APRIL 6TH, 2018
READY TO ADVERTISE
Bldg 130
South Burlington, Vermont
158th Fighter Wing Vermont Air National Guard
CURZ152801 - F-35 ALTER AIRCRAFT SHELTER BLDG 130
F-35 JSF BEDDOWN - PHASE 1
NOT FOR
CONSTRUCTION
92654
S c a le
F o r M ic ro fi lm in g
In c h e s
M il li m e te rs date detailed checkeddesigned project contract rev.drawing fileC O
PY
R
IG
H
T
B
U R
N S
AN
D
M cD
O N
N
EL
L
EN
G
IN
EE
R
IN
G
C O
M
PA
N Y, IN
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
DG-001
SHEET INDEX
01/05/17
RTHOMPSON PCONSTANZO
RTHOMPSON
BLDG 130 - ARCHITECTURAL DRAWING LIST
SHEET NUMBER SHEET TITLE
AG001 ARCHITECTURAL LEGEND & ABBREVIATIONS
AD001 DEMOLITION NOTES
AD101 DEMOLITION FLOOR PLAN
AD201 EXTERIOR BUILDING ELEVATIONS DEMOLITION
AD501 INTERIOR BUILDING ELEVATIONS DEMOLITION
AD502 INTERIOR BUILDING ELEVATIONS DEMOLITION
AD503 INTERIOR BUILDING ELEVATIONS DEMOLITION
AD504 INTERIOR BUILDING ELEVATIONS DEMOLITION
A-001 OVERALL STRIPING PLAN
A-101 OVERALL FLOOR AND ROOF PLAN
A-102 ENLARGED FLOOR PLAN AREA A
A-103 ENLARGED FLOOR PLAN AREA B
A-201 EXTERIOR BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-302 WALL SECTIONS
A-401 ENLARGED RAMP PLANS AND DETAILS
A-501 MISCELLANEOUS DETAILS
A-502 ROOF AND WALL DETAILS
A-503 BID OPTION 1 - ROOF DETAILS
A-504 BID OPTION 1 - ROOF DETAILS
A-601 DOOR SCHEDULE
A-602 DOOR DETAILS
A-721 SIGNAGE SCHEDULE AND DETAILS
BLDG 130 - CIVIL/INFRASTURCTURE DRAWING LIST
SHEET NUMBER SHEET TITLE
GC101 LOCATION & VICINITY MAP
GC102 ACCESS & SAFETY PLAN
GC103 ACCESS & SAFETY NOTES
CD101 DEMOLITION PLAN - GRID 1
CD102 DEMOLITION PLAN - GRID 2
CS101 SITE PLAN - GRID 1
CS102 SITE PLAN - GRID 2
CS500 SITE DETAILS - 1
CS501 SITE DETAILS - 2
CU101 UTILITY PLAN - GRID 2
BLDG 130 - STRUCTURAL DRAWING LIST
SHEET NUMBER SHEET TITLE
S-001 GENERAL NOTES
S-002 LEGEND & ABBREVIATIONS
S-003 STATEMENT OF SPECIAL INSPECTIONS
S-004 STATEMENT OF SPECIAL INSPECTIONS
S-005 STANDARD CONCRETE DETAILS
S-006 STANDARD STEEL FRAMING DETAILS
S-007 STANDARD MASONRY DETAILS
SD100 DEMOLITION PLANS
SD101 DEMOLITION ELEVATIONS
SD102 DEMOLITION DETAILS
SD103 DEMOLITION DETAILS
S-100 FOUNDATION PLAN
S-110 ROOF AND BOTTOM CHORD FRAMING PLAN
S-120 FALL RESTRAINT AND HANGAR DOOR GIRT PLAN
S-200 FRAMING ELEVATIONS
S-300 FOUNDATION SECTION AND DETAILS
S-301 FOUNDATION SECTION AND DETAILS
S-302 FOUNDATION SECTION AND DETAILS
S-303 FOUNDATION SECTION AND DETAILS
S-304 FOUNDATION SECTION AND DETAILS
S-305 FOUNDATION SECTION AND DETAILS
S-306 FOUNDATION SECTION AND DETAILS
S-400 TRUSS FRAMING DETAILS
S-401 TRUSS FRAMING DETAILS
S-402 TRUSS FRAMING DETAILS
S-403 TRUSS FRAMING DETAILS
S-425 HANGAR DOOR SUPPORT DETAILS
S-450 STEEL FRAMING SECTIONS AND DETAILS
S-451 STEEL FRAMING SECTIONS AND DETAILS
S-452 STEEL FRAMING SECTIONS AND DETAILS
BLDG 130 - FIRE PROTECTION DRAWING LIST
SHEET NUMBER SHEET TITLE
FA001 FIRE ALARM SYMBOLS, LEGEND AND ABBREVIATIONS
FA101D FIRE ALARM DEMOLITION PLAN
FA101 FIRE ALARM PLAN
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM ONE-LINE DIAGRAM
FA602 FIRE ALARM CONTROL UNIT (FACU) MATRIX AND RELEASING
SERVICE FIRE ALARM CONTROL UNIT (RSFACU) MATRIX
FX001 FIRE SUPPRESSION NOTES, LEGEND, AND ABBREVIATIONS
FX101 FIRE SUPPRESSION PLAN
FX601 FIRE SUPPRESSION RISER DIAGRAM AND DETAILS
LS001 LIFE SAFETY NARRATIVE AND BUILDING CODE ANALYSIS
LS101 LIFE SAFETY PLAN
BLDG 130 - MECHANICAL DRAWING LIST
SHEET NUMBER SHEET TITLE
MP001 LEGEND AND ABBREVIATIONS
MD101 MECHANICAL DEMOLITION PLAN
MP101 MECHANICAL NEW WORK PLAN AREA A
MP102 MECHANICAL NEW WORK PLAN AREA B
MP401 MECHANICAL NEW WORK PLAN BLDG 130 & 131
MP501 MECHANICAL PIPING AND PLUMBING DETAILS
MP601 MECHANICAL PIPING AND PLUMBING SCHEDULES
MP701 MECHANICAL CONTROLS
MP901 RISER DIAGRAMS
BLDG 130 - TELECOMMUNICATIONS DRAWING LIST
SHEET NUMBER SHEET TITLE
T-001 COMMUNICATIONS LEGEND
TD501 COMMUNICATIONS DEMOLITION DETAILS
T-101 COMMUNICATIONS NEW WORK PLAN
T-501 COMMUNICATIONS DETAILS
T-502 COMMUNICATION DETAILS
T-701 COMMUNICATION RISERS AND SCHEDULES
BLDG 130 - ELECTRICAL DRAWING LIST
SHEET NUMBER SHEET TITLE
E-001 ELECTRICAL SYMBOLS LEGEND AND ABBREVIATIONS
ED101 POWER DEMOLITION PLAN - AREA A
ED102 POWER DEMOLITION PLAN - AREA B
ED103 POWER DEMOLITION PLAN - AREA C
ED104 POWER DEMOLITION PLAN - AREA D
ED501 ELECTRICAL DEMOLITION DETAILS
EG101 GROUNDING PLAN - AREA A
EG102 OVERALL LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
E-011 HAZARDOUS LOCATION PLAN - AREA A
E-012 HAZARDOUS LOCATION PLAN - AREA B
E-013 HAZARDOUS LOCATION PLAN - AREA C
E-014 HAZARDOUS LOCATION PLAN - AREA D
E-101 POWER PLAN - AREA A
E-102 POWER PLAN - AREA B
E-103 POWER PLAN - AREA C
E-104 POWER PLAN - AREA D
E-401 ELECTRICAL ENLARGED PLANS AND ELEVATIONS
E-402 ELECTRICAL ENLARGED PLANS AND ELEVATIONS
E-601 ONE-LINE DIAGRAM
E-602 PANELBOARD SCHEDULE
A 10/20/17 B.2 SUBMITTAL PC
B 12/12/17 B.3 SUBMITTAL PC
C 3/2/18 B.3 FINAL SUBMITTAL PC
D 4/6/18 RTA PC
BID OPTION 22 - ROOF DETAILS
BID OPTION 22 - LADDER DETAILS
N
C
O
D
R
I
V
E
N
I
V
E
N
I
V
E
F
A
L
C
S
R
E
E
T
T
B
I
L
A
N
E
L
O
O
P
M U
S T
A N
G
P A
S S
N
I
V
E
T
H
U
R
B
N
D
E
O
L
92654B130C-GC101.DWG
K. ROBERTSS. WAGNER
S. LUEHRS
DGC101
LOCATION & VICINITY MAP
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
C4
VICINITY MAP
SCALE: 1" = 200'
400'0 200'
N
PROJECT SITE
A 10/20/17 B.2 SUBMITTAL SEW
C1
LOCATION MAP
SCALE: NTS
PROJECT LOCATION
VERMONT AIR NATIONAL GUARD
B 12/12/17 B.3 SUBMITTAL SEW
C 3/2/18 B.3 FINAL SUBMITTAL SEW
D 4/6/18 RTA SEW
BLDG 387
BLDG 130
BLDG 60
N
I
V
E
BLDG 203
BLDG 120
BLDG 215
SUB-
GMP
BLDG 385
BLDG 160
BLDG 70
BLDG 303
N
I
V
E
N
I
V
E
F
A
L
C
R
E
E
T
D
O
W
N
STATION
BLDG 312
BLDG 90
BLDG 223
A
L
A
S
K
A
S
H
E
L
T
E
R
O
L
F
A
BLDG 68
V E
H
IC
L E
B A
R R
IE
R
P
S
L
O
O
P
M U
S T
A N
G
P A
S S
N
A
T
I
O
N
A
L
GU AR
D
A
V
E
N
U
E
BLDG 205
R
I
T
E
BLDG 140
BLDG 310
BLDG 170
BLDG 360
BLDG 314
BLDG 300
BLDG
BLDG
BLDG 150
NORTH GATE
N
I
V
E
T
H
U
R
B
N
D
E
O
L
T
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG 315
BLDG 313
BLDG 336
BLDG 334
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
MAIN GATE
BLDG
PROJECT LOCATION AND
PRIMARY CONTRACTOR STAGING AREA
BLDG
BLDG
BLDG 130
CONTRACTOR HAUL ROUTE
CONTRACTOR
PARKING AREA
(SEE NOTE 2)
CONTRACTOR ACCESS
NO CONTRACTOR ACCESS
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
92654B130C-GC102.DWG
DGC102
ACCESS & SAFETY PLAN
9/22/16
1. SEE SHEET GC103 FOR ACCESS & SAFETY NOTES.
2. CONTRACTOR PARKING AREA IS INTENDED FOR THREE
PROJECTS: BUILDING 130, 131 AND 132 CONSTRUCTION.
CONTRACTOR SHALL COORDINATE NUMBER OF STALLS
AND LOCATION WITHIN AREA WITH CONTRACTING
OFFICER.
NOTES:
N
100' 200'0
A 10/20/17 B.2 SUBMITTAL SEW
A1
ACCESS & SAFETY PLAN
SCALE: 1" = 100'
B 12/12/17 B.3 SUBMITTAL SEW
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
92654B130C-GC103.DWG
DGC103
ACCESS & SAFETY NOTES
9/22/16
ACCESS AND STAGING:
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON GC102
AND ARE SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE OFF-SITE HAUL ROUTES WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS
ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE BASED ON
OPERATIONAL REQUIREMENTS OF THE BASE.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS
UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO
EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A
DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE
WITH THE CONTRACTING OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF
CONTRACTOR'S STAGING SHALL BE AS ILLUSTRATED ON GC102 AND IS SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER.
CONTRACTOR MAY SUBMIT ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA IS SUBJECT
TO CHANGE AT THE DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE
BASE.
7. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES SHALL BE PARKED IN THE STAGING
AREA.
8. CONTRACTOR SHALL PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A PROFESSIONALLY PAINTED SIGN, MEETING
CONTRACTING OFFICER APPROVAL, TO DIRECT MATERIAL SUPPLIERS, EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION SITE. THE
SIGN SHALL READ “CONSTRUCTION VEHICLES ONLY - NO VENDORS ALLOWED.”
9. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER REGARDING CONSTRUCTION
DELIVERIES PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE SCHEDULED MONDAY-FRIDAY, 0800 TO 1500.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO SEARCH BY SECURITY WHEN ENTERING THE BASE AND MAY
EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND VALID PHOTO IDENTIFICATION PER BASE SECURITY
REQUIREMENTS, AND ALL VEHICLES MUST HAVE CURRENT AND VALID REGISTRATION AND INSURANCE.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH THE BASE SECURITY OFFICE IN
OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING SECURE AREAS.
12. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO
THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE CONTRACTING OFFICER.
COORDINATION AND COMMUNICATION:
1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CONTRACTING
OFFICER, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL
TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY
CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE
PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CONTRACTING OFFICER
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE
CONTRACTING OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE
CONTRACTING OFFICER.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN EMERGENCY:
a. EMERGENCY 911
b. OWNER CONTRACTING OFFICER
c. OTHER CONTACTS AS DIRECTED AT PRE-CONSTRUCTION MEETING
TRAFFIC CONTROL:
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS AREAS
BY USING BARRICADES APPROVED BY THE CONTRACTING OFFICER.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH
ARE CLEARLY VISIBLE. FOR VEHICLES, CRANES, OR EQUIPMENT EXCEEDING THE HEIGHT OF BUILDING 130, CONTRACTOR SHALL
PROVIDE EACH VEHICLE WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 3 FEET SQUARE HAVING INTERNATIONAL
ORANGE AND WHITE CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN.
5. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS.
6. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 1 WEEK TO BASE AND THE CONTRACTING OFFICER FOR ROAD CLOSURE PRIOR TO
THE ROAD REQUIRING CLOSURE.
7. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE CONTRACTOR SHALL REQUEST THE CONTRACTING
OFFICER TO SCHEDULE AN INSPECTION. NO ROADWAY OR PORTION OF THE AIRFIELD SHALL BE RE-OPENED UNTIL THE CONTRACTING
OFFICER HAS COMPLETED INSPECTION AND APPROVED THE RE-OPENING OF ACTIVE AREAS.
8. CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE OPERATOR OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) CONTROL
TRAINING COURSE. COORDINATE WITH CONTRACTING OFFICER FOR CLASSS SCHEUDLE/FREQUENCY.
9. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO
RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER.
EQUIPMENT AND STOCKPILE HEIGHT:
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR AC 150/5370-2E AND AC 150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 45 DAYS TO THE CONTRACTING OFFICER AND BASE OPERATIONS PRIOR TO THE
START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL OF FAA FORM 7460-1 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE
CRANES SHALL BE ISSUED BY BASE OPERATIONS AND THE CONTRACTING OFFICER AFTER APPROVAL BY THE FAA. ALL EQUIPMENT
SHALL COMPLY WITH ALL FAA ADVISORY CIRCULARS (CURRENT EDITIONS).
2. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
3. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD
PENETRATE AVIATION SURFACES.
EXCAVATION AND TRENCHES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA REGULATIONS AND THE STATE OF VERMONT LAWS
CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING, AND SHORING ARE PERFORMED IN A
MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS
FOR CONSTRUCTION.
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH
FLASHING RED LIGHTS ACCEPTABLE TO THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES
AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED.
6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER
THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED.
OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR
CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS
IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE
CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS
SUBJECT TO THE DIRECTION OF THE CONTRACTING OFFICER.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED EQUIPMENT WITH THE CONTRACTING OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH STATE AND LOCAL AUTHORITIES AND SUBMITTING
DOCUMENTS FOR PERMITTING FOR EROSION, SEDIMENT CONTROL, AND STORMWATER POLLUTION PREVENTION.
7. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES
WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF. SEE DRAWING CS101 FOR EROSION AND SEDIMENT CONTROL
REQUIREMENTS.
8. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND OR JET BLAST
CONDITIONS.
9. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO
BASE OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK
AREA REGARDLESS OF SOURCE.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE REMOVED
FROM THE PROJECT LIMITS.
11. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE
PROPERLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY
REMOVED FROM THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING CONSTRUCTION
ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
12. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CONTRACTING OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE
SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
13. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR BASE OPERATIONS SHALL IMMEDIATELY BE REMOVED
FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN THROUGHOUT THE REMAINDER OF THE PROJECT.
CONTRACTOR PERMITTING REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER PERMIT FOR LAND DISTURBANCE OF MORE THAN 1 ACRE PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH LOCAL AUTHORITIES TO COMPLETE AND SUBMIT THE
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR APPROVAL. LOCAL AUTHORITIES INCLUDE BUT ARE NOT LIMITED TO
COUNTY AND CITY STORMWATER MANAGEMENT GROUPS. CONTRACTOR SHALL COORDINATE ALL ENVIRONMENTAL AND STORM WATER
CORRESPONDENCE, DOCUMENTATION, AND PERMITTING WITH CONTRACTING OFFICER. THE STORMWATER PERMITTING PROCESS MAY
INCLUDE THE FOLLOWING:
a. SUBMIT STORM WATER QUALITY PERMIT APPLICATION FEE.
b. SUBMIT NPDES GENERAL CONSTRUCTION PERMIT.
c. SUBMIT STORM WATER POLLUTION PREVENTION PLAN.
d. SUBMIT AFFIDAVIT STATING PROPERTY OWNER'S COMMITMENT TO COMPLY WITH STORM WATER QUALITY MANAGEMENT PLAN
AND LOCAL REGULATIONS FOR STORM WATER QUALITY MANAGEMENT.
e. SUBMIT COPY OF APPROVED PROJECT DRAWING SET TO CONTRACTING OFFICER.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY
REQUIREMENTS. THE PERMITTING PROCESS MAY INCLUDE THE SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
a. EROSION AND SEDIMENT CONTROL
b. STORMWATER MANAGEMENT
c. WATER POLLUTION
d. CLEARING
e. DIGGING
f. AIR EMISSIONS
g. DRINKING WATER
h. NOISE ABATEMENT
i. AIRPORT HAZARD/AIRFIELD SAFETY CLEARANCES (7460-1)
EXISTING CONDITIONS NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS.
UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK
COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE CONTRACTING OFFICER BEFORE
ANY FURTHER WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND
TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK
LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK.
CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER AND ALL ASSOCIATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY
THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF
MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF OPERATIONAL PLANS. IN THE EVENT AN
UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE CONTRACTOR'S
OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE CONTRACTING OFFICER.
A 10/20/17 B.2 SUBMITTAL SEW
B 12/12/17 B.3 SUBMITTAL SEW
G
G
GG
G
W W
W W
W W
W W
W W
W
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S T
S T
S T
S T
S T
S T
S T
S T
S T
S T
S T
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
S
T
S
T
A
G
G-1
N 59993.90
E 122607.72
A-1
N 59988.45
E 122602.94
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
92654B130C-CD101.DWG
K. ROBERTSS. WAGNER
S. LUEHRS
DCD101
DEMOLITION PLAN - GRID 1
9/22/16
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS
SHALL BE DISPOSED OF OFF BASE.
2. THE DIVERSION RATE GOAL FOR THE BASE IS 60% DIVERSION RATE OF
CONSTRUCTION AND DEMOLITION MATERIALS FROM LANDFILLS.
COORDINATE WITH CONTRACTING OFFICER.
3. LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF THE
FOLLOWING MATERIALS: AGGREGATE, CONCRETE, ASPHALT, MASONRY,
FOUNDATIONS, REBAR, FENCE MATERIAL, PIPING, AND MISCELLANEOUS
STRUCTURES. LARGE PIECES OF MATERIAL MAY NEED TO BE CRUSHED
AND/OR BROKEN UP FURTHER IN ORDER TO BE HAULED AWAY TO THE
WASTE DISPOSAL SITE.
4. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT
REMOVAL WITH PROPOSED PAVEMENT LAYOUT AND JOINTING PLAN.
5. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE DOUBLE SAWCUT FULL
DEPTH.
6. EXISTING PAVEMENT EDGES SHALL BE SAWCUT IN LOCATIONS SHOWN TO
PROVIDE CLEAN EDGE FOR CONSTRUCTION OF PROPOSED PAVEMENT.
7. PAVEMENT REMOVAL LIMITS SHALL BE TO THE NEAREST EXISTING
PAVEMENT JOINT TO THE GREATEST EXTENT POSSIBLE TO PREVENT
PARTIAL PANEL REMOVAL. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL
OF PAVEMENT AND ANY SUBBASE MATERIAL PRESENT. EXISTING ASPHALT
PAVEMENT TO BE REMOVED IS APPROXIMATELY 4-5 INCHES ASPHALT.
EXISTING CONCRETE IS APPROXIMATELY 11 INCHES.
8. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE
REPAIRED OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE
GOVERNMENT.
9. ALTHOUGH NOT ANTICIPATED SPECIAL HANDLING AND CONSIDERATION
SHALL BE REQUIRED FOR EXCAVATED SOILS THOUGHT TO CONTAIN
PETROLEUM-BASED/CONTAMINATED/HAZARDOUS SUBSTANCES.
CONTRACTOR SHALL PERIODICALLY MONITOR EXCAVATED SOILS. SOILS
SHALL BE TREATED ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE
WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS AND THE PROJECT
SPECIFICATIONS. CONTRACTOR SHALL PAY FOR AND COORDINATE
REMOVAL OF PETROLEUM-BASED/CONTAMINATED/HAZARDOUS MATERIALS
WITH CONTRACTING OFFICER.
10. PRIOR TO DEMOLITION OF EXISTING PAVEMENT, VERIFY FOUNDATION
LIMITS AND SIZES PER STRUCTURAL SHEETS. REPORT ANY
DISCREPANCIES TO THE CONTRACTING OFFICER.
A1
DEMOLITION PLAN - GRID 1
SCALE: 1" = 10'
N
10' 20'0
LEGEND:
CONCRETE DEMOLITION
PAVEMENT MARKING REMOVAL
SAWCUT
GRID 1 GRID 2
AIRCRAFT APRON
PROJECT (BY OTHERS)
AIRCRAFT APRON
PROJECT (BY OTHERS)
M A
T C
H L I N
E
S
E
E
F
N
T I N
U A
T I O
N
N
KEY MAP
SEE NOTE 10 (TYP).
13.75'±
15.61'
11.37'±
KEYED NOTE
REMOVE CONCRETE PAVEMENT FROM FACE OF BUILDING TO
FIRST JOINT LINE. APPROXIMATELY 4.25'
15.76'
A 10/20/17 B.2 SUBMITTAL SEW
EXISTING
GROUNDING LOOP
DO NOT DISTURB
B 12/12/17 B.3 SUBMITTAL SEW
7.97'
13.74'±
G G G
GGG
W W
W W
W W
W W
W W
W
U C
U C
U C
U C
U C
U C
U C
U C
U C
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
UE
UE
UE
UE
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U C
U C
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
G G
G
G
G
G
G
G
G
MW
A
G
G-6
N 59970.79
E 122634.08
A-6
N 59965.34
E 122629.30
92654B130C-CD101.DWG
K. ROBERTSS. WAGNER
S. LUEHRS
DCD102
DEMOLITION PLAN - GRID 2
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
GENERAL DEMOLITION NOTE:
1. SEE GENERAL DEMOLITION AND UTILITY DEMOLITION NOTES ON SHEET
CD101.
2. CONTRACTOR SHALL SURVEY AND FIELD VERIFY PAVEMENT ELEVATIONS
AND TIE-IN LOCATIONS PRIOR TO BEGINNING SITE DEMOLITION.
A1
DEMOLITION PLAN - GRID 2
SCALE: 1" = 10'
N
10' 20'0
GRID 1
GRID 1 GRID 2
BLDG 130
AIRCRAFT APRON
PROJECT (BY OTHERS)
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
N
N
KEY MAP
LEGEND:
ASPHALT DEMOLITION
CONCRETE DEMOLITION
PAVEMENT MARKING REMOVAL
BLDG
KEYED NOTE
REMOVE CONCRETE PAVEMENT FROM FACE OF BUILDING TO
FIRST JOINT LINE. APPROXIMATELY 4.25'
13.43'
A 10/20/17 B.2 SUBMITTAL SEW
13.75'± 16.25'±
13.60'±
4.09'±
B 12/12/17 B.3 SUBMITTAL SEW
REMOVE
CONCRETE
EQUIPMENT PADS
REMOVE
CONCRETE
EQUIPMENT PADS
REMOVE FENCE AND GATE,
EXISTING ELECTRICAL
CONDUIT TO REMAIN. SEE
ELECTRICAL SHEETS
EXISTING
GROUNDING LOOP
DO NOT DISTURB
COMM AND ELEC
DUCT BANK
(BY OTHERS)
G
GG
G
G
A
B1 B1 B1 B1 B1 B1
E E E E
B
E
H
B
R
H
EB R
R R R R
H
R R R R
B1 B1 B1 B1 B1 B1
E
E
E
E
R
B1
B1
B1 B1 B1 B1
E E E E
R R R
E
R
B
B
B
B B
B
B
B
E
H
R
E
H
E
E
H
H
R
R
B1 B1 B1 B1 B1 B1
E E E E
R R R R
H
E
H
R
R
B
B
H H H H H
H H H H H
H H H
H H
H H H H
H
B
B
B
B
E
E
B E
E
E
E
E
E
E
E
H
H
H
R
R
R
R
E
E
E
E
E
H H H
B
B B
LEGEND:
ASPHALT PAVEMENT
CONCRETE PAVEMENT
ISOLATION JOINT
DOWELED CONSTRUCTION JOINT
DUMMY CONTRACTION JOINT
REINFORCED PANEL
SEDIMENT SOCK
B
E
CS500
C1
CS500
C3
CS500
C5
CS500
A1
CS500
C2
CS500
A3
R
H
CS501
B1
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
92654B130C-CS101.DWG
DCS101
SITE PLAN - GRID 1
9/22/16
A1
SITE PLAN - GRID 1
SCALE: 1" = 10'
N
10' 20'0
GENERAL SITE NOTES:
1. CONTRACTOR SHALL SURVEY AND FIELD VERIFY PAVEMENT
ELEVATIONS AND TIE-IN LOCATIONS PRIOR TO BEGINNING SITE
DEMOLITION.
2. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM
EQUIPMENT YARD AND BUILDING.
3. CONTRACTOR SHALL COORDINATE PAVEMENT REMOVAL AND
REPLACEMENT WITH APRON REPLACEMENT PROJECT (BY
OTHERS).
4. EXISTING JOINT LINE LOCATIONS ARE APPROXIMATE. FIELD VERIFY.
5. ALL PAVEMENT SHALL MATCH EXISTING ELEVATION AND SHALL BE
A STRAIGHT-LINE GRADE BETWEEN POINTS.
VERTICAL LIFT FABRIC DOORS
SEE ARCHITECTURAL SHEETS
AIRCRAFT APRON
PROJECT (BY OTHERS)
AIRCRAFT APRON
PROJECT (BY OTHERS)
BUILDING 130
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
N
GRID 1 GRID 2
N
KEY MAP
5.00'
16.32'
A 10/20/17 B.2 SUBMITTAL SEW
CONCRETE STOOP
AND RAMP. SEE
ARCHITECTURAL
SHEETS
CONCRETE STOOP
AND RAMP. SEE
ARCHITECTURAL
SHEETS
CONCRETE STOOP
AND RAMP. SEE
ARCHITECTURAL
SHEETS
CONCRETE STOOP
AND RAMP. SEE
ARCHITECTURAL
SHEETS
TAXILINE
STRIPING PER
ARCHITECTURAL
SHEETS (TYP)
TAXILINE STRIPING
OUTSIDE BUILDING
FACE BY APRON
CONTRACTOR (TYP)
B 12/12/17 B.3 SUBMITTAL SEW
10.67'±
15.61'
11.37'±
8.04'
13.74'±
CONCRETE STOOP
AND RAMP. SEE
ARCHITECTURAL
SHEETS
ISOLATION JOINT AT
APRON PAVEMENT
CS501
A4
B1
G
A
X
X
X
CS501
A1
E H
E
R R R R
B1 B1 B1
B1
B1 B1
E E E E
R R R
B1 B1 B1 B1 B1
E E E
B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
R R R R R R R
E E E E E E E
H
E
R
R
B
B
E
H H
E
E
H H
E
E
H
E
B
R
R
R R
R
R
B
H H H H H H H H H
H H H H H H H H H
E
E
E
E
E
E
H H H
H
E
E
H
B
H
B B
B
B B
B
B
B
B
B
B
B
B
B
LEGEND:
ASPHALT PAVEMENT
CONCRETE PAVEMENT
ISOLATION JOINT
DOWELED CONSTRUCTION JOINT
DUMMY CONTRACTION JOINT
REINFORCED PANEL
SEDIMENT SOCK
FENCE
B
E
CS500
C1
CS500
C3
CS500
C5
CS500
A1
CS500
C2
CS500
A3
R
H
CS501
B1
CS501
A2
X
92654B130C-CS101.DWG
D
K. ROBERTSS. WAGNER
S. LUEHRS
DCS102
SITE PLAN - GRID 2
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
A1
SITE PLAN - GRID 2
SCALE: 1" = 10'
N
10' 20'0
GENERAL SITE NOTES:
1. SEE SHEET CS101 FOR GENERAL SITE NOTES.
VERTICAL LIFT FABRIC DOORS
SEE ARCHITECTURAL SHEETS
AIRCRAFT APRON
PROJECT (BY OTHERS)
AIRCRAFT APRON
PROJECT (BY OTHERS)
M A
T C
H L I N
E
S
E
F
N
T I N
U A
T I O
N
GRID 1
GRID 1 GRID 2
N
KEY MAP
BLDG 130
13.42'
A 10/20/17 B.2 SUBMITTAL SEW
CONCRETE STOOP
AND RAMP PER
ARCHITECTURAL
SHEETS (TYP)
CONCRETE STOOP
AND RAMP PER
ARCHITECTURAL
SHEETS
6.33' x 7.83' CONCRETE PAD FOR
TRANSFORMER
SEE STRUCTURAL FOR PAD DETAILS
TAXILINE
STRIPING PER
ARCHITECTURAL
SHEETS
TAXILINE STRIPING
OUTSIDE BUILDING
FACE BY APRON
CONTRACTOR (TYP)
12.58' x 6.33' CONCRETE PAD FOR
SWITCHGEAR
SEE STRUCTURAL FOR PAD DETAILS
CONCRETE STOOP
AND RAMP PER
ARCHITECTURAL
SHEETS
PEDESTRIAN GATE
B 12/12/17 B.3 SUBMITTAL SEW
ISOLATION JOINT AT
APRON PAVEMENT
CS501
A4
B1
ELEVATION OF
PAVEMENT = 329.17
DOWELS WELDED
ALTERNATELY TO
TOP SPACER BARS
0.362" DIA "VEE" LEG
CHAIRS WELDED AT ALL
INTERSECTIONS TO TOP
AND BOTTOM SPACER BAR
0.177" DIA. SPREADER WIRES
WELDED TO TOP SPACER
BARS 3 PER ASSEMBLY TO
BE CLIPPED AFTER STAKING
0.362" DIA BOTTOM
SPACER BARS WELDED TO
LEG CHAIRS - 2 PER ASSEMBLY
0.362" DIA TOP SPACER
BARS WELDED TO LEG
CHAIRS - 2 PER ASSEMBLY
D1
DOWEL BAR ASSEMBLY (OPTIONAL)
SCALE: NTS
2" ASPHALT
SURFACE COURSE
SAWCUT FULL DEPTH AND REMOVE
EXISTING PAVEMENT AND BASE COURSE.
CLEAN AND TACK COAT EDGES. (TYP)
EXISTING ASPHALT
CONCRETE PAVEMENT
(THICKNESS VARIES)
EXISTING AGGREGATE
BASE COURSE
(THICKNESS VARIES)
EXISTING SUBGRADE
8" AGGREGATE BASE COURSE
12" COMPACTED SUBGRADE
A1
ASPHALT PAVEMENT
SCALE: NTS
3" ASPHALT
BINDER COURSE
9" PORTLAND CEMENT CONCRETE
REINFORCEMENT (FOR PANELS
DESIGNATED WITH "R" ONLY, SEE A3, THIS SHEET)
6" AGGREGATE BASE COURSE
12" COMPACTED SUBGRADE
T
T
C5
PCC PAVEMENT
SCALE: NTS
T
W = 3/4"
W
T
W
W = 1/2" - 5/8"
BOND BREAKER TAPE
PAVEMENT
SURFACE
JOINT SEALANT
NON-EXTRUDING
PREFORMED
COMPRESSIBLE
MATERIAL
1/2" ROD
BACK-UP
MATERIAL
SAWED
JOINT FACE
SAWED
JOINT FACE
JOINT SEALANT
PAVEMENT
SURFACE
W
SAWED
JOINT FACE
C O
N S
T R
U C
T
B
Y
S
A W
I N
G
W = 1/2" - 5/8"
1/2" ROD
BACK-UP
MATERIAL
SAWED
JOINT FACE
JOINT SEALANT
PAVEMENT
SURFACE
D3
CONSTRUCTION JOINT
SCALE: NTS
D5
CONTRACTION JOINT
SCALE: NTS
D2
ISOLATION JOINT
SCALE: NTS
C1
TYPE E - DOWELED CONSTRUCTION JOINT
SCALE: NTS
C2
TYPE H - DUMMY CONTRACTION JOINT
SCALE: NTS
CS500
D5
L2
DOWELS SHALL BE EPOXYED
INTO DRILLED HOLES HAVING
A DIAMETER OF 1/8'' LARGER
THAN THE DOWEL DIAMETER.
GREASE ONE END OF DOWEL
T
T
CS500
D3
1-1/4" DIA - 20" LONG SOLID DOWEL SPACED
AT 15" OC. BAR CLEARANCE AT EDGE OF
PANEL SHALL BE A MINIMUM OF 1/2 TO
MAXIMUM OF 3/4 OF THE BAR SPACING.
T
T
OR 10'-0" IF JOINT SPACING
IS GREATER THAN 12'-0"
TO NEAREST JOINT
FOUNDATION
OR STRUCTURE
NON-EXTRUDING PREFORMED
COMPRESSIBLE MATERIAL
C3
TYPE B - ISOLATION JOINT
SCALE: NTS
CS500
D2
1/2" WIRE SPACING
OR 3" MAX
NOTES:
1. SLABS INDICATED WITH THE LETTER "R" ON THE JOINT LAYOUT PLAN SHALL BE
REINFORCED WITH STEEL REBAR OR WELDED WIRE FABRIC OF THE SIZES
SHOWN. OTHER WELDED WIRE FABRIC SIZES MAY BE USED PROVIDED THE
STEEL AREA (SQUARE INCHES PER FOOT) IN THE LONGITUDINAL AND
TRANSVERSE DIRECTIONS IS EQUAL TO OR EXCEEDS THAT SHOWN IN TABLE 2.
2. WELDED WIRE FABRIC OR REBAR SHALL BE OVERLAPPED FOR A DISTANCE
EQUAL TO AT LEAST ONE SPACING OF THE WIRE IN THE FABRIC OR 32 WIRE
DIAMETERS, WHICHEVER IS GREATER. THE WIRES IN THE LAP SHALL BE WIRED
OR OTHERWISE SECURELY FASTENED TO PREVENT SEPARATION DURING
CONCRETE PLACEMENT.
TABLE 2
PAVEMENT
THICKNESS
(INCHES)
MINIMUM REQUIRED
AREA OF STEEL
(SQ. INCHES/FOOT)
WELDED WIRE
FABRIC
9-12 0.072 6x6-W4.0xW4.0
T
T
PAVEMENT
JOINT OR EDGE
SLABS WITH LETTER "R" ON JOINT
PLANS ARE REINFORCED. SEE
TABLE FOR SIZE AND SPACING OF
REINFORCEMENT
T/4 + 1"
DOWEL BAR.
SEE TABLE 2
THIS SHEET
A3
REINFORCED CONCRETE PAVEMENT
SCALE: NTS
12" 12"
13" PORTLAND CEMENT CONCRETE
REINFORCEMENT (FOR PANELS
DESIGNATED WITH "R" ONLY, SEE A3, THIS SHEET)
C5
EXTERIOR PCC APRON PAVEMENT
SCALE: NTS
16" AGGREGATE BASE COUSE
12" COMPACTED SUBGRADE
12" AGGREGATE BASE COURSE
6" DRAINAGE LAYER
NOTES:
1. COORDINATE SAWCUT DEPTH OF JOINT RESERVOIR WITH SEALANT
MANUFACTURER'S RECOMMENDATIONS.
NOTES:
1. COORDINATE SAWCUT DEPTH OF JOINT RESERVOIR WITH SEALANT
MANUFACTURER'S RECOMMENDATIONS.
NOTES:
1. COORDINATE SAWCUT DEPTH OF JOINT RESERVOIR WITH SEALANT
MANUFACTURER'S RECOMMENDATIONS.
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
92654B130C-CS500.DWG
DCS500
SITE DETAILS - 1
9/22/16
A 10/20/17 B.2 SUBMITTAL SEW
B 12/12/17 B.3 SUBMITTAL SEW
COMPOST FILTER SOCK
L
O
P
E
A
F L O
W
COMPOST FILTER SOCK
1. CONTRACTOR SHALL PLACE
FILTER SOCK AS REQUIRED
WITH APPROVAL FROM THE
COR.
DETAIL A
12" DIA. COMPOST
FILTER SOCK
M
I N
NOT TO SCALE
FLOW
STAKE (TYP. WHEN NOT
USED ON PAVEMENT)
PROVIDE SUFFICIENT LENGTH
TO PREVENT WATER FROM
FLOWING AROUND THE
COMPOST FILTER SOCK
COMPOST
FILTER SOCK
COMPOST FILTER SOCK INSTALLATION IN DITCHES
DITCH PLAN VIEW
DITCH ELEVATION VIEW
COMPOST
FILTER SOCK
(SEE NOTE 1)
2" X 2" X 36" LONG WOODEN
STAKE @ 10' O.C. WHEN
NOT USED ON PAVEMENT
BLOWN/PLACED
FILTER MEDIA
D
IS
T U
R B
E D
A R
E A
U N
D
IS
T U
R B
E D
A R
E A
B1
SEDIMENT SOCK
SCALE: NTS
10'-0" (MAXIMUM)END BAY MULTIPLES OF
10'-0" MAXIMUM
TOP RAIL
ANGLE OR
CORNER POST
FINISH
GRADE
CHAIN LINK FABRIC
BOTTOM RAIL
10"
(MIN)
CONCRETE
FOOTING (TYP)
TRUSS ROD
A2
CHAIN-LINK FENCE
SCALE: NTS
12"
GATE
FRAME
GATE POST
TOP RAIL
BRACE
CHAIN
LINK FABRIC
LATCH TO
ACCOMMODATE
PADLOCK
BRACE
(MIN.)
CONCRETE
FOOTING (TYP)
TRUSS ROD
A1
SECURITY PERSONNEL GATE
SCALE: NTS
NOTES:
1. SPACING OF POSTS SHALL BE COORDINATED WITH BELOW GRADE
UTILITIES, BUT NO GREATER THAN 10'-0" (MAX) SPACING.
T
PCC PAVEMENT
APRON PCC PAVEMENT
A4
TYPE B1 - ISOLATION JOINT AT APRON PAVEMENT
SCALE: NTS
D2
CS500
92654B130C-CS500.DWG
DCS501
SITE DETAILS - 2
9/22/16
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
5 61 2 3 4
A 10/20/17 B.2 SUBMITTAL SEW
B 12/12/17 B.3 SUBMITTAL SEW
W W
W W
W W
W W
W W
W
U C
U C
U C
U C
U C
U C
U C
U C
U C
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
UE
UE
UE
UE
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U C
U C
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
P
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
F O
G G
G
G
G
G
G
G
G
NOT FOR
CONSTRUCTION
92654
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
VERMONT AIR NATIONAL GUARD
BURLINGTON INTERNATIONAL AIRPORT
SO BURLINGTON, VERMONT
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - CURZ152801
F-35 ALTER AIRCRAFT
SHELTER BUILDING 130
D
C
A
B
E
D
C
A
B
E
5 61 2 3 4
92654B130C-CU101.DWG
DCU101
UTILITY PLAN - GRID 2
9/22/16
BLDG 131
BLDG 130
GENERAL UTILITY NOTES:
1. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING
CONNECTIONS WITH BUILDING CONTRACTOR AND THE INFORMATION
PROVIDED ON MECHANICAL AND ELECTRICAL DRAWINGS FOR EACH
FACILITY.
3. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER AND ALL
ASSOCIATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE
LOCATION OF UTILITIES PRIOR TO COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL COORDINATE ALL REQUIRED UTILITY SHUTDOWNS
FOR UTILITY CONNECTIONS WITH THE CONTRACTING OFFICER.
5. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL
UTILITY CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR
THE UTILITY CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL
FEES ASSOCIATED WITH CONNECTION CHARGES AND METERS.
A1
UTILITY PLAN - GRID 2
SCALE: 1" = 10'
N
10' 20'0
CONNECTION TO EXISTING
NATURAL GAS LINE BY
VERMONT GAS. GAS LINE
SHALL BE RUN ON PIPE RACK
TO BUILDING 130, SEE
MECHANICAL DRAWINGS FOR
CONNECTION AND ROUTING
NATURAL GAS UTILITY NOTES:
1. ALL WORK DONE BY VERMONT GAS COMPANY SHALL BE PAID FOR BY
CONTRACTOR.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRENCHING ,
EXCAVATION, BACKFILLING, AND ALL OTHER ASSOCIATED EARTHWORK.
EXCAVATION AND BACKFILLING SHALL CONFORM TO VERMONT GAS
FACILITIES INSTALLATION STANDARDS. VERMONT GAS COMPANY WILL
INSTALL THE NATURAL GAS LINE PIPING.
GRID 1
GRID 1 GRID 2
N
KEY MAP
ABANDONED FUEL LINES
DO NOT DISTURB
UNDERGROUND COMM LINE
(BY APRON CONTRACTOR)
UNDERGROUND ELECTRICAL
LINE (BY APRON CONTRACTOR)
A 10/20/17 B.2 SUBMITTAL SEW
B 12/12/17 B.3 SUBMITTAL SEW
EXISTING GROUNDING LOOP
DO NOT DISTURB
COMM AND ELEC
DUCT BANK
(BY OTHERS)
GENERAL NOTES:
1. GENERAL:
A. THESE NOTES, AND OTHER DRAWING NOTES CONTAINED WITHIN, ARE PROVIDED
TO MEET SPECIFIC REQUIREMENTS AND TO SUPPLEMENT THE CONTRACT
SPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE THE
PROVISIONS AND REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWN
ON ALL OTHER DRAWINGS.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND
REPORT ANY DISCREPANCIES FROM THE CONTRACT DRAWINGS
TO THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR
TO COMMENCING WITH WORK. SCALING OF WORKING DIMENSIONS FROM THE
STRUCTURAL DRAWINGS IS PROHIBITED.
D. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS
OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARY
BRACING. CONTRACTOR SHALL UNDERTAKE ALL NECESSARY MEASURES TO ENSURE
SAFETY OF ALL PERSONS AND STRUCTURES AT THE SITE AND ADJACENT TO THE SITE.
VISITS TO THE SITE BY THE CONTRACTING OFFICER'S
REPRESENTATIVE SHALL NOT RELIEVE THE CONTRACTOR OF SUCH RESPONSIBILITY.
E. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT
DRAWINGS OR SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME
CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITH
THE APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE.
WHERE SECTIONS VARY, CONTRACTOR SHALL PROVIDE FOR SMOOTH TRANSITIONS
BETWEEN THEM, UNLESS NOTED OTHERWISE.
F. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS'
WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
G. ELEVATION 100'-0" CORRESPONDS TO NAVD 88 ELEVATION 329.17 FT, SEE CIVIL.
H. WHERE NEW STRUCTURE CONFLICTS WITH EXISTING ARCHITECTURAL/MECHANICAL/
ELECTRICAL/FIRE PROTECTION SYSTEMS TO REMAIN, EXISTING SYSTEMS SHALL BE
DISCONNECTED AND RELOCATED TO ACCOMMODATE NEW STRUCTURE. CONTRACTOR
SHALL ACCOUNT FOR ALL MODIFICATIONS REQUIRED FOR EXISTING SYSTEMS TO BE
DISCONNECTED, RECONNECTED AND OPERATE AS REQUIRED BY OTHER DISCIPLINE DRAWINGS.
2. DESIGN STANDARDS
A. PRINCIPAL CODE OF RECORD: INTERNATIONAL BUILDING CODE 2015.
B. ASCE 7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2010.
C. ACI 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, 2014.
D. ACI 530/ASCE 5/TMS 402, BUILDING CODE REQUIREMENTS FOR MASONRY
STRUCTURES, 2013.
E. AISC 325, STEEL CONSTRUCTION MANUAL, 14th EDITION, 2011.
F. AISI COLD-FORMED STEEL DESIGN MANUAL, 2012.
G. UFC 3-301-01 STRUCTURAL ENGINEERING, 20 JUNE 2016
H. UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 9 FEBRUARY 2012
I. INTERNATIONAL EXISTING BUILDING CODE, 2015
E. SNOW LOAD PER ASCE 7-10
1. GROUND SNOW LOAD: 40 PSF.
2. EXPOSURE FACTOR: 0.9.
3. THERMAL FACTOR: 1.0.
F. WIND LOAD PER ASCE 7-10
1. ULTIMATE DESIGN WIND SPEED: 115 MPH 3-SECOND GUST.
2. NOMINAL DESIGN WIND SPEED: 89 MPH 3-SECOND GUST.
3. BUILDING CONDITION: PARTIALLY ENCLOSED.
4. TOPOGRAPHIC FACTOR: 1.0.
5. FOR VERTICAL LIFT FABRIC DOOR COMPONENTS AND CLADDING SEE S-425.
6. WALL COMPONENTS AND CLADDING SHALL BE DESIGNED FOR THE FOLLOWING
UNFACTORED ULTIMATE WIND LOADS (PER ASCE 7-10) UNLESS NOTED OTHERWISE:
a. WITHIN 9'-0" OF CORNERS: 44 PSF INWARD, 55 PSF OUTWARD
b. GREATER THAN 9'-0" FROM CORNERS: 44 PSF INWARD, 47 PSF OUTWARD
7. ROOF COMPONENTS AND CLADDING SHALL BE DESIGNED FOR THE FOLLOWING
UNFACTORED ULTIMATE WIND LOADS (PER ASCE 7-10), UNLESS NOTED OTHERWISE:
a. WITHIN 9'-0" OF CORNERS: 26 PSF INWARD, 103 PSF OUTWARD
b. WITHIN 9'-0" OF EDGES: 26 PSF INWARD, 72 PSF OUTWARD
c. GREATER THAN 9'-0" FROM EDGES: 26 PSF INWARD, 48 PSF OUTWARD
G. SEISMIC LOAD PER ASCE 7-10
1. MAXIMUM CONSIDERED EARTHQUAKE SPECTRAL RESPONSE
ACCELERATIONS Ss = 0.355, S1 = 0.105.
2. DESIGN EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS Sds = 0.357, Sd1 = 0.151.
3. SITE CLASS: D.
4. SEISMIC DESIGN CATEGORY: C.
5. BASIC SEISMIC FORCE RESISTING SYSTEM: STRUCTURAL STEEL NOT SPECIFICALLY
DETAILED FOR SEISMIC RESISTANCE.
6. RESPONSE MODIFICATION COEFFICIENT: R = 3.
5. GEOTECHNICAL INFORMATION
A. SOURCE: EXISTING B130 DRAWINGS AND ATL REPORT NO. CD7338E-1-07-17, 1 SEPTEMBER 2017
(FROM ADJACENT B360 AND B385).
B. SITE PREPARATION
1. EXCAVATION, FILL AND BACKFILL SHALL BE IN ACCORDANCE WITH THE CONTRACT
DRAWINGS AND SPECIFICATIONS, DIVISION 31.
2. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER WHEN LOSE OR SOFT SOILS
ARE EXPOSED WHERE SLABS, MATS, OR FOOTINGS ARE TO BE PLACED SO THAT A
DETERMINATION MAY BE MADE REGARDING IMPROVEMENT OF THIS POTENTIALLY
UNDESIRABLE CONDITION.
C. SLAB, MAT, AND FOOTING DESIGN PARAMETERS
1. ALLOWABLE BEARING CAPACITIES
a. GRAVITY LOADS: 2000 PSF
2. FROST DEPTH: 60".
3. MINIMUM STABILITY FACTORS OF SAFETY
a. OVERTURNING: 1.5
b. UPLIFT: 1.5.
c. SLIDING: 1.5.
f. EMBEDMENT AND LAP SPLICE LENGTHS FOR ALL REINFORCING STEEL BARS SHALL
CONFORM TO THE FOLLOWING PROVISIONS, UNLESS NOTED OTHERWISE.
(1) HORIZONTAL BARS HAVING MORE THAN 12" OF CONCRETE PLACED BELOW
THEM SHALL BE CONSIDERED TOP REINFORCEMENT AND SHALL HAVE
MINIMUM STRAIGHT EMBEDMENT AND LAP SPLICE LENGTHS INCREASED BY
NOT LESS THAN 30% OVER THOSE GIVEN ABOVE.
(2) HOOK EMBEDMENT IS THE MINIMUM STRAIGHT LINE DISTANCE FROM THE
CRITICAL SECTION OF THE BAR TO THE FARTHEST EDGE OF THE HOOK.
g. PROVIDE ADDITIONAL REINFORCEMENT AT ALL OPENINGS AND CORNER BARS AT
ALL INTERSECTING GRADE BEAMS, WALLS, AND CURBS IN ACCORDANCE WITH THE
STANDARD DETAILS, UNLESS NOTED OTHERWISE.
5. JOINTS
a. LOCATE ALL CONSTRUCTION, CONTRACTION, ISOLATION, EXPANSION, AND OTHER
JOINTS AS INDICATED OR SPECIFIED, OR OTHERWISE APPROVED BY THE
CONTRACTING OFFICER.
b. SURFACES OF ALL HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS SHALL BE
CLEANED OF LAITANCE AND SHALL EXPOSE CLEAN COARSE AGGREGATE SOLIDLY
EMBEDDED IN MORTAR MIX. JUST PRIOR TO DEPOSITING CONCRETE, SURFACE OF
CONSTRUCTION JOINT SHALL BE THOROUGHLY CLEANED AND WETTED.
c. THESE PROVISIONS SHALL ALSO APPLY WHEN NEW CONCRETE IS PLACED AGAINST
EXISTING CONCRETE. IN ADDITION, EXISTING CONCRETE SURFACE SHALL BE
ADEQUATELY PREPARED BY APPLICATION OF A BONDING AGENT.
d. PROVIDE WATERSTOPS AT CONCRETE JOINTS WHERE INDICATED ON THE
CONTRACT DRAWINGS.
3. SPECIAL INSPECTIONS
A. SEE S-003 AND S-004.
4. DESIGN LOADS
A. RISK CATEGORY: II PER UFC 3-301-01.
B. LIVE LOADS PER ASCE/SEI 7-10
1. ROOF LIVE LOAD: 20 PSF (NONREDUCIBLE ) AND CONCURRENT
300-LB CONCENTRATED LOAD.
C. COLLATERAL LOADS:
1. ROOF: 10 PSF
2. FIRE PROTECTION PIPING: 2 PSF
3. LIGHTING AND ELECTRICAL: 2 PSF
4. EQUIPMENT: ESTIMATED WEIGHTS
D. EQUIPMENT LOADS
1. AS INDICATED FOR EQUIPMENT WEIGHING IN EXCESS OF 300 LBS. FRAMING AND
FOUNDATIONS ARE DESIGNED FOR EQUIPMENT WHICH SATISFIES THE CONTRACT
SPECIFICATIONS.
2. IF EQUIPMENT FURNISHED IS HEAVIER THAN THE WEIGHTS INDICATED, OR
REQUIRES STRUCTURAL CHANGES FOR ANY OTHER REASON, CONTRACTOR SHALL
PROVIDE ENGINEERING DESIGN CALCULATIONS AND ADDITIONAL STRUCTURAL
WORK NECESSARY TO SUPPORT ALL LOADS IN ACCORDANCE WITH THE DESIGN
STANDARDS SPECIFIED ABOVE, AT NO ADDITIONAL COST TO THE OWNER AND WITH
NO INCREASE IN CONTRACT TIME.
6. MATERIALS: SEE THE CONTRACT SPECIFICATIONS FOR COMPLETE REQUIREMENTS
AND COMPLY WITH ALL APPLICABLE OSHA REGULATIONS
A. REINFORCED CONCRETE:
1. REINFORCED CONCRETE SHALL BE PREPARED AND PLACED IN
ACCORDANCE WITH ACI MANUAL OF CONCRETE PRACTICE.
2. CONCRETE
a. UNLESS NOTED OTHERWISE: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 4500 PSI, NORMAL WEIGHT.
b. INTERIOR SLABS WITH TROWEL FINISH SHALL NOT HAVE AIR ENTRAINMENT.
3. FORMWORK
a. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN, ENGINEERING, STRUCTURAL
ADEQUACY, AND CONSTRUCTION OF ALL CONCRETE FORMWORK IN ACCORDANCE
WITH THE CONTRACT SPECIFICATIONS.
b. COORDINATE ALL CONCRETE WORK WITH THE PLACEMENT OF PIPING, INSERTS, FLOOR DRAINS, AND OTHER EMBEDDED ITEMS INDICATED ON THE CONTRACT
DRAWINGS OR IN THE CONTRACT SPECIFICATIONS.
c. ALL NEW OR EXISTING PIPING OR UTILITIES PASSING THROUGH NEW CONCRETE
SHALL BE SLEEVED, UNLESS NOTED OTHERWISE. SEE OTHER DISCIPLINE
DRAWINGS FOR SLEEVE DETAILS.
CONTRACTOR SHALL PROVIDE MEASURES TO ENSURE THAT SLEEVES REMAIN
FREE OF DEBRIS AND WATER DURING CONSTRUCTION.
d. PROVIDE 3/4" CHAMFER STRIPS ON ALL EDGES OF EXPOSED CONCRETE, UNLESS
NOTED OTHERWISE.
e. WITH THE EXPLICIT PRIOR APPROVAL IN WRITING OF THE CONTRACTING OFFICER'S
REPRESENTATIVE, COLUMN AND WALL FOOTINGS MAY BE EARTH-FORMED USING
UNDISTURBED NATIVE SOIL. PROVIDE A MINIMUM
EXCAVATION WIDTH 4" GREATER THAN INDICATED, AND A DEPTH 2" GREATER THAN
INDICATED.
4. REINFORCING STEEL
a. BARS: ASTM A615 GRADE 60.
b. WELDED WIRE REINFORCEMENT: ASTM A1064.
c. ALL CONCRETE SHALL BE REINFORCED UNLESS SPECIFICALLY MARKED "NOT
REINFORCED" OR "UNREINFORCED".
d. CONTRACTOR SHALL DETAIL AND PLACE ALL REINFORCEMENT IN ACCORDANCE
WITH ACI SP-66, ACI 301, ACI 318, AND CRSI MANUAL OF STANDARD PRACTICE.
e. MINIMUM CONCRETE CLEAR COVER OVER REINFORCEMENT SHALL BE AS
FOLLOWS, UNLESS NOTED OTHERWISE:
(1) CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3".
(2) CONCRETE EXPOSED TO EARTH OR WEATHER: #6 THROUGH #11 BARS - 2";
#5 AND SMALLER BARS, WELDED WIRE FABRIC - 1 1/2".
(3) CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND:
SLABS AND WALLS - 3/4"; BEAMS AND COLUMNS, PRIMARY REINFORCEMENT,
TIES, STIRRUPS, SPIRALS - 1 1/2".
B. STRUCTURAL STEEL:
1. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH AISC STEEL
CONSTRUCTION MANUAL, 14th EDITION.
2. TEMPORARY ERECTION BRACING SHALL BE DESIGNED AND PROVIDED BY THE CONTRACTOR
AS REQUIRED AND SHALL NOT BE REMOVED UNTIL ALL PERMANENT LATERAL-LOAD-RESISTING
ELEMENTS AND CONNECTIONS ARE COMPLETELY INSTALLED.
3. WIDE FLANGE SHAPES AND TEES: ASTM A992, Fy = 50 KSI.
4. OTHER SHAPES, PLATES, AND THREADED RODS
a. ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE.
b. ASTM A572 GRADE 50, Fy = 50 KSI, WHERE INDICATED AS "(50)".
5. SQUARE AND RECTANGULAR HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE C,
Fy = 50 KSI.
6. PIPE: ASTM A53 TYPE E OR S, GRADE B, Fy = 35 KSI.
7. BOLTS
a. 3/4" DIAMETER ASTM A325, UNLESS NOTED OTHERWISE.
b. FRAMING CONNECTIONS: PRETENSIONED JOINTS
WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
c. ON ONE SIDE OF EACH DOUBLE CONNECTION OF BEAMS TO A COLUMN WEB OR A
GIRDER WEB DIRECTLY OVER A COLUMN, PROVIDE A TEMPORARY SEAT ANGLE
ATTACHED TO COLUMN OR GIRDER WEB AND TO BOTTOM FLANGE OF BEAM. MINIMUM
SEAT CONNECTION SHALL BE L4x3x3/8 LLH WITH TWO 3/4" DIAMETER A307 OR A325-ST
BOLTS EACH LEG. SINGLE AND DOUBLE STAGGERED CONNECTIONS ARE PROHIBITED
WITHOUT THE EXPLICIT PRIOR APPROVAL IN WRITING OF THE STRUCTURAL ENGINEER OF
RECORD.
9. WELDING: IN ACCORDANCE WITH AWS D1.1 USING E70 ELECTRODE.
10. ALL DOUBLE ANGLE MEMBERS SHALL HAVE SPACER PLATES TO COMPLY WITH AISC
PARAGRAPH E6.2.
a. THICKNESS: TO MATCH END GUSSET PLATES.
b. MINIMUM ATTACHMENT: CONNECT TO HEEL AND TOE OF EACH ANGLE USING 3/16" x 1"
LONG FILLET WELDS.
11. HEADED STUDS
a. COLD-FINISHED STEEL CONFORMING TO ASTM A108, GRADE 1015 OR 1020.
b. ALL STUDS LOCATED SO AS TO OBSTRUCT WALKING SURFACES OF BEAMS OR JOISTS
SHALL BE FIELD INSTALLED.
12. ANCHOR BOLTS
a. ASTM F1554 GRADE 36.
b. LOCATE ANCHOR BOLTS ACCURATELY, SET WITH TEMPLATES, AND SECURELY HOLD IN
POSITION WHILE PLACING
CONCRETE. PROTECT IN-PLACE ANCHOR BOLTS FROM CONSTRUCTION ACTIVITY.
c. THE FOLLOWING ARE PROHIBITED WITHOUT THE EXPLICIT PRIOR APPROVAL IN WRITING
OF THE STRUCTURAL ENGINEER OF RECORD:
(1) INSERTING ANCHOR BOLTS INTO FRESH OR PARTIALLY HARDENED CONCRETE.
(2) SUBSTITUTING POST-INSTALLED ANCHORS WHERE EMBEDDED ANCHOR BOLTS
ARE INDICATED.
(3) REPAIRING, REPLACING, OR MODIFYING INSTALLED ANCHOR BOLTS.
13. POST-INSTALLED ANCHORS
a. CONCRETE ANCHORS: CARBON STEEL MANUALLY EXPANDED WEDGE
TYPE, UNLESS NOTED…