W912QR21R0039_Plans-0001.pdf

PDF 3 MB Posted

Attached to
Construction of an Aerial Port Facility
Solicitation number
W912QR21R0039
Issued by

About this file

This solicitation is for the design, bid, and build construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, Minnesota. The estimated construction cost is between $10 million and $25 million. The NAICS code is 236220 and size determination is $39.5 million. This is a full and open procurement requiring a 10% price evaluation for HUBZone small businesses. Funds are not presently available and no contract award will be made until appropriated funds are available. Technical inquiries should be submitted via Bidder Inquiry in ProjNet. A site visit is available per FAR 52.236-27 ALT 1. The term "bid" may be used interchangeably with "proposal" throughout the solicitation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL PROJECT NOTES

A. MECHANICAL PLANS AND SECTIONS ARE

INTENDED TO ILLUSTRATE THE SCOPE OF WORK

ACCURATELY, HOWEVER THEY ARE STILL

DIAGRAMMATIC IN NATURE. REPRESENTATIONS

OF EQUIPMENT, VALVES, FITTINGS, ETC. SHOWN

ON THESE DRAWINGS MAY NOT REFLECT THE

LOOK OR SIZE OF THE ACTUAL MATERIALS

SPECIFIED.

B. MECHANICAL DRAWINGS DO NOT SHOW ALL

MINOR ITEMS THAT MUST BE INSTALLED. THE

CONTRACTOR SHALL PROVIDE ALL LABOR AND

MATERIALS REQUIRED FOR A FULLY FUNCTIONING

SYSTEM COMPLIANT WITH ALL APPLICABLE

CODES AND LAWS.

C. PLAN AND SECTION DRAWINGS DO NOT SHOW ALL

REQUIRED BRANCH PIPING OR VALVES AND

GAUGES. REFER TO FLOW DIAGRAMS, DETAILS

AND PROJECT SPECIFICATIONS FOR REQUIRED

PIPING, VALVES AND GAUGES.

D. SECTION DRAWINGS DO NOT SHOW ALL

REQUIRED WORK IN THE AREA THEY ARE CUT.

SECTION DRAWINGS ARE PROVIDED TO

ILLUSTRATE ONLY CERTAIN CONDITIONS THAT

MAY BE TOO CONGESTED TO ILLUSTRATE IN A

PLAN VIEW.

E. MECHANICAL DRAWINGS DO NOT SHOW ALL

REQUIRED OFFSETS IN PIPING AND DUCTWORK

REQUIRED FOR INSTALLATION COORDINATED

WITH ALL OTHER DISCIPLINES SUCH AS

STRUCTURAL STEEL. THE CONTRACTOR SHALL

PROVIDE ELBOWS IN PIPING AND DUCTWORK,

ONLY WHEN ABSOLUTELY REQUIRED, TO AVOID

CONFLICT WITH OTHER MECHANICAL

COMPONENTS OR WORK OF OTHER TRADES.

OFFSETS SHALL USE ELBOWS OF LEAST DEGREE

TURN AS POSSIBLE.

F. ALL DUCT SIZES INDICATED REPRESENT INSIDE

CLEAR DIMENSIONS. CONTRACTOR SHALL

ADJUST SHEET METAL SIZE TO ACCOUNT FOR

LINER THICKNESS WHEN LINER IS REQUIRED PER

THE CONTRACT DOCUMENTS.

G. ALL EXPOSED PIPING NOT REQUIRED BY THE

SPECIFICATIONS TO BE INSULATED SHALL BE

PAINTED PER THE SPECIFICATION SECTION UFGS

09 90 00 "PAINTS AND COATINGS".

H. NOT USED.

I. MODIFY ROUTING OF PIPING AT EQUIPMENT

CONNECTION POINTS FROM THAT SHOWN TO

MATCH ACTUAL LOCATION OF CONNECTION

POINTS FOR SPECIFIC EQUIPMENT PURCHASED.

CONNECT ALL EQUIPMENT IN ACCORDANCE WITH

EQUIPMENT MANUFACTURER’S INSTRUCTIONS.

J. ALL FLUE PIPES FROM GAS-FIRED EQUIPMENT

AND ASSOCIATED DIRECT VENT COMBUSTION AIR

PIPES (IF USED) SHALL BE SIZED BY THE GAS-

FIRED EQUIPMENT MANUFACTURER BASED ON

THE SPECIFIC PIPE ROUTING AND ELEVATIONS

FOR THIS PROJECT. LIKEWISE THE MATERIALS OF

ALL FLUE PIPING AND DIRECT VENT COMBUSTION

AIR PIPING SHALL BE AS REQUIRED BY THE

MANUFACTURER OF THE GAS-FIRED EQUIPMENT

THE PIPING IS CONNECTED TO. FLUE PIPING

SHALL BE INSTALLED PER CODE.

K. PIPING, DUCTWORK AND EQUIPMENT HANGERS

AND SUPPORTS SHALL NOT INTERFERE WITH

OPERATION AND MAINTENANCE OF EQUIPMENT,

INCLUDING BEING AT LEAST 3 INCHES ABOVE THE

TOP SIDE OF FINISHED ACCESSIBLE CEILING GRID.

L. EVERY PIECE OF FLOOR OR GRADE MOUNTED

HVAC OR PLUMBING EQUIPMENT SHALL HAVE A 6

INCH TALL CONCRETE HOUSEKEEPING PAD. THIS

APPLIES AS WELL TO EQUIPMENT SUPPORTED BY

STEEL STRUCTURE OR LEGS. ALL HOUSEKEEPING

PADS SHALL EXTEND BEYOND THE OUTER

PERIMETER OF THE EQUIPMENT, SUPPORT

STRUCTURE OR LEGS BY AT LEAST 3 INCHES.

M. PROJECT ELEVATION / ALTITUDE IS 872 FEET

(ABOVE SEA LEVEL), USE THIS FOR SIZING ALL

AIRSIDE EQUIPMENT & FANS.

N. FANS SHALL BE SELECTED SO B.H.P. DOES NOT

EXCEED 85% OF MOTOR NAMEPLATE H.P.

O. PUMPS SHALL BE SELECTED WHERE DUTY POINT

IS NOT WITHIN THE LARGEST NOR THE SMALLEST

IMPELLER SIZE FOR THAT PUMP SIZE / CURVE.

NOTE: ALL OTHER DIMENSIONS IN INCHES

UNLESS NOTED OTHERWISE.

NOTES:

"*" INDICATES SYMBOL OR ABBREVIATION IS

NOT IN THE NATIONAL CADD STANDARDS.

NOT ALL SYMBOLS AND ABBREVIATIONS

SHOWN IN THIS SHEET ARE USED ON THIS

PROJECT.

DESCRIPTIONSYMBOL

DUCT SECTION, ROUND

DUCT SECTION, FLAT OVAL

DUCT SECTION, EXHAUST

DUCT SECTION, RETURN

DUCT SECTION, SUPPLY

FLEXIBLE DUCT

CONNECT TO EXISTING

REMOVE BEYOND/BETWEEN

POINT(S)

OPEN FUNNEL DRAIN

PNEUMATIC VALVE

OPERATOR

ELECTRIC VALVE OPERATOR

ANGLE VALVE

GLOBE VALVE

THREE-WAY VALVE

BUTTERFLY VALVE

GATE VALVE

BALL VALVE

RELIEF OR SAFETY VALVE

PLUG VALVE

COMBINATION VALVE

INCLUDING ISOLATION

VALVE, UNION P/T PORT,

AND AUTOMATIC FLOW

CONTROL VALVE

COMBINATION VALVE

INCLUDING DIELECTRIC

UNION, AIR VENT AND P/T

PORT

COMBINATION VALVE

INCLUDING ISOLATION

VALVE, STRAINER,

DIELECTRIC UNION, P/T

PORTS AND DRAIN VALVE

FCV

TEMPERATURE /

PRESSURE RELIEF VALVE

BACK FLOW PREVENTION

DEVICE (BFP)

AUTOMATIC FLOW

CONTROL VALVE

FCV

C - CONTROLLER

D - DAMPER MOTOR

DM - ELECTRICAL DEMAND METER

DPS - DIFFERENTIAL PRESSURE SWITCH

DPT - DIFFERENTIAL PRESSURE

TRANSMITTER

FS - FLOW SWITCH

H - DUCT HUMIDITY SENSOR

M - ELECTRIC MOTOR

MS - MOTOR STARTER

PT - PRESSURE TRANSMITTER

S - SWITCH

SD - SMOKE DETECTOR

SPT - DUCT STATIC PRESSURE

TRANSMITTER

T - DUCT TEMPERATURE SENSOR

TS - TEMPERATURE SENSOR

TS - TIMER SWITCH

V - VIBRATION SWITCH

VFD - VARIABLE FREQUENCY DRIVE

W - WATT TRANSDUCER

WB - DEW POINT (WET BULB)

DESCRIPTIONSYMBOL

DIMENSIONS (IN x IN)

RECTANGULAR DUCT:

DEVICE AIRFLOW (CFM)

AIR TERMINALS (GRILLES, REGISTERS,

& DIFFUSERS):

12x12

DEVICE TYPE, REFER

TO SCHEDULE FOR FACE

AND INLET/OUTLET SIZEA-1

MECHANICAL CALLOUTS:

3" MIN.

90° ELBOW DOWN

90° ROUND ELBOW,

HORIZONTAL

RECTANGULAR &

ROUND END CAPS

VD

VD

90° RECTANGULAR ELBOW

UP WITH TURNING VANES

90° ELBOW UP

90° RECTANGULAR ELBOW

DOWN WITH TURNING

VANES

90° RECTANGULAR ELBOW

HORIZ. WITH TURNING

VANES

RECTANGULAR TEE,

DIVERGING, MAIN AND TAP

(45° ENTRY) TYPICAL FOR

ALL SUPPLY RECTANGULAR

TAPS

STRAIGHT SIDED

BRANCH SPLIT.

TRANSITION TO

FULL SIZE BEFORE

ELBOW. * WITH

TURNING VANES

BRANCH OR WYE

SPLIT. TRANSITION

TO FULL SIZE

BEFORE ELBOW.*

WITH TURNING

VANES

THREE WAY SPLIT.

TRANSITION TO FULL

SIZE BEFORE

ELBOW.* WITH

TURNING VANES

SIDE WALL SUPPLY GRILLE

OR REGISTER, REVERSE

ARROW INDICATES

EXHAUST OR RETURN.

CEILING DIFFUSER SQUARE

PATTERN. NO ARROWS

INDICATE 4-WAY AIR

PATTERN.

ACCESS

DOOR

DAMPER: BDD BACK DRAFT DAMPER

FD FIRE DAMPER

FSD FIRE AND SMOKE

DAMPER

OA OUTSIDE AIR DAMPER

RA RETURN AIR DAMPER

SD SMOKE DAMPER

VD <OR> NO LABEL

MANUAL VOLUME

DAMPER

ROUND PRESSURE TAP

ROUND LOW-LOSS TEE

* LOCATE OPPOSED BLADE MANUALLY

OPERATED BALANCING DAMPER 3X DUCT

DEPTHS DOWNSTREAM FROM ELBOW

VD

VD

VDVD

VD

SIZE (IN)

ROUND DUCT or PIPE:

12 ø

DESCRIPTIONSYMBOL

A COMPRESSED AIR

EXHAUST AIR DUCTEA

CONDENSATE DRAIN LINECD

HWR HEATING WATER RETURN

HEATING WATER SUPPLYHWS

CHR CHILLED WATER RETURN

CHILLED WATER SUPPLY

CHEMICAL FEEDCF

AS

45° DOWN (ELBOW)

EXPANSION JOINT

A AUTOMATIC BALANCING

VALVE

DIRECTION OF FLOW

PIPE GUIDE

PIPE SLEEVE THRU WALL

PIPE ANCHOR

LOCK SHIELD VALVE

AIR SEPARATOR

FLEXIBLE CONNECTOR

CHECK VALVE

PRESSURE REDUCING VALVE

BLOWDOWN STRAINER

STRAINER

UNION

ECCENTRIC REDUCER

CONCENTRIC REDUCER

PIPE CAP

TOP CONNECTION

SIDE CONNECTION

BOTTOM CONNECTION

TEE DOWN

TEE UP

RISE OR DROP

RISER UP (ELBOW)

RISER DOWN (ELBOW)

BLIND FLANGE

MANUAL AIR VENT

TEST PLUG

PRESSURE GAUGE

TEMPERATURE GAUGE

AUTOMATIC AIR VENT

THERMOMETER WELL

TW

THERMOMETER

STEAM TRAP

GAUGE AND COCK

ORIFICE PLATE

AV

MAV

P1

RA RETURN AIR DUCT

SA SUPPLY AIR DUCT

MA MAKE-UP AIR DUCT

CWR CONDENSER WATER RETURN

CONDENSER WATER SUPPLYCWS

CALIBRATED MANUAL

BALANCING VALVE

T1

CHS ELL - ELBOW

EMER - EMERGENCY

ESP - EXTERNAL STATIC PRESSURE

EST - ESTIMATE

ETC - ET CETRA (AND SO FORTH)

EUH* - ELECTRIC UNIT HEATER

EVAP - EVAPORATE / EVAPORATIVE

EWT - ENTERING WATER TEMP.

EX - EXAMPLE

EXH - EXHAUST

EXT - EXTERIOR / EXTERNAL

F - FAHRENHEIT

FA - FIRE ALARM

FCU - FAN COIL UNIT

FCV - FLOW CONTROL VALVE

FF* - FINISHED FLOOR

FFA - FROM FLOOR ABOVE

FFB - FROM FLOOR BELOW

FIN - FINISH

FLA - FULL LOAD AMPS

FLEX - FLEXIBLE

FLR - FLOOR

FP - FIRE PROTECTION

FPD* - FIRE PROTECTION, DRY PIPE

FPM - FEET PER MINUTE

FPS - FEET PER SECOND

FREQ - FREQUENCY

FSTAT - FREEZESTAT

FT - FOOT / FEET

G - GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GFS - GLYCOL FEED SYSTEM

GOVT - GOVERNMENT

GPH - GALLONS PER HOUR

GPM - GALLONS PER MINUTE

GRV - GRAVITY ROOF VENTILATOR

HB - HOSE BIBB

HC - HEATING COIL

HORIZ - HORIZONTAL

HP - HORSEPOWER

HR* - HOUR

HSKPG - HOUSEKEEPING

HT - HEIGHT

HUH* - HYDRONIC UNIT HEATER

HUM* - HUMIDIFIER

HVAC - HEATING, VENTILATION, AND

AIR CONDITIONING

HW - HOT WATER

HWBT* - HEATING WATER BUFFER

TANK

HWCP* - HEATING WATER COIL PUMP

HWP* - HEATING WATER PUMP

Hz - HERTZ

I/O - INPUT/OUTPUT

ID - INSIDE DIAMETER

IN WC - INCHES WATER COLUMN

IN* - INCH / INCHES

INFO - INFORMATION

IP - INTERNET PROTOCOL

IPLV* - INTERNAL PART LOAD VALUE

IPS - IRON PIPE SIZE

ISO - ISOMETRIC

K - KELVIN

K - KILO

K - THOUSAND

kPa - KILOPASCAL kW - KILOWATT kWh - KILOWATT HOUR

L - LITER

L/s - LITERS PER SECOND

LAT - LEAVING AIR TEMPERATURE

LBS - POUNDS

LEL - LOWER EXPLOSIVE LIMIT

LF - LINEAR FEET / FOOT

LPM - LITRES PER MINUTE

LRA - LOCKED ROTOR AMPS

LVR* - LOUVER

m - METER

MAINT - MAINTENANCE

MAN - MANUAL

MATL - MATERIAL

MAU - MAKE UP AIR UNIT

MAX - MAXIMUM

MBH - THOUSAND BTU PER HOUR

MCA - MINIMUM CIRCUIT AMPS

MD - MANUAL DAMPER

MECH - MECHANICAL

MED - MEDIUM

MEZZ - MEZZANINE

MFG - MANUFACTURING

MFR - MANUFACTURER

MIN - MINIMUM

MISC - MISCELLANEOUS

mm - MILLIMETER

MOD - MODIFY

ms - MILLISECOND

MTD - MOUNTED

MULT - MULTIPLE

mW - MILLIWATT

N - NORTH

NA or N/A - NOT APPLICABLE

NC - NORMALLY CLOSED

NC - NOISE CRITERIA

NCS - NATIONAL CAD STANDARD

NEG - NEGATIVE

NIC - NOT IN CONTRACT

NO - NORMALLY OPEN

NO - NUMBER

NOM - NOMINAL

NTS - NOT TO SCALE

O - OXYGEN

O&M - OPERATIONS AND

MAINTENANCE

OA* - OUTSIDE / OUTDOOR AIR

OBD* - OPPOSED BLADE DAMPER

OC - ON CENTER

OD - OUTSIDE DIAMETER

OPP - OPPOSITE

ORIG - ORIGINAL

OUT - OUTLET

OZ - OUNCE

PA - PASCAL

PCT (%) - PERCENT

PD - PRESSURE DROP

PD - PRESSURE DIFFERENCE

PH (Φ) - PHASE

PKG - PACKAGE

PLBG - PLUMBING

PN - PART NUMBER

PNEU - PNEUMATIC

PPM - PARTS PER MILLION

PRELIM - PRELIMINARY

PRESS - PRESSURE

PRI - PRIMARY

PSI - POUNDS PER SQUARE INCH

PSIA - PSI ABSOLUTE

PSIG - PSI GAUGE

PT* - POINT

PVC - POLYVINYL CHLORIDE

PWR - POWER

QA - QUALITY ASSURANCE

QTY - QUANTITY

R - THERMAL RESISTANCE

RA* - RETURN AIR

REC'D - RECEIVED

REF - REFERENCE

RET - RETURN

REV - REVISE / REVISION

RF* - RETURN FAN

RFI - REQUEST FOR INFORMATION

RFP - REQUEST FOR PROPOSAL

RH* - RELATIVE HUMIDITY

RM - ROOM

RPBP - REDUCED PRESSURE

BACKFLOW PREVENTER

RPM - REVOLUTIONS PER MINUTE

RPS - REVOLUTIONS PER SECOND

RTH* - RADIANT TUBE HEATER

RV - RELIEF VALVE / VENT

SA* - SUPPLY AIR

SF - SQUARE FEET / FOOT

SDG* - STEAM DISPERSION GRID

STD - STANDARD

STRUCT - STRUCTURAL

SW - SWITCH

SYS - SYSTEM

TD - TEMPERATURE DIFFERENCE

TDH - TOTAL DYNAMIC HEAD

TEMP - TEMPERATURE

TFA - TO FLOOR ABOVE

TFB - TO FLOOR BELOW

THRU - THROUGH

TP - TOTAL PRESSURE

TYP - TYPICAL

UFC - UNIFIED FACILITIES CRITERIA

UFGS - UNIFIED FACILITIES GUIDE

SPECIFICATION

UH* - UNIT HEATER

UL - UNDERWRITERS

LABORATORIES

UMCS - UTILITY MONITORING AND

CONTROL SYSTEM

UNO - UNLESS NOTED OTHERWISE

V - VOLT

VAR - VARIES

VAV - VARIABLE AIR VOLUME

VEL - VELOCITY

VENT - VENTILATION / VENTILATOR

VF* - VENTILATION FAN

VFD - VARIABLE FREQUENCY DRIVE

VS - VENT STACK

W - WATT

W - WEST

W/ - WITH

W/O - WITHOUT

WC - WATER COLUMN

WG - WATER GAUGE

WH - WATER HEATER

WT - WEIGHT

XT* - EXPANSION TANK

YH - YARD HYDRANT

YR - YEAR

AAC* - AMBIENT AIR CURTAIN

ABV* - ABOVE

AC - AIR CONDITIONING UNIT

ACCU - AIR COOLED CONDENSING

UNIT

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFMD - AIR FLOW MONITORING

DEVICE

AHU - AIR HANDLING UNIT

ALT - ALTERNATE

AMP - AMPERE

ANSI - AMERICAN NATIONAL

STANDARDS INSTITUTE

APD - AIR PRESSURE DROP

APPROX - APPROXIMATE

ARCH - ARCHITECT, ARCHITECTURAL

ASHRAE - AMERICAN SOCIETY OF

HEATING, REFRIGERATION

AND AIR CONDITIONING

ENGINEERS

ASI - ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASME - AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

ASTM - AMERICAN SOCIETY FOR

TESTING AND MATERIALS

AT/FP - ANTI TERRORISM / FORCE

PROTECTION

ATT - ATTENUATOR

AUTO - AUTOMATIC

AUX - AUXILIARY

AVG - AVERAGE

BACNET - THE ASHRAE BUILDING

AUTOMATION AND CONTROL

NETWORKING PROTOCOL

BAS - BUILDING AUTOMATION

SYSTEM

BCP* - BOILER CIRCULATOR PUMP

BDD - BACKDRAFT DAMPER

BFF - BELOW FINISHED FLOOR

BFP - BACKFLOW PREVENTER

BHP - BRAKE HORSEPOWER

BLDG - BUILDING

BLR - BOILER

BOT - BOTTOM

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT/HOUR

BYP - BYPASS

C - CELSIUS

CAP - CAPACITY

CD* - CONDENSATE DRAIN

CD* - CONTROL DAMPER

CERT - CERTIFY

CFM - CUBIC FEET PER MINUTE

CHL - CHILLER

CL - CENTER LINE

CLASS - CLASSIFICATION

CLG - CEILING

CO - CLEANOUT

COL - COLUMN

COMM - COMMUNICATION

COMP - COMPRESSOR

CONC - CONCRETE

CONN - CONNECT

CONT - CONTINUE / CONTINUOUS

COORD - COORDINATE

CORR - CORRIDOR

CTR - CENTER

CTRL - CONTROL

CU* - CONDENSING UNIT

CU - CUBIC

Cv - VALVE SIZING COEFFICIENT

CW - COLD WATER PIPING

D* - DRAIN

dB - DECIBEL

DB - DRY BULB

DDC - DIRECT DIGITAL CONTROL

DEG (°) - DEGREE

DEMO - DEMOLITION / DEMOLISH

DEPT - DEPARTMENT

DET - DETAIL

DF* - DESTRATIFICATION FAN

DHU* - DE-HUMIDIFIER UNIT

DIA (Ø) - DIAMETER

DIAG - DIAGRAM / DIAGRAMMATIC

DIM - DIMENSION

DIV - DIVISION

DN* - DOWN

DP - DEW POINT

DWG - DRAWING

DWH - DOMESTIC WATER HEATER

DWV - DRAIN, WASTE, AND VENT

E - EAST

EA - EACH

EAT - ENTERING AIR TEMPERATURE

EER - ENERGY EFFICIENCY RATIO

EF* - EXHAUST FAN

EFF - EFFICIENCY

EHS - EMER. HVAC SHUTDOWN

EL - ELEVATION

ELEC - ELECTRIC, ELECTRICALUP SLOPE DIRECTION

FOR PIPE OR DUCT

DN.OR

VAV NO.

VAV TERMINALS:

ASSOCIATED A.H.U. NO.

VAV-2-03

ALL OTHER EQUIP. MARKS:

EQUIP. TYPE / ABBREVIATION,

REFER TO SCHEDULE SHEETS

AHU-2 EQUIP. NO.

CO - CARBON MONOXIDE SENSOR

CO2 - CARBON DIOXIDE SENSOR

CS - CURRENT SENSING RELAY

EBS - EMERGENCY BOILER SHUTDOWN

EHS - EMERGENCY HVAC SHUTDOWN

H - SPACE HUMIDITY SENSOR

NO2 - NITROGEN DIOXIDE SENSOR

OCO - OCCUPANCY OVERRIDE

PS - PRESSURE SWITCH

PT - PRESSURE SENSOR/TRANSMITTER

T - SPACE TEMPERATURE SENSOR

LOCK SHIELD (FOR VALVE)

SECTOR PLAN

AB

D C

1 2 3 4 5

A

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:0

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-001

LE

G

EN

D

A

BB

R

EV

IA

TI

O

N S

P.

LI

TT

LE

J.

W

O O

D

J.

W

O O

D

C .N

IC

EK

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

0 0

/0

1/

A

M E

N D

M E

N T

W

2Q R

R

-0

GROUND FLOOR

100'-0"

HIGH EAVE

134'-0"

SUPPORT GRID

114'-6"

MECH PLATFORM

116'-0"

55.5678 4.9

M-301 A2

M-301 A2

AHU-1

RF-1

E-1

E-1

12"x40"

12"x40"

24"ø

32"ø

4"ø 1"

1"

G

G

GAS MAIN

MIN. 3"

5' -0

BRIDGE CRANE BEAM

BRIDGE CRANE TRAVELING CROSSBEAM

LOW BAY

SLOPING

ROOF

HIGH BAY SLOPING ROOF

BRIDGE CRANE BEAM

VEHICLE

STO

HIGH

BAY

AERIAL

DELIVERY

AERIAL

DELIVERY

RIGGER

OFFICE

AAC-1

RTH-2

MIN. 12" CHAIN / HANGER LENGTH 18

GROUND FLOOR

100'-0"

SUPPORT GRID

114'-6"

MECH PLATFORM

116'-0"

12345 4.9

M-301 C3

M-301 C3

GRV-1GRV-7

14"x14"

VAV-1-07

HWS & HWR MAINS

EAGLE

CR 1

MEN

WOMEN 123

CONF

CORR

BREAK

ROOM

VAV-1-02

17 17 17 17

(BEYOND)

16"x14"

12"ø

12"x14"

5 5

LOW BAY ROOF SLOPING DOWN & AWAY

24"x28" RA

28"x28" RA

28"x28" RA

28"x28" EXH28"x28" OA

1 2 3 4 5

A

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:2

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-302

SE

C

TI

O

N S

P.

L

IT

TL

E

J.

W

O O

D

J.

W

O O

D

C . N

IC

EK

SCALE: = 1'-0"3/16"

0 4 8 124

GENERAL NOTES

SHEET KEYNOTES

A. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, &

GENERAL NOTES.

B. SEAL ALL DUCTWORK IN ACCORDANCE WITH

SMACNA SEAL CLASS "A".

C. DUCT RUNOUT SIZES TO DEVICES ARE THE SAME

SIZE AS THE DEVICE NECK SIZE SCHEDULED U.N.O.

D. VAV OUTLET DUCT PLENUM SIZES ARE THE SAME

AS THE BOX OUTLET SIZE U.N.O.

E. AIR INTAKES SHALL BE SEPARATED FROM

PLUMBING VENTS THRU ROOF & EXHAUST AIR

OUTLETS BY CODE-MINIMUM OF 10'-0".

F. MINIMUM CONDENSATE PIPING SIZE IS 3/4".

G. ALL MAIN HORIZONTAL CONDENSATE DRAINAGE

PIPING SHALL BE SLOPED 1/8" PER FT. MINIMUM.

H. ALL NATURAL GAS APPLIANCES TO INCLUDE

SHUTOFF COCK & DIRT LEG.

I. ALL HEATING WATER PIPING BRANCHES SHALL TEE

OUT OF THE TOP OF THE MAINS.

J. MINIMUM HEATING WATER PIPING SIZE IS 3/4".

BRANCH PIPING TO EACH VAV H.W. COIL IS 3/4"

U.N.O.

K. ALL ARCHITECTURAL, STRUCTURAL, FIRE

PROTECTION, PLUMBING, & ELECTRICAL ITEMS

WHICH ARE SHOWN IN MECHANICAL SECTION

VIEWS ARE FOR REFERENCE ONLY. REFER TO

RESPECTIVE DISCIPLINE'S DRAWINGS &

SPECIFICATIONS FOR FINAL LOCATIONS, SIZES,

DEPTHS, ETC.

1. CONCRETE MECHANICAL PLATFORM, REF. STRUCT.

SHEET SF103.

2. CONC. PAD AT MECH. EQUIP., REF. DET. C4/M-501.

3. SLEEVE & SEAL ALL PIPING & DUCTWORK

PENETRATIONS THRU INSULATED WALL BETWEEN

HIGH & LOW BAY.

4. INSTALL PIPES & DUCTS WITH FLOOR SUPPORTS

AT MECH. PLATFORM - MIN. 5'-0" A.F.F. CLEAR

BELOW FOR MAINTENANCE ACCESS, TOP AT MAX.

OF 8'-7" A.F.F. AS BRIDGE CRANE TRAVELS ABOVE.

5. COLD-FORMED JOIST FRAMING, REF: STRUCT.

SHEETS SF100, SF101, & SF102.

6. AHU-2 REFRIGERANT PIPING SET.

7. AHU-1 REFRIGERANT PIPING SET.

8. AFTER LARGE DUCTS EXIT THE MECH. PLATFORM

INTO THE LOW BAY ATTIC, DUCTS CAN OFFSET

DOWN TO BE SUPPORTED FROM/SECURED TO THE

STRUCTURAL GRID (AS SHOWN). CONTRACTOR TO

COORDINATE HANGERS OR SUPPORTS.

9. CONTROL DAMPERS FOR A.H.U. DUCTS.

10. SUPPORT PIPES & DUCTS WITH FLOOR SUPPORTS

AT MECH. PLATFORM, CRANE TRAVELS ABOVE.

11. MINIMUM CLEARANCE REQUIRED AT/AROUND

MOVING BRIDGE CRANE ELEMENTS, REF.

STRUCTURAL DRAWINGS FOR BEAM SIZES,

MOUNTING HEIGHTS, ETC. (SHEET S-009).

12. WALL SUPPORTS REQUIRED AT THE RADIANT TUBE

HEATERS & ASSOCIATED INTAKE/VENT DUCTS &

GAS PIPING. TO BE DELEGATED STRUCTURAL

DESIGN & COORD. WITH METAL BUILDING FOR

ATTACHMENT POINTS.

13. MOUNT AMBIENT AIR CURTAIN AAC-1 ABOVE

OVERHEAD DOOR AT PACKING/RIGGING ROOM 129.

14. HWS & HWR MAINS SOUTH OF PACKING/RIGGING

ROOM 129.

15. GAS MAIN SOUTH OF PACKING/RIGGING ROOM 129.

16. HWS & HWR MAINS & GAS MAIN ABOVE

PACKING/RIGGING ROOM 129 HIGH CEILING.

17. GRILLES IN HIGH CEILING IN PACKING/RIGGING 129.

18. CONFIRM WITH MFR'S DATA FOR SUBMITTED

HEATER'S MINIMUM HANGER & SUPPORT

REQUIREMENTS.

SCALE: 3/16" = 1'-0"

EAST-WEST MECHANICAL SECTION - HIGH BAYA1

SCALE: 3/16" = 1'-0"

EAST-WEST MECHANICAL SECTION - ADMIN./LOW BAYC1

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

0 0

/0

1/

A

M E

N D

M E

N T

W

2Q R

R

-0

P

REMOVABLE

STRAINER

SUCTION

DIFFUSER

ISOLATION

VALVE

VERTICAL

SPLIT-COUPLED

CENTRIFUGAL

PUMP

PRESSURE GAUGE

SEPARATE ISOLATION VALVE, BALANCE VALVE, AND

NON-SLAM CHECK VALVE ON PUMP DISCHARGE

("TRIPLE-DUTY" VALVES SHALL NOT BE USED).

ADJUSTABLE

SUPPORT LEG,

TYPICAL

BALL

VALVE,

TYP.LONG RADIUS

ELBOW

REF: DET. C4/M-501

FOR CONCRETE

PAD INSTALLATIONFLOOR

VIBRATION ISO.

PAD TYPICAL

FLEXIBLE

CONNECTION,

TYPICAL

TRANSITION AS

REQUIRED TO DUCT

SIZE DOWNSTREAM

OF TERMINAL UNIT

HOT WATER HEATING

COIL, REF. DETAILS B4 &

C2 ON SHEET M-502 FOR

COIL PIPING DETAILS

TERMINAL UNIT

INTERNALLY

LINED UNIT

TERMINAL UNIT BRANCH

TAKE-OFF DUCT SIZE AS

INDICATED ON PLANSAIR VALVE ACTUATORCONTROL ENCLOSURE. LEAVE MIN.

12" CLEAR FROM ALL OBSTRUCTIONS

TO PERMIT SERVICE

INSULATED ACCESS PANEL

TO PERMIT INSPECTION OF

AIR FLOW SENSOR

AIR FLOW SENSOR

SIZE (MIN. 3 DUCT DIAMETERS)

CONNECTED RIGID DUCT TO BE

SAME SIZE AS TERMINAL INLET

DUCT INSULATION

PER SPECIFICATIONS

MINISPLIT OUTDOOR UNIT

MFR'S LOW-AMBIENT

WIND BAFFLE

MFR'S WALL BRACKET

EXTERIOR WALLA.

F.

G

3' -0

FINISHED GRADE,

REF. CIVIL SHEETS

C-120 & C-121

NOTES: INSTALL UNIT, PIPING, & ALL

ACCESSORIES PER MFR'S INSTRUCTIONS.

SPACE PER MFR'S INSTRUCTIONS

IN-LINE PUMP

REDUCER (IF REQ'D)BALL VALVE

CHECK VALVE

UNION (UP TO 2-1/2")

FLANGE (3" & OVER)

PRESSURE GAUGE

W/ GAGECOCK

HANGER / SUPPORTS,

EACH SIDE OF PUMP

MANUAL

AIR VENT

HEATING

WATER COIL

RETURN

SUPPLY

UNION

BALL VALVE

Y-PATTERN

STRAINER

PRESSURE-INDEPENDENT

CONTROL VALVE

VALVED AND CAPPED CONNECTION

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

DRAIN PLUG

MIN. 24" FLEXIBLE METAL HOSE

TEST PLUG

FCV

MANUAL

AIR VENT

HEATING

WATER COIL

RETURN

SUPPLY

UNION

VALVED AND CAPPED CONNECTION

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

DRAIN PLUG

MIN. 24" FLEXIBLE METAL HOSE

TEST PLUG

DIFFERENTIAL

PRESSURE

TRANSMITTER

REMOVABLE CAP

(TYP. OF TWO)

BYPASS (NC)

HIGH PRESSURE

LOW PRESSURE

AUTO AIR VENT REQUIRED AT HIGH

POINT OF ALL HEATING WATER

LINES AND WHERE SHOWN ON

DWGS.

3/16"

ROUTE 1/2"

TO DRAIN

BALL VALVE

STANDARD WEIGHT STEEL

FINISHED ESCUTCHEON

PIPING EXPOSED TO VIEWCONCEALED PIPING

FINISHED WALL

SURFACE

PIPE AND INSULATION

TO BE PER

SPECIFICATIONS

SEAL OR CAULK

SLEEVES

TERMINATE SLEEVE

FLUSH WITH

FINISHED WALL

WALL

SLEEVE

PIPE

MODULAR SEAL

ELEMENT

INSIDE

OUTSIDE

MODULAR LINK SEALS FOR PIPING

MIN/MAX PRE-

TIGHTENING

WIDTH

0.4"/0.48"

1.3"/1.45" 0.65"/0.72"

2.1"/2.4"

PIPE SIZES

UP TO 3"

4" TO 6"

4"

8" TO 12"

SLEEVE OPENING

1" LARGER THAN PIPE O.D.

3" LARGER THAN PIPE O.D.

5" LARGER THAN PIPE O.D.

1-1/2" LARGER THAN PIPE O.D.

MIN.

SEATING

WIDTH

2-1/4"

5" 5"

3"

MODULAR LINK SEAL REQUIREMENTS:

1. SHALL HAVE RUBBER SEALING ELEMENTS SUITABLE TO THE INSTALLED

CONDITIONS. WITH REGARD TO PIPING & EXPOSURE TEMPERATURES &

CONTAMINATION-RESISTANCE.

2. SHALL HAVE PRESSURE PLATES & BOLTS WHICH ARE CORROSION-

RESISTANT.

PIPE MATL.

COPPER

CAST IRON

COPPER

CAST IRON

ROOF

SUPPORT FAN FROM

SECURED STRUT

CHANNEL SPANNING

TWO (2) PURLINS MIN.

SIZE TO SUPPORT FAN

ASSEMBLY, DO NOT

CANTILEVER STRUT

CHANNEL.

SAFETY CABLE (PROVIDED

BY MFR.)ATTACHED TO

STRUT CHANNEL. NO

CONNECTION SHALL BE

MADE DIRECTLY TO A

PURLIN.

STEEL CABLE (OR OTHER METHOD

PER NOTE 2 BELOW) ATTACHED

FROM STRUT CHANNEL TO EYE

BOLT OF FAN. SIZE AS REQUIRED

FOR PROPER SUPPORT OF FAN.

AIR

INTAKEFAN POWER CORD SECURED

TO HANDLE & HANGER

SUPPORT BY CABLE TIE.

DESTRATIFICATION FAN

DISCHARGE AIRFLOW SHALL HAVE

UNOBSTRUCTED PATH TO FLOOR

BELOW.

NOTES:

1. INSTALL BOTTOM OF FAN AT ARCHITECTURAL ELEVATION OF 130'-0" (REL. TO MAIN FINISHED

FLOOR ARCH. ELEV. OF 100'-0"). MAINTAIN 3" MINIMUM CLEARANCE BETWEEN BOTTOM OF

FAN & TOP OF BRIDGE CRANE BEAM TRAVEL BELOW. REFER TO STRUCTURAL DETAIL A3 ON

SHEET S-009 FOR BRIDGE CRANE DETAILS.

2. OPTIONAL HANGING METHODS INCLUDE: BEAM CLAMP/BRIDLE RING, CHAIN

LINK/CARABINER, THREADED ROD/LOCK NUTS, ETC.

3. NO SUPPORT CONNECTION SHALL BE MADE DIRECTLY TO PURLINS OR ROOF DECK.

4. CONTRACTOR TO PROVIDE POWER FEED IN CONDUIT. THE ELECTRICAL CONNECTION (NOT

SHOWN) IS A PLUG CONNECTION (J-BOX/RECEPTACLE).

3" M

IN

TRAVELING BRIDGE

CRANE BEAM

STRUCTURAL PURLINS

1 2 3 4 5

A

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:1

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-502

D

ET

AI

LS

P.

L

IT

TL

E

J.

W

O O

D

J.

W

O O

D

C . N

IC

EK

SCALE: NTS

PAD-MOUNTED IN-LINE PUMP DETAILC3

SCALE: NTS

TYP. SINGLE-DUCT VAV TERMINAL UNIT INSTALLATIONA4

SCALE: NTS

WALL-MOUNT MINISPLITD2

SCALE: NTS

SUSPENDED IN-LINE PUMP DETAILB2 SCALE: NTS

2-WAY VAV BOX REHEAT COIL PIPINGB4

SCALE: NTS

3-WAY VAV BOX REHEAT COIL PIPINGC2

SCALE:NTS

D1

DIFFERENTIAL PRESSURE

TRANSMITTER 5 VALVE

BLOCK & BLEED DETAIL

SCALE: NTS

TYPICAL AUTOMATIC AIR VENT DETAILC1

SCALE:NTS

A2

TYPICAL INTERIOR WALL

PIPE PENETRATION DETAIL

SCALE: NTS

PIPE SLEEVE THRU OUTSIDE WALLA1

SCALE: NTS

DESTRATIFICATION FAN DETAILC4

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

0 0

/0

1/

A

M E

N D

M E

N T

W

2Q R

R

-0

1 2 3 4 5

A

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:0

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-601

SC

H

ED

U

LE

S

P.

L

IT

TL

E

J.

W

O O

D

J.

W

O O

D

C . N

IC

EK

NOTES:

1. CONTRACTOR SHALL FURNISH AND INSTALL EACH INDIVIDUAL TERMINAL UNIT WITH THE SAME CONFIGURATION, I.E. LOCATION OF COIL

CONNECTIONS, CONTROL ENCLOSERS, ETC. AS SHOWN ON THE DRAWINGS.

2. VAV CONTROLLERS SHALL BE FURNISHED BY THE CONTRACTOR FOR FACTORY INSTALLATION BY VAV TERMINAL UNIT MANUFACTURER.

3. E.W.T. IS 160°F. FINS PER INCH MIN. IS 10. HEATING MEDIUM IS WATER WITH 30% GLYCOL.

4. PROVIDE WITH 24V CONTROL TRANSFORMER. POWERED BY 120V ELECTRICAL SUPPLY, DISCONNECT BY E.C.

5. E.A.T. IS 54°F, INLET STATIC PRESSURE IS 1.0" W.C., & DOWNSTREAM STATIC PRESSURE DROP IS 0.5" W.C.

6. REFER TO "MECHANICAL CALLOUTS" DESCRIPTIONS ON SHEET M-001.

7. PRESSURE INDEPENDENT SINGLE DUCT TERMINAL UNIT WITH DIGITAL CONTROL.

VARIABLE AIR VOLUME (V.A.V.) BOX SCHEDULE

MARK

(NOTE

#6)

SERVING ROOM

NUMBERS

SIZE

AIRFLOW

(CFM)

MIN.

S.P.

DROP

(IN.

W.C.)

MAX.

NC

(RAD. /

DIS.)

HEATING

AIRFLOW

(CFM)

REHEAT

CAPACITY

(MBH)

LAT

(°F)

HOT WATER COIL

NOTES

INLET

(IN.)

OUTLET

(INxIN) MAX. MIN.

FLOW

(GPM)

LWT

(°F)

MAX.

WPD

(FT. W.C.)

MIN.

ROWS

(QTY)

VAV-1-01 139 9 14x12.5 855 425 0.25 24 425 21 99.7 1.7 134 0.25 2 ALL VAV-1-02 129 12 16x15 1,290 645 0.26 24 775 33.5 94 2.1 128 0.36 2 ALL VAV-1-03 130, 138 9 14x12.5 850 425 0.25 24 425 21 99.7 1.7 134 0.25 2 ALL VAV-1-04 132, 133, 134 8 12x10 585 295 0.22 27 295 14.4 99.1 1.1 134 0.25 2 ALL VAV-1-05 102 TO 105, 131 9 14x12.5 900 450 0.28 25 450 21.5 98.2 1.7 134 0.25 2 ALL VAV-1-06 106, 107, 108 6 12x8 350 175 0.15 22 175 6.6 88.9 1.4 150 0.8 1 ALL VAV-1-07 123 7 12x10 510 255 0.25 24 305 13.5 94.8 0.9 130 0.19 2 ALL VAV-1-08 110, 112 8 12x10 590 295 0.23 27 295 14.4 99.1 1.1 134 0.25 2 ALL VAV-1-09 122, 124, 125, 126 7 12x10 520 260 0.26 24 260 12 96.6 0.8 129 0.17 2 ALL VAV-1-10 127, 128 6 12x8 350 175 0.24 22 175 7.9 95.6 0.6 133 0.08 2 ALL VAV-2-01 117, 121 9 14x12.5 730 365 0.19 22 365 16.2 95 1.7 140 0.38 2 ALL VAV-2-02 120 10 14x12.5 960 480 0.27 27 480 22.1 96.7 1.7 133 0.25 2 ALL VAV-2-03 119 9 14x12.5 920 460 0.29 25 460 21.7 97.7 1.7 133 0.25 2 ALL VAV-2-04 118 9 14x12.5 850 425 0.13 24 425 14.5 85.5 3.2 151 0.99 1 ALL VAV-2-05 115 12 16x15 1,170 585 0.22 24 700 30.4 94.2 1.8 125 0.31 2 ALL VAV-2-06 114 12 16x15 1,170 585 0.22 24 700 30.4 94.2 1.8 125 0.31 2 ALL VAV-2-07 113 12 16x15 1,170 585 0.22 24 700 30.4 94.2 1.8 125 0.31 2 ALL VAV-2-08 111 12 16x15 1,080 540 0.13 23 540 17.6 85 2.5 146 0.83 1 ALL

AIR HANDLING UNIT (A.H.U.) SPLIT SYSTEM SCHEDULE (INDOOR UNITS)

MARK

AREA

SERVED

CABINET

SIZE

LxWxH

(IN.)

UNIT FEATURES

M

IN

. O U

TS

ID

E

AI

R (C

FM

SUPPLY FAN D.X. EVAPORATOR (COOLING) COIL HOT WATER PRE-HEAT COIL FILTRATION ELECTRICAL

WEIGHT

(LBS) N

O

TE

S

SYSTEM

CONTROL H

YD

R

O N

IC

P

R E-

H

EA

T C

O

IL

D .X

. C O

O

LI

N G

C O

IL

D .X

. H O

T G

AS

R

E- H

EA

T

D .X

. H O

T G

AS

B

YP

AS

S

EC

O

N O

M

IZ

ER

M

AX

. S U

PP

LY

A

IR

(C

FM

M

IN

. S U

PP

LY

A

IR

(C

FM

TYPE Q

TY

MOTOR

H.P.

E.

S.

P.

(I

N . W

.C

T.

S.

P.

(I

N . W

.C

FA

N

S

PE

ED

(R

PM

E.A.T. (°F) L.A.T. (°F)

C O

O

LI

N G

F

LU

ID

AI

R

FL

O

W (C

FM

FA

C

E

VE

LO

C

IT

Y

(F

PM

M

AX

. A .P

.D

IN

. W

.C

NET

CAPACITY

(MBH) D.B. (°F)

H

EA

TI

N

G F

LU

ID

FL

U

ID

F

LO

W

(G

PM

L.

W

.T

°F

N O

TE

M

AX

. W .P

.D

FT

. W

.C

AI

R

FL

O

W (C

FM

FA

C

E

VE

LO

C

IT

Y

(F

PM

M

AX

. A .P

.D

IN

. W

.C

N

ET

C

AP

AC

IT

Y (M

BH

PRE- /

POST

FILTERS

[NOTE 5] V / ϕ / Hz FL

A

M C

A

M O

P

H .P

. E

AC

H

B.

H

.P . E

AC

H

TO

T.

D .B

W .B

D .B

W .B

SE

N

SI

BL

E

TO

TA

L

E.

A.

T.

L.

A.

T.

AHU-1 VAV-1-01 -

VAV-1-10

71x78x42 MULTI-ZONE

VAV

Yes Yes Yes Yes Yes 1,620 6,800 3,400 PLENUM 2 7.5 4.88 15 1.5 2.8 1,827 80.4 65.3 53.3 52.5 R410A 6,800 450 0.63 156 222 54.5 80 30%

GLYCOL

6.8 106 2.2 6,800 478 0.2 181 2" MERV 8 /

4" MERV 13

460 / 3 / 60 13.2 14.8 20 1,880 ALL

AHU-2 VAV-2-01 -

VAV-2-08

80x96x51 MULTI-ZONE

VAV

Yes Yes Yes Yes Yes 1,980 8,050 4,025 PLENUM 2 5 4.27 10 1.5 2.3 1,481 80.4 66.3 53.3 52.6 R410A 8,050 311 0.35 228 326 54.5 80 30%

GLYCOL

8.0 106 0.3 8,050 322 0.1 213 2" MERV 8 /

4" MERV 13

460 / 3 / 60 9.2 10.3 15 1,850 ALL

NOTES:

1. MANUFACTURER SHALL DEMONSTRATE CAPABILITY OF STABLE OPERATION THROUGHOUT THE FULL RANGE OF SCHEDULED AIRFLOWS.

2. A.H.U. FANS SHALL BE AMCA CLASS III AND SHALL INCLUDE INTEGRAL TYPE 'S1' SPRING ISOLATORS WITH MINIMUM 1" DEFLECTION OR AHU MFR MAY ALTERNATIVELY PROVIDE FAN ASSEMBLIES THAT ARE FACTORY BALANCED TO A MINIMUM BV-5 RATING IN ACCORDANCE WITH AMCA

STANDARD 204-96.

3. CONTRACTOR SHALL FURNISH AND INSTALL ALL ACTUATORS FOR ALL FACTORY-INSTALLED UNIT-MOUNTED CONTROL DAMPERS.

4. ENTERING WATER TEMPERATURE (E.W.T.) IS 160°F.

5. FILTER MERV RATINGS ARE THE MINIMUM REQUIRED.

6. REFER TO: "SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)" FOR ASSOCIATED DIRECT-EXPANSION (D.X.) SPLIT CONDENSER UNIT.

7. PROVIDE AT A MINIMUM: VARIABLE SPEED LEAD COMPRESSOR & A STAGED SECONDARY COMPRESSOR FOR VARIABLE & LOW-LOAD DEHUMIDIFICATION CONTROL.

NOTES:

1. FACTORY-PROVIDED V.F.D.'S FOR FANS ARE "MANUAL-ADJUSTMENT" FOR INITIAL T.A.B. & ENERGY SAVINGS.

2. PROVIDE FACTORY PREWIRED STARTER-DISCONNECT.

3. PROVIDE RETURN AIR HUMIDITY SENSOR.

4. PROVIDE SUPPLY AIR TEMPERATURE SENSOR.

5. REFER TO: "SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)" FOR ASSOCIATED DIRECT-EXPANSION (D.X.) SPLIT CONDENSER UNIT FOR PRE-COOLING COIL.

6. DE-HUMIDIFIER UNIT & ALL SUPPORTING ACCESSORIES, DUCTS, PIPES, ETC. ARE PART OF "DRYING TOWER" BID OPTION.

DE-HUMIDIFIER UNIT (D.H.U.) SPLIT SYSTEM SCHEDULE

MARK AREA SERVED

CABINET

SIZE

LxWxH

(IN.)

PROCESS AIRSTREAM (RE-CIRCULATION AIR FROM DRYING TOWER) ENERGY WHEEL REACTIVATION AIRSTREAM (100% O.A.) ELECTRICAL

WEIGHT

(LBS) N

O

TE

S

AI

R

FL

O

W (C

FM

IN

LE

T

FI

LT

ER

FAN PRE-COOLING COIL (D.X.) POST-HEATER

W H

EE

L

TY

PE

W H

EE

L

SP

EE

D (R

PH

M O

TO

R

F .L

.A

DEHUMIDI-

FICATION

AI

R

FL

O

W (C

FM

IN

LE

T

FI

LT

ER

FAN PRE-HEATER

V / ϕ / Hz

FLA /

MCA /

MOCPTY

PE

V.

F.

D

N O

TE

H .P

B.

H

.P

E.

S.

P.

(I

N . W

.C

T.

S.

P.

(I

N . W

.C

ENTER-

ING

LEAV-

ING

C O

O

LI

N G

F

LU

ID

N

ET

T O

TA

L

C

AP

AC

IT

Y (M

BH

) DEHUMIDI-

FICATION

H

EA

T

SO

U R

C E

K.

W

TE

M

P.

R

IS

E

F)

TY

PE

R

AT

E (L

B/ H

R

TY

PE

V.

F.

D

N O

TE

H .P

B.

H

.P

E.

S.

P.

(I

N . W

.C

T.

S.

P.

(I

N . W

.C

H

EA

T

SO

U R

C E

FI

R

E

TY

PE

IN

PU

T C

AP

AC

IT

Y

(M

BH

O U

TP

U

T C

AP

AC

IT

Y

(M

BH

TE

M

P.

R

IS

E

F)

D .B

°F

M O

IS

TU

R E

(G R

/L B)

D .B

°F

M O

IS

TU

R E

(G R

/L B)

TY

PE

R

AT

E (L

B/ H

R

DHU-1 PARACHUTE

DRYING TOWER

158x43x81 2,250 2" MERV 8 AIRFOIL Yes 5 4.0 0.8 4.0 85 25 46 25 R407C 96 COND. 138 ELEC.

RESIST.

48 16 DESICCANT 8 0.42 ADSORP. 72 692 METAL

MESH

AIRFOIL Yes 3 2.1 0.5 5.9 NAT. GAS DIRECT-

FIRED

200 184 229 460 / 3 / 60 73.7 / 93 / 100 2,713 ALL

SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)

MARK LOCATION

ASSOCIATED

EQUIPMENT

OUTDOOR

AMBIENT

DB (ºF)

REFRIGERANT

TYPE

LOW AMBIENT

COOLING

REQUIRED

MINIMUM

EFFICIENCY

(SEER)

ELECTRICAL

WEIGHT

(LBS) NOTESV / ɸ / Hz

MCA /

MOCP

CU-1 SLAB ON GRADE, NORTH OF HIGH BAY AHU-1 92.8 R-410A YES 11.4 (EER) 460 / 3 / 60 46.7 / 60 1,900 1,2,3,4 CU-2 SLAB ON GRADE, NORTH OF HIGH BAY AHU-2 92.8 R-410A YES 11.5 (EER) 460 / 3 / 60 56.8 / 70 1,900 1,2,3,4 CU-3 SLAB ON GRADE, NORTH OF HIGH BAY DHU-1 92.8 R-407C YES 460 / 3 / 60 26.2 / 40 1,020 1,4,7 CU-4 NORTH FACE OF BLDG. FCU-1 95.8 R-410A YES (-40°F) 19.7 208 / 1 / 60 24 / 30 160 5,6 CU-5 NORTH FACE OF BLDG. FCU-2 95.8 R-410A YES (-40°F) 18.8 208 / 1 / 60 13 / 15 95 5,6

NOTES:

1. FACTORY-PROVIDED MAIN DISCONNECT.

2. UNIT-POWERED 120V MAINTENANCE RECEPTACLE ATTACHED TO UNIT.

3. REFER TO "AIR HANDLING UNIT (A.H.U.) SPLIT SYSTEM SCHEDULE (INDOOR UNITS)" FOR COOLING CAPACITIES.

4. GRADE-MOUNTED CONDENSERS TO BE ELEVATED 24" ABOVE FINISHED GRADE TO BE ABOVE SNOW DRIFTS.

5. POWER & CONTROL WIRING PROVIDED FROM OUTDOOR (AIR-COOLED CONDENSING) UNIT TO INDOOR (FAN COIL) UNIT.

6. REFER TO "MINISPLIT FAN COIL UNIT (F.C.U.) SCHEDULE (INDOOR UNITS)" FOR CAPACITIES.

7. REFER TO "DE-HUMIDIFIER UNIT (D.H.U.) SPLIT SYSTEM SCHEDULE" FOR COOLING CAPACITIES.

MINISPLIT FAN COIL UNIT (F.C.U.) SCHEDULE (INDOOR UNITS)

MARK LOCATION UNIT TYPE

MIN REQ'D TOTAL

COOLING

CAPACITY (MBH)

MIN SENSIBLE

COOLING

CAPACITY (MBH)

MIN HEAT

CAPACITY

(MBH)

INDOOR UNIT

AIRFLOW

(CFM) NOTES

FCU-1 COMM 137 WALL-MTD. EVAPORATOR 30.9 30.9 N/A 777 ALL

FCU-2 FIRE PUMP 135 WALL-MTD. EVAPORATOR 10.3 9.9 N/A 406 ALL

NOTES:

1. POWER PROVIDED FROM OUTDOOR (AIR-COOLED CONDENSING) UNIT, REFER TO CONDENSING UNIT SCHEDULE NOTE #5.

2. UNIT PROVIDED WITH WIRED T-STAT/CONTROLLER & PACKAGED DIGITAL CONTROLS.

3. CONTRACTOR TO CONNECT INDOOR & OUTDOOR UNITS WITH CONTROL WIRING.

4. PROVIDE UNIT WITH OPTIONAL CONDENSATE PUMP, POWERED BY UNIT.

5. REFER TO: "SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)" FOR ASSOCIATED DIRECT-

EXPANSION (D.X.) SPLIT CONDENSER UNIT.

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

0 0

1 111

1 1 1 1

1 1 1 1 1

/0

1/

A

M E

N D

M E

N T

W

2Q R

R

-0

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:0

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-602

SC

H

ED

U

LE

S

P.

L

IT

TL

E

J.

W

O O

D

J.

W

O O

D

C . N

IC

EK

ELECTRIC & HYDRONIC UNIT HEATER (E.U.H. & H.U.H.) SCHEDULE

MARK LOCATION TYPE HEAT SOURCE

HEATING

CAPACITY

(MBH)

AIRFLOW

(CFM) FAN TYPE

HYDRONIC COIL ELECTRICAL

WEIGHT

(LBS) NOTES

COIL

ROWS

FLOWRATE

(GPM)

HEAD

LOSS (FT.)

E.W.T. (°F) / L.W.T. (°F)

ELEMENT

(KW) V / ɸ / Hz

MOTOR

HP FLA

EUH-1 ELEC 136 BASEBOARD ELEC. RESIST. 1.1 - - - - - - 0.5 208 / 1 / 60 - - 6 1

EUH-2 COMM 137 EXPOSED HORIZONTAL DISCHARGE ELEC. RESIST. 2.0 300 PROPELLER - - - - 1.5 208 / 1 / 60 - - 20 1 EUH-3 MECH 145 EXPOSED HORIZONTAL DISCHARGE ELEC. RESIST. 4.0 300 PROPELLER - - - - 1.5 208 / 1 / 60 - - 20 1 EUH-4 VEST 101 CEILING RECESSED ELEC. RESIST. 4.6 310 INTERNAL - - - - 2 208 / 1 / 60 - - 31 1 HUH-1 VEST 109 FLOOR MOUNTED EXPOSED CABINET HTG. WTR. (30% GLYCOL) 2.6 260 CENTRIFUGAL EC 1 0.5 0.1 160 / 115 - 120 / 1 / 60 1/4 0.37 85 ALL HUH-2 VEST 116 FLOOR MOUNTED EXPOSED CABINET HTG. WTR. (30% GLYCOL) 2.6 260 CENTRIFUGAL EC 1 0.5 0.1 160 / 115 - 120 / 1 / 60 1/4 0.37 85 ALL HUH-3 FIRE PUMP 135 EXPOSED HORIZONTAL DISCHARGE HTG. WTR. (30% GLYCOL) 4.5 400 PROPELLER 1 0.9 0.04 160 / 130 - 120 / 1 / 60 - 0.6 37 1

NOTES:

1. PROVIDE WALL-MOUNTED THERMOSTAT.

2. PROVIDE PERMANENT, CLEANABLE FILTERS.

3. ENTERING AIR TEMPERATURE IS 40°F.

MAKE-UP AIR UNIT (M.A.U.) SCHEDULE

MARK LOCATION

FAN DATA

MIN.

OUTSIDE

AIR (CFM)

HEATING DATA MOTOR DATA

FILTER

ELECTRICAL

WEIGHT

(LBS) NOTES

SUPPLY

AIRFLOW

(CFM)

ESP

(in. H2O)

INPUT

CAPACITY

(MBH)

OUTPUT

CAPACITY

(MBH)

TEMP.

RISE

(°F)

HEAT

SOURCE FIRE TYPE RPM HP BHP V / ɸ / Hz

FLA /

MCA /

MOCP

MAU-1 MECH PLATFORM 15,000 1.4 500 1,705 1,568 100 NAT. GAS DIRECT 702 15 10.8 2" METAL MESH 460 / 3 / 60 18.2 / 23.8 / 40 2,717 ALL

NOTES:

1. LOW LEAKAGE MOTORIZED INLET DAMPER WITH FACTORY FURNISHED AND INSTALLED ACTUATOR AND END SWITCH.

2. SUPPLY AIR TEMPERATURE SENSOR.

3. 120V SERVICE OUTLET WITH DISCONNECT ON A SEPARATE CIRCUIT FROM THE UNIT MAIN ELECTRICAL SERVICE.

4. BASIC FM APPROVED FUEL TRAIN WITH MODULATING GAS VALVE CAPABLE OF 6:1 TURNDOWN.

5. HIGH PRESSURE AND LOW PRESSURE GAS SWITCHES. CLOGGED FILTER SWITCH.

6. BACNET IP COMPATIBLE BMS INTERFACE.

7. VARIABLE FREQUENCY DRIVE FACTORY-MOUNTED AND WIRED IN UNIT CONTROL VESTIBULE.

NOTES:

1. PROVIDE VARIABLE FREQUENCY DRIVE & SHAFT GROUNDING RING.

2. PROVIDE OUTLET SAFETY SCREEN.

3. PROVIDE SPRING ISOLATORS FOR SUPPORT.

4. PROVIDE WITH ELECTRICAL POWER DISCONNECT.

5. PROVIDE ALUMINUM WHEEL.

6. PROVIDE INLET SAFETY SCREEN.

7. PROVIDE FAN SPEED CONTROLLER FOR BALANCING.

8. 6-FOOT CORD & PLUG PROVIDED WITH 120V UNIT.

9. PROVIDE MANUAL SPEED CONTROLLER TO CONTROL ALL EIGHT (8) FANS AT ONCE. PROVIDE POWER TO SPEED CONTROLLER THRU 4-HOUR SPRING WOUND TIMER SWITCH.

DESTRATIFICATION / EXHAUST / RETURN / VENTILATION FAN (D.F. / E.F. / R.F. / V.F.) SCHEDULE

MARK LOCATION SERVICE FAN TYPE QTY.

AIRFLOW

MAX / OPER.

(CFM)

MAXIMUM

TSP

(IN. WC)

FAN

SPEED

(RPM)

SOUND

LIMITATION

(dBA)

DRIVE

TYPE

MOTOR DATA

WEIGHT

(LBS) NOTESBHP HP V / ɸ / Hz DF-1 TO DF-8 HIGH BAY DE-STRATIFICATION CIRCULATION 8 715 - 1,650 69 DIRECT - 54 W 120 / 1 / 60 14 8,9

EF-1 MECH PLATFORM HIGH BAY RELIEF MIXED FLOW INLINE 1 15,000 0.5 769 67 DIRECT 2.37 3 208 / 3 / 60 887 1,3,4,5,6 EF-2 ABV. CORR. 122 CEILING RESTROOM EXHAUST CENTRIFUGAL INLINE 1 560 0.4 999 50 DIRECT 0.09 1/6 120 / 1 / 60 114 4,5,7 RF-1 MECH PLATFORM AHU-1 RETURN FAN MIXED FLOW INLINE 1 6,800 / 6,100 0.8 1,725 75 DIRECT 2.20 3 208 / 3 / 60 308 1,3,4 RF-2 MECH PLATFORM AHU-2 RETURN FAN MIXED FLOW INLINE 1 8,050 / 7,980 0.8 1,160 71 DIRECT 2.24 3 208 / 3 / 60 308 1,3,4 VF-1 ELEC 136 VENTILATION COOLING CENTRIFUGAL INLINE 1 650 0.25 1,375 52 DIRECT - 239 W 120 / 1 / 60 30 2,3,4 VF-2 MECH 145 VENTILATION COOLING CENTRIFUGAL INLINE 1 650 0.25 1,375 52 DIRECT - 239 W 120 / 1 / 60 30 2,3,4

RADIANT TUBE HEATER (R.T.H.) SCHEDULE

MARK LOCATION TYPE

INPUT HEAT

MAX. / MIN.

(BTU/HR)

NAT. GAS.

PRESSURE

MOUNTING

HEIGHT LENGTH

ELECTRICAL DATA

WEIGHT

(LBS) NOTESFLA MOCP V / ɸ / Hz RTH-1 HIGH BAY MODULATING, INFRARED 80,000 / 52,000 5-14 IN. W.C. 18'-0" 20 FT. 1.3 4.8 120 / 1 / 60 126 ALL RTH-2 HIGH BAY MODULATING, INFRARED 80,000 / 52,000 5-14 IN. W.C. 18'-0" 20 FT. 1.3 4.8 120 / 1 / 60 126 ALL RTH-3 HIGH BAY MODULATING, INFRARED 115,000 / 75,000 5-14 IN. W.C. 18'-0" 40 FT. 1.3 4.8 120 / 1 / 60 201 ALL RTH-4 HIGH BAY MODULATING, INFRARED 80,000 / 52,000 5-14 IN. W.C. 18'-0" 20 FT. 1.3 4.8 120 / 1 / 60 126 ALL

NOTES:

1. STANDARD REFLECTORS.

2. SIDE WALL VENT KIT.

3. ELEVATIONS PROVIDED FROM TOP OF GROUND FLOOR SLAB TO BOTTOM OF HEATER.

4. PROVIDE 24V ZONE THERMOSTAT CONTROL. THERMOSTAT SHALL BE SET TO ACTIVATE BURNERS WHEN TEMPERATURE IS BELOW 55°F.

5. FACTORY-FURNISHED TURBULATOR.

6. PROVIDE ALL HARDWARE & SUPPORTS NECESSARY TO SUPPORT HEATERS AS INDICATED ON DETAIL B2/M-501.

NOTES:

1. VARIABLE STEAM OUTPUT VOLUME CONTROL.

2. STEAM DISPERSION MANIFOLD GRID INCLUDING STEAM DISTRIBUTOR & DRAIN LINES, TO PROVIDE A MAX. ABSORPTION DISTANCE OF 6".

3. PROVIDE WITH HIGH LIMIT DUCT HUMIDISTAT & AIRFLOW PROVING SWITCH. INSTALL PER MANUFACTURERS INSTRUCTIONS.

4. PROVIDE DRAIN COOLER WITH HUMIDIFIER.

5. PROVIDE 2 FOOT HIGH STAND FOR UNIT, MOUNTED ON HOUSEKEEPING PAD.

ELECTRIC STEAM HUMIDIFIER (HUM.) SCHEDULE WITH STEAM DISPERSION GRID (S.D.G.)

MARK SERVES

OUTPUT CAPACITY

(LBS/HR)

S.A.

CFM

OUTSIDE AIR ELECTRICAL

WEIGHT

(LBS)

STEAM DISPERSION GRID (S.D.G.)

NOTESREQUIRED

WITH

LOSS CFM DB (°F) RH% FLA V / ɸ / Hz

EQUIP.

REF.

ABSORPTION

DIST. (IN.)

DUCT SIZE

(IN.)

HEAT GAIN TO

AIRSTREAM (°F)

TUBE

QTY.

HUM-1 AHU-1 29.2 30.4 6,800 1,620 -4.7 58 33.3 208 / 3 / 60 139 SDG-1 6 36x20 0.5 4 ALL HUM-2 AHU-2 35.6 37.9 8,050 1,980 -4.7 58 38.9 208 / 3 / 60 139 SDG-2 6 45x20 0.5 5 ALL

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

0 0

1 1

1 1

1 1

11 1

/0

1/

A

M E

N D

M E

N T

W

2Q R

R

-0

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:1

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-603

SC

H

ED

U

LE

S

P.

L

IT

TL

E

J.

W

O O

D

J.

W

O O

D

C . N

IC

EK

HEATING WATER / BOILER CIRCULATOR / HEATING WATER COIL PUMP (H.W.P. / B.C.P. / H.W.C.P.) SCHEDULE

MARK LOCATION TYPE SERVICE FLUID

CAPACITY

(GPM)

TDH

(FT. H20)

MOTOR DATA

NOTESHP BHP RPM V / ɸ / Hz BCP-1 MECH 145 CENTRIFUGAL INLINE, WET ROTOR PRIMARY HTG. WTR. 30% GLYCOL 45 20 1/2 0.46 3264 208 / 1 / 60 2,3,4,5 BCP-2 MECH 145 CENTRIFUGAL INLINE, WET ROTOR PRIMARY HTG. WTR. 30% GLYCOL 45 20 1/2 0.46 3264 208 / 1 / 60 2,3,4,5

HWCP-1 PLATFORM 144 CENTRIFUGAL INLINE, CLOSE COUPLED AHU-1 HTG. WTR. COIL 30% GLYCOL 20 20 1/3 0.19 1725 120 / 1 / 60 3,4,5 HWCP-2 PLATFORM 144 CENTRIFUGAL INLINE, CLOSE COUPLED AHU-2 HTG. WTR. COIL 30% GLYCOL 20 20 1/3 0.19 1725 120 / 1 / 60 3,4,5 HWP-1 MECH 145 CENTRIFUGAL INLINE, FLEX COUPLED SECONDARY HTG. WTR. 30% GLYCOL 32 50 2 0.93 1660 208 / 3 / 60 1,3,4 HWP-2 MECH 145 CENTRIFUGAL INLINE, FLEX COUPLED SECONDARY HTG. WTR. 30% GLYCOL 32 50 2 0.93 1660 208 / 3 / 60 1,3,4

NOTES:

1. PROVIDE VARIABLE FREQUENCY DRIVE & SHAFT GROUNDING RING.

2. PROVIDE WITH SPEED CONTROL FOR ELECTRICALLY COMMUTATED MOTOR (ECM).

3. DISCONNECT PROVIDED BY ELECTRICAL.

4. SELECTED PUMP SHALL BE NON-OVERLOADING.

5. MOTOR STARTER PROVIDED BY ELECTRICAL.

GLYCOL FEED SYSTEM (G.F.S.) SCHEDULE

MARK LOCATION SERVICE

TANK

CAPACITY

(GAL) TANK MATERIAL

PUMP

FLOW

(GPM)

PUMP

PRESSURE

(PSIG)

ELECTRICAL DATA

NOTESHP RPM V / ɸ / Hz

GFS-1 MECH 145 HEATING WATER (30%

PROPYLENE GLYCOL)

50 POLYETHYLENE 2 30 1/3 1750 120 / 1 / 60 ALL

NOTES:

1. HINGED POLYETHYLENE TANK COVER.

2. 10 - 40 PSI AVAILABLE PRESSURE RANGE.

3. PRESSURE SWITCH AND GAUGE.

4. LOW LEVEL FLOAT SWITCH.

5. PRESSURE RELIEF VALVES.

6. AUDIBLE ALARM AND SILENCE SWITCH ON LOCAL CONTROL PANEL.

7. LOW LEVEL ALARM SIGNAL TO DDC PANEL.

8. PROVIDE HIGH TEMPERATURE HEADER.

9. POWERED BY 8-FT. CORD & PLUG.

NOTES:

1. ASME CERTIFIED VESSEL RATED FOR 125 PSI OR GREATER.

EXPANSION TANK (X.T.) SCHEDULE

MARK TYPE SERVICE

MIN TANK

VOLUME

(GAL)

MIN VOLUME

ACCEPTANCE

(GAL)

SYSTEM FILL

PRESSURE

(PSIG)

MAX SYSTEM

WORKING

PRESSURE (PSIG) NOTES

XT-1 VERTICAL BLADDER HEATING WATER (30% GLYCOL) 31.7 8 30 50 ALL

CONDENSING HOT WATER BOILER (BLR.) SCHEDULE

MARK FLUID

DESIGN

FLOW

(GPM)

EWT

(°F)

LWT

(°F)

MAX

WPD

(PSIG)

MAX

INPUT

(MBH)

MAX

OUTPUT

(MBH) FUEL

ELECTRICAL DATA

NOTESFLA / MOCP V / ɸ / Hz

BLR-1 30% GLYCOL 45 120 160 1.7 600 540 NATURAL GAS 13.1 / 20 120 / 1 / 60 ALL

BLR-2 30% GLYCOL 45 120 160 1.7 600 540 NATURAL GAS 13.1 / 20 120 / 1 / 60 ALL

NOTES:

1. PROVIDE FACTORY-FURNISHED OR FACTORY-INSTALLED COMPONENTS AND ACCESSORIES TO INCLUDE BUT NOT BE LIMITED TO: SUPPLY WATER

TEMPERATURE SENSOR, RETURN WATER TEMPERATURE SENSOR, MANUAL RESET HIGH-LIMIT AQUASTAT, SAFETY RELIEF VALVE, AND LOW WATER

CUTOFF.

2. PROVIDE CONDENSATE TRAP AND NEUTRALIZER (REF. KEYNOTE #34 ON SHEET M-401) BEFORE INDIRECT CONNECTION OF CONDENSATE TO DRAIN.

3. BOILER'S PACKAGED CONTROLLER SHALL HAVE NON-VOLATILE MEMORY THAT RETAINS ITS PROGRAMMING AFTER LOSS OF POWER.

4. BOILER SHALL HAVE MINIMUM 5:1 TURNDOWN OF BURNER.

NOTES:

1. THREADED CONNECTIONS.

2. ASME CERTIFIED VESSEL RATED FOR 125 PSI OR GREATER.

3. FACTORY-FURNISHED TOP-SIDE AUTOMATIC AIR VENT.

4. FACTORY-FURNISHED BOTTOM-SIDE DRAIN VALVE.

5. FACTORY-FURNISHED TANK THERMOMETER.

6. PRIMARY-SECONDARY HEATING WATER SYSTEM BUFFER TANK.

HEATING WATER BUFFER TANK (H.W.B.T.) SCHEDULE

MARK SERVICE

MINIMUM

BOILER

RUNTIME

TANK

CAPACITY

(GAL.)

TANK

INSULATION

THICKNESS

(IN.)

TANK

DIMENSIONS (IN.) SYSTEM

CONNECTIONS

[(QTY.) @ SIZE] NOTES

DIA. (W/

INSUL.) HEIGHT

HWBT-1 HEATING WATER

(30% GLYCOL)

10 MINUTES 60 3 24 64 (4) @ 2" ALL

SUPPLEMENTAL METER SCHEDULE

MARK LOCATION

SYSTEM /

SERVICE

METER

UNITS

NOMINAL

LINE

SIZE (IN.) CONFIGURATION

POWER

SOURCE

METER-1 MECH 145 BUILDING

NATURAL GAS

THERMS 4" INLINE WITH INTEGRAL

DISPLAY & ELECTRONICS

24V

CONTROL

AIR TERMINAL SCHEDULE (TYPES "A" THRU "F")

MARK SERVICE TYPE

FACE SIZE

(IN. X IN.)

NECK SIZE

(IN. x IN. OR

IN. Ø) NC LEVEL NOTES

A-1 SUPPLY SQUARE 3-CONE CEILING DIFFUSER 24X24 6 <35 1,2,3,4

A-2 SUPPLY SQUARE 3-CONE CEILING DIFFUSER 24X24 8 <35 1,2,3,4

A-3 SUPPLY SQUARE 3-CONE CEILING DIFFUSER 24X24 10 <35 1,2,3,4

B-1 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 24X8 22X6 <35 1,2,3,4,5 B-2 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 24X12 22X10 <35 1,2,3,4,5 B-3 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 24X24 22X22 <35 1,2,3,4,5 B-4 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 12X12 10X10 <35 1,2,3,4,5

C-1 RETURN / EXHAUST LOUVERED GRILLE, 35° ANGLE, HORIZ.

BLADES, 3/4" SPACING

6X6 6X6 <40 1,2,3,4,5

C-2 RETURN / EXHAUST LOUVERED GRILLE, 35° ANGLE, HORIZ.

BLADES, 3/4" SPACING

12X12 12X12 <40 1,2,3,4,5

D-1 SUPPLY DOUBLE DEFLECTION DIFFUSER, HORIZ.

FRONT BLADES, 3/4" SPACING

12X12 10X10 <40 1,2,3,4,5

E-1 SUPPLY DRUM LOUVER 40X12 40X12 <40 1,2,3,4,5

F-1 SUPPLY ROUND-DUCT MTD. DBL. DEFL. DIFFUSER,

LONG FRONT BLADES, 3/4" SPACING

20X12 18X10 <40 1,2,3,4,5

F-2 RETURN ROUND-DUCT MTD. DBL. DEFL. DIFFUSER,

LONG FRONT BLADES, 3/4" SPACING

24X14 22X12 <40 1,2,3,4,5

NOTES:

1. REFER TO HVAC PLANS FOR DEVICES USED & REFER TO "MECHANICAL CALLOUTS" DESCRIPTIONS ON SHT. M-001.

2. MOUNTING AND BORDER TYPE SHALL MATCH THE ACTUAL CEILING TYPE, SIDEWALL OR DUCT MOUNT AS INSTALLED.

3. WHITE FINISH.

4. MATERIAL IS ALUMINUM.

5. PROVIDE INTEGRAL DAMPER WHERE INDICATED ON PLANS.

GRAVITY ROOF VENTILATOR (G.R.V.) SCHEDULE

MARK SERVICE TYPE

AIRFLOW

(CFM)

AIR VELOCITY

(FPM) WIDTH

(IN.)

LENGTH

(IN.)

PRES.

DROP

(IN. W.C.) NOTESFACE THROAT

GRV-1 AHU-1 RELIEF AIR RELIEF 7,200 1,329 1,152 30 30 0.05 1,2,4-6

GRV-2 AHU-2 RELIEF AIR RELIEF 8,500 1,081 848 38 38 0.14 1,2,4-6

GRV-3 EF-1 RELIEF AIR RELIEF 15,000 1,125 938 48 48 0.18 1-3,5,6

GRV-4 VF-1 RELIEF AIR RELIEF 647 216 647 12 12 0.01 1-3,5,6

GRV-5 VF-2 RELIEF AIR RELIEF 647 216 647 12 12 0.01 1-3,5,6

GRV-6 EF-2 RELIEF AIR RELIEF 562 187 562 12 12 0.02 1-3,5,6

GRV-7 AHU-1 OUTDOOR AIR INTAKE 7,200 505 897 34 34 0.11 1,2,4-6

GRV-8 AHU-2 OUTDOOR AIR INTAKE 8,500 476 848 38 38 0.10 1,2,4-6

GRV-9 MAU-1 OUTDOOR AIR INTAKE 15,000 514 938 48 48 0.12 1,2,4-6

NOTES:

1. MOUNT LEVEL ON SLOPED CURB.

2. 1/2" MESH ALUMINUM BIRD SCREEN.

3. FACTORY-FURNISHED PARALLEL-BLADE CONTROL DAMPER WITH END SWITCH & 120V ACTUATOR.

4. GRAVITY BACKDRAFT DAMPERS MOUNTED WITHIN CURB.

5. STANDARD LORENIZED POWDER COATED FINISH.

6. PROVIDE ROOF CURB TALL ENOUGH TO LEAVE 24" CLEAR FROM UPSLOPE EDGE OF HOOD DOWN TO

ROOF SURFACE.

LOUVER (LVR.) SCHEDULE

MARK SERVICE TYPE

DEPTH

(IN)

WIDTH

(IN)

HEIGHT

(IN)

MINIMUM

FREE

AREA

(SQ. FT.)

AIRFLOW

RATE

(CFM)

FREE

AREA

VELOCITY

(FPM)

PRESS.

DROP (IN.

WC)

ELEVATION

(BOTTOM

FLANGE OF

LOUVER) NOTES

LVR-1 VF-1 OUTSIDE AIR EXTRUDED DRAINABLE 6 17 16 0.83 647 783 0.10 10' - 4 1/2" 1-3 LVR-2 VF-2 OUTSIDE AIR EXTRUDED DRAINABLE 6 17 16 0.83 647 783 0.10 10' - 4 1/2" 1-3 LVR-3 DHU-1 REACTIVATION AIR RELIEF EXTRUDED DRAINABLE 6 17 16 0.83 656 793 0.08 20' - 0 1/2" 1-5 LVR-4 DHU-1 REACTIVATION AIR INTAKE EXTRUDED DRAINABLE 6 17 16 0.83 656 793 0.10 19' - 4 1/2" 1-5

NOTES:

1. INTEGRAL FLANGE.

2. PREFINISHED ALUMINUM LOUVER, ALL FACTORY-WELDED CONSTRUCTION, REFER TO ARCHITECTURAL PLANS FOR COLOR SCHEDULE.

3. BIRD SCREEN.

4. COUNTERBALANCED BACK-DRAFT DAMPER.

5. PRICE BREAKOUT SCHEDULE ITEM "PARACHUTE DRYING TOWER ADDITION".

6. BOTTOM FLANGE OF LOUVER ELEVATION IS RELATIVE TO FIRST FLOOR FINISHED SLAB ELEVATION.

AMBIENT AIR CURTAIN (A.A.C.) SCHEDULE

MARK LOCATION

DOOR SIZE

(FT.)

HEAT

TYPE

INTAKE

ORIENTATION

AIRFLOW

(CFM)

MOTOR ELECTRICAL

WEIGHT

(LBS)

SOUND

(DB) NOTESWIDTH HEIGHT DRIVE QTY.

HP

V / ɸ / Hz

MCA /

MOPEA. TOT.

AAC-1 PACKING/RIGGING 129 14 12 AMBIENT FRONT 6,332 DIRECT 4 0.5 2.0 208 / 3 / 60 14 / 20 394 69 ALL

NOTES:

1. SINGLE-SPEED OPERATION.

2. WALL MOUNTING.

3. GRAY POWDER COATED EXTERIOR WITH SCREEN.

4. PROVIDE CONTROL PANEL FOR THREE-PHASE MOTOR OPERATION.

5. PROVIDE WITH DOOR SWITCH FOR ON/OFF CONTROL, TO ENGAGE UNIT WHEN DOOR IS MORE THAN 12" A.F.F. WITH A TWO (2) SECOND DELAY (ADJ.).

6. PROVIDE ON/OFF STATUS OUTPUT TO U.M.C.S. AND GENERATE ALARM AT U.M.C.S. IF CONTINUOUS RUNTIME EXCEEDS TWO (2) HOURS (ADJ.).

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AD

D

EN

D U

M

0 0

11 11 1

111 1

/0

1/

A

M E

N D

M E

N T

W

2Q R

R

-0

B

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

D -X

XX

X

W

2Q R

-1 8-

D -0

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

P O

R T

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

XX

-X

-X

XX

X

M

A R

C H

FI

LE

N

AM

E:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

CERTIFIED FINAL DESIGN SUBMITTAL

C

6/

/2

2:

:2

PM

C :\U se rs

\jl w

\D oc um en ts \M y R ev it\

0_ M ec h_

JW

oo dE ng r4 4.

rv t

M-604

SC

H

ED

U

LE

S

P.

L

IT

TL

E

J.

W

O O

D

J.

W

O O

D

C . N

IC

EK

FLOW CONTROL VALVE SCHEDULE

MARK

ASSOCIATED

EQUIPMENT LOCATION FLUID / SERVICE

FLUID

TEMP

(°F)

FLOW

RATE

(GPM)

NOM.

VALVE

SIZE VALVE TYPE CONFIGURATION ACTION

RANGE

(GPM) Cv

CLOSE-OFF

RATING NOTES

FCV-A BLR-1 MECH 145 HEATING WATER / ISO. VALVE 160 60 2 1/2" BUTTERFLY 2-WAY 2-POSITION N/A 282 100 ALL FCV-A BLR-2 MECH 145 HEATING WATER / ISO. VALVE 160 60 2 1/2" BUTTERFLY 2-WAY 2-POSITION N/A 282 100 ALL FCV-B VAV-1-01 MOBILITY STOR. 139 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-1-03 CORRIDOR 130 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-1-06 CORR 105 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-1-07 CORR 105 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 2-WAY MODULATING 0-2 4.7 200 ALL FCV-B VAV-1-08 PROG/UDT/UTM/SEC 110 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 2-WAY MODULATING 0-2 4.7 200 ALL FCV-B VAV-1-10 CORRIDOR 122 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 2-WAY MODULATING 0-2 4.7 200 ALL FCV-B VAV-2-01 RAMP 121 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-02 PAX 120 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-03 CARGO 119 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-05 TRAINING C 115 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-06 TRAINING B 114 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-07 TRAINING A 113 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-C VAV-1-02 PACKING/RIGGING 129 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 3-WAY MODULATING 0-3 4.7 200 ALL FCV-C VAV-1-04 MGR'S 134 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 3-WAY MODULATING 0-2 4.7 200 ALL FCV-C VAV-1-05 CORR 105 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 3-WAY MODULATING 0-3 4.7 200 ALL FCV-C VAV-1-09 CORRIDOR 122 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 3-WAY MODULATING 0-2 4.7 200 ALL FCV-C VAV-2-04 SPEC/HANDLING 118 HEATING WATER / HEATING VALVE 160 4 3/4" CHAR. BALL 3-WAY MODULATING 0-5 4.7 200 ALL FCV-C VAV-2-08 LOAD PLNG/ATOC 111 HEATING WATER / HEATING VALVE 160 3 3/4" CHAR. BALL 3-WAY MODULATING 0-5 4.7 200 ALL FCV-D AHU-1 MECH PLATFORM 144 HEATING WATER / HEATING VALVE 160 20 1 1/4" CHAR. BALL 2-WAY MODULATING 0-25 25 200 ALL FCV-D AHU-2 MECH PLATFORM 144 HEATING WATER / HEATING VALVE 160 20 1 1/4" CHAR. BALL 2-WAY MODULATING 0-25 25 200 ALL

NOTES:

1. PROVIDE ACTUATOR FOR USE WITH 24V POWER SOURCE.

2. PROVIDE ACTUATOR WITH LIMIT SWITCHES (2-POSITION TYPE) OR POSITION INDICATOR (MODULATING TYPE).

3. REFER TO CONTROL DIAGRAMS FOR NECESSARY ACTUATOR FAILURE POSITIONS.

4. HEATING WATER FLUID IS 30% PROPYLENE GLYCOL.

CONTROL DAMPER SCHEDULE

MARK

ASSOCIATED

EQUIPMENT LOCATION AIR / SERVICE

FLUID TEMP. (°F)

AIRFLOW

(CFM)

NOMINAL

DAMPER

SIZE

BLADE

TYPE ACTION

RANGE

(CFM) NOTESWINTER SUMMER

CD-01 VF-1 MECH 145 OUTSIDE AIR -6 88 650 16x16 PARALLEL 2-POSITION 0-3,000 ALL CD-02 VF-2 MECH 145 OUTSIDE AIR -6 88 650 16x16 PARALLEL 2-POSITION 0-3,000 ALL CD-03 AHU-1 PLATFORM 144 OUTSIDE AIR -6 88 6,800 28x28 OPPOSED MODULATING 0-11,500 ALL CD-04 AHU-1 PLATFORM 144 RETURN AIR 65 81 6,800 28x28 OPPOSED MODULATING 0-11,500 ALL CD-05 AHU-1 PLATFORM 144 RELIEF…