W912QR21R0039-0005.pdf
PDF 1 MB Posted
- Attached to
- Construction of an Aerial Port Facility
- Solicitation number
- W912QR21R0039
About this file
This document provides an amendment to a solicitation for the construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, MN.
The amendment revises the price breakout schedule to include additional option items for components such as a 5-ton bridge crane, covered loading area canopy, floor finishes, furniture fixtures and equipment, high bay translucent wall panels, unit assembly foldable partitions, parachute drying tower addition, communications equipment, exterior insulated metal wall panels, pre-manufactured canopies, exterior block wainscoting, generator hook up, and installation of a new gate. The schedule provides item numbers, descriptions, and units of measure for the base proposal and each optional item. The description defines the scope of work covered under each item. Offerors are required to provide a total price for the base proposal as well as individual prices for each optional item. The solicitation is issued by the U.S. Army Corps of Engineers with an estimated construction cost between $10-25 million.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR21R0039 for the Construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, MN is hereby amended as follow s:
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0039
X 9B. DATED (SEE ITEM 11)
08-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR21R0039-0005
W912QR21R0039
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT. 0005 CONTINUATION PAGE
AMENDMENT REPORT
Amendment Number: 0005 Project Title: Aerial Port Facility Project Location: Minneapolis-Saint Paul IAP ARS, MN
a. The following DOCUMENTS have been REVISED:
1) Price Breakout Schedule
b. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
PRICE BREAKOUT SCHEDULE
PROJECT: Aerial Port Facility, DBB
LOCATION: Minneapolis-Saint Paul Air Reserve Station, MN
PROPOSER’S NAME:
BASE PROPOSAL
Item No.
Description
New Construction, Aerial Port Facility
Unit
JOB
Amount __
0002 Site Work JOB $
Subtotal $
OPTION ITEMS
0003 Option-1 – 5-Ton Bridge Crane JOB $
0004 Option-2 – Covered Loading Area Canopy
Addition
JOB $
0005 Option-3 – Floor Finishes JOB $
0006 Option-4 – Furniture, Fixtures, and Equipment
(FFE)
JOB $
0007 Option-5 – High Bay Translucent Walls Panels JOB $
0008 Option-6 – Unit Assembly Foldable Partitions JOB $
0009 Option-7 – Parachute Drying Tower Addition JOB $
0010 Option-8 – Communications Equipment JOB $
0011 Option-9 – Exterior Insulated Metal Wall Panels JOB $_______________
0012 Option-10 – Pre-Manufactured Canopies JOB $_______________
0013 Option-11 – Exterior Block Wainscoting JOB $_______________
0014 Option-12 – Generator Hook Up JOB $_______________
0015 Option-13 – Install New Gate JOB $_______________
TOTAL OPTIONS $_______________
TOTAL BASE PROPOSAL + OPTION ITEMS $
Description of Base Proposal Items
(a) Item No. 0001 "New Construction Aerial Port" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements of the AERIAL PORT FACILITY as required by the contract document drawings and specifications, except that work covered by Items No. 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, and 0015.
(b) Item No. 0002 "Site work" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements of the AERIAL
PORT FACILITY as required by the contract document drawings and specifications., except that work covered by Items No. 0001, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, and 0015.
Description of Option Items
(c) Option-1, Item No. 0003 "5-Ton Bridge Crane" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of the 5-ton bridge crane, runway beams, and associated utilities as indicated in the contract documents drawings and specifications.
This option may be exercised within 60 calendar days from Notice To Proceed.
(d) Option-2, Item No. 0004 "Covered Loading Area Canopy " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of an exterior canopy with associated supports, bollards, and fire suppression as required by the contract documents drawings and specifications.
This option may be exercised within 60 calendar days from Notice To Proceed.
(a) Option-3, Item No. 0005 "Floor Finishes" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of alternate floor finishes in lieu of sealed concrete in areas indicated in the contract documents drawings and white epoxy flooring in the Packing/Rigging room.
This option may be exercised within 60 calendar days from Notice To Proceed.
(b) Option-4, Item No. 0006 "Furniture, Fixtures, and Equipment (FFE)" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the purchase and installation of all FFE items. Contractor shall purchase furniture including checking accuracy of all acknowledgements and schedules from manufacturers and making necessary corrections to ensure that the manufacturer has a correct understanding of the order and requirement. Contractor shall purchase furniture from the open market. GSA information is provided FOR INFORMATIONAL PURPOSES ONLY. It is encouraged to solicit and provide
GSA pricing on furniture. Complete the furniture purchase by obtaining a minimum of (3) separate proposals. Furniture is subject to FAR clause 52.236-5 Materials and Workmanship. If necessary, to meet project timeline requirements, furniture may be purchased using manufacturer’s quick-ship programs or by coordinating factory times.
This option may be exercised within 180 calendar days from Notice To Proceed.
(c) Option-5, Item No. 0007 "High Bay Translucent Wall Panels" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation and furnishing of translucent wall panels on the exterior wall of the building in the high bay area.
This option may be exercised within 60 calendar days from Notice To Proceed.
(d) Option-6, Item No. 0008 "Unit Assembly Foldable Partitions " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation and furnishing of translucent wall panels on the exterior wall of the building in the high bay area.
This option may be exercised within 60 calendar days from Notice To Proceed.
(e) Option-7, Item No. 0009 "Parachute Drying Tower Addition" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the of the parachute drying tower and exterior sidewalk as required by the contract documents and specifications.
This option may be exercised within 60 calendar days from Notice To Proceed.
(f) Option-8, Item No. 0010 "Communications Equipment" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of communications equipment as indicated in the construction documents and specifications.
This option may be exercised within 60 calendar days from Notice To Proceed.
(g) Option-9, Item No. 0011 "Exterior Insulated Metal Wall Panels " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of insulated wall panels in lieu of standard wall panels for the building. Price shall also include the area associated with Option-7, Item No. 0009 “Parachute Drying Tower Addition”.
This option shall include a credit to the Government for the cost of the standard wall panels.
This option may be exercised within 60 calendar days from Notice To Proceed.
(h) Option-10, Item No. 0012 "Pre-Manufactured Canopies" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of selected canopies over entry doors along the perimeter of the building. Contractor shall note that canopies at corridors 101 and 109 shall be considered within the base proposal. All other exterior canopies at doors are considered proposal options.
This option may be exercised within 60 calendar days from Notice To Proceed.
(i) Option-11, Item No. 0013 " Exterior Block Wainscoting " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of the wainscoting around the perimeter of the building as indicated in the drawings and specifications. Price shall also include the perimeter associated with Option-7, Item No. 0009
“Parachute Drying Tower Addition”.
This option may be exercised within 60 calendar days from Notice To Proceed.
(j) Option-12, Item No. 0014 " Generator Hook Up " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of the generator hook up for the building.
This option may be exercised within 60 calendar days from Notice To Proceed.
(k) Option-13, Item No. 0015 " Install New Gate " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the installation of the airfield access gate as shown in the drawings.