W912QR21R0039_Specs-0001.pdf
PDF 2 MB Posted
- Attached to
- Construction of an Aerial Port Facility
- Solicitation number
- W912QR21R0039
About this file
This is a solicitation for the design and construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, Minnesota. The project has an estimated construction cost between $10 million and $25 million, and involves the design, bid, and build of the facility. The solicitation is full and open, with a HUBZone 10% price evaluation requirement. No contract award will be made until funds are appropriated. Technical inquiries should be submitted through Bidder Inquiry in ProjNet. The site visit date is provided in FAR 52.236-27 ALT 1. Responses are due by the date specified in any amendments to this solicitation. The Army Corps of Engineers Engineering District Louisville is the agency issuing this solicitation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: LEVI SPETH
600 DR M L KING JR PL
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR21R0039 for the Construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, MN is hereby amended as follow s:
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0039
X 9B. DATED (SEE ITEM 11)
08-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jul-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
X
W912QR21R0039-0001
W912QR21R0039
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT. 0001 CONTINUATION PAGE
AMENDMENT REPORT
Amendment Number: 0001 Project Title: Aerial Port Facility Project Location: Minneapolis-Saint Paul IAP ARS, MN
The purpose of Amendment 001 to the design documents for the replacement bulk fuel storage – hydrant repair is to revise the Ready to Advertise documents. Changes are outlined below.
a. The proposal due date is hereby revised from 08 July 2021 to 20 July 2021 at 2:00 PM Eastern Time.
b. The following PLAN SHEETS have been REPLACED in their entirety:
1) M-001 - LEGEND & ABBREVIATIONS
2) M-302 - SECTIONS
3) M-502 - DETAILS
4) M-601 - SCHEDULES
5) M-602 - SCHEDULES
6) M-603 - SCHEDULES
7) M-604 - SCHEDULES
8) M-701 - CONTROLS LEGEND
9) M-702 - CONTROLS CONTRACTOR INSTRUCTIONS
10) M-703 - CONTROLS
11) M-704 - CONTROLS
12) M-705 - CONTROLS
13) M-706 - CONTROLS
14) M-707 - CONTROLS
15) M-708 - CONTROLS
16) M-709 - CONTROLS
17) M-710 - CONTROLS
18) M-711 - CONTROLS
19) M-712 - CONTROLS
20) M-713 - CONTROLS
21) M-714 - CONTROLS
22) M-715 - CONTROLS
23) M-716 - CONTROLS
24) P-501 - PLUMBING DETAILS
25) P-502 - PLUMBING DETAILS
26) P-601 - PLUMBING SCHEDULES
27) P-602 - PLUMBING SCHEDULES
28) ET401 - ENLARGED TELECOMMUNICATIONS PLAN
c. The following SPECIFICATION SECTIONS have been REPLACED in their entirety:
1) TABLE OF CONTENTS
W912QR21R0039
2) SUBMITTAL REGISTER
3) 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
4) 23 52 00 HEATING BOILERS
5) 41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
d. The following SPECIFICATION SECTIONS have been ADDED:
1) 41 22 23.23 SPECIALTY HOISTS
e. The Site Visit Sign-In Sheet has been attached.
f. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 08-Jul-2021 02:00 PM to 20-Jul-2021 02:00 PM.
(End of Summary of Changes)
Last Name First Name Middle Name Company Phone # E-mail Thome Nathan Robert Versacon 763-391-5634 kbell@versaconinc.com Thompson Casey John LS Black Constructors 651-789-2910 cthompson@lsblack.com Monse Cyril James LS Black Constructors Gallagher Dustin Dean LS Black Constructors Clark Jacob Aloysius Aero Material Handling 763-231-4441 Jake@Aero-Material.com Browne Matthew Brian DonlarCorp 651-227-0631 matthew.browne@donlarcorp.com
AERIAL PORT FACILITY (P2: 331663)
MINNEAPOLIS-ST. PAUL ARS, MINNESOTA
AMENDMENT 0001
01 JULY 2021
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23
PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR
TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
AERIAL PORT FACILITY (P2: 331663)
MINNEAPOLIS-ST. PAUL ARS, MINNESOTA
CERTIFIED FINAL DESIGN SUBMITTAL
19 MARCH 2021
AMENDMENT 0001
PROJECT TABLE OF CONTENTS Page 2
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 34 19.10 20 ROLLING SERVICE DOORS
08 36 13 SECTIONAL OVERHEAD DOORS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 PORCELAIN TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 77 20 FIBERGLASS REINFORCED WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 53 00 MANUFACTURED CANOPY
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
MINNEAPOLIS-ST. PAUL ARS, MINNESOTA
CERTIFIED FINAL DESIGN SUBMITTAL
AMENDMENT 0001
PROJECT TABLE OF CONTENTS Page 3
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.10 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH
C-I-A DETERMINATION H-H-H
25 05 11.11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH
C-I-A DETERMINATION L-M-M
25 05 11.12 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH
C-I-A DETERMINATION M-M-H
25 05 11.13 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH
C-I-A DETERMINATION M-M-M
25 05 11.14 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS WITH
C-I-A DETERMINATION L-L-L
DIVISION 26 - ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 43 NETWORK LIGHTING CONTROLS (WIRED)
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 36 20 PORTABLE GENERATOR AND LOAD BANK CONNECTION CABINETS
(PGLBCC)
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
MINNEAPOLIS-ST. PAUL ARS, MINNESOTA
CERTIFIED FINAL DESIGN SUBMITTAL
AMENDMENT 0001
PROJECT TABLE OF CONTENTS Page 4
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
AMENDMENT0001****************************************************
41 22 23.23 SPECIALTY HOISTS
****************************************************AMENDMENT0001
-- End of Project Table of Contents --
MINNEAPOLIS-ST. PAUL ARS, MINNESOTA
CERTIFIED FINAL DESIGN SUBMITTAL
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 107 PAGES
Aerial Port Facility
00 80 00.00 06 SD-01 Preconstruction Submittals
1.28 GLabor, Equipment, and Material
Report
1.28 GDaily Equipment Report
1.37 GRadioactive Material/Equipment
SD-02 Shop Drawings
1.41 GMechanical/Electrical Room
Layout
SD-04 Samples
1.16 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.12SF1413 Statement and
Acknowledgement
1.14Local Agency Check
1.45Progress Photographs
SD-07 Certificates
1.16Warranty of Construction
1.15 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.32Insurance
1.30Sales and Use Tax
SD-11 Closeout Submittals
1.7.4 GPreliminary (Working) As-Built
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 107 PAGES
00 80 00.00 06 1.7.1 GFinal As-Built Drawings
1.7.1.2 GCAD Working As-Built Drawings
1.9.1Equipment-in-Place List
1.9.1Maintenance and Parts Data
1.16 GWarranty Management Plan
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 GPreliminary Project Schedule
3.4 GProject Schedule
SD-05 Design Data
3.5.2Narrative Report
3.5.4Schedule Reports
3.4.4 GPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals
G ROSubmittal register
01 33 29.00 06 SD-01 Preconstruction Submittals
1.5.1.1 GSustainability Action Plan
1.4 GGBI GPCP
GDesign Phase High Performance and Sustainable Building Checklist
1.5.1.4 GSustainability Progress Report
SD-11 Closeout Submittals
1.5.1.2 GFinal Sustainability eNotebook
1.5.1.2 GAmended Final Sustainability
eNotebook
1.5.1.2 GFinal High Performance and
Sustainable Building Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 107 PAGES
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
1.7Asbestos Abatement Plan &
Specifications
1.7Abrasive Blasting Plan
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Crystalline Silica Assessment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 107 PAGES
01 35 26.00 06 1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Erection and Removal Plan for
Formwork and Shoring
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Tree Felling/Maintenance
Program
1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Aircraft/Airfield Safety Plan
Compliance Document (SPCD)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 107 PAGES
01 35 26.00 06 1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.2 G ROConstruction Quality Control Plan
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 107 PAGES
01 45 35 3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written Practices
3.1.3Written Practices
3.1.1NDT Procedures and Equipment
Calibration Records
3.1.3NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1AC472 Accreditation
2.1Steel Joist Institute Membership
2.1Certified Plant
2.1Certificate of Compliance
1.5.13 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.1Interim Final Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 107 PAGES
01 45 35 3.1.3Interim Final Report
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 46 00.00 06 SD-01 Preconstruction Submittals
1.3 G DOCommissioning Specialists
1.7.2 G DOProject Schedule
SD-05 Design Data
3.1.3 G DODesign Review Report
SD-06 Test Reports
3.1.2 G DOConstruction Phase
Commissioning Plan
1.5Issues Log
3.2 G DOCommissioning Report
3.1.5.2 GBuilding Envelope Inspection
Checklists
3.1.5.3 GPre-Functional Checklists
3.1.5.5 GTrend Log Report
3.3 GTrend Log Report
SD-07 Certificates
1.6 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 G DOSystems Training
3.1.7 G ROTraining Plan
3.1.8 G DOSystems Manual
01 50 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 107 PAGES
01 50 00 1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19.00 06 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.11 GSolid Waste Management Permit
1.6.2 GRegulatory Notifications
1.7 GEnvironmental Protection Plan
1.7.9.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
1.6.4 GEnvironmental Manager
Qualifications
3.12 GNotice Of Soil Treatment
3.2.1 GStormwater Pollution Prevention
Plan (Swppp)
SD-06 Test Reports
3.2.2.2Inspection Reports
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates
1.6.5 GEmployee Training Records
1.6.5.1Certificate of Competency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 107 PAGES
01 57 19.00 06 1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.2.3 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.2.4 GStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.4.5 G RODisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
1.11 G ROSolid Waste Management Permit
3.7.2.1 G ROSolid Waste Management Report
3.7.4.1 G ROHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
01 62 35 SD-01 Preconstruction Submittals
1.7 GBiobased Products
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 107 PAGES
01 74 19 1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
1.7.1As-Built Record of Equipment and Materials
3.6As-Built Record of Equipment and Materials
3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
2.2 GCertification of EPA Designated
Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 107 PAGES
01 78 00 2.3 GCertification Of USDA Designated
Items
3.9.1 GInterim DD FORM 1354
3.9.2 GChecklist for DD FORM 1354
3.9.2 GHigh Performance And
Sustainable Building (Hpsb)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
03 30 00 SD-01 Preconstruction Submittals
1.7.3.1Concrete Curing Plan
1.7.6 GQuality Control Plan
1.7.7 GQuality Control Personnel
Certifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 107 PAGES
03 30 00 1.7.7Quality Control Organizational
Chart
1.7.9 GLaboratory Accreditation
1.7.2.1 GForm Removal Schedule
SD-02 Shop Drawings
1.7.2.1Formwork
1.7.2.2 GReinforcing Steel
3.10.1 GConstruction Joint
SD-03 Product Data
2.4.8Joint Sealants
2.4.7Joint Filler
2.1Materials for Forms
2.4.1Cementitious Materials
2.4.6Vapor Retarder
2.3.3Concrete Curing Materials
2.5Reinforcement
2.6.1Liquid Chemical Floor Hardener
2.6.2Penetrating Water Repellent
2.4.5Admixtures
2.4.9Biodegradable Form Release
Agent
1.7.3.2Pumping Concrete
1.9.2Biobased Materials
SD-04 Samples
1.7.5.1Slab Finish Sample
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 107 PAGES
03 30 00 2.3.1 GMix Design
1.7.1.1Formwork Calculations
SD-06 Test Reports
1.7.1.2 GConcrete Mix Design
1.7.4.1Fly Ash
1.7.4.1Pozzolan
1.7.4.2Ground Granulated Blast-Furnace
Slag
2.4.3Aggregates
3.9.2.1Tolerance Report
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete
3.13.2.6Ion Concentration
3.13.2.4Air Content
3.13.2.1Slump Tests
2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
1.10Welder Qualifications
1.7.10Concrete Polisher Qualifications
1.7.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 107 PAGES
03 30 00 1.9.1VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.7.3.4Material Safety Data Sheets
1.7.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.6.1Liquid Chemical Floor Hardener
2.6.2Penetrating Water Repellent
2.3.3Curing Compound
04 20 00 SD-02 Shop Drawings
3.4.1.1 G AEDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.2.3.1.1 GCement
2.3.1.1 GCementitious Materials
SD-04 Samples
2.2.2 GClay or Shale Brick
2.2.3.1 GConcrete Masonry Units (CMU)
2.3.1.3 GAdmixtures for Masonry Mortar
2.5.2 GAnchors, Ties, and Bar
Positioners
SD-05 Design Data
2.1.2 G AEMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 107 PAGES
04 20 00 SD-06 Test Reports
3.6.1.1Field Testing of Mortar
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.1Concrete Masonry Units (CMU)
2.3.1.1Cementitious Materials
2.3.1.3Admixtures for Masonry Mortar
2.3.2.2Admixtures for Grout
2.5.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.3.1.3Admixtures for Masonry Mortar
2.3.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
SRecycled Content
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.3Accessories
2.2Deck Units
2.2.4Galvanizing Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 107 PAGES
05 30 00 2.3.16Mechanical Fasteners
2.2.4Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-04 Samples
2.2.1Metal Roof Deck Units
2.3.4Flexible Closure Strips
SD-05 Design Data
2.2 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.3.11Stud Manufacture's Certification
2.3.11Stud Manufacture's Test Reports
2.1 GCertificates Of Compliance
SD-11 Closeout Submittals
2.1 SRecycled Content
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 107 PAGES
05 40 00 1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.4 GBollards/Pipe Guards
2.5 GAngles and Plates
2.6 GRoof Hatches
SD-03 Product Data
2.6 GRoof Hatches
2.1 GCertificates of Compliance
2.1 SRecycled Content
05 51 33 SD-02 Shop Drawings
2.3Ladders
2.3.2Ship's Ladder
SD-03 Product Data
2.3Ladders
2.3.2Ship's Ladder
2.3.1Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 107 PAGES
05 51 33 1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.3.1 GStructural Steel Plates, Shapes, and Bars
2.3.2 GStructural Steel Tubing
2.3.4 GCold-Finished Steel Bars
2.3.3 GHot-Rolled Carbon Steel Bars
2.3.5 GCold-Drawn Steel Tubing
2.3.7 GMasonry Anchorage Devices
2.2.2 GProtective Coating
2.3.9 GSteel Railings and Handrails
3.2 GAnchorage and Fastening
Systems
SD-07 Certificates
1.3.1 GWelder Qualification
2.1 GCertificates Of Compliance
SD-08 Manufacturer’s Instructions
3.2 GInstallation Instructions
SD-11 Closeout Submittals
2.1 SRecycled Content
06 10 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 107 PAGES
06 10 00 2.2.1 GNailing Strips
2.3.2.1 GNailing Strips
SD-03 Product Data
1.8Fire-retardant Treatment
2.4.2Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
1.9.2 GCertified Sustainably Harvested
Wood
1.7Preservative Treatment
1.9.3Indoor Air Quality
SD-11 Closeout Submittals
2.2.1 SCertified Sustainably Harvested
Framing Lumber
2.3.1.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
2.3.2.1 SCertified Sustainably Harvested
Plywood for Other Uses
2.4.2 SIndoor Air Quality for Aerosol
Adhesives
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
06 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 107 PAGES
06 20 00 1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.2 GWood Products
2.3 GCountertops
2.5 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
1.7.1.2 GCertified Sustainably Harvested
Wood
2.1.1 GCertified Sustainably Harvested
Wood
1.7.1.3 GIndoor Air Quality
SD-11 Closeout Submittals
2.2.3 SCertified Sustainably Harvested
Hardwood Plywood
2.2.3 SVOC Content for Hardwood
Plywood
2.6.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.6.1.2 SIndoor Air Quality for Aerosol
Adhesives
2.2.4 SRecycled Content for
MDF/Particleboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 107 PAGES
06 41 16.00 10 SD-02 Shop Drawings
2.10Shop Drawings
3.1Installation
SD-03 Product Data
2.2Wood Materials
1.5.2Certification
2.2.2.1 SRecycled Content For Mdf
SD-04 Samples
2.4Plastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.5.2.1 GCertificates of Grade
1.5Quality Assurance
3.1Laminate Clad Casework
1.5.2.2 GCertified Sustainably Harvested
Wood
1.5.2.3 GIndoor Air Quality
SD-11 Closeout Submittals
1.5.2.2 SCertified Sustainably Harvested
Wood
2.8.1 SIndoor Air Quality For
Non-Aerosol Adhesives
2.8.1 SIndoor Air Quality For Aerosol
Adhesives
SRecycled Content For
MDF/Particleboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 107 PAGES
06 41 16.00 10 SVoc Content For Softwood
Plywood
SCertified Sustainably Harvested
Softwood Plywood
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.2Solid Polymer Material
1.5.2Qualifications
2.4Fabrications
SD-04 Samples
2.2 GMaterial
2.4.5 GCounter and Vanity Tops
SD-06 Test Reports
2.2Solid Polymer Material
SD-07 Certificates
2.4Fabrications
1.5.2Qualifications
1.5.1.1Indoor Air Quality
SD-10 Operation and Maintenance
Data
3.2Clean-up
SD-11 Closeout Submittals
2.1.1 SRecycled Content
1.5.1.1 GCertificates Of Compliance
1.5.1.1 SVoc Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 107 PAGES
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 13 53 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GElastomeric Waterproofing Sheet
Material
2.5 GProtection Board
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
2.4 GHydrophilic waterstop
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 107 PAGES
07 13 53 2.2 GElastomeric Waterproofing Sheet
Material
3.7 GProtective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
1.4 GProtective Coverings
1.9 GSpecial Warranties
1.9 GSpecial Warranties
2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
SD-08 Manufacturer’s Instructions
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GBlock or Board Insulation
1.4 GProtection Board
2.3 GProtection Board
3.3.2 GProtection Board
3.4.3 GProtection Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 107 PAGES
07 21 13 2.4 GAccessories
SD-07 Certificates
2.2 GBlock or Board Insulation
1.8 GSpecial Warranties
1.5 GULE Greenguard
SD-08 Manufacturer’s Instructions
2.2Block or Board Insulation
2.4.1Adhesive
SD-11 Closeout Submittals
1.5 SULE Greenguard
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 21 16 SD-03 Product Data
2.2Blanket Insulation
2.3Accessories
1.3.1Biobased Materials
SD-08 Manufacturer’s Instructions
3.2.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC)
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 107 PAGES
07 22 00 1.3 GVerification of Existing Conditions
SD-03 Product Data
2.2 GInsulation
1.4 GProtection Board
2.4 GFasteners
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
2.1.1 GVolatile Organic Compounds
(VOC) Content
1.6 GInstaller Qualifications
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.2 GInsulation
SD-11 Closeout Submittals
2.1.1 SVolatile Organic Compounds
(VOC) Content
2.1.2 SRecycled Content
2.2.2 SRecycled Content
07 27 10.00 10 SD-04 Samples
3.1.2 GMock-Up
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 107 PAGES
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
3.3.1 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 107 PAGES
07 27 26 3.3.1 GTransition Membrane
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
3.3.1 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content
07 27 36 SD-01 Preconstruction Submittals
1.9.1 GQualification of Manufacturer
1.9.2 GQualification of Installer
1.10 GQuality Control Plan
1.10 GSafety Plan
1.8.1 GFire Prevention Plan
1.8.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.10 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.2.2 GClosed Cell
2.3 GPrimers, Adhesives, and Mastics
2.4 GSealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 107 PAGES
07 27 36 1.5.2 GSafety Data Sheets
2.2.1 GThermal Barrier Materials
SD-06 Test Reports
1.5.3 GField Peel Adhesion Test
3.4.5.1 GThermographic Test
1.7 GAir Barrier Test
1.11.2 GPrimers
1.5.3 GFire-Ratings Of Thermal Barrier
Materials
1.5.3 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
3.4.1 GSite Inspections
SD-07 Certificates
2.2.2 GClosed cell
1.9.1 GQualification of Manufacturer
1.9.2 GQualification of Installer
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GThermal Barrier
2.3 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.10Core Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 107 PAGES
07 27 36 3.3.2Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
SD-11 Closeout Submittals
2.1.1Volatile Organic Compound
(VOC) Content
2.1.2Recycled Content
07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.4.1Qualifications for Welding Work
SD-02 Shop Drawings
1.5.1Fabrication and Installation drawings
1.5.1Wall Panel Assemblies
1.5.1Flashing and Accessories
1.5.1Anchorage Systems
SD-03 Product Data
1.5.1Certification
1.5.1sustainable acquisition
1.5.1Manufacturer's catalog data
1.5.1Factory Color Finish
1.5.1Sub-girts and Formed Shapes
1.5.1Closure Materials
1.5.1Insulation
1.5.1Pressure Sensitive Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 107 PAGES
07 42 63 2.4.4.1Sealants and Caulking
1.5.1Rated Wall Assembly
1.5.1Galvanizing Repair Paint
1.5.1Enamel Repair Paint
1.5.1Aluminized Steel Repair Paint
1.5.1Accessories
SD-04 Samples
1.5.1Wall Panel Assemblies
1.5.1Fasteners
1.5.1Metal Closure Strips
1.5.1Insulation
1.5.1manufacturer's color charts and chips
SD-05 Design Data
1.5.1Wind Design Analysis
SD-06 Test Reports
3.7.2Leakage Tests
1.3.2Wind Load Tests
1.3.2Seismic Tests
1.5.1Factory Color Finish
SD-07 Certificates
1.5.1Fasteners
1.5.1Galvanizing Repair Paint
1.5.1Enamel Repair Paint
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 107 PAGES
07 42 63 1.5.1wall system assembly wind load and fire rating classification…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .