W912QR21R0039_Specs-0004.pdf

PDF 2 MB Posted

Attached to
Construction of an Aerial Port Facility
Solicitation number
W912QR21R0039
Issued by

About this file

This solicitation is for the design/build construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, Minnesota. The estimated construction cost is between $10 million and $25 million, with a NAICS code of 236220. This is a full and open procurement requiring compliance with HUBZone price evaluation preferences. Funds are not presently available and no contract award will be made until appropriated funds are released. Technical inquiries and questions relating to proposal procedures or bonds must be submitted via the Bidder Inquiry system on ProjNet. The site visit information can be found in FAR 52.236-27 ALT 1. The response due date is not specified. The Department of the Army Corps of Engineers Engineering District Louisville is the contracting agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: LEVI SPETH

600 DR M L KING JR PL

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR21R0039 for the Construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, MN is hereby amended as follow s:

See Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0039

X 9B. DATED (SEE ITEM 11)

08-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE

DATE

20-Jul-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964860

FACILITY CODECODE

EMAIL:TEL:

W912QR21R0039_Specs-0004

W912QR21R0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT. 0004 CONTINUATION PAGE

AMENDMENT REPORT

Amendment Number: 0004 Project Title: Aerial Port Facility Project Location: Minneapolis-Saint Paul IAP ARS, MN

a. The proposal due date has changed to 27 July 2021 at 2:00 pm ET.

b. The following DRAWINGS have been REVISED:

1) F-501 FIRE PROTECTION ENLARGED PLANS

c. The following SPECIFICATION SECTIONS have been REVISED:

1) 08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS

2) 21 30 00 FIRE PUMPS

d. The following DOCUMENTS have been REVISED:

1) Furnishings, Fixtures, and Equipment (FF&E)

e. The Price Breakout Schedule has been REVISED:

f. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 20-Jul-2021 02:00 PM to 27-Jul-2021 02:00 PM.

(End of Summary of Changes)

PRICE BREAKOUT SCHEDULE

PROJECT: Aerial Port Facility, DBB

LOCATION: Minneapolis-Saint Paul Air Reserve Station, MN

PROPOSER’S NAME:

BASE PROPOSAL

Item No.

Description

New Construction, Aerial Port Facility

Unit

JOB

Amount __

0002 Site Work JOB $

Subtotal

OPTION ITEMS

Option-1 – 5-Ton Bridge Crane

JOB

0004 Option-2 – Covered Loading Area Canopy

Addition

JOB $

0005 Option-3 – Floor Finishes JOB $

0006 Option-4 – Furniture, Fixtures, and Equipment

(FFE)

JOB $

0007 Option-5 – High Bay Translucent Walls Panels JOB $

0008 Option-6 – Unit Assembly Foldable Partitions JOB $

0009 Option-7 – Parachute Drying Tower Addition JOB $

0010 Option-8 – Communications Equipment JOB $

0011 Option-9 – Exterior Insulated Metal Wall Panels JOB $_______________

0012 Option-10 – Pre-Manufactured Canopies JOB $_______________

0013 Option-11 – Exterior Block Wainscoting JOB $_______________

0014 Option-12 – Generator Hook Up JOB $_______________

0015 Option-13 – Install New Gate JOB $_______________

TOTAL OPTIONS

TOTAL BASE PROPOSAL + OPTION ITEMS $

Description of Base Proposal Items

(a) Item No. 0001 "New Construction Aerial Port" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements of the AERIAL PORT FACILITY as required by the contract document drawings and specifications, except that work covered by Items No. 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, and 0015.

(b) Item No. 0002 "Site work" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements of the AERIAL

PORT FACILITY as required by the contract document drawings and specifications., except that work covered by Items No. 0001, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, and 0015.

Description of Option Items

(c) Option-1, Item No. 0003 "5-Ton Bridge Crane" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of the 5-ton bridge crane, runway beams, and associated utilities as indicated in the contract documents drawings and specifications.

This option may be exercised within 60 calendar days from Notice To Proceed.

(d) Option-2, Item No. 0004 "Covered Loading Area Canopy " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of an exterior canopy with associated supports, bollards, and fire suppression as required by the contract documents drawings and specifications.

This option may be exercised within 60 calendar days from Notice To Proceed.

(e) Option-3, Item No. 0005 "Floor Finishes" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of LVT in lieu of sealed concrete in areas indicated in the contract documents drawings and white epoxy flooring in the Packing/Rigging room.

This option may be exercised within 60 calendar days from Notice To Proceed.

(f) Option-4, Item No. 0006 "Furniture, Fixtures, and Equipment (FFE)" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the purchase and installation of all FFE items. Contractor shall purchase furniture including checking accuracy of all acknowledgements and schedules from manufacturers and making necessary corrections to ensure that the manufacturer has a correct understanding of the order and requirement. Contractor shall purchase furniture from the open market. GSA information is provided FOR INFORMATIONAL PURPOSES ONLY. It is encouraged to solicit and provide

GSA pricing on furniture. Complete the furniture purchase by obtaining a minimum of (3) separate proposals. Furniture is subject to FAR clause 52.236-5 Materials and Workmanship. If necessary, to meet project timeline requirements, furniture may be purchased using manufacturer’s quick-ship programs or by coordinating factory times.

This option may be exercised within 180 calendar days from Notice To Proceed.

(g) Option-5, Item No. 0007 "High Bay Translucent Wall Panels" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation and furnishing of translucent wall panels on the exterior wall of the building in the high bay area.

This option may be exercised within 60 calendar days from Notice To Proceed.

(h) Option-6, Item No. 0008 "Unit Assembly Foldable Partitions " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation and furnishing of translucent wall panels on the exterior wall of the building in the high bay area.

This option may be exercised within 60 calendar days from Notice To Proceed.

(i) Option-7, Item No. 0009 "Parachute Drying Tower Addition" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the of the parachute drying tower and exterior sidewalk as required by the contract documents and specifications.

This option may be exercised within 60 calendar days from Notice To Proceed.

(j) Option-8, Item No. 0010 "Communications Equipment" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of communications equipment as indicated in the construction documents and specifications.

This option may be exercised within 60 calendar days from Notice To Proceed.

(k) Option-9, Item No. 0011 "Exterior Insulated Metal Wall Panels " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of insulated wall panels in lieu of standard wall panels for the building. Price shall also include the area associated with Option-7, Item No. 0009 “Parachute Drying Tower Addition”.

This option shall include a credit to the Government for the cost of the standard wall panels.

This option may be exercised within 60 calendar days from Notice To Proceed.

(l) Option-10, Item No. 0012 "Pre-Manufactured Canopies" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of selected canopies over entry doors along the perimeter of the building. Contractor shall note that canopies at corridors 101 and 109 shall be considered within the base proposal. All other exterior canopies at doors are considered proposal options.

This option may be exercised within 60 calendar days from Notice To Proceed.

(m) Option-11, Item No. 0013 " Exterior Block Wainscoting " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of the wainscoting around the perimeter of the building as indicated in the drawings and specifications. Price shall also include the perimeter associated with Option-7, Item No. 0009

“Parachute Drying Tower Addition”.

This option may be exercised within 60 calendar days from Notice To Proceed.

(n) Option-12, Item No. 0014 " Generator Hook Up " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of the generator hook up for the building.

This option may be exercised within 60 calendar days from Notice To Proceed.

(o) Option-13, Item No. 0015 " Install New Gate " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of the airfield access gate as shown in the drawings.

This option may be exercised within 60 calendar days from Notice To Proceed.

AERIAL PORT FACILITY (P2: 331663) CERTIFIED FINAL DESIGN SUBMITTAL

MINNEAPOLIS-ST. PAUL ARS, MINNESOTA 19 MARCH 2021

PROJECT TABLE OF CONTENTS Page 1

AMENDMENT 0004

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 33 29.00 06 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) 01 45

04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 – CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 – METALS

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

PROJECT TABLE OF CONTENTS Page 2

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 34 19.10 20 ROLLING SERVICE DOORS

08 36 13 SECTIONAL OVERHEAD DOORS

Amendment 0004*************************************************************

08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS

*************************************************************Amendment 0004

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 – FINISHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 PORCELAIN TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

Amendment 0002*************************************************************

09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING

*************************************************************Amendment 0002

09 68 00 CARPETING

09 77 20 FIBERGLASS REINFORCED WALL PANELS

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 53 00 MANUFACTURED CANOPY

PROJECT TABLE OF CONTENTS Page 3

AMENDMENT 0004

Amendment 0002*************************************************************

DIVISION 11 – EQUIPMENT

11 13 19.13 LOADING DOCK BUMPERS

11 94 10 ROOFTOP FALL PROTECTION ANCHORS

*************************************************************Amendment 0002

DIVISION 12 – FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.10 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH

C-I-A DETERMINATION H-H-H

25 05 11.11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH

C-I-A DETERMINATION L-M-M

25 05 11.12 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH

C-I-A DETERMINATION M-M-H

25 05 11.13 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH

C-I-A DETERMINATION M-M-M

25 05 11.14 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH

C-I-A DETERMINATION L-L-L

PROJECT TABLE OF CONTENTS Page 4

DIVISION 26 – ELECTRICAL

26 05 19.10 10 INSULATED WIRE AND CABLE

26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 08 00 APPARATUS INSPECTION AND TESTING

26 09 43 NETWORK LIGHTING CONTROLS (WIRED)

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 13.10 30 ELECTRIC METERS

26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 36 20 PORTABLE GENERATOR AND LOAD BANK CONNECTION CABI-

NETS(PGLBCC)

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING 26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 – EARTHWORK

31 00 00.00 06 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 11 20 SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 – UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

PROJECT TABLE OF CONTENTS Page 5

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

Amendment 0001*************************************************************

41 22 23.23 SPECIALTY HOISTS

**************************************************************Amendment 0001

Amendment 0003**************************************************************

APPENDICES

APPENDIX A GEOTECHNICAL INVESTIGATION REPORT

**************************************************************Amendment 0003

-- End of Project Table of Contents --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 108 PAGES

Aerial Port Facility

00 80 00.00 06 SD-01 Preconstruction Submittals

1.28 GLabor, Equipment, and Material

Report

1.28 GDaily Equipment Report

1.37 GRadioactive Material/Equipment

SD-02 Shop Drawings

1.41 GMechanical/Electrical Room

Layout

SD-04 Samples

1.16 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.12SF1413 Statement and

Acknowledgement

1.14Local Agency Check

1.45Progress Photographs

SD-07 Certificates

1.16Warranty of Construction

1.15 GNO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.32Insurance

1.30Sales and Use Tax

SD-11 Closeout Submittals

1.7.4 GPreliminary (Working) As-Built

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 108 PAGES

00 80 00.00 06 1.7.1 GFinal As-Built Drawings

1.7.1.2 GCAD Working As-Built Drawings

1.9.1Equipment-in-Place List

1.9.1Maintenance and Parts Data

1.16 GWarranty Management Plan

01 32 01.00 06 SD-01 Preconstruction Submittals

3.4.1 GPreliminary Project Schedule

3.4 GProject Schedule

SD-05 Design Data

3.5.2Narrative Report

3.5.4Schedule Reports

3.4.4 GPeriodic Schedule Updates

01 33 00.00 06 SD-01 Preconstruction Submittals

G ROSubmittal register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.5.1.1 GSustainability Action Plan

1.4 GGBI GPCP

GDesign Phase High Performance and Sustainable Building Checklist

1.5.1.4 GSustainability Progress Report

SD-11 Closeout Submittals

1.5.1.2 GFinal Sustainability eNotebook

1.5.1.2 GAmended Final Sustainability

eNotebook

1.5.1.2 GFinal High Performance and

Sustainable Building Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 108 PAGES

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Automatic External Defibrillator

(AED) Program

1.7Site Layout Plan

1.7Access/Haul Road Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

1.7Hazard Communication Program

1.7Process Safety Management

Plan

1.7Lead Compliance Plan &

Specifications

1.7Asbestos Abatement Plan &

Specifications

1.7Abrasive Blasting Plan

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Crystalline Silica Assessment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 108 PAGES

01 35 26.00 06 1.7Lighting Plan for Night Operations

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Arc Flash Hazard Analysis

1.7Assured Equipment Grounding

Control Program (AEGCP)

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

1.7Critical Lift Plan - LHE

1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Rope Access Work Plan

1.7Excavation/Trenching Plan

1.7Erection and Removal Plan for

Formwork and Shoring

1.7Masonry Bracing Plan

1.7Steel Erection Plan

1.7Tree Felling/Maintenance

Program

1.7Aircraft/Airfield Construction

Safety & Phasing Plan (CSPP)

1.7Aircraft/Airfield Safety Plan

Compliance Document (SPCD)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 108 PAGES

01 35 26.00 06 1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications(SSHO)

1.12.7 G ROProof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.2 G ROConstruction Quality Control Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 108 PAGES

01 45 35 3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written Practices

3.1.3Written Practices

3.1.1NDT Procedures and Equipment

Calibration Records

3.1.3NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1AC472 Accreditation

2.1Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5.13 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1Interim Final Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 108 PAGES

01 45 35 3.1.3Interim Final Report

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 46 00.00 06 SD-01 Preconstruction Submittals

1.3 G DOCommissioning Specialists

1.7.2 G DOProject Schedule

SD-05 Design Data

3.1.3 G DODesign Review Report

SD-06 Test Reports

3.1.2 G DOConstruction Phase

Commissioning Plan

1.5Issues Log

3.2 G DOCommissioning Report

3.1.5.2 GBuilding Envelope Inspection

Checklists

3.1.5.3 GPre-Functional Checklists

3.1.5.5 GTrend Log Report

3.3 GTrend Log Report

SD-07 Certificates

1.6 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 G DOSystems Training

3.1.7 G ROTraining Plan

3.1.8 G DOSystems Manual

01 50 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 108 PAGES

01 50 00 1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.11 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 GEnvironmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications

3.12 GNotice Of Soil Treatment

3.2.1 GStormwater Pollution Prevention

Plan (Swppp)

SD-06 Test Reports

3.2.2.2Inspection Reports

3.7.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.6.5 GEmployee Training Records

1.6.5.1Certificate of Competency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 108 PAGES

01 57 19.00 06 1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.2.3 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.2.4 GStormwater Notice of Termination

3.7.1 G ROWaste Determination

Documentation

3.7.4.5 G RODisposal Documentation for

Hazardous and Regulated Waste

1.6.5 GAssembled Employee Training

Records

1.11 G ROSolid Waste Management Permit

3.7.2.1 G ROSolid Waste Management Report

3.7.4.1 G ROHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

01 62 35 SD-01 Preconstruction Submittals

1.7 GBiobased Products

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 108 PAGES

01 74 19 1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.5Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.7.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

2.2 GCertification of EPA Designated

Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 108 PAGES

01 78 00 2.3 GCertification Of USDA Designated

Items

3.9.1 GInterim DD FORM 1354

3.9.2 GChecklist for DD FORM 1354

3.9.2 GHigh Performance And

Sustainable Building (Hpsb)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

03 30 00 SD-01 Preconstruction Submittals

1.7.3.1Concrete Curing Plan

1.7.6 GQuality Control Plan

1.7.7 GQuality Control Personnel

Certifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 108 PAGES

03 30 00 1.7.7Quality Control Organizational

Chart

1.7.9 GLaboratory Accreditation

1.7.2.1 GForm Removal Schedule

SD-02 Shop Drawings

1.7.2.1Formwork

1.7.2.2 GReinforcing Steel

3.10.1 GConstruction Joint

SD-03 Product Data

2.4.8Joint Sealants

2.4.7Joint Filler

2.1Materials for Forms

2.4.1Cementitious Materials

2.4.6Vapor Retarder

2.3.3Concrete Curing Materials

2.5Reinforcement

2.6.1Liquid Chemical Floor Hardener

2.6.2Penetrating Water Repellent

2.4.5Admixtures

2.4.9Biodegradable Form Release

Agent

1.7.3.2Pumping Concrete

1.9.2Biobased Materials

SD-04 Samples

1.7.5.1Slab Finish Sample

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 108 PAGES

03 30 00 2.3.1 GMix Design

1.7.1.1Formwork Calculations

SD-06 Test Reports

1.7.1.2 GConcrete Mix Design

1.7.4.1Fly Ash

1.7.4.1Pozzolan

1.7.4.2Ground Granulated Blast-Furnace

Slag

2.4.3Aggregates

3.9.2.1Tolerance Report

3.13.2.3 GCompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete

3.13.2.6Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

1.10Welder Qualifications

1.7.10Concrete Polisher Qualifications

1.7.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 108 PAGES

03 30 00 1.9.1VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.7.3.4Material Safety Data Sheets

1.7.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.6.1Liquid Chemical Floor Hardener

2.6.2Penetrating Water Repellent

2.3.3Curing Compound

04 20 00 SD-02 Shop Drawings

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.2.3.1.1 GCement

2.3.1.1 GCementitious Materials

SD-04 Samples

2.2.2 GClay or Shale Brick

2.2.3.1 GConcrete Masonry Units (CMU)

2.3.1.3 GAdmixtures for Masonry Mortar

2.5.2 GAnchors, Ties, and Bar

Positioners

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 108 PAGES

04 20 00 SD-06 Test Reports

3.6.1.1Field Testing of Mortar

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.2.3.1Concrete Masonry Units (CMU)

2.3.1.1Cementitious Materials

2.3.1.3Admixtures for Masonry Mortar

2.3.2.2Admixtures for Grout

2.5.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.3.1.3Admixtures for Masonry Mortar

2.3.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

SRecycled Content

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.3Accessories

2.2Deck Units

2.2.4Galvanizing Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 108 PAGES

05 30 00 2.3.16Mechanical Fasteners

2.2.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.2.1Metal Roof Deck Units

2.3.4Flexible Closure Strips

SD-05 Design Data

2.2 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.3.11Stud Manufacture's Certification

2.3.11Stud Manufacture's Test Reports

2.1 GCertificates Of Compliance

SD-11 Closeout Submittals

2.1 SRecycled Content

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 108 PAGES

05 40 00 1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.4 GBollards/Pipe Guards

2.5 GAngles and Plates

2.6 GRoof Hatches

SD-03 Product Data

2.6 GRoof Hatches

2.1 GCertificates of Compliance

2.1 SRecycled Content

05 51 33 SD-02 Shop Drawings

2.3Ladders

2.3.2Ship's Ladder

SD-03 Product Data

2.3Ladders

2.3.2Ship's Ladder

2.3.1Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 108 PAGES

05 51 33 1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.3.1 GStructural Steel Plates, Shapes, and Bars

2.3.2 GStructural Steel Tubing

2.3.4 GCold-Finished Steel Bars

2.3.3 GHot-Rolled Carbon Steel Bars

2.3.5 GCold-Drawn Steel Tubing

2.3.7 GMasonry Anchorage Devices

2.2.2 GProtective Coating

2.3.9 GSteel Railings and Handrails

3.2 GAnchorage and Fastening

Systems

SD-07 Certificates

1.3.1 GWelder Qualification

2.1 GCertificates Of Compliance

SD-08 Manufacturer’s Instructions

3.2 GInstallation Instructions

SD-11 Closeout Submittals

2.1 SRecycled Content

06 10 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 108 PAGES

06 10 00 2.2.1 GNailing Strips

2.3.2.1 GNailing Strips

SD-03 Product Data

1.8Fire-retardant Treatment

2.4.2Adhesives

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

1.9.2 GCertified Sustainably Harvested

Wood

1.7Preservative Treatment

1.9.3Indoor Air Quality

SD-11 Closeout Submittals

2.2.1 SCertified Sustainably Harvested

Framing Lumber

2.3.1.1 SCertified Sustainably Harvested

Plywood Wall Sheathing

2.3.2.1 SCertified Sustainably Harvested

Plywood for Other Uses

2.4.2 SIndoor Air Quality for Aerosol

Adhesives

2.4.2 SIndoor Air Quality for Non-aerosol

Adhesives

06 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 108 PAGES

06 20 00 1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.2 GWood Products

2.3 GCountertops

2.5 GHardware and Accessories

SD-04 Samples

1.5 GSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

1.7.1.2 GCertified Sustainably Harvested

Wood

2.1.1 GCertified Sustainably Harvested

Wood

1.7.1.3 GIndoor Air Quality

SD-11 Closeout Submittals

2.2.3 SCertified Sustainably Harvested

Hardwood Plywood

2.2.3 SVOC Content for Hardwood

Plywood

2.6.1.2 SIndoor Air Quality for Non-aerosol

Adhesives

2.6.1.2 SIndoor Air Quality for Aerosol

Adhesives

2.2.4 SRecycled Content for

MDF/Particleboard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 108 PAGES

06 41 16.00 10 SD-02 Shop Drawings

2.10Shop Drawings

3.1Installation

SD-03 Product Data

2.2Wood Materials

1.5.2Certification

2.2.2.1 SRecycled Content For Mdf

SD-04 Samples

2.4Plastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.5.2.1 GCertificates of Grade

1.5Quality Assurance

3.1Laminate Clad Casework

1.5.2.2 GCertified Sustainably Harvested

Wood

1.5.2.3 GIndoor Air Quality

SD-11 Closeout Submittals

1.5.2.2 SCertified Sustainably Harvested

Wood

2.8.1 SIndoor Air Quality For

Non-Aerosol Adhesives

2.8.1 SIndoor Air Quality For Aerosol

Adhesives

SRecycled Content For

MDF/Particleboard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 108 PAGES

06 41 16.00 10 SVoc Content For Softwood

Plywood

SCertified Sustainably Harvested

Softwood Plywood

06 61 16 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

2.2Solid Polymer Material

1.5.2Qualifications

2.4Fabrications

SD-04 Samples

2.2 GMaterial

2.4.5 GCounter and Vanity Tops

SD-06 Test Reports

2.2Solid Polymer Material

SD-07 Certificates

2.4Fabrications

1.5.2Qualifications

1.5.1.1Indoor Air Quality

SD-10 Operation and Maintenance

Data

3.2Clean-up

SD-11 Closeout Submittals

2.1.1 SRecycled Content

1.5.1.1 GCertificates Of Compliance

1.5.1.1 SVoc Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 108 PAGES

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.7 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 13 53 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.2 GElastomeric Waterproofing Sheet

Material

2.5 GProtection Board

1.4 GPrimers, Adhesives, and Mastics

2.2 GPrimers, Adhesives, and Mastics

2.4 GHydrophilic waterstop

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 108 PAGES

07 13 53 2.2 GElastomeric Waterproofing Sheet

Material

3.7 GProtective Covering

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

1.4 GPrimers, Adhesives, and Mastics

2.2 GPrimers, Adhesives, and Mastics

1.4 GProtective Coverings

1.9 GSpecial Warranties

1.9 GSpecial Warranties

2.1.1 GCertificates Of Compliance

2.1.2 GCertificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4 GPrimers, Adhesives, and Mastics

2.2 GPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1 GCertificates Of Compliance

2.1.2 GCertificates Of Compliance

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.2 GBlock or Board Insulation

1.4 GProtection Board

2.3 GProtection Board

3.3.2 GProtection Board

3.4.3 GProtection Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 108 PAGES

07 21 13 2.4 GAccessories

SD-07 Certificates

2.2 GBlock or Board Insulation

1.8 GSpecial Warranties

1.5 GULE Greenguard

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.4.1Adhesive

SD-11 Closeout Submittals

1.5 SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 21 16 SD-03 Product Data

2.2Blanket Insulation

2.3Accessories

1.3.1Biobased Materials

SD-08 Manufacturer’s Instructions

3.2.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC)

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .