWER PLAN
E-401 ELECTRICAL ENLARGED PLANS AND ELEVATIONS
E-601 ONE-LINE DIAGRAM
E-602 PANELBOARD SCHEDULE
FIRE PROTECTION SHEET INDEX
SHEET NUMBER SHEET NAME
FA001 FIRE ALARM SYMBOLS, LEGEND AND ABBREVIATIONS
FA101D FIRE ALARM DEMOLITION PLAN
FA101 FIRE ALARM PLAN
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM ONE-LINE DIAGRAM
FA602 FIRE ALARM CONTROL UNIT (FACU) MATRIX AND RELEASING
SERVICE FIRE ALARM CONTROL UNIT (RSFACU) MATRIX
FX001 FIRE SUPPRESSION NOTES, LEGEND, AND ABBREVIATIONS
FX101 FIRE SUPPRESSION PLAN
FX601 FIRE SUPPRESSION RISER DIAGRAM AND DETAILS
LS001 LIFE SAFETY NARRATIVE AND BUILDING CODE ANALYSIS
LS101 LIFE SAFETY GROUND FLOOR PLAN
A 10/20/17 B.2 SUBMITTAL PC
B 12/12/17 B.3 SUBMITTAL PC
C 3/2/17 B.3 FINAL SUBMITTAL PC
D 4/6/18 RTA PC
TELECOMMUNICATIONS SHEET INDEX
SHEET NUMBER SHEET NAME
T-001 COMMUNICATIONS LEGEND
T-100 COMMUNICATIONS NEW WORK PLAN
T-101 COMMUNICATION CONDUIT ROUTING
T-501 COMMUNICATIONS DETAILS
N
C
O
D
R
I
V
E
N
I
V
E
N
I
V
E
F
A
L
C
S
R
E
E
T
T
B
I
L
A
N
E
L
O
O
P
M U
S T
A N
G
P A
S S
N
I
V
E
T
H
U
R
B
N
D
E
O
L
T
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
92654B132C-GC104.DWG
K. ROBERTSS. WAGNER
S. LUEHRS
DGC101
LOCATION & VICINITY MAP
9/22/16
C4
VICINITY MAP
SCALE: 1" = 200'
400'0 200'
N
PROJECT SITE
10/20/17 B.2 SUBMITTAL SEW
C1
LOCATION MAP
SCALE: NTS
PROJECT LOCATION
VERMONT AIR NATIONAL GUARD
A
12/12/17 B.3 SUBMITTAL SEWB
C 3/2/18 B.3 FINAL SUBMITTAL SEW
D 4/6/18 RTA SEW
AutoCAD SHX Text
SENSITIVE
AutoCAD SHX Text
LOCUS 2
AutoCAD SHX Text
VT-CH-980
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text a
AutoCAD SHX Text k
AutoCAD SHX Text e
AutoCAD SHX Text C
AutoCAD SHX Text h
AutoCAD SHX Text a
AutoCAD SHX Text m
AutoCAD SHX Text p
AutoCAD SHX Text l
AutoCAD SHX Text a
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text C
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text c
AutoCAD SHX Text t
AutoCAD SHX Text i
AutoCAD SHX Text c
AutoCAD SHX Text u
AutoCAD SHX Text t
AutoCAD SHX Text R
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text L
AutoCAD SHX Text a
AutoCAD SHX Text k
AutoCAD SHX Text e
AutoCAD SHX Text M
AutoCAD SHX Text e
AutoCAD SHX Text m
AutoCAD SHX Text p
AutoCAD SHX Text h
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text m
AutoCAD SHX Text a
AutoCAD SHX Text g
AutoCAD SHX Text o
AutoCAD SHX Text g
AutoCAD SHX Text W
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text s
AutoCAD SHX Text k
AutoCAD SHX Text i
AutoCAD SHX Text R
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text B
AutoCAD SHX Text a
AutoCAD SHX Text r
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text B
AutoCAD SHX Text e
AutoCAD SHX Text l
AutoCAD SHX Text l
AutoCAD SHX Text o
AutoCAD SHX Text w
AutoCAD SHX Text s
AutoCAD SHX Text F
AutoCAD SHX Text a
AutoCAD SHX Text l
AutoCAD SHX Text l
AutoCAD SHX Text s
AutoCAD SHX Text N
AutoCAD SHX Text e
AutoCAD SHX Text w
AutoCAD SHX Text p
AutoCAD SHX Text o
AutoCAD SHX Text r
AutoCAD SHX Text t
AutoCAD SHX Text R
AutoCAD SHX Text u
AutoCAD SHX Text t
AutoCAD SHX Text l
AutoCAD SHX Text a
AutoCAD SHX Text n
AutoCAD SHX Text d
AutoCAD SHX Text S
AutoCAD SHX Text t
AutoCAD SHX Text A
AutoCAD SHX Text l
AutoCAD SHX Text b
AutoCAD SHX Text a
AutoCAD SHX Text n
AutoCAD SHX Text s
AutoCAD SHX Text B
AutoCAD SHX Text e
AutoCAD SHX Text n
AutoCAD SHX Text n
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text t
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text B
AutoCAD SHX Text r
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text t
AutoCAD SHX Text l
AutoCAD SHX Text e
AutoCAD SHX Text b
AutoCAD SHX Text o
AutoCAD SHX Text r
AutoCAD SHX Text o
AutoCAD SHX Text S
AutoCAD SHX Text t
AutoCAD SHX Text J
AutoCAD SHX Text o
AutoCAD SHX Text h
AutoCAD SHX Text n
AutoCAD SHX Text s
AutoCAD SHX Text b
AutoCAD SHX Text u
AutoCAD SHX Text r
AutoCAD SHX Text y
AutoCAD SHX Text S
AutoCAD SHX Text p
AutoCAD SHX Text r
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text f
AutoCAD SHX Text i
AutoCAD SHX Text e
AutoCAD SHX Text l
AutoCAD SHX Text d
AutoCAD SHX Text W
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text d
AutoCAD SHX Text s
AutoCAD SHX Text o
AutoCAD SHX Text r
AutoCAD SHX Text M
AutoCAD SHX Text i
AutoCAD SHX Text d
AutoCAD SHX Text d
AutoCAD SHX Text l
AutoCAD SHX Text e
AutoCAD SHX Text b
AutoCAD SHX Text u
AutoCAD SHX Text r
AutoCAD SHX Text y
AutoCAD SHX Text V
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text g
AutoCAD SHX Text e
AutoCAD SHX Text n
AutoCAD SHX Text n
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text S
AutoCAD SHX Text w
AutoCAD SHX Text a
AutoCAD SHX Text n
AutoCAD SHX Text t
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text W
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text s
AutoCAD SHX Text k
AutoCAD SHX Text i
AutoCAD SHX Text S
AutoCAD SHX Text o
AutoCAD SHX Text u
AutoCAD SHX Text t
AutoCAD SHX Text h
AutoCAD SHX Text B
AutoCAD SHX Text u
AutoCAD SHX Text r
AutoCAD SHX Text l
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text t
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text W
AutoCAD SHX Text h
AutoCAD SHX Text i
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text R
AutoCAD SHX Text i
AutoCAD SHX Text v
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text J
AutoCAD SHX Text c
AutoCAD SHX Text t
AutoCAD SHX Text I
AutoCAD SHX Text s
AutoCAD SHX Text l
AutoCAD SHX Text a
AutoCAD SHX Text n
AutoCAD SHX Text d
AutoCAD SHX Text P
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text d
AutoCAD SHX Text H
AutoCAD SHX Text y
AutoCAD SHX Text d
AutoCAD SHX Text e
AutoCAD SHX Text P
AutoCAD SHX Text a
AutoCAD SHX Text r
AutoCAD SHX Text k
AutoCAD SHX Text W
AutoCAD SHX Text a
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text b
AutoCAD SHX Text u
AutoCAD SHX Text r
AutoCAD SHX Text y
AutoCAD SHX Text N
AutoCAD SHX Text o
AutoCAD SHX Text r
AutoCAD SHX Text t
AutoCAD SHX Text h
AutoCAD SHX Text f
AutoCAD SHX Text i
AutoCAD SHX Text e
AutoCAD SHX Text l
AutoCAD SHX Text d
AutoCAD SHX Text B
AutoCAD SHX Text e
AutoCAD SHX Text t
AutoCAD SHX Text h
AutoCAD SHX Text e
AutoCAD SHX Text l
AutoCAD SHX Text W
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text d
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text o
AutoCAD SHX Text c
AutoCAD SHX Text k
AutoCAD SHX Text L
AutoCAD SHX Text u
AutoCAD SHX Text d
AutoCAD SHX Text l
AutoCAD SHX Text o
AutoCAD SHX Text w
AutoCAD SHX Text M
AutoCAD SHX Text a
AutoCAD SHX Text n
AutoCAD SHX Text c
AutoCAD SHX Text h
AutoCAD SHX Text e
AutoCAD SHX Text s
AutoCAD SHX Text t
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text B
AutoCAD SHX Text u
AutoCAD SHX Text r
AutoCAD SHX Text l
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text t
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text M
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text t
AutoCAD SHX Text p
AutoCAD SHX Text e
AutoCAD SHX Text l
AutoCAD SHX Text i
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text r
AutoCAD SHX Text e
AutoCAD SHX Text e
AutoCAD SHX Text n
AutoCAD SHX Text M
AutoCAD SHX Text o
AutoCAD SHX Text u
AutoCAD SHX Text n
AutoCAD SHX Text t
AutoCAD SHX Text a
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text s
AutoCAD SHX Text M
AutoCAD SHX Text t
AutoCAD SHX Text M
AutoCAD SHX Text a
AutoCAD SHX Text n
AutoCAD SHX Text s
AutoCAD SHX Text f
AutoCAD SHX Text i
AutoCAD SHX Text e
AutoCAD SHX Text l
AutoCAD SHX Text d
AutoCAD SHX Text K
AutoCAD SHX Text i
AutoCAD SHX Text l
AutoCAD SHX Text l
AutoCAD SHX Text i
AutoCAD SHX Text n
AutoCAD SHX Text g
AutoCAD SHX Text t
AutoCAD SHX Text o
AutoCAD SHX Text n
AutoCAD SHX Text P
AutoCAD SHX Text e
AutoCAD SHX Text a
AutoCAD SHX Text k
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 387
BLDG 130
BLDG 60
N
I
V
E
BLDG 203
BLDG 120
BLDG 215
SUB-
GMP
BLDG 385
BLDG 160
BLDG 70
BLDG 303
N
I
V
E
N
I
V
E
F
A
L
C
R
E
E
T
D
O
W
N
STATION
BLDG 312
BLDG 90
BLDG 223
A
L
A
S
K
A
S
H
E
L
T
E
R
O
L
F
A
BLDG 68
V E
H
IC
L E
B A
R R
IE
R
P
S
L
O
O
P
M U
S T
A N
G
P A
S S
N
A
T
I
O
N
A
L
GU AR
D
A
V
E
N
U
E
BLDG 205
R
I
T
E
BLDG 140
BLDG 310
BLDG 170
BLDG 360
BLDG 314
BLDG 300
BLDG
BLDG
BLDG 150
NORTH GATE
N
I
V
E
T
H
U
R
B
N
D
E
O
L
T
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG 315
BLDG 313
BLDG 336
BLDG 334
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
MAIN GATE
BLDG
PROJECT LOCATION AND
PRIMARY CONTRACTOR
STAGING AREA
CONTRACTOR HAUL ROUTE
NATIONAL GUARD AVENUE
FALCON STREET
CONTRACTOR
PARKING AREA
(SEE NOTE 2)
NORTH GATE
(CONTRACTOR ACCESS)
MAIN GATE
(NO CONTRACTOR ACCESS)
92654B132C-GC101.DWG
DGC102
ACCESS & SAFETY PLAN
9/22/16
1. SEE SHEET GC103 FOR ACCESS & SAFETY NOTES.
2. CONTRACTOR PARKING AREA IS INTENDED FOR THREE PROJECTS,
BUILDING 130, 131, AND 132 CONSTRUCTION. CONTRACTOR SHALL
COORDINATE NUMBER OF STALLS AND LOCATION WITHIN AREA
WITH CONTRACTING OFFICER.
NOTES:
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
A1
ACCESS & SAFETY PLAN
SCALE: 1" = 100'
N
100' 200'0
10/20/17 B.2 SUBMITTAL SEWA
12/12/17 B.3 SUBMITTAL SEWB
C 3/2/18 B.3 FINAL SUBMITTAL SEW
D 4/6/18 RTA SEW
AutoCAD SHX Text
TAXIWAY E
AutoCAD SHX Text
TAXIWAY F
AutoCAD SHX Text
CLASS III WETLAND
AutoCAD SHX Text
CLASS III WETLAND
AutoCAD SHX Text
ARCHAEOLOGICALLY
AutoCAD SHX Text
SENSITIVE
AutoCAD SHX Text
ARCHAEOLOGICALLY
AutoCAD SHX Text
SENSITIVE
AutoCAD SHX Text
LOCUS 1
AutoCAD SHX Text
VT-CH-980
AutoCAD SHX Text
CLASS III
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
ARCHAEOLOGICALLY
AutoCAD SHX Text
SENSITIVE
AutoCAD SHX Text
VT-CH-994
AutoCAD SHX Text 33-15
AutoCAD SHX Text 33-15
AutoCAD SHX Text 1-19
AutoCAD SHX Text 1-19
92654B132C-GC102.DWG
DGC103
ACCESS & SAFETY NOTES
9/22/16
ACCESS AND STAGING:
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON GC102
AND ARE SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE OFF-SITE HAUL ROUTES WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS
ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE BASED
ON OPERATIONAL REQUIREMENTS OF THE BASE.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS
UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO
EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A
DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE
WITH THE CONTRACTING OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF
CONTRACTOR'S STAGING SHALL BE AS ILLUSTRATED ON GC102 AND IS SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER.
CONTRACTOR MAY SUBMIT ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA IS SUBJECT
TO CHANGE AT THE DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE
BASE.
7. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES SHALL BE PARKED IN THE STAGING
AREA.
8. CONTRACTOR SHALL PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A PROFESSIONALLY PAINTED SIGN, MEETING
CONTRACTING OFFICER APPROVAL, TO DIRECT MATERIAL SUPPLIERS, EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION SITE.
THE SIGN SHALL READ “CONSTRUCTION VEHICLES ONLY - NO VENDORS ALLOWED.”
9. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER REGARDING CONSTRUCTION
DELIVERIES PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE SCHEDULED MONDAY-FRIDAY, 0800 TO 1500.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO SEARCH BY SECURITY WHEN ENTERING THE BASE AND MAY
EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND VALID PHOTO IDENTIFICATION PER BASE SECURITY
REQUIREMENTS, AND ALL VEHICLES MUST HAVE CURRENT AND VALID REGISTRATION AND INSURANCE.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH THE BASE SECURITY OFFICE IN
OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING SECURE AREAS.
12. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO
THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE CONTRACTING OFFICER.
COORDINATION AND COMMUNICATION:
1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CONTRACTING
OFFICER, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL
TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY
CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE
PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CONTRACTING OFFICER
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE
CONTRACTING OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE
CONTRACTING OFFICER.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN EMERGENCY:
a. EMERGENCY 911
b. OWNER CONTRACTING OFFICER
c. OTHER CONTACTS AS DIRECTED AT PRE-CONSTRUCTION MEETING
TRAFFIC CONTROL:
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS AREAS
BY USING BARRICADES APPROVED BY THE CONTRACTING OFFICER.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH
ARE CLEARLY VISIBLE. FOR VEHICLES/CRANES EXCEEDING THE HEIGHT OF B132, CONTRACTOR SHALL PROVIDE EACH VEHICLE WITH A
FLAG ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 3 FEET SQUARE HAVING INTERNATIONAL ORANGE AND WHITE
CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN.
5. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS.
6. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 1 WEEK TO BASE AND THE CONTRACTING OFFICER FOR ROAD CLOSURE PRIOR
TO THE ROAD REQUIRING CLOSURE.
7. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE CONTRACTOR SHALL REQUEST THE CONTRACTING
OFFICER TO SCHEDULE AN INSPECTION. NO ROADWAY OR PORTION OF THE AIRFIELD SHALL BE RE-OPENED UNTIL THE CONTRACTING
OFFICER HAS COMPLETED INSPECTION AND APPROVED THE RE-OPENING OF ACTIVE AREAS.
8. CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE OPERATOR OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) CONTROL
TRAINING COURSE. COORDINATE WITH CONTRACTING OFFICER FOR CLASS SCHEDULE/FREQUENCY.
9. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO
RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER.
EQUIPMENT AND STOCKPILE HEIGHT:
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR AC 150/5370-2E AND AC 150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 45 DAYS TO THE CONTRACTING OFFICER AND BASE OPERATIONS PRIOR TO THE
START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL OF FAA FORM 7460-1 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE
CRANES SHALL BE ISSUED BY BASE OPERATIONS AND THE CONTRACTING OFFICER AFTER APPROVAL BY THE FAA. ALL EQUIPMENT
SHALL COMPLY WITH ALL FAA ADVISORY CIRCULARS (CURRENT EDITIONS).
2. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
3. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD
PENETRATE AVIATION SURFACES.
EXCAVATION AND TRENCHES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA REGULATIONS AND THE STATE OF VERMONT LAWS
CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING, AND SHORING ARE PERFORMED IN A
MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS
FOR CONSTRUCTION.
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH
FLASHING RED LIGHTS ACCEPTABLE TO THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES
AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED.
6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER
THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED.
OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR
CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS
IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE
CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS
SUBJECT TO THE DIRECTION OF THE CONTRACTING OFFICER.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED EQUIPMENT WITH THE CONTRACTING OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH STATE AND LOCAL AUTHORITIES AND SUBMITTING
DOCUMENTS FOR PERMITTING FOR EROSION, SEDIMENT CONTROL, AND STORMWATER POLLUTION PREVENTION.
7. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES
WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF. SEE DRAWING CS101 FOR EROSION AND SEDIMENT CONTROL
REQUIREMENTS.
8. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND OR JET BLAST
CONDITIONS.
9. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE
TO BASE OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK
AREA REGARDLESS OF SOURCE.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE REMOVED
FROM THE PROJECT LIMITS.
11. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE
PROPERLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY
REMOVED FROM THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING CONSTRUCTION
ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
12. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CONTRACTING OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE
SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
13. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR BASE OPERATIONS SHALL IMMEDIATELY BE REMOVED
FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN THROUGHOUT THE REMAINDER OF THE PROJECT.
CONTRACTOR PERMITTING REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER PERMIT FOR LAND DISTURBANCE OF MORE THAN 1 ACRE PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH LOCAL AUTHORITIES TO COMPLETE AND SUBMIT THE
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR APPROVAL. LOCAL AUTHORITIES INCLUDE BUT ARE NOT LIMITED TO
COUNTY AND CITY STORMWATER MANAGEMENT GROUPS. CONTRACTOR SHALL COORDINATE ALL ENVIRONMENTAL AND STORM
WATER CORRESPONDENCE, DOCUMENTATION, AND PERMITTING WITH CONTRACTING OFFICER. THE STORMWATER PERMITTING
PROCESS MAY INCLUDE THE FOLLOWING:
a. SUBMIT STORM WATER QUALITY PERMIT APPLICATION FEE.
b. SUBMIT NPDES GENERAL CONSTRUCTION PERMIT.
c. SUBMIT STORM WATER POLLUTION PREVENTION PLAN.
d. SUBMIT AFFIDAVIT STATING PROPERTY OWNER'S COMMITMENT TO COMPLY WITH STORM WATER QUALITY MANAGEMENT PLAN
AND LOCAL REGULATIONS FOR STORM WATER QUALITY MANAGEMENT.
e. SUBMIT COPY OF APPROVED PROJECT DRAWING SET TO CONTRACTING OFFICER.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY
REQUIREMENTS. THE PERMITTING PROCESS MAY INCLUDE THE SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
a. EROSION AND SEDIMENT CONTROL
b. STORMWATER MANAGEMENT
c. WATER POLLUTION
d. CLEARING
e. DIGGING
f. AIR EMISSIONS
g. DRINKING WATER
h. NOISE ABATEMENT
i. AIRPORT HAZARD/AIRFIELD SAFETY CLEARANCES (7460-1)
EXISTING CONDITIONS NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS.
UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK
COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE CONTRACTING OFFICER BEFORE
ANY FURTHER WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND
MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK.
CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER AND ALL ASSOCATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY
THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF
MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF OPERATIONAL PLANS. IN THE EVENT AN
UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE CONTRACTING OFFICER.
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
10/20/17 B.2 SUBMITTAL SEWA
12/12/17 B.3 SUBMITTAL SEWB
C 3/2/18 B.3 FINAL SUBMITTAL SEW
D 4/6/18 RTA SEW
BUILDING 132BUILDING 131
5.00' MAX
SEE NOTE 10
N 719570.49
E 1471713.86
N 719573.79
E 1471710.11
W W
W W
W W
W W
W W
W
W
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
U
E
U
E
U
E
U
E
U
E
U
E
U
P
U
P
U
P
U
P
U
P
U
P
U
E
U
E
U
E
U
E
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
GGGGG
GGGGG
G
G
G
G
G
G
W
W
W
W
W
W
W
W
W
W
W
W
W
EXISTING NATURAL
GAS LINE
(DO NOT DISTURB)
EXISTING UNDERGROUND
COMM LINE
(DO NOT DISTURB)
EXISTING UNDERGROUND
ELECTRICAL LINE
(DO NOT DISTURB)
EXISTING WATER LINE
(DO NOT DISTURB)
EXISTING DOMESTIC
WATER LINE
(DO NOT DISTURB)
N 719543.73
E 1471683.70
N 719544.20
E 1471690.76
M
A X
S E
E
N
O T
E
PUMPED CONDENSATE LINE (BY APRON CONTRACTOR)
EXISTING UNDERGROUND
COMM LINE
(DO NOT DISTURB)
EXISTING NATURAL
GAS LINE
(DO NOT DISTURB)
EXISTING
CONCRETE CURB
(DO NOT DISTURB)
COMM AND ELEC
DUCT BANK
(BY OTHERS)
92654B132C-CD101.DWG
DCD101
DEMOLITION PLAN
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
A1
DEMOLITION PLAN
SCALE: 1" = 10'
N
10' 20'0
LEGEND:
CONCRETE DEMOLITION
AGGREGATE DEMOLITION
PAVEMENT MARKING REMOVAL
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS SHALL BE
DISPOSED OF OFF BASE.
2. THE DIVERSION RATE GOAL FOR THE BASE IS 60% DIVERSION RATE OF
CONSTRUCTION AND DEMOLITION MATERIALS FROM LANDFILL. COORDINATE
WITH CONTRACTING OFFICER.
3. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF THE
FOLLOWING MATERIALS: AGGREGATE, CONCRETE, ASPHALT, MASONRY,
FOUNDATIONS, REBAR, FENCE MATERIAL, PIPING, AND MISCELLANEOUS
STRUCTURES. LARGE PIECES OF MATERIAL MAY NEED TO BE CRUSHED AND/OR
BROKEN UP FURTHER IN ORDER TO BE HAULED AWAY TO THE WASTE DISPOSAL
SITE.
4. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL
WITH PROPOSED PAVEMENT LAYOUT AND JOINTING PLAN.
5. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT FULL DEPTH.
6. EXISTING PAVEMENT EDGES SHALL BE SAWCUT IN LOCATIONS SHOWN TO
PROVIDE CLEAN EDGE FOR CONSTRUCTION OF PROPOSED PAVEMENT.
7. PAVEMENT REMOVAL LIMITS SHALL BE TO THE NEAREST EXISTING PAVEMENT
JOINT TO THE GREATEST EXTENT POSSIBLE TO PREVENT PARTIAL PANEL
REMOVAL. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF PAVEMENT AND
ANY SUBBASE MATERIAL PRESENT. EXISTING ASPHALT PAVEMENT TO BE
REMOVED IS APPROXIMATELY 4-5 INCHES ASPHALT.
8. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE
REPAIRED OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE
GOVERNMENT.
9. ALTHOUGH NOT ANTICIPATED SPECIAL HANDLING AND CONSIDERATION SHALL
BE REQUIRED FOR EXCAVATED SOILS THOUGHT TO CONTAIN
PETROLEUM-BASED/CONTAMINATED/HAZARDOUS SUBSTANCES. CONTRACTOR
SHALL PERIODICALLY MONITOR EXCAVATED SOILS. SOILS SHALL BE TREATED
ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL FEDERAL,
STATE, AND LOCAL REQUIREMENTS AND THE PROJECT SPECIFICATIONS.
CONTRACTOR SHALL PAY FOR AND COORDINATE REMOVAL OF
PETROLEUM-BASED/CONTAMINATED/HAZARDOUS MATERIALS WITH
CONTRACTING OFFICER.
10. TRENCH BOXES SHALL BE USED DURING THE INSTALLATION OF THE DOMESTIC
WATER AND PUMPED CONDENSATION LINES. TRENCH BOX SHALL BE DESIGNED
AND SUBMITTED BY CONTRACTOR. MAXIMUM WIDTH OF PAVEMENT
DISTURBANCE/DEMOLITION IS 5-FEET CENTERED BETWEEN COLUMN 3 AND
COLUMN 4. CONCRETE CURB AT BUILDING FACE SHALL NOT BE DISTURBED.
11. COORDINATE WITH CONTRACTING OFFICER FOR ANY REVISIONS TO THE APRON
PROJECT LIMITS/WORK.
10/20/17 B.2 SUBMITTAL SEWA
KEYED NOTE:
REMOVE AGGREGATE INSTALLED BY APRON CONTRACTOR TO EXISTING
SUBGRADE. ACTUAL LIMITS MAY VARY DUE TO CONSTRUCTION IN THE
AREA BY OTHERS. INSTALL WATER LINE FROM EXISTING VALVE AND
FLANGE TO BUILDING 132. SEE MECHANICAL FOR COORDINATION.
12/12/17 B.3 SUBMITTAL SEWB
N 719570.48
E 1471713.87
N 719573.79
E 1471710.10
W W
W W
W W
W W
W W
W
W
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
U
E
U
E
U
E
U
E
U
E
U
E
U
P
U
P
U
P
U
P
U
P
U
P
U
E
U
E
U
E
U
E
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
GGGGG
GGGGG
G
G
G
G
G
G
W
W
W
W
W
W
W
W
W
W
W
W
W
EXISTING NATURAL
GAS LINE
(DO NOT DISTURB)
TAXILINE STRIPING OUTSIDE
BUILDING FACE BY APRON
CONTRACTOR (TYP)
N 719544.19
E 1471690.77
N 719543.74
E 1471683.71
H
E
H
E E
B
E
E
E
E
B
E
E
E
SEDIMENT SOCK
2" EXISTING
WATER LINE
EXISTING CONCRETE
CURB TO REMAIN
B
BOLLARD (TYP)
SEE NOTE 4
CS500
D5
TAXILINE STRIPING
PER ARCHITECTURAL
SHEETS
4" RED REFLECTIVE STRIPING CENTERED
ON EXTERIOR LADDER, CROSS HATCH ONE
FOOT ON CENTER. SEE NOTE 4
LEGEND:
REINFORCED CONCRETE PAVEMENT
DOWELED CONSTRUCTION JOINT
DUMMY CONTRACTION JOINT
ISOLATION JOINT
SEDIMENT SOCK
E
H
CS500
B5
CS500
A1
CS500
D1
B
CS500
A2
CS500
A4
92654B132C-CS101.DWG
DCS101
SITE PLAN
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
A1
SITE PLAN
SCALE: 1" = 10'
N
10' 20'0
GENERAL SITE NOTES:
1. PAVEMENT REPLACEMENT SHALL MATCH EXISTING ELEVATIONS AND
DRAINAGE AND DRAINAGE PATTERN OF EXISTING PAVEMENT.
2. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDING 131
AND 132 AT ALL TIMES DURING CONSTRUCTION.
3. CONTRACTOR SHALL COORDINATE CONCRETE REMOVAL AND REPLACEMENT
WITH APRON REPLACEMENT PROJECT (BY OTHERS) WITH CONTRACTING
OFFICER.
4. BOLLARDS AND CLEAR ZONE ARE REQUIRED IF BID OPTION 31 (EXTERIOR
LADDER) IS AWARDED.
5.00'
10/20/17 B.2 SUBMITTAL SEWA
12/12/17 B.3 SUBMITTAL SEWB
3.00'
12" PORTLAND CEMENT CONCRETE
REINFORCEMENT (SEE D3, THIS SHEET)
6" AGGREGATE BASE COURSE
12" COMPACTED SUBGRADE
T
T
A4
REINFORCED PCC PAVEMENT
SCALE: NTS
T
B2
CONSTRUCTION JOINT
SCALE: NTS
B4
CONTRACTION JOINT
SCALE: NTS
B1
ISOLATION JOINT
SCALE: NTS
A1
TYPE H - DUMMY CONTRACTION JOINT
SCALE: NTS
CS500
B4
T
T
OR 10'-0" IF JOINT SPACING
IS GREATER THAN 12'-0"
TO NEAREST JOINT
FOUNDATION
OR STRUCTURE
NON-EXTRUDING PREFORMED
COMPRESSIBLE MATERIAL
A2
TYPE B - ISOLATION JOINT
SCALE: NTS
CS500
B1
COMPOST FILTER SOCK
S
L
O
P
E
A
F L O
W
COMPOST FILTER SOCK
1. CONTRACTOR SHALL PLACE
FILTER SOCK AS REQUIRED
WITH APPROVAL FROM THE
COR.
DETAIL A
12" DIA. COMPOST
FILTER SOCK
M
I N
NOT TO SCALE
FLOW
STAKE (TYP.)
PROVIDE SUFFICIENT LENGTH
TO PREVENT WATER FROM
FLOWING AROUND THE
COMPOST FILTER SOCK
COMPOST
FILTER SOCK
COMPOST FILTER SOCK INSTALLATION IN DITCHES
DITCH PLAN VIEW
DITCH ELEVATION VIEW
COMPOST
FILTER SOCK
(SEE NOTE 1)
2" X 2" X 36" LONG
WOODEN STAKE
@ 10' O.C.
BLOWN/PLACED
FILTER MEDIA
D
IS
T U
R B
E D
A R
E A
U N
D
IS
T U
R B
E D
A R
E A
D1
SEDIMENT SOCK
SCALE: NTS
NOTES:
1. SLABS INDICATED WITH THE LETTER "R" ON THE JOINT LAYOUT PLAN SHALL BE
REINFORCED WITH STEEL REBAR OR WELDED WIRE FABRIC OF THE SIZES
SHOWN. OTHER WELDED WIRE FABRIC SIZES MAY BE USED PROVIDED THE
STEEL AREA (SQUARE INCHES PER FOOT) IN THE LONGITUDINAL AND
TRANSVERSE DIRECTIONS IS EQUAL TO OR EXCEEDS THAT SHOWN IN TABLE 2.
2. WELDED WIRE FABRIC OR REBAR SHALL BE OVERLAPPED FOR A DISTANCE
EQUAL TO AT LEAST ONE SPACING OF THE WIRE IN THE FABRIC OR 32 WIRE
DIAMETERS, WHICHEVER IS GREATER. THE WIRES IN THE LAP SHALL BE WIRED
OR OTHERWISE SECURELY FASTENED TO PREVENT SEPARATION DURING
CONCRETE PLACEMENT.
TABLE 2
PAVEMENT
THICKNESS
(INCHES)
MINIMUM REQUIRED
AREA OF STEEL
(SQ. INCHES/FOOT)
WELDED WIRE
FABRIC
9-12 0.072 6x6-W4.0xW4.0
PAVEMENT
JOINT OR EDGE
SLABS WITH LETTER "R" ON JOINT
PLANS ARE REINFORCED. SEE
TABLE FOR SIZE AND SPACING OF
REINFORCEMENT
T/4 + 1"
DOWEL BAR.
SEE DETAIL A5 THIS
SHEET, TABLE 2
D3
REINFORCED CONCRETE PAVEMENT
SCALE: NTS
B5
TYPE E - DOWELED CONSTRUCTION JOINT
SCALE: NTS
L2
DOWELS SHALL BE EPOXYED
INTO DRILLED HOLES HAVING
A DIAMETER OF 1/8'' LARGER
THAN THE DOWEL DIAMETER.
GREASE ONE END OF DOWEL
T
T
CS500
B2
1-1/4" DIA - 20" LONG SOLID DOWEL SPACED
AT 15" OC. BAR CLEARANCE AT EDGE OF
PANEL SHALL BE A MINIMUM OF 1/2 TO
MAXIMUM OF 3/4 OF THE BAR SPACING.
D5
BOLLARD
SCALE: NTS
MIN
FINISH GRADE
CONCRETE
6" STD WT STEEL PIPE
WITH SAFETY YELLOW
PLASTIC BOLLARD COVER.
(FILL WITH CONCRETE)
1. PREPARE SURFACE BY SSPC-SP3 METHODS
TO SSPC-SP6 QUALITY AND 1.0 MIL MIN PROFILE
DEPTH. FIRST COAT IS TO BE ALKYD PRIMER AT
MIN 40% SOLIDS BY VOLUME.
12"
NOTE:
A5
DOWEL BAR LOCATION AND SIZES
SCALE: NTS
L
L
M I N
0.6L
MIN.
THICKNESS
OF SLAB (T)
DIAM LENGTH SPACING
8"-11.5"
12"-15.5"
1"
1-1/4"
16"
20"
12"
15"
DOWEL BAR SIZE -TABLE 2
NOTES:
1. SEE SPECIFICATION SECTION 32 13 11 CONCRETE PAVEMENT FOR
AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS FOR ADDITIONAL DOWEL
BAR SPACING REQUIREMENTS.
2. WHEN DOWELED JOINTS ARE REQUIRED BETWEEN PAVEMENTS OF
DIFFERING THICKNESS, THE DOWELS SHALL BE SIZED FOR THE THINNER
SECTION, AND PLACED AT T/2 ± D/2 OF THE THINNER PAVEMENT.
DOWEL
JOINT
W = 3/4"
W
BOND BREAKER TAPE
PAVEMENT
SURFACE
JOINT SEALANT
NON-EXTRUDING
PREFORMED
COMPRESSIBLE
MATERIAL
W
W = 1/2" - 5/8"
1/2" ROD
BACK-UP
MATERIAL
SAWED
JOINT FACE
SAWED
JOINT FACE
JOINT SEALANT
PAVEMENT
SURFACE
T
W
SAWED
JOINT FACE
C O
N S
T R
U C
T
B
Y
S
A W
I N
G
W = 1/2" - 5/8"
1/2" ROD
BACK-UP
MATERIAL
SAWED
JOINT FACE
JOINT SEALANT
PAVEMENT
SURFACE
NOTES:
1. COORDINATE SAWCUT DEPTH OF JOINT RESERVOIR WITH SEALANT
MANUFACTURER'S RECOMMENDATIONS.
NOTES:
1. COORDINATE SAWCUT DEPTH OF JOINT RESERVOIR WITH SEALANT
MANUFACTURER'S RECOMMENDATIONS.
NOTES:
1. COORDINATE SAWCUT DEPTH OF JOINT RESERVOIR WITH SEALANT
MANUFACTURER'S RECOMMENDATIONS.
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
92654B132C-CS500.DWG
DCS500
SITE DETAILS
9/22/16
10/20/17 B.2 SUBMITTAL SEWA
12/12/17 B.3 SUBMITTAL SEWB
W W
W W
W W
W W
W W
W
W
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
U
E
U
E
U
E
U
E
U
E
U
E
U
P
U
P
U
P
U
P
U
P
U
P
U
E
U
E
U
E
U
E
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
GGGGG
GGGGG
G
G
G
G
G
G
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
DOMESTIC WATER
INV = 322.50
N 59961.53
E 122641.13
SEE MECHANICAL
FOR CONTINUATION
PUMPED CONDENSATE
INV = 322.50
N 59961.40
E 122641.03
SEE MECHANICAL
FOR CONTINUATION
G G
G G
G
G
G G
G
P
C R
P
C R
P
C R
92654B132C-CU101.DWG
DCU101
UTILITY PLAN
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
GENERAL UTILITY NOTES:
1. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING CONNECTIONS
WITH BUILDING CONTRACTOR AND THE INFORMATION PROVIDED ON MECHANICAL
AND ELECTRICAL DRAWINGS FOR EACH FACILITY.
3. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER AND ALL ASSOCIATED
UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES
PRIOR TO COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL COORDINATE ALL REQUIRED UTILITY SHUTDOWNS FOR
UTILITY CONNECTIONS WITH THE CONTRACTING OFFICER.
5. CONNECTION TO EXISTING WATER SHALL BE CONSTRUCTED IN ACCORDANCE
WITH ALL REQUIREMENTS OF ASSOCIATED UTILITY COMPANIES AND AGENCIES.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL UTILITY
CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR THE UTILITY
CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED WITH
CONNECTION CHARGES AND METERS.
7. SEE DETAIL A1 ON DRAWING CU500 FOR TYPICAL PIPE TRENCH DETAIL.
8. THE MINIMUM DEPTH OF COVER FOR ALL UTILITY PIPING SHALL BE 36 INCHES
UNLESS INDICATED OTHERWISE.
a. WATER: 72 INCHES
b. ELECTRICAL AND COMMUNICATION: 24 INCHES
c. ALL OTHER UTILITIES: 36 INCHES
9. ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND
INSPECTION METHODS DETAILED IN THE SPECIFICATIONS, WHICH MAY INCLUDE
VIDEO CAMERA INSPECTION.
10. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY ENGINEER
AND THE CONTRACTING OFFICER.
11. TRENCH BOXES SHALL BE USED FOR THE INSTALLATION OF THE DOMESTIC WATER
AND PUMPED CONDENSATE LINES. MAXIMUM WIDTH OF PAVEMENT
DISTURBANCE/DEMOLITION IS 5-FEET. CONCRETE CURB AT BUILDING FACE SHALL
NOT BE DISTURBED.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL TEES, BENDS, OR
ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS, AND MANUFACTURER'S RECOMMENDATIONS. SEE DETAIL B3 ON
DRAWING CU500 FOR TYPICAL THRUST BLOCK DETAIL.
2. CONTRACTOR SHALL COORDINATE THE INSTALLATION, TESTING, AND INSPECTION
OF ALL DOMESTIC WATER WITH THE ASSOCIATED UTILITY COMPANIES AND
AGENCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS ON WATER
UTILITY TESTING AND INSPECTION.
3. CONNECT TO EXISTING DOMESTIC WATER FLANGE AND VALVE. FIELD VERIFY
LOCATION. SEE MECHANICAL DRAWINGS FOR CONTINUATION TO BUILDING 132.
4. CONNECT TO EXISTING PUMPED CONDENSATE LINE INSTALLED BY OTHERS. FILED
VERIFY LOCATION. SEE MECHANICAL DRAWINGS FOR CONTINUATION WITHIN
BUILDING 132.
A1
UTILITY PLAN
SCALE: 1" = 20'
N
20' 40'0
BUILDING 150
BUILDING 132
BUILDING 131
WATER LINE BEYOND VALVE TO BE
INSTALLED UNDER THIS CONTRACT
(SEE WATER UTILITY NOTE 3)
10/20/17 B.2 SUBMITTAL SEWA
11.00
LEGEND
DOMESTIC WATER LINE
PUMPED CONDENSATE LINE
W
PCR
EXISTING GROUNDING LOOP
DO NOT DISTURB
12/12/17 B.3 SUBMITTAL SEWB
PUMPED CONDENSATE
LINE BELOW APRON
PAVEMENT TO BE
INSTALLED BY OTHERS
SEE NOTE 4
EXISTING
WATER LINE
TAPPING VALVE
WITH VALVE BOX
(BY OTHERS)
NEW SERVICE LINE
(BY OTHERS)
PLAN
VALVE
BOX
NEW SERVICE
LINE
CONCRETE
PAD
THREADED
GATE VALVE
(BY OTHERS)
THREADED GALVANIZED
STEEL NIPPLE 6" LONG
RESTRAINER
EXISTING
WATER LINE
THRUST BLOCK
SECTION A
A
A
MECHANICAL JOINT
MECHANICAL JOINT
RESTRAINER
A3
WATER SERVICE TAPPING SLEEVE
SCALE: NTS
A1
UTILITY TRENCH
SCALE: NTS
M I N
C O
V E
R
SURFACE
TREATMENT
AS SPECIFIED
FINISH GRADE
TRENCH WIDTH
AS SPECIFIED
NOTES:
1. TRENCH TERMINOLOGY:
BEDDING: SUPPORTIVE, COMPACTED MATERIAL TO PROVIDE EVEN SUPPORT FOR THE PIPE. BOTTOM OF TRENCH
AND BEDDING MATERIAL SHALL PROVIDE UNIFORM LONGITUDINAL SUPPORT FOR BOTTOM SECTION OF PIPE.
HAUNCHING: EXTENDS FROM THE BOTTOM OF THE PIPE TO THE CENTERLINE OF THE PIPE TO PROVIDE THE MOST
RESISTANCE TO PIPE DEFLECTION. MATERIAL SHALL BE FREE OF ROCKS AND BE PLACED BY HAND.
INITIAL BACKFILL: EXTENDS FROM THE SPRINGLINE TO A POINT ABOVE THE TOP OF THE PIPE TO PROVIDE SOME
PIPE SUPPORT AND HELPS TO PREVENT DAMAGE TO THE PIPE DURING PLACEMENT OF THE FINAL BACKFILL. THE
COVER EXTENDS FROM THE TOP OF THE PIPE TO THE TOP OF THE INITIAL BACKFILL.
FINAL BACKFILL: THIS ZONE EXTENDS FROM THE TOP OF THE INITIAL BACKFILL TO THE TOP OF THE TRENCH. FINAL
BACKFILL UNDER PAVEMENTS MAY BE SUBJECT TO ADDITIONAL COMPACTION REQUIREMENTS AND TESTING.
2. BURIED WARNING AND IDENTIFICATION TAPE SHALL BE PROVIDED IN ACCORDANCE WITH SPECIFICATIONS.
NOTE: BEARING AREA BASED ON 1000 PSF SOIL BEARING CAPACITY AND A PIPE TEST
PRESSURE OF 150 PSI.
VARIES
V
A
R
I
E
S
H
NOTES:
1. THRUST BLOCKS ARE REQUIRED AT ALL VERTICAL AND HORIZONTAL TEES, OR ELBOWS OF
PRESSURIZED PIPING.
2. BLOCKING PROVIDED SHALL BE ADEQUATE TO WITHSTAND FULL TEST PRESSURE.
3. THRUST BLOCK CONCRETE SHALL EXTEND TO UNDISTURBED EARTH.
4. A NONPOROUS MATERIAL 8 MILS MIN VISQUEEN OR 15 LB MIN FELT SHALL BE PLACED
BETWEEN THE FITTING AND CONCRETE THRUST BLOCK.
5. JOINTS SHALL NOT BE COVERED WITH CONCRETE. SUFFICIENT CLEARANCE SHALL BE
PROVIDED BETWEEN CONCRETE AND FITTINGS FOR FUTURE MAINTENANCE.
6. DOUBLE LAYER OF TAR PAPER BETWEEN CONCRETE BLOCK AND PLUG TO PERMIT EASY
REMOVAL FOR FUTURE EXTENSION OF WATER MAIN WHERE REQUIRED.
7. JOINT RESTRAINTS CAN BE PROVIDED WHERE USE OF CONCRETE THRUST BLOCKING CANNOT
BE USED BECAUSE OF OBSTRUCTIONS OR REQUIREMENTS IN THE SPECIFICATIONS.
RESTRAINT DETAILS SHALL BE SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION.
45° MIN (TYP)
2" MIN (TYP)
45° MIN
(TYP)
2" MIN (TYP)
M
I N
T
Y P
B
POURED
CONCRETE
BLOCKS (TYP)
45° MIN (TYP)
H
V
A
R
I
E
S
I
Y
P
THRUST BLOCK BEARING AREA (SQ FT)
SERVICE
TYPE
FITTING
SIZE
TEE &
END
90°
BEND
45°
BEND
22-1/2°
BEND
11-1/4°
BEND
DW 1" 0.18 0.25 0.14 0.07 0.03
B3
THRUST BLOCK
SCALE: NTS
COMPACTED BACKFILL
PIPE EMBEDMENT MATERIAL
92654B132C-CU500.DWG
DCU500
UTILITY DETAILS
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152804
F-35 LOW OBSERVABLE
COMPOSITE REPAIR FACILITY
BUILDING 132
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
10/20/17 B.2 SUBMITTAL SEWA
12/12/17 B.3 SUBMITTAL SEWB
GENERAL NOTES:
1. GENERAL:
A. THESE NOTES, AND OTHER DRAWING NOTES CONTAINED WITHIN, ARE PROVIDED
TO MEET SPECIFIC REQUIREMENTS AND TO SUPPLEMENT THE CONTRACT
SPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE THE
PROVISIONS AND REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWN
ON ALL OTHER DRAWINGS.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND
REPORT ANY DISCREPANCIES FROM THE CONTRACT DRAWINGS
TO THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR
TO COMMENCING WITH WORK. SCALING OF WORKING DIMENSIONS FROM THE
STRUCTURAL DRAWINGS IS PROHIBITED.
D. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS
OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARY
BRACING. CONTRACTOR SHALL UNDERTAKE ALL NECESSARY MEASURES TO ENSURE
SAFETY OF ALL PERSONS AND STRUCTURES AT THE SITE AND ADJACENT TO THE SITE.
VISITS TO THE SITE BY THE CONTRACTING OFFICER'S
REPRESENTATIVE SHALL NOT RELIEVE THE CONTRACTOR OF SUCH RESPONSIBILITY.
E. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT
DRAWINGS OR SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME
CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITH
THE APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE.
WHERE SECTIONS VARY, CONTRACTOR SHALL PROVIDE FOR SMOOTH TRANSITIONS
BETWEEN THEM, UNLESS NOTED OTHERWISE.
F. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS'
WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
G. WHERE NEW STRUCTURE CONFLICTS WITH EXISTING ARCHITECTURAL/MECHANICAL/
ELECTRICAL/FIRE PROTECTION SYSTEMS TO REMAIN, EXISTING SYSTEMS SHALL BE
DISCONNECTED AND RELOCATED TO ACCOMMODATE NEW STRUCTURE. CONTRACTOR
SHALL ACCOUNT FOR ALL MODIFICATIONS REQUIRED FOR EXISTING SYSTEMS TO BE
DISCONNECTED, RECONNECTED AND OPERATE AS REQUIRED BY OTHER DISCIPLINE DRAWINGS.
2. DESIGN STANDARDS
A. PRINCIPAL CODE OF RECORD: INTERNATIONAL BUILDING CODE 2015.
B. ASCE 7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2010.
C. ACI 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, 2014.
D. ACI 530/ASCE 5/TMS 402, BUILDING CODE REQUIREMENTS FOR MASONRY
STRUCTURES, 2013.
E. AISC 325, STEEL CONSTRUCTION MANUAL, 14th EDITION, 2011.
F. AISI COLD-FORMED STEEL DESIGN MANUAL, 2012.
G. UFC 3-301-01 STRUCTURAL ENGINEERING, 20 JUNE 2016
H. UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 9 FEBRUARY 2012
I. INTERNATIONAL EXISTING BUILDING CODE, 2015
C. WIND LOAD PER ASCE 7-10
1. ULTIMATE DESIGN WIND SPEED: 115 MPH 3-SECOND GUST.
2. NOMINAL DESIGN WIND SPEED: 89 MPH 3-SECOND GUST.
3. RISK CATEGORY: II
4. BUILDING CONDITION: PARTIALLY ENCLOSED.
6. TOPOGRAPHIC FACTOR: 1.0.
D. SEISMIC LOAD PER ASCE 7-10
1. MAXIMUM CONSIDERED EARTHQUAKE SPECTRAL RESPONSE
ACCELERATIONS Ss = 0.355, S1 = 0.105.
2. DESIGN EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS Sds = 0.357, Sd1 = 0.151.
3. RISK CATEGORY: II.
4. SITE CLASS: D.
5. SEISMIC DESIGN CATEGORY: C.
f. EMBEDMENT AND LAP SPLICE LENGTHS FOR ALL REINFORCING STEEL BARS SHALL
CONFORM TO THE FOLLOWING PROVISIONS, UNLESS NOTED OTHERWISE.
(1) HORIZONTAL BARS HAVING MORE THAN 12" OF CONCRETE PLACED BELOW
THEM SHALL BE CONSIDERED TOP REINFORCEMENT AND SHALL HAVE
MINIMUM STRAIGHT EMBEDMENT AND LAP SPLICE LENGTHS INCREASED BY
NOT LESS THAN 30% OVER THOSE GIVEN ABOVE.
(2) HOOK EMBEDMENT IS THE MINIMUM STRAIGHT LINE DISTANCE FROM THE
CRITICAL SECTION OF THE BAR TO THE FARTHEST EDGE OF THE HOOK.
(3) EPOXY-COATED BARS SHALL HAVE MINIMUM STRAIGHT EMBEDMENT, LAP
SPLICE, AND HOOK EMBEDMENT LENGTHS INCREASED BY NOT LESS THAN
20% OVER THOSE GIVEN ABOVE.
(4) EPOXY GROUT: CONFORM TO ASTM C881, TYPE IV, GRADE 3, EXCEPT GEL
TIMES. PROVIDE MINIMUM EMBEDMENT LENGTH REQUIRED TO DEVELOP
ULTIMATE STRENGTH OF BAR.
g. PROVIDE ADDITIONAL REINFORCEMENT AT ALL OPENINGS AND CORNER BARS AT
ALL INTERSECTING GRADE BEAMS, WALLS, AND CURBS IN ACCORDANCE WITH THE
STANDARD DETAILS, UNLESS NOTED OTHERWISE.
5. JOINTS
a. LOCATE ALL CONSTRUCTION, CONTRACTION, ISOLATION, EXPANSION, AND OTHER
JOINTS AS INDICATED OR SPECIFIED, OR OTHERWISE APPROVED BY THE
CONTRACTING OFFICER.
b. SURFACES OF ALL HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS SHALL BE
CLEANED OF LAITANCE AND SHALL EXPOSE CLEAN COARSE AGGREGATE SOLIDLY
EMBEDDED IN MORTAR MIX. JUST PRIOR TO DEPOSITING CONCRETE, SURFACE OF
CONSTRUCTION JOINT SHALL BE THOROUGHLY CLEANED AND WETTED.
c. THESE PROVISIONS SHALL ALSO APPLY WHEN NEW CONCRETE IS PLACED AGAINST
EXISTING CONCRETE. IN ADDITION, EXISTING CONCRETE SURFACE SHALL BE
ADEQUATELY PREPARED BY APPLICATION OF A BONDING AGENT.
d. PROVIDE WATERSTOPS AT CONCRETE JOINTS WHERE INDICATED ON THE
CONTRACT DRAWINGS.
3. SPECIAL INSPECTIONS
A. DUE TO MINOR NATURE OF WORK, SPECIAL INSPECTIONS NOT REQUIRED.
4. DESIGN LOADS
A. RISK CATEGORY: II PER UFC 3-301-01.
B. EQUIPMENT LOADS
1. AS INDICATED FOR EQUIPMENT WEIGHING IN EXCESS OF 300 LBS. FRAMING AND
FOUNDATIONS ARE DESIGNED FOR EQUIPMENT WHICH SATISFIES THE CONTRACT
SPECIFICATIONS.
2. IF EQUIPMENT FURNISHED IS HEAVIER THAN THE WEIGHTS INDICATED, OR
REQUIRES STRUCTURAL CHANGES FOR ANY OTHER REASON, CONTRACTOR SHALL
PROVIDE ENGINEERING DESIGN CALCULATIONS AND ADDITIONAL STRUCTURAL
WORK NECESSARY TO SUPPORT ALL LOADS IN ACCORDANCE WITH THE DESIGN
STANDARDS SPECIFIED ABOVE, AT NO ADDITIONAL COST TO THE OWNER AND WITH
NO INCREASE IN CONTRACT TIME.
6. MATERIALS: SEE THE CONTRACT SPECIFICATIONS FOR COMPLETE REQUIREMENTS
AND COMPLY WITH ALL APPLICABLE OSHA REGULATIONS
A. REINFORCED CONCRETE:
1. REINFORCED CONCRETE SHALL BE PREPARED AND PLACED IN
ACCORDANCE WITH ACI MANUAL OF CONCRETE PRACTICE.
2. CONCRETE
a. UNLESS NOTED OTHERWISE: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 4500 PSI, NORMAL WEIGHT.
b. INTERIOR SLABS WITH TROWEL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.