This solicitation is for the design, bid, and build construction of an Aerial Port Facility located at Minneapolis-St Paul Air Reserve Station, Minnesota. The estimated construction cost is between $10 million and $25 million. The NAICS code is 236220 and size determination is $39.5 million. This is a full and open procurement requiring a 10% price evaluation for HUBZone small businesses. Funds are not presently available and no contract award will be made until appropriated funds are available. Technical inquiries should be submitted via Bidder Inquiry in ProjNet. A site visit is available per FAR 52.236-27 ALT 1. The term "bid" may be used interchangeably with "proposal" throughout the solicitation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PROJECT NOTES
A. MECHANICAL PLANS AND SECTIONS ARE
INTENDED TO ILLUSTRATE THE SCOPE OF WORK
ACCURATELY, HOWEVER THEY ARE STILL
DIAGRAMMATIC IN NATURE. REPRESENTATIONS
OF EQUIPMENT, VALVES, FITTINGS, ETC. SHOWN
ON THESE DRAWINGS MAY NOT REFLECT THE
LOOK OR SIZE OF THE ACTUAL MATERIALS
SPECIFIED.
B. MECHANICAL DRAWINGS DO NOT SHOW ALL
MINOR ITEMS THAT MUST BE INSTALLED. THE
CONTRACTOR SHALL PROVIDE ALL LABOR AND
MATERIALS REQUIRED FOR A FULLY FUNCTIONING
SYSTEM COMPLIANT WITH ALL APPLICABLE
CODES AND LAWS.
C. PLAN AND SECTION DRAWINGS DO NOT SHOW ALL
REQUIRED BRANCH PIPING OR VALVES AND
GAUGES. REFER TO FLOW DIAGRAMS, DETAILS
AND PROJECT SPECIFICATIONS FOR REQUIRED
PIPING, VALVES AND GAUGES.
D. SECTION DRAWINGS DO NOT SHOW ALL
REQUIRED WORK IN THE AREA THEY ARE CUT.
SECTION DRAWINGS ARE PROVIDED TO
ILLUSTRATE ONLY CERTAIN CONDITIONS THAT
MAY BE TOO CONGESTED TO ILLUSTRATE IN A
PLAN VIEW.
E. MECHANICAL DRAWINGS DO NOT SHOW ALL
REQUIRED OFFSETS IN PIPING AND DUCTWORK
REQUIRED FOR INSTALLATION COORDINATED
WITH ALL OTHER DISCIPLINES SUCH AS
STRUCTURAL STEEL. THE CONTRACTOR SHALL
PROVIDE ELBOWS IN PIPING AND DUCTWORK,
ONLY WHEN ABSOLUTELY REQUIRED, TO AVOID
CONFLICT WITH OTHER MECHANICAL
COMPONENTS OR WORK OF OTHER TRADES.
OFFSETS SHALL USE ELBOWS OF LEAST DEGREE
TURN AS POSSIBLE.
F. ALL DUCT SIZES INDICATED REPRESENT INSIDE
CLEAR DIMENSIONS. CONTRACTOR SHALL
ADJUST SHEET METAL SIZE TO ACCOUNT FOR
LINER THICKNESS WHEN LINER IS REQUIRED PER
THE CONTRACT DOCUMENTS.
G. ALL EXPOSED PIPING NOT REQUIRED BY THE
SPECIFICATIONS TO BE INSULATED SHALL BE
PAINTED PER THE SPECIFICATION SECTION UFGS
09 90 00 "PAINTS AND COATINGS".
H. NOT USED.
I. MODIFY ROUTING OF PIPING AT EQUIPMENT
CONNECTION POINTS FROM THAT SHOWN TO
MATCH ACTUAL LOCATION OF CONNECTION
POINTS FOR SPECIFIC EQUIPMENT PURCHASED.
CONNECT ALL EQUIPMENT IN ACCORDANCE WITH
EQUIPMENT MANUFACTURER’S INSTRUCTIONS.
J. ALL FLUE PIPES FROM GAS-FIRED EQUIPMENT
AND ASSOCIATED DIRECT VENT COMBUSTION AIR
PIPES (IF USED) SHALL BE SIZED BY THE GAS-
FIRED EQUIPMENT MANUFACTURER BASED ON
THE SPECIFIC PIPE ROUTING AND ELEVATIONS
FOR THIS PROJECT. LIKEWISE THE MATERIALS OF
ALL FLUE PIPING AND DIRECT VENT COMBUSTION
AIR PIPING SHALL BE AS REQUIRED BY THE
MANUFACTURER OF THE GAS-FIRED EQUIPMENT
THE PIPING IS CONNECTED TO. FLUE PIPING
SHALL BE INSTALLED PER CODE.
K. PIPING, DUCTWORK AND EQUIPMENT HANGERS
AND SUPPORTS SHALL NOT INTERFERE WITH
OPERATION AND MAINTENANCE OF EQUIPMENT,
INCLUDING BEING AT LEAST 3 INCHES ABOVE THE
TOP SIDE OF FINISHED ACCESSIBLE CEILING GRID.
L. EVERY PIECE OF FLOOR OR GRADE MOUNTED
HVAC OR PLUMBING EQUIPMENT SHALL HAVE A 6
INCH TALL CONCRETE HOUSEKEEPING PAD. THIS
APPLIES AS WELL TO EQUIPMENT SUPPORTED BY
STEEL STRUCTURE OR LEGS. ALL HOUSEKEEPING
PADS SHALL EXTEND BEYOND THE OUTER
PERIMETER OF THE EQUIPMENT, SUPPORT
STRUCTURE OR LEGS BY AT LEAST 3 INCHES.
M. PROJECT ELEVATION / ALTITUDE IS 872 FEET
(ABOVE SEA LEVEL), USE THIS FOR SIZING ALL
AIRSIDE EQUIPMENT & FANS.
N. FANS SHALL BE SELECTED SO B.H.P. DOES NOT
EXCEED 85% OF MOTOR NAMEPLATE H.P.
O. PUMPS SHALL BE SELECTED WHERE DUTY POINT
IS NOT WITHIN THE LARGEST NOR THE SMALLEST
IMPELLER SIZE FOR THAT PUMP SIZE / CURVE.
NOTE: ALL OTHER DIMENSIONS IN INCHES
UNLESS NOTED OTHERWISE.
NOTES:
"*" INDICATES SYMBOL OR ABBREVIATION IS
NOT IN THE NATIONAL CADD STANDARDS.
NOT ALL SYMBOLS AND ABBREVIATIONS
SHOWN IN THIS SHEET ARE USED ON THIS
PROJECT.
DESCRIPTIONSYMBOL
DUCT SECTION, ROUND
DUCT SECTION, FLAT OVAL
DUCT SECTION, EXHAUST
DUCT SECTION, RETURN
DUCT SECTION, SUPPLY
FLEXIBLE DUCT
CONNECT TO EXISTING
REMOVE BEYOND/BETWEEN
POINT(S)
OPEN FUNNEL DRAIN
PNEUMATIC VALVE
OPERATOR
ELECTRIC VALVE OPERATOR
ANGLE VALVE
GLOBE VALVE
THREE-WAY VALVE
BUTTERFLY VALVE
GATE VALVE
BALL VALVE
RELIEF OR SAFETY VALVE
PLUG VALVE
COMBINATION VALVE
INCLUDING ISOLATION
VALVE, UNION P/T PORT,
AND AUTOMATIC FLOW
CONTROL VALVE
COMBINATION VALVE
INCLUDING DIELECTRIC
UNION, AIR VENT AND P/T
PORT
COMBINATION VALVE
INCLUDING ISOLATION
VALVE, STRAINER,
DIELECTRIC UNION, P/T
PORTS AND DRAIN VALVE
FCV
TEMPERATURE /
PRESSURE RELIEF VALVE
BACK FLOW PREVENTION
DEVICE (BFP)
AUTOMATIC FLOW
CONTROL VALVE
FCV
C - CONTROLLER
D - DAMPER MOTOR
DM - ELECTRICAL DEMAND METER
DPS - DIFFERENTIAL PRESSURE SWITCH
DPT - DIFFERENTIAL PRESSURE
TRANSMITTER
FS - FLOW SWITCH
H - DUCT HUMIDITY SENSOR
M - ELECTRIC MOTOR
MS - MOTOR STARTER
PT - PRESSURE TRANSMITTER
S - SWITCH
SD - SMOKE DETECTOR
SPT - DUCT STATIC PRESSURE
TRANSMITTER
T - DUCT TEMPERATURE SENSOR
TS - TEMPERATURE SENSOR
TS - TIMER SWITCH
V - VIBRATION SWITCH
VFD - VARIABLE FREQUENCY DRIVE
W - WATT TRANSDUCER
WB - DEW POINT (WET BULB)
DESCRIPTIONSYMBOL
DIMENSIONS (IN x IN)
RECTANGULAR DUCT:
DEVICE AIRFLOW (CFM)
AIR TERMINALS (GRILLES, REGISTERS,
& DIFFUSERS):
12x12
DEVICE TYPE, REFER
TO SCHEDULE FOR FACE
AND INLET/OUTLET SIZEA-1
MECHANICAL CALLOUTS:
3" MIN.
90° ELBOW DOWN
90° ROUND ELBOW,
HORIZONTAL
RECTANGULAR &
ROUND END CAPS
VD
VD
90° RECTANGULAR ELBOW
UP WITH TURNING VANES
90° ELBOW UP
90° RECTANGULAR ELBOW
DOWN WITH TURNING
VANES
90° RECTANGULAR ELBOW
HORIZ. WITH TURNING
VANES
RECTANGULAR TEE,
DIVERGING, MAIN AND TAP
(45° ENTRY) TYPICAL FOR
ALL SUPPLY RECTANGULAR
TAPS
STRAIGHT SIDED
BRANCH SPLIT.
TRANSITION TO
FULL SIZE BEFORE
ELBOW. * WITH
TURNING VANES
BRANCH OR WYE
SPLIT. TRANSITION
TO FULL SIZE
BEFORE ELBOW.*
WITH TURNING
VANES
THREE WAY SPLIT.
TRANSITION TO FULL
SIZE BEFORE
ELBOW.* WITH
TURNING VANES
SIDE WALL SUPPLY GRILLE
OR REGISTER, REVERSE
ARROW INDICATES
EXHAUST OR RETURN.
CEILING DIFFUSER SQUARE
PATTERN. NO ARROWS
INDICATE 4-WAY AIR
PATTERN.
ACCESS
DOOR
DAMPER: BDD BACK DRAFT DAMPER
FD FIRE DAMPER
FSD FIRE AND SMOKE
DAMPER
OA OUTSIDE AIR DAMPER
RA RETURN AIR DAMPER
SD SMOKE DAMPER
VD <OR> NO LABEL
MANUAL VOLUME
DAMPER
ROUND PRESSURE TAP
ROUND LOW-LOSS TEE
* LOCATE OPPOSED BLADE MANUALLY
OPERATED BALANCING DAMPER 3X DUCT
DEPTHS DOWNSTREAM FROM ELBOW
VD
VD
VDVD
VD
SIZE (IN)
ROUND DUCT or PIPE:
12 ø
DESCRIPTIONSYMBOL
A COMPRESSED AIR
EXHAUST AIR DUCTEA
CONDENSATE DRAIN LINECD
HWR HEATING WATER RETURN
HEATING WATER SUPPLYHWS
CHR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHEMICAL FEEDCF
AS
45° DOWN (ELBOW)
EXPANSION JOINT
A AUTOMATIC BALANCING
VALVE
DIRECTION OF FLOW
PIPE GUIDE
PIPE SLEEVE THRU WALL
PIPE ANCHOR
LOCK SHIELD VALVE
AIR SEPARATOR
FLEXIBLE CONNECTOR
CHECK VALVE
PRESSURE REDUCING VALVE
BLOWDOWN STRAINER
STRAINER
UNION
ECCENTRIC REDUCER
CONCENTRIC REDUCER
PIPE CAP
TOP CONNECTION
SIDE CONNECTION
BOTTOM CONNECTION
TEE DOWN
TEE UP
RISE OR DROP
RISER UP (ELBOW)
RISER DOWN (ELBOW)
BLIND FLANGE
MANUAL AIR VENT
TEST PLUG
PRESSURE GAUGE
TEMPERATURE GAUGE
AUTOMATIC AIR VENT
THERMOMETER WELL
TW
THERMOMETER
STEAM TRAP
GAUGE AND COCK
ORIFICE PLATE
AV
MAV
P1
RA RETURN AIR DUCT
SA SUPPLY AIR DUCT
MA MAKE-UP AIR DUCT
CWR CONDENSER WATER RETURN
CONDENSER WATER SUPPLYCWS
CALIBRATED MANUAL
BALANCING VALVE
T1
CHS ELL - ELBOW
EMER - EMERGENCY
ESP - EXTERNAL STATIC PRESSURE
EST - ESTIMATE
ETC - ET CETRA (AND SO FORTH)
EUH* - ELECTRIC UNIT HEATER
EVAP - EVAPORATE / EVAPORATIVE
EWT - ENTERING WATER TEMP.
EX - EXAMPLE
EXH - EXHAUST
EXT - EXTERIOR / EXTERNAL
F - FAHRENHEIT
FA - FIRE ALARM
FCU - FAN COIL UNIT
FCV - FLOW CONTROL VALVE
FF* - FINISHED FLOOR
FFA - FROM FLOOR ABOVE
FFB - FROM FLOOR BELOW
FIN - FINISH
FLA - FULL LOAD AMPS
FLEX - FLEXIBLE
FLR - FLOOR
FP - FIRE PROTECTION
FPD* - FIRE PROTECTION, DRY PIPE
FPM - FEET PER MINUTE
FPS - FEET PER SECOND
FREQ - FREQUENCY
FSTAT - FREEZESTAT
FT - FOOT / FEET
G - GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GFS - GLYCOL FEED SYSTEM
GOVT - GOVERNMENT
GPH - GALLONS PER HOUR
GPM - GALLONS PER MINUTE
GRV - GRAVITY ROOF VENTILATOR
HB - HOSE BIBB
HC - HEATING COIL
HORIZ - HORIZONTAL
HP - HORSEPOWER
HR* - HOUR
HSKPG - HOUSEKEEPING
HT - HEIGHT
HUH* - HYDRONIC UNIT HEATER
HUM* - HUMIDIFIER
HVAC - HEATING, VENTILATION, AND
AIR CONDITIONING
HW - HOT WATER
HWBT* - HEATING WATER BUFFER
TANK
HWCP* - HEATING WATER COIL PUMP
HWP* - HEATING WATER PUMP
Hz - HERTZ
I/O - INPUT/OUTPUT
ID - INSIDE DIAMETER
IN WC - INCHES WATER COLUMN
IN* - INCH / INCHES
INFO - INFORMATION
IP - INTERNET PROTOCOL
IPLV* - INTERNAL PART LOAD VALUE
IPS - IRON PIPE SIZE
ISO - ISOMETRIC
K - KELVIN
K - KILO
K - THOUSAND
kPa - KILOPASCAL kW - KILOWATT kWh - KILOWATT HOUR
L - LITER
L/s - LITERS PER SECOND
LAT - LEAVING AIR TEMPERATURE
LBS - POUNDS
LEL - LOWER EXPLOSIVE LIMIT
LF - LINEAR FEET / FOOT
LPM - LITRES PER MINUTE
LRA - LOCKED ROTOR AMPS
LVR* - LOUVER
m - METER
MAINT - MAINTENANCE
MAN - MANUAL
MATL - MATERIAL
MAU - MAKE UP AIR UNIT
MAX - MAXIMUM
MBH - THOUSAND BTU PER HOUR
MCA - MINIMUM CIRCUIT AMPS
MD - MANUAL DAMPER
MECH - MECHANICAL
MED - MEDIUM
MEZZ - MEZZANINE
MFG - MANUFACTURING
MFR - MANUFACTURER
MIN - MINIMUM
MISC - MISCELLANEOUS
mm - MILLIMETER
MOD - MODIFY
ms - MILLISECOND
MTD - MOUNTED
MULT - MULTIPLE
mW - MILLIWATT
N - NORTH
NA or N/A - NOT APPLICABLE
NC - NORMALLY CLOSED
NC - NOISE CRITERIA
NCS - NATIONAL CAD STANDARD
NEG - NEGATIVE
NIC - NOT IN CONTRACT
NO - NORMALLY OPEN
NO - NUMBER
NOM - NOMINAL
NTS - NOT TO SCALE
O - OXYGEN
O&M - OPERATIONS AND
MAINTENANCE
OA* - OUTSIDE / OUTDOOR AIR
OBD* - OPPOSED BLADE DAMPER
OC - ON CENTER
OD - OUTSIDE DIAMETER
OPP - OPPOSITE
ORIG - ORIGINAL
OUT - OUTLET
OZ - OUNCE
PA - PASCAL
PCT (%) - PERCENT
PD - PRESSURE DROP
PD - PRESSURE DIFFERENCE
PH (Φ) - PHASE
PKG - PACKAGE
PLBG - PLUMBING
PN - PART NUMBER
PNEU - PNEUMATIC
PPM - PARTS PER MILLION
PRELIM - PRELIMINARY
PRESS - PRESSURE
PRI - PRIMARY
PSI - POUNDS PER SQUARE INCH
PSIA - PSI ABSOLUTE
PSIG - PSI GAUGE
PT* - POINT
PVC - POLYVINYL CHLORIDE
PWR - POWER
QA - QUALITY ASSURANCE
QTY - QUANTITY
R - THERMAL RESISTANCE
RA* - RETURN AIR
REC'D - RECEIVED
REF - REFERENCE
RET - RETURN
REV - REVISE / REVISION
RF* - RETURN FAN
RFI - REQUEST FOR INFORMATION
RFP - REQUEST FOR PROPOSAL
RH* - RELATIVE HUMIDITY
RM - ROOM
RPBP - REDUCED PRESSURE
BACKFLOW PREVENTER
RPM - REVOLUTIONS PER MINUTE
RPS - REVOLUTIONS PER SECOND
RTH* - RADIANT TUBE HEATER
RV - RELIEF VALVE / VENT
SA* - SUPPLY AIR
SF - SQUARE FEET / FOOT
SDG* - STEAM DISPERSION GRID
STD - STANDARD
STRUCT - STRUCTURAL
SW - SWITCH
SYS - SYSTEM
TD - TEMPERATURE DIFFERENCE
TDH - TOTAL DYNAMIC HEAD
TEMP - TEMPERATURE
TFA - TO FLOOR ABOVE
TFB - TO FLOOR BELOW
THRU - THROUGH
TP - TOTAL PRESSURE
TYP - TYPICAL
UFC - UNIFIED FACILITIES CRITERIA
UFGS - UNIFIED FACILITIES GUIDE
SPECIFICATION
UH* - UNIT HEATER
UL - UNDERWRITERS
LABORATORIES
UMCS - UTILITY MONITORING AND
CONTROL SYSTEM
UNO - UNLESS NOTED OTHERWISE
V - VOLT
VAR - VARIES
VAV - VARIABLE AIR VOLUME
VEL - VELOCITY
VENT - VENTILATION / VENTILATOR
VF* - VENTILATION FAN
VFD - VARIABLE FREQUENCY DRIVE
VS - VENT STACK
W - WATT
W - WEST
W/ - WITH
W/O - WITHOUT
WC - WATER COLUMN
WG - WATER GAUGE
WH - WATER HEATER
WT - WEIGHT
XT* - EXPANSION TANK
YH - YARD HYDRANT
YR - YEAR
AAC* - AMBIENT AIR CURTAIN
ABV* - ABOVE
AC - AIR CONDITIONING UNIT
ACCU - AIR COOLED CONDENSING
UNIT
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFMD - AIR FLOW MONITORING
DEVICE
AHU - AIR HANDLING UNIT
ALT - ALTERNATE
AMP - AMPERE
ANSI - AMERICAN NATIONAL
STANDARDS INSTITUTE
APD - AIR PRESSURE DROP
APPROX - APPROXIMATE
ARCH - ARCHITECT, ARCHITECTURAL
ASHRAE - AMERICAN SOCIETY OF
HEATING, REFRIGERATION
AND AIR CONDITIONING
ENGINEERS
ASI - ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASME - AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASTM - AMERICAN SOCIETY FOR
TESTING AND MATERIALS
AT/FP - ANTI TERRORISM / FORCE
PROTECTION
ATT - ATTENUATOR
AUTO - AUTOMATIC
AUX - AUXILIARY
AVG - AVERAGE
BACNET - THE ASHRAE BUILDING
AUTOMATION AND CONTROL
NETWORKING PROTOCOL
BAS - BUILDING AUTOMATION
SYSTEM
BCP* - BOILER CIRCULATOR PUMP
BDD - BACKDRAFT DAMPER
BFF - BELOW FINISHED FLOOR
BFP - BACKFLOW PREVENTER
BHP - BRAKE HORSEPOWER
BLDG - BUILDING
BLR - BOILER
BOT - BOTTOM
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT/HOUR
BYP - BYPASS
C - CELSIUS
CAP - CAPACITY
CD* - CONDENSATE DRAIN
CD* - CONTROL DAMPER
CERT - CERTIFY
CFM - CUBIC FEET PER MINUTE
CHL - CHILLER
CL - CENTER LINE
CLASS - CLASSIFICATION
CLG - CEILING
CO - CLEANOUT
COL - COLUMN
COMM - COMMUNICATION
COMP - COMPRESSOR
CONC - CONCRETE
CONN - CONNECT
CONT - CONTINUE / CONTINUOUS
COORD - COORDINATE
CORR - CORRIDOR
CTR - CENTER
CTRL - CONTROL
CU* - CONDENSING UNIT
CU - CUBIC
Cv - VALVE SIZING COEFFICIENT
CW - COLD WATER PIPING
D* - DRAIN
dB - DECIBEL
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROL
DEG (°) - DEGREE
DEMO - DEMOLITION / DEMOLISH
DEPT - DEPARTMENT
DET - DETAIL
DF* - DESTRATIFICATION FAN
DHU* - DE-HUMIDIFIER UNIT
DIA (Ø) - DIAMETER
DIAG - DIAGRAM / DIAGRAMMATIC
DIM - DIMENSION
DIV - DIVISION
DN* - DOWN
DP - DEW POINT
DWG - DRAWING
DWH - DOMESTIC WATER HEATER
DWV - DRAIN, WASTE, AND VENT
E - EAST
EA - EACH
EAT - ENTERING AIR TEMPERATURE
EER - ENERGY EFFICIENCY RATIO
EF* - EXHAUST FAN
EFF - EFFICIENCY
EHS - EMER. HVAC SHUTDOWN
EL - ELEVATION
ELEC - ELECTRIC, ELECTRICALUP SLOPE DIRECTION
FOR PIPE OR DUCT
DN.OR
VAV NO.
VAV TERMINALS:
ASSOCIATED A.H.U. NO.
VAV-2-03
ALL OTHER EQUIP. MARKS:
EQUIP. TYPE / ABBREVIATION,
REFER TO SCHEDULE SHEETS
AHU-2 EQUIP. NO.
CO - CARBON MONOXIDE SENSOR
CO2 - CARBON DIOXIDE SENSOR
CS - CURRENT SENSING RELAY
EBS - EMERGENCY BOILER SHUTDOWN
EHS - EMERGENCY HVAC SHUTDOWN
H - SPACE HUMIDITY SENSOR
NO2 - NITROGEN DIOXIDE SENSOR
OCO - OCCUPANCY OVERRIDE
PS - PRESSURE SWITCH
PT - PRESSURE SENSOR/TRANSMITTER
T - SPACE TEMPERATURE SENSOR
LOCK SHIELD (FOR VALVE)
SECTOR PLAN
AB
D C
1 2 3 4 5
A
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:0
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-001
LE
G
EN
D
A
BB
R
EV
IA
TI
O
N S
P.
LI
TT
LE
J.
W
O O
D
J.
W
O O
D
C .N
IC
EK
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
0 0
/0
1/
A
M E
N D
M E
N T
W
2Q R
R
-0
GROUND FLOOR
100'-0"
HIGH EAVE
134'-0"
SUPPORT GRID
114'-6"
MECH PLATFORM
116'-0"
55.5678 4.9
M-301 A2
M-301 A2
AHU-1
RF-1
E-1
E-1
12"x40"
12"x40"
24"ø
32"ø
4"ø 1"
1"
G
G
GAS MAIN
MIN. 3"
5' -0
BRIDGE CRANE BEAM
BRIDGE CRANE TRAVELING CROSSBEAM
LOW BAY
SLOPING
ROOF
HIGH BAY SLOPING ROOF
BRIDGE CRANE BEAM
VEHICLE
STO
HIGH
BAY
AERIAL
DELIVERY
AERIAL
DELIVERY
RIGGER
OFFICE
AAC-1
RTH-2
MIN. 12" CHAIN / HANGER LENGTH 18
GROUND FLOOR
100'-0"
SUPPORT GRID
114'-6"
MECH PLATFORM
116'-0"
12345 4.9
M-301 C3
M-301 C3
GRV-1GRV-7
14"x14"
VAV-1-07
HWS & HWR MAINS
EAGLE
CR 1
MEN
WOMEN 123
CONF
CORR
BREAK
ROOM
VAV-1-02
17 17 17 17
(BEYOND)
16"x14"
12"ø
12"x14"
5 5
LOW BAY ROOF SLOPING DOWN & AWAY
24"x28" RA
28"x28" RA
28"x28" RA
28"x28" EXH28"x28" OA
1 2 3 4 5
A
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:2
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-302
SE
C
TI
O
N S
P.
L
IT
TL
E
J.
W
O O
D
J.
W
O O
D
C . N
IC
EK
SCALE: = 1'-0"3/16"
0 4 8 124
GENERAL NOTES
SHEET KEYNOTES
A. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, &
GENERAL NOTES.
B. SEAL ALL DUCTWORK IN ACCORDANCE WITH
SMACNA SEAL CLASS "A".
C. DUCT RUNOUT SIZES TO DEVICES ARE THE SAME
SIZE AS THE DEVICE NECK SIZE SCHEDULED U.N.O.
D. VAV OUTLET DUCT PLENUM SIZES ARE THE SAME
AS THE BOX OUTLET SIZE U.N.O.
E. AIR INTAKES SHALL BE SEPARATED FROM
PLUMBING VENTS THRU ROOF & EXHAUST AIR
OUTLETS BY CODE-MINIMUM OF 10'-0".
F. MINIMUM CONDENSATE PIPING SIZE IS 3/4".
G. ALL MAIN HORIZONTAL CONDENSATE DRAINAGE
PIPING SHALL BE SLOPED 1/8" PER FT. MINIMUM.
H. ALL NATURAL GAS APPLIANCES TO INCLUDE
SHUTOFF COCK & DIRT LEG.
I. ALL HEATING WATER PIPING BRANCHES SHALL TEE
OUT OF THE TOP OF THE MAINS.
J. MINIMUM HEATING WATER PIPING SIZE IS 3/4".
BRANCH PIPING TO EACH VAV H.W. COIL IS 3/4"
U.N.O.
K. ALL ARCHITECTURAL, STRUCTURAL, FIRE
PROTECTION, PLUMBING, & ELECTRICAL ITEMS
WHICH ARE SHOWN IN MECHANICAL SECTION
VIEWS ARE FOR REFERENCE ONLY. REFER TO
RESPECTIVE DISCIPLINE'S DRAWINGS &
SPECIFICATIONS FOR FINAL LOCATIONS, SIZES,
DEPTHS, ETC.
1. CONCRETE MECHANICAL PLATFORM, REF. STRUCT.
SHEET SF103.
2. CONC. PAD AT MECH. EQUIP., REF. DET. C4/M-501.
3. SLEEVE & SEAL ALL PIPING & DUCTWORK
PENETRATIONS THRU INSULATED WALL BETWEEN
HIGH & LOW BAY.
4. INSTALL PIPES & DUCTS WITH FLOOR SUPPORTS
AT MECH. PLATFORM - MIN. 5'-0" A.F.F. CLEAR
BELOW FOR MAINTENANCE ACCESS, TOP AT MAX.
OF 8'-7" A.F.F. AS BRIDGE CRANE TRAVELS ABOVE.
5. COLD-FORMED JOIST FRAMING, REF: STRUCT.
SHEETS SF100, SF101, & SF102.
6. AHU-2 REFRIGERANT PIPING SET.
7. AHU-1 REFRIGERANT PIPING SET.
8. AFTER LARGE DUCTS EXIT THE MECH. PLATFORM
INTO THE LOW BAY ATTIC, DUCTS CAN OFFSET
DOWN TO BE SUPPORTED FROM/SECURED TO THE
STRUCTURAL GRID (AS SHOWN). CONTRACTOR TO
COORDINATE HANGERS OR SUPPORTS.
9. CONTROL DAMPERS FOR A.H.U. DUCTS.
10. SUPPORT PIPES & DUCTS WITH FLOOR SUPPORTS
AT MECH. PLATFORM, CRANE TRAVELS ABOVE.
11. MINIMUM CLEARANCE REQUIRED AT/AROUND
MOVING BRIDGE CRANE ELEMENTS, REF.
STRUCTURAL DRAWINGS FOR BEAM SIZES,
MOUNTING HEIGHTS, ETC. (SHEET S-009).
12. WALL SUPPORTS REQUIRED AT THE RADIANT TUBE
HEATERS & ASSOCIATED INTAKE/VENT DUCTS &
GAS PIPING. TO BE DELEGATED STRUCTURAL
DESIGN & COORD. WITH METAL BUILDING FOR
ATTACHMENT POINTS.
13. MOUNT AMBIENT AIR CURTAIN AAC-1 ABOVE
OVERHEAD DOOR AT PACKING/RIGGING ROOM 129.
14. HWS & HWR MAINS SOUTH OF PACKING/RIGGING
ROOM 129.
15. GAS MAIN SOUTH OF PACKING/RIGGING ROOM 129.
16. HWS & HWR MAINS & GAS MAIN ABOVE
PACKING/RIGGING ROOM 129 HIGH CEILING.
17. GRILLES IN HIGH CEILING IN PACKING/RIGGING 129.
18. CONFIRM WITH MFR'S DATA FOR SUBMITTED
HEATER'S MINIMUM HANGER & SUPPORT
REQUIREMENTS.
SCALE: 3/16" = 1'-0"
EAST-WEST MECHANICAL SECTION - HIGH BAYA1
SCALE: 3/16" = 1'-0"
EAST-WEST MECHANICAL SECTION - ADMIN./LOW BAYC1
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
0 0
/0
1/
A
M E
N D
M E
N T
W
2Q R
R
-0
P
REMOVABLE
STRAINER
SUCTION
DIFFUSER
ISOLATION
VALVE
VERTICAL
SPLIT-COUPLED
CENTRIFUGAL
PUMP
PRESSURE GAUGE
SEPARATE ISOLATION VALVE, BALANCE VALVE, AND
NON-SLAM CHECK VALVE ON PUMP DISCHARGE
("TRIPLE-DUTY" VALVES SHALL NOT BE USED).
ADJUSTABLE
SUPPORT LEG,
TYPICAL
BALL
VALVE,
TYP.LONG RADIUS
ELBOW
REF: DET. C4/M-501
FOR CONCRETE
PAD INSTALLATIONFLOOR
VIBRATION ISO.
PAD TYPICAL
FLEXIBLE
CONNECTION,
TYPICAL
TRANSITION AS
REQUIRED TO DUCT
SIZE DOWNSTREAM
OF TERMINAL UNIT
HOT WATER HEATING
COIL, REF. DETAILS B4 &
C2 ON SHEET M-502 FOR
COIL PIPING DETAILS
TERMINAL UNIT
INTERNALLY
LINED UNIT
TERMINAL UNIT BRANCH
TAKE-OFF DUCT SIZE AS
INDICATED ON PLANSAIR VALVE ACTUATORCONTROL ENCLOSURE. LEAVE MIN.
12" CLEAR FROM ALL OBSTRUCTIONS
TO PERMIT SERVICE
INSULATED ACCESS PANEL
TO PERMIT INSPECTION OF
AIR FLOW SENSOR
AIR FLOW SENSOR
SIZE (MIN. 3 DUCT DIAMETERS)
CONNECTED RIGID DUCT TO BE
SAME SIZE AS TERMINAL INLET
DUCT INSULATION
PER SPECIFICATIONS
MINISPLIT OUTDOOR UNIT
MFR'S LOW-AMBIENT
WIND BAFFLE
MFR'S WALL BRACKET
EXTERIOR WALLA.
F.
G
3' -0
FINISHED GRADE,
REF. CIVIL SHEETS
C-120 & C-121
NOTES: INSTALL UNIT, PIPING, & ALL
ACCESSORIES PER MFR'S INSTRUCTIONS.
SPACE PER MFR'S INSTRUCTIONS
IN-LINE PUMP
REDUCER (IF REQ'D)BALL VALVE
CHECK VALVE
UNION (UP TO 2-1/2")
FLANGE (3" & OVER)
PRESSURE GAUGE
W/ GAGECOCK
HANGER / SUPPORTS,
EACH SIDE OF PUMP
MANUAL
AIR VENT
HEATING
WATER COIL
RETURN
SUPPLY
UNION
BALL VALVE
Y-PATTERN
STRAINER
PRESSURE-INDEPENDENT
CONTROL VALVE
VALVED AND CAPPED CONNECTION
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
DRAIN PLUG
MIN. 24" FLEXIBLE METAL HOSE
TEST PLUG
FCV
MANUAL
AIR VENT
HEATING
WATER COIL
RETURN
SUPPLY
UNION
VALVED AND CAPPED CONNECTION
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
DRAIN PLUG
MIN. 24" FLEXIBLE METAL HOSE
TEST PLUG
DIFFERENTIAL
PRESSURE
TRANSMITTER
REMOVABLE CAP
(TYP. OF TWO)
BYPASS (NC)
HIGH PRESSURE
LOW PRESSURE
AUTO AIR VENT REQUIRED AT HIGH
POINT OF ALL HEATING WATER
LINES AND WHERE SHOWN ON
DWGS.
3/16"
ROUTE 1/2"
TO DRAIN
BALL VALVE
STANDARD WEIGHT STEEL
FINISHED ESCUTCHEON
PIPING EXPOSED TO VIEWCONCEALED PIPING
FINISHED WALL
SURFACE
PIPE AND INSULATION
TO BE PER
SPECIFICATIONS
SEAL OR CAULK
SLEEVES
TERMINATE SLEEVE
FLUSH WITH
FINISHED WALL
WALL
SLEEVE
PIPE
MODULAR SEAL
ELEMENT
INSIDE
OUTSIDE
MODULAR LINK SEALS FOR PIPING
MIN/MAX PRE-
TIGHTENING
WIDTH
0.4"/0.48"
1.3"/1.45" 0.65"/0.72"
2.1"/2.4"
PIPE SIZES
UP TO 3"
4" TO 6"
4"
8" TO 12"
SLEEVE OPENING
1" LARGER THAN PIPE O.D.
3" LARGER THAN PIPE O.D.
5" LARGER THAN PIPE O.D.
1-1/2" LARGER THAN PIPE O.D.
MIN.
SEATING
WIDTH
2-1/4"
5" 5"
3"
MODULAR LINK SEAL REQUIREMENTS:
1. SHALL HAVE RUBBER SEALING ELEMENTS SUITABLE TO THE INSTALLED
CONDITIONS. WITH REGARD TO PIPING & EXPOSURE TEMPERATURES &
CONTAMINATION-RESISTANCE.
2. SHALL HAVE PRESSURE PLATES & BOLTS WHICH ARE CORROSION-
RESISTANT.
PIPE MATL.
COPPER
CAST IRON
COPPER
CAST IRON
ROOF
SUPPORT FAN FROM
SECURED STRUT
CHANNEL SPANNING
TWO (2) PURLINS MIN.
SIZE TO SUPPORT FAN
ASSEMBLY, DO NOT
CANTILEVER STRUT
CHANNEL.
SAFETY CABLE (PROVIDED
BY MFR.)ATTACHED TO
STRUT CHANNEL. NO
CONNECTION SHALL BE
MADE DIRECTLY TO A
PURLIN.
STEEL CABLE (OR OTHER METHOD
PER NOTE 2 BELOW) ATTACHED
FROM STRUT CHANNEL TO EYE
BOLT OF FAN. SIZE AS REQUIRED
FOR PROPER SUPPORT OF FAN.
AIR
INTAKEFAN POWER CORD SECURED
TO HANDLE & HANGER
SUPPORT BY CABLE TIE.
DESTRATIFICATION FAN
DISCHARGE AIRFLOW SHALL HAVE
UNOBSTRUCTED PATH TO FLOOR
BELOW.
NOTES:
1. INSTALL BOTTOM OF FAN AT ARCHITECTURAL ELEVATION OF 130'-0" (REL. TO MAIN FINISHED
FLOOR ARCH. ELEV. OF 100'-0"). MAINTAIN 3" MINIMUM CLEARANCE BETWEEN BOTTOM OF
FAN & TOP OF BRIDGE CRANE BEAM TRAVEL BELOW. REFER TO STRUCTURAL DETAIL A3 ON
SHEET S-009 FOR BRIDGE CRANE DETAILS.
2. OPTIONAL HANGING METHODS INCLUDE: BEAM CLAMP/BRIDLE RING, CHAIN
LINK/CARABINER, THREADED ROD/LOCK NUTS, ETC.
3. NO SUPPORT CONNECTION SHALL BE MADE DIRECTLY TO PURLINS OR ROOF DECK.
4. CONTRACTOR TO PROVIDE POWER FEED IN CONDUIT. THE ELECTRICAL CONNECTION (NOT
SHOWN) IS A PLUG CONNECTION (J-BOX/RECEPTACLE).
3" M
IN
TRAVELING BRIDGE
CRANE BEAM
STRUCTURAL PURLINS
1 2 3 4 5
A
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:1
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-502
D
ET
AI
LS
P.
L
IT
TL
E
J.
W
O O
D
J.
W
O O
D
C . N
IC
EK
SCALE: NTS
PAD-MOUNTED IN-LINE PUMP DETAILC3
SCALE: NTS
TYP. SINGLE-DUCT VAV TERMINAL UNIT INSTALLATIONA4
SCALE: NTS
WALL-MOUNT MINISPLITD2
SCALE: NTS
SUSPENDED IN-LINE PUMP DETAILB2 SCALE: NTS
2-WAY VAV BOX REHEAT COIL PIPINGB4
SCALE: NTS
3-WAY VAV BOX REHEAT COIL PIPINGC2
SCALE:NTS
D1
DIFFERENTIAL PRESSURE
TRANSMITTER 5 VALVE
BLOCK & BLEED DETAIL
SCALE: NTS
TYPICAL AUTOMATIC AIR VENT DETAILC1
SCALE:NTS
A2
TYPICAL INTERIOR WALL
PIPE PENETRATION DETAIL
SCALE: NTS
PIPE SLEEVE THRU OUTSIDE WALLA1
SCALE: NTS
DESTRATIFICATION FAN DETAILC4
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
0 0
/0
1/
A
M E
N D
M E
N T
W
2Q R
R
-0
1 2 3 4 5
A
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:0
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-601
SC
H
ED
U
LE
S
P.
L
IT
TL
E
J.
W
O O
D
J.
W
O O
D
C . N
IC
EK
NOTES:
1. CONTRACTOR SHALL FURNISH AND INSTALL EACH INDIVIDUAL TERMINAL UNIT WITH THE SAME CONFIGURATION, I.E. LOCATION OF COIL
CONNECTIONS, CONTROL ENCLOSERS, ETC. AS SHOWN ON THE DRAWINGS.
2. VAV CONTROLLERS SHALL BE FURNISHED BY THE CONTRACTOR FOR FACTORY INSTALLATION BY VAV TERMINAL UNIT MANUFACTURER.
3. E.W.T. IS 160°F. FINS PER INCH MIN. IS 10. HEATING MEDIUM IS WATER WITH 30% GLYCOL.
4. PROVIDE WITH 24V CONTROL TRANSFORMER. POWERED BY 120V ELECTRICAL SUPPLY, DISCONNECT BY E.C.
5. E.A.T. IS 54°F, INLET STATIC PRESSURE IS 1.0" W.C., & DOWNSTREAM STATIC PRESSURE DROP IS 0.5" W.C.
6. REFER TO "MECHANICAL CALLOUTS" DESCRIPTIONS ON SHEET M-001.
7. PRESSURE INDEPENDENT SINGLE DUCT TERMINAL UNIT WITH DIGITAL CONTROL.
VARIABLE AIR VOLUME (V.A.V.) BOX SCHEDULE
MARK
(NOTE
#6)
SERVING ROOM
NUMBERS
SIZE
AIRFLOW
(CFM)
MIN.
S.P.
DROP
(IN.
W.C.)
MAX.
NC
(RAD. /
DIS.)
HEATING
AIRFLOW
(CFM)
REHEAT
CAPACITY
(MBH)
LAT
(°F)
HOT WATER COIL
NOTES
INLET
(IN.)
OUTLET
(INxIN) MAX. MIN.
FLOW
(GPM)
LWT
(°F)
MAX.
WPD
(FT. W.C.)
MIN.
ROWS
(QTY)
VAV-1-01 139 9 14x12.5 855 425 0.25 24 425 21 99.7 1.7 134 0.25 2 ALL VAV-1-02 129 12 16x15 1,290 645 0.26 24 775 33.5 94 2.1 128 0.36 2 ALL VAV-1-03 130, 138 9 14x12.5 850 425 0.25 24 425 21 99.7 1.7 134 0.25 2 ALL VAV-1-04 132, 133, 134 8 12x10 585 295 0.22 27 295 14.4 99.1 1.1 134 0.25 2 ALL VAV-1-05 102 TO 105, 131 9 14x12.5 900 450 0.28 25 450 21.5 98.2 1.7 134 0.25 2 ALL VAV-1-06 106, 107, 108 6 12x8 350 175 0.15 22 175 6.6 88.9 1.4 150 0.8 1 ALL VAV-1-07 123 7 12x10 510 255 0.25 24 305 13.5 94.8 0.9 130 0.19 2 ALL VAV-1-08 110, 112 8 12x10 590 295 0.23 27 295 14.4 99.1 1.1 134 0.25 2 ALL VAV-1-09 122, 124, 125, 126 7 12x10 520 260 0.26 24 260 12 96.6 0.8 129 0.17 2 ALL VAV-1-10 127, 128 6 12x8 350 175 0.24 22 175 7.9 95.6 0.6 133 0.08 2 ALL VAV-2-01 117, 121 9 14x12.5 730 365 0.19 22 365 16.2 95 1.7 140 0.38 2 ALL VAV-2-02 120 10 14x12.5 960 480 0.27 27 480 22.1 96.7 1.7 133 0.25 2 ALL VAV-2-03 119 9 14x12.5 920 460 0.29 25 460 21.7 97.7 1.7 133 0.25 2 ALL VAV-2-04 118 9 14x12.5 850 425 0.13 24 425 14.5 85.5 3.2 151 0.99 1 ALL VAV-2-05 115 12 16x15 1,170 585 0.22 24 700 30.4 94.2 1.8 125 0.31 2 ALL VAV-2-06 114 12 16x15 1,170 585 0.22 24 700 30.4 94.2 1.8 125 0.31 2 ALL VAV-2-07 113 12 16x15 1,170 585 0.22 24 700 30.4 94.2 1.8 125 0.31 2 ALL VAV-2-08 111 12 16x15 1,080 540 0.13 23 540 17.6 85 2.5 146 0.83 1 ALL
AIR HANDLING UNIT (A.H.U.) SPLIT SYSTEM SCHEDULE (INDOOR UNITS)
MARK
AREA
SERVED
CABINET
SIZE
LxWxH
(IN.)
UNIT FEATURES
M
IN
. O U
TS
ID
E
AI
R (C
FM
SUPPLY FAN D.X. EVAPORATOR (COOLING) COIL HOT WATER PRE-HEAT COIL FILTRATION ELECTRICAL
WEIGHT
(LBS) N
O
TE
S
SYSTEM
CONTROL H
YD
R
O N
IC
P
R E-
H
EA
T C
O
IL
D .X
. C O
O
LI
N G
C O
IL
D .X
. H O
T G
AS
R
E- H
EA
T
D .X
. H O
T G
AS
B
YP
AS
S
EC
O
N O
M
IZ
ER
M
AX
. S U
PP
LY
A
IR
(C
FM
M
IN
. S U
PP
LY
A
IR
(C
FM
TYPE Q
TY
MOTOR
H.P.
E.
S.
P.
(I
N . W
.C
T.
S.
P.
(I
N . W
.C
FA
N
S
PE
ED
(R
PM
E.A.T. (°F) L.A.T. (°F)
C O
O
LI
N G
F
LU
ID
AI
R
FL
O
W (C
FM
FA
C
E
VE
LO
C
IT
Y
(F
PM
M
AX
. A .P
.D
IN
. W
.C
NET
CAPACITY
(MBH) D.B. (°F)
H
EA
TI
N
G F
LU
ID
FL
U
ID
F
LO
W
(G
PM
L.
W
.T
°F
N O
TE
M
AX
. W .P
.D
FT
. W
.C
AI
R
FL
O
W (C
FM
FA
C
E
VE
LO
C
IT
Y
(F
PM
M
AX
. A .P
.D
IN
. W
.C
N
ET
C
AP
AC
IT
Y (M
BH
PRE- /
POST
FILTERS
[NOTE 5] V / ϕ / Hz FL
A
M C
A
M O
P
H .P
. E
AC
H
B.
H
.P . E
AC
H
TO
T.
D .B
W .B
D .B
W .B
SE
N
SI
BL
E
TO
TA
L
E.
A.
T.
L.
A.
T.
AHU-1 VAV-1-01 -
VAV-1-10
71x78x42 MULTI-ZONE
VAV
Yes Yes Yes Yes Yes 1,620 6,800 3,400 PLENUM 2 7.5 4.88 15 1.5 2.8 1,827 80.4 65.3 53.3 52.5 R410A 6,800 450 0.63 156 222 54.5 80 30%
GLYCOL
6.8 106 2.2 6,800 478 0.2 181 2" MERV 8 /
4" MERV 13
460 / 3 / 60 13.2 14.8 20 1,880 ALL
AHU-2 VAV-2-01 -
VAV-2-08
80x96x51 MULTI-ZONE
VAV
Yes Yes Yes Yes Yes 1,980 8,050 4,025 PLENUM 2 5 4.27 10 1.5 2.3 1,481 80.4 66.3 53.3 52.6 R410A 8,050 311 0.35 228 326 54.5 80 30%
GLYCOL
8.0 106 0.3 8,050 322 0.1 213 2" MERV 8 /
4" MERV 13
460 / 3 / 60 9.2 10.3 15 1,850 ALL
NOTES:
1. MANUFACTURER SHALL DEMONSTRATE CAPABILITY OF STABLE OPERATION THROUGHOUT THE FULL RANGE OF SCHEDULED AIRFLOWS.
2. A.H.U. FANS SHALL BE AMCA CLASS III AND SHALL INCLUDE INTEGRAL TYPE 'S1' SPRING ISOLATORS WITH MINIMUM 1" DEFLECTION OR AHU MFR MAY ALTERNATIVELY PROVIDE FAN ASSEMBLIES THAT ARE FACTORY BALANCED TO A MINIMUM BV-5 RATING IN ACCORDANCE WITH AMCA
STANDARD 204-96.
3. CONTRACTOR SHALL FURNISH AND INSTALL ALL ACTUATORS FOR ALL FACTORY-INSTALLED UNIT-MOUNTED CONTROL DAMPERS.
4. ENTERING WATER TEMPERATURE (E.W.T.) IS 160°F.
5. FILTER MERV RATINGS ARE THE MINIMUM REQUIRED.
6. REFER TO: "SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)" FOR ASSOCIATED DIRECT-EXPANSION (D.X.) SPLIT CONDENSER UNIT.
7. PROVIDE AT A MINIMUM: VARIABLE SPEED LEAD COMPRESSOR & A STAGED SECONDARY COMPRESSOR FOR VARIABLE & LOW-LOAD DEHUMIDIFICATION CONTROL.
NOTES:
1. FACTORY-PROVIDED V.F.D.'S FOR FANS ARE "MANUAL-ADJUSTMENT" FOR INITIAL T.A.B. & ENERGY SAVINGS.
2. PROVIDE FACTORY PREWIRED STARTER-DISCONNECT.
3. PROVIDE RETURN AIR HUMIDITY SENSOR.
4. PROVIDE SUPPLY AIR TEMPERATURE SENSOR.
5. REFER TO: "SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)" FOR ASSOCIATED DIRECT-EXPANSION (D.X.) SPLIT CONDENSER UNIT FOR PRE-COOLING COIL.
6. DE-HUMIDIFIER UNIT & ALL SUPPORTING ACCESSORIES, DUCTS, PIPES, ETC. ARE PART OF "DRYING TOWER" BID OPTION.
DE-HUMIDIFIER UNIT (D.H.U.) SPLIT SYSTEM SCHEDULE
MARK AREA SERVED
CABINET
SIZE
LxWxH
(IN.)
PROCESS AIRSTREAM (RE-CIRCULATION AIR FROM DRYING TOWER) ENERGY WHEEL REACTIVATION AIRSTREAM (100% O.A.) ELECTRICAL
WEIGHT
(LBS) N
O
TE
S
AI
R
FL
O
W (C
FM
IN
LE
T
FI
LT
ER
FAN PRE-COOLING COIL (D.X.) POST-HEATER
W H
EE
L
TY
PE
W H
EE
L
SP
EE
D (R
PH
M O
TO
R
F .L
.A
DEHUMIDI-
FICATION
AI
R
FL
O
W (C
FM
IN
LE
T
FI
LT
ER
FAN PRE-HEATER
V / ϕ / Hz
FLA /
MCA /
MOCPTY
PE
V.
F.
D
N O
TE
H .P
B.
H
.P
E.
S.
P.
(I
N . W
.C
T.
S.
P.
(I
N . W
.C
ENTER-
ING
LEAV-
ING
C O
O
LI
N G
F
LU
ID
N
ET
T O
TA
L
C
AP
AC
IT
Y (M
BH
) DEHUMIDI-
FICATION
H
EA
T
SO
U R
C E
K.
W
TE
M
P.
R
IS
E
F)
TY
PE
R
AT
E (L
B/ H
R
TY
PE
V.
F.
D
N O
TE
H .P
B.
H
.P
E.
S.
P.
(I
N . W
.C
T.
S.
P.
(I
N . W
.C
H
EA
T
SO
U R
C E
FI
R
E
TY
PE
IN
PU
T C
AP
AC
IT
Y
(M
BH
O U
TP
U
T C
AP
AC
IT
Y
(M
BH
TE
M
P.
R
IS
E
F)
D .B
°F
M O
IS
TU
R E
(G R
/L B)
D .B
°F
M O
IS
TU
R E
(G R
/L B)
TY
PE
R
AT
E (L
B/ H
R
DHU-1 PARACHUTE
DRYING TOWER
158x43x81 2,250 2" MERV 8 AIRFOIL Yes 5 4.0 0.8 4.0 85 25 46 25 R407C 96 COND. 138 ELEC.
RESIST.
48 16 DESICCANT 8 0.42 ADSORP. 72 692 METAL
MESH
AIRFOIL Yes 3 2.1 0.5 5.9 NAT. GAS DIRECT-
FIRED
200 184 229 460 / 3 / 60 73.7 / 93 / 100 2,713 ALL
SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)
MARK LOCATION
ASSOCIATED
EQUIPMENT
OUTDOOR
AMBIENT
DB (ºF)
REFRIGERANT
TYPE
LOW AMBIENT
COOLING
REQUIRED
MINIMUM
EFFICIENCY
(SEER)
ELECTRICAL
WEIGHT
(LBS) NOTESV / ɸ / Hz
MCA /
MOCP
CU-1 SLAB ON GRADE, NORTH OF HIGH BAY AHU-1 92.8 R-410A YES 11.4 (EER) 460 / 3 / 60 46.7 / 60 1,900 1,2,3,4 CU-2 SLAB ON GRADE, NORTH OF HIGH BAY AHU-2 92.8 R-410A YES 11.5 (EER) 460 / 3 / 60 56.8 / 70 1,900 1,2,3,4 CU-3 SLAB ON GRADE, NORTH OF HIGH BAY DHU-1 92.8 R-407C YES 460 / 3 / 60 26.2 / 40 1,020 1,4,7 CU-4 NORTH FACE OF BLDG. FCU-1 95.8 R-410A YES (-40°F) 19.7 208 / 1 / 60 24 / 30 160 5,6 CU-5 NORTH FACE OF BLDG. FCU-2 95.8 R-410A YES (-40°F) 18.8 208 / 1 / 60 13 / 15 95 5,6
NOTES:
1. FACTORY-PROVIDED MAIN DISCONNECT.
2. UNIT-POWERED 120V MAINTENANCE RECEPTACLE ATTACHED TO UNIT.
3. REFER TO "AIR HANDLING UNIT (A.H.U.) SPLIT SYSTEM SCHEDULE (INDOOR UNITS)" FOR COOLING CAPACITIES.
4. GRADE-MOUNTED CONDENSERS TO BE ELEVATED 24" ABOVE FINISHED GRADE TO BE ABOVE SNOW DRIFTS.
5. POWER & CONTROL WIRING PROVIDED FROM OUTDOOR (AIR-COOLED CONDENSING) UNIT TO INDOOR (FAN COIL) UNIT.
6. REFER TO "MINISPLIT FAN COIL UNIT (F.C.U.) SCHEDULE (INDOOR UNITS)" FOR CAPACITIES.
7. REFER TO "DE-HUMIDIFIER UNIT (D.H.U.) SPLIT SYSTEM SCHEDULE" FOR COOLING CAPACITIES.
MINISPLIT FAN COIL UNIT (F.C.U.) SCHEDULE (INDOOR UNITS)
MARK LOCATION UNIT TYPE
MIN REQ'D TOTAL
COOLING
CAPACITY (MBH)
MIN SENSIBLE
COOLING
CAPACITY (MBH)
MIN HEAT
CAPACITY
(MBH)
INDOOR UNIT
AIRFLOW
(CFM) NOTES
FCU-1 COMM 137 WALL-MTD. EVAPORATOR 30.9 30.9 N/A 777 ALL
FCU-2 FIRE PUMP 135 WALL-MTD. EVAPORATOR 10.3 9.9 N/A 406 ALL
NOTES:
1. POWER PROVIDED FROM OUTDOOR (AIR-COOLED CONDENSING) UNIT, REFER TO CONDENSING UNIT SCHEDULE NOTE #5.
2. UNIT PROVIDED WITH WIRED T-STAT/CONTROLLER & PACKAGED DIGITAL CONTROLS.
3. CONTRACTOR TO CONNECT INDOOR & OUTDOOR UNITS WITH CONTROL WIRING.
4. PROVIDE UNIT WITH OPTIONAL CONDENSATE PUMP, POWERED BY UNIT.
5. REFER TO: "SPLIT SYSTEM AIR-COOLED CONDENSING UNIT (C.U.) SCHEDULE (OUTDOOR UNITS)" FOR ASSOCIATED DIRECT-
EXPANSION (D.X.) SPLIT CONDENSER UNIT.
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
0 0
1 111
1 1 1 1
1 1 1 1 1
/0
1/
A
M E
N D
M E
N T
W
2Q R
R
-0
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:0
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-602
SC
H
ED
U
LE
S
P.
L
IT
TL
E
J.
W
O O
D
J.
W
O O
D
C . N
IC
EK
ELECTRIC & HYDRONIC UNIT HEATER (E.U.H. & H.U.H.) SCHEDULE
MARK LOCATION TYPE HEAT SOURCE
HEATING
CAPACITY
(MBH)
AIRFLOW
(CFM) FAN TYPE
HYDRONIC COIL ELECTRICAL
WEIGHT
(LBS) NOTES
COIL
ROWS
FLOWRATE
(GPM)
HEAD
LOSS (FT.)
E.W.T. (°F) / L.W.T. (°F)
ELEMENT
(KW) V / ɸ / Hz
MOTOR
HP FLA
EUH-1 ELEC 136 BASEBOARD ELEC. RESIST. 1.1 - - - - - - 0.5 208 / 1 / 60 - - 6 1
EUH-2 COMM 137 EXPOSED HORIZONTAL DISCHARGE ELEC. RESIST. 2.0 300 PROPELLER - - - - 1.5 208 / 1 / 60 - - 20 1 EUH-3 MECH 145 EXPOSED HORIZONTAL DISCHARGE ELEC. RESIST. 4.0 300 PROPELLER - - - - 1.5 208 / 1 / 60 - - 20 1 EUH-4 VEST 101 CEILING RECESSED ELEC. RESIST. 4.6 310 INTERNAL - - - - 2 208 / 1 / 60 - - 31 1 HUH-1 VEST 109 FLOOR MOUNTED EXPOSED CABINET HTG. WTR. (30% GLYCOL) 2.6 260 CENTRIFUGAL EC 1 0.5 0.1 160 / 115 - 120 / 1 / 60 1/4 0.37 85 ALL HUH-2 VEST 116 FLOOR MOUNTED EXPOSED CABINET HTG. WTR. (30% GLYCOL) 2.6 260 CENTRIFUGAL EC 1 0.5 0.1 160 / 115 - 120 / 1 / 60 1/4 0.37 85 ALL HUH-3 FIRE PUMP 135 EXPOSED HORIZONTAL DISCHARGE HTG. WTR. (30% GLYCOL) 4.5 400 PROPELLER 1 0.9 0.04 160 / 130 - 120 / 1 / 60 - 0.6 37 1
NOTES:
1. PROVIDE WALL-MOUNTED THERMOSTAT.
2. PROVIDE PERMANENT, CLEANABLE FILTERS.
3. ENTERING AIR TEMPERATURE IS 40°F.
MAKE-UP AIR UNIT (M.A.U.) SCHEDULE
MARK LOCATION
FAN DATA
MIN.
OUTSIDE
AIR (CFM)
HEATING DATA MOTOR DATA
FILTER
ELECTRICAL
WEIGHT
(LBS) NOTES
SUPPLY
AIRFLOW
(CFM)
ESP
(in. H2O)
INPUT
CAPACITY
(MBH)
OUTPUT
CAPACITY
(MBH)
TEMP.
RISE
(°F)
HEAT
SOURCE FIRE TYPE RPM HP BHP V / ɸ / Hz
FLA /
MCA /
MOCP
MAU-1 MECH PLATFORM 15,000 1.4 500 1,705 1,568 100 NAT. GAS DIRECT 702 15 10.8 2" METAL MESH 460 / 3 / 60 18.2 / 23.8 / 40 2,717 ALL
NOTES:
1. LOW LEAKAGE MOTORIZED INLET DAMPER WITH FACTORY FURNISHED AND INSTALLED ACTUATOR AND END SWITCH.
2. SUPPLY AIR TEMPERATURE SENSOR.
3. 120V SERVICE OUTLET WITH DISCONNECT ON A SEPARATE CIRCUIT FROM THE UNIT MAIN ELECTRICAL SERVICE.
4. BASIC FM APPROVED FUEL TRAIN WITH MODULATING GAS VALVE CAPABLE OF 6:1 TURNDOWN.
5. HIGH PRESSURE AND LOW PRESSURE GAS SWITCHES. CLOGGED FILTER SWITCH.
6. BACNET IP COMPATIBLE BMS INTERFACE.
7. VARIABLE FREQUENCY DRIVE FACTORY-MOUNTED AND WIRED IN UNIT CONTROL VESTIBULE.
NOTES:
1. PROVIDE VARIABLE FREQUENCY DRIVE & SHAFT GROUNDING RING.
2. PROVIDE OUTLET SAFETY SCREEN.
3. PROVIDE SPRING ISOLATORS FOR SUPPORT.
4. PROVIDE WITH ELECTRICAL POWER DISCONNECT.
5. PROVIDE ALUMINUM WHEEL.
6. PROVIDE INLET SAFETY SCREEN.
7. PROVIDE FAN SPEED CONTROLLER FOR BALANCING.
8. 6-FOOT CORD & PLUG PROVIDED WITH 120V UNIT.
9. PROVIDE MANUAL SPEED CONTROLLER TO CONTROL ALL EIGHT (8) FANS AT ONCE. PROVIDE POWER TO SPEED CONTROLLER THRU 4-HOUR SPRING WOUND TIMER SWITCH.
DESTRATIFICATION / EXHAUST / RETURN / VENTILATION FAN (D.F. / E.F. / R.F. / V.F.) SCHEDULE
MARK LOCATION SERVICE FAN TYPE QTY.
AIRFLOW
MAX / OPER.
(CFM)
MAXIMUM
TSP
(IN. WC)
FAN
SPEED
(RPM)
SOUND
LIMITATION
(dBA)
DRIVE
TYPE
MOTOR DATA
WEIGHT
(LBS) NOTESBHP HP V / ɸ / Hz DF-1 TO DF-8 HIGH BAY DE-STRATIFICATION CIRCULATION 8 715 - 1,650 69 DIRECT - 54 W 120 / 1 / 60 14 8,9
EF-1 MECH PLATFORM HIGH BAY RELIEF MIXED FLOW INLINE 1 15,000 0.5 769 67 DIRECT 2.37 3 208 / 3 / 60 887 1,3,4,5,6 EF-2 ABV. CORR. 122 CEILING RESTROOM EXHAUST CENTRIFUGAL INLINE 1 560 0.4 999 50 DIRECT 0.09 1/6 120 / 1 / 60 114 4,5,7 RF-1 MECH PLATFORM AHU-1 RETURN FAN MIXED FLOW INLINE 1 6,800 / 6,100 0.8 1,725 75 DIRECT 2.20 3 208 / 3 / 60 308 1,3,4 RF-2 MECH PLATFORM AHU-2 RETURN FAN MIXED FLOW INLINE 1 8,050 / 7,980 0.8 1,160 71 DIRECT 2.24 3 208 / 3 / 60 308 1,3,4 VF-1 ELEC 136 VENTILATION COOLING CENTRIFUGAL INLINE 1 650 0.25 1,375 52 DIRECT - 239 W 120 / 1 / 60 30 2,3,4 VF-2 MECH 145 VENTILATION COOLING CENTRIFUGAL INLINE 1 650 0.25 1,375 52 DIRECT - 239 W 120 / 1 / 60 30 2,3,4
RADIANT TUBE HEATER (R.T.H.) SCHEDULE
MARK LOCATION TYPE
INPUT HEAT
MAX. / MIN.
(BTU/HR)
NAT. GAS.
PRESSURE
MOUNTING
HEIGHT LENGTH
ELECTRICAL DATA
WEIGHT
(LBS) NOTESFLA MOCP V / ɸ / Hz RTH-1 HIGH BAY MODULATING, INFRARED 80,000 / 52,000 5-14 IN. W.C. 18'-0" 20 FT. 1.3 4.8 120 / 1 / 60 126 ALL RTH-2 HIGH BAY MODULATING, INFRARED 80,000 / 52,000 5-14 IN. W.C. 18'-0" 20 FT. 1.3 4.8 120 / 1 / 60 126 ALL RTH-3 HIGH BAY MODULATING, INFRARED 115,000 / 75,000 5-14 IN. W.C. 18'-0" 40 FT. 1.3 4.8 120 / 1 / 60 201 ALL RTH-4 HIGH BAY MODULATING, INFRARED 80,000 / 52,000 5-14 IN. W.C. 18'-0" 20 FT. 1.3 4.8 120 / 1 / 60 126 ALL
NOTES:
1. STANDARD REFLECTORS.
2. SIDE WALL VENT KIT.
3. ELEVATIONS PROVIDED FROM TOP OF GROUND FLOOR SLAB TO BOTTOM OF HEATER.
4. PROVIDE 24V ZONE THERMOSTAT CONTROL. THERMOSTAT SHALL BE SET TO ACTIVATE BURNERS WHEN TEMPERATURE IS BELOW 55°F.
5. FACTORY-FURNISHED TURBULATOR.
6. PROVIDE ALL HARDWARE & SUPPORTS NECESSARY TO SUPPORT HEATERS AS INDICATED ON DETAIL B2/M-501.
NOTES:
1. VARIABLE STEAM OUTPUT VOLUME CONTROL.
2. STEAM DISPERSION MANIFOLD GRID INCLUDING STEAM DISTRIBUTOR & DRAIN LINES, TO PROVIDE A MAX. ABSORPTION DISTANCE OF 6".
3. PROVIDE WITH HIGH LIMIT DUCT HUMIDISTAT & AIRFLOW PROVING SWITCH. INSTALL PER MANUFACTURERS INSTRUCTIONS.
4. PROVIDE DRAIN COOLER WITH HUMIDIFIER.
5. PROVIDE 2 FOOT HIGH STAND FOR UNIT, MOUNTED ON HOUSEKEEPING PAD.
ELECTRIC STEAM HUMIDIFIER (HUM.) SCHEDULE WITH STEAM DISPERSION GRID (S.D.G.)
MARK SERVES
OUTPUT CAPACITY
(LBS/HR)
S.A.
CFM
OUTSIDE AIR ELECTRICAL
WEIGHT
(LBS)
STEAM DISPERSION GRID (S.D.G.)
NOTESREQUIRED
WITH
LOSS CFM DB (°F) RH% FLA V / ɸ / Hz
EQUIP.
REF.
ABSORPTION
DIST. (IN.)
DUCT SIZE
(IN.)
HEAT GAIN TO
AIRSTREAM (°F)
TUBE
QTY.
HUM-1 AHU-1 29.2 30.4 6,800 1,620 -4.7 58 33.3 208 / 3 / 60 139 SDG-1 6 36x20 0.5 4 ALL HUM-2 AHU-2 35.6 37.9 8,050 1,980 -4.7 58 38.9 208 / 3 / 60 139 SDG-2 6 45x20 0.5 5 ALL
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
0 0
1 1
1 1
1 1
11 1
/0
1/
A
M E
N D
M E
N T
W
2Q R
R
-0
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:1
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-603
SC
H
ED
U
LE
S
P.
L
IT
TL
E
J.
W
O O
D
J.
W
O O
D
C . N
IC
EK
HEATING WATER / BOILER CIRCULATOR / HEATING WATER COIL PUMP (H.W.P. / B.C.P. / H.W.C.P.) SCHEDULE
MARK LOCATION TYPE SERVICE FLUID
CAPACITY
(GPM)
TDH
(FT. H20)
MOTOR DATA
NOTESHP BHP RPM V / ɸ / Hz BCP-1 MECH 145 CENTRIFUGAL INLINE, WET ROTOR PRIMARY HTG. WTR. 30% GLYCOL 45 20 1/2 0.46 3264 208 / 1 / 60 2,3,4,5 BCP-2 MECH 145 CENTRIFUGAL INLINE, WET ROTOR PRIMARY HTG. WTR. 30% GLYCOL 45 20 1/2 0.46 3264 208 / 1 / 60 2,3,4,5
HWCP-1 PLATFORM 144 CENTRIFUGAL INLINE, CLOSE COUPLED AHU-1 HTG. WTR. COIL 30% GLYCOL 20 20 1/3 0.19 1725 120 / 1 / 60 3,4,5 HWCP-2 PLATFORM 144 CENTRIFUGAL INLINE, CLOSE COUPLED AHU-2 HTG. WTR. COIL 30% GLYCOL 20 20 1/3 0.19 1725 120 / 1 / 60 3,4,5 HWP-1 MECH 145 CENTRIFUGAL INLINE, FLEX COUPLED SECONDARY HTG. WTR. 30% GLYCOL 32 50 2 0.93 1660 208 / 3 / 60 1,3,4 HWP-2 MECH 145 CENTRIFUGAL INLINE, FLEX COUPLED SECONDARY HTG. WTR. 30% GLYCOL 32 50 2 0.93 1660 208 / 3 / 60 1,3,4
NOTES:
1. PROVIDE VARIABLE FREQUENCY DRIVE & SHAFT GROUNDING RING.
2. PROVIDE WITH SPEED CONTROL FOR ELECTRICALLY COMMUTATED MOTOR (ECM).
3. DISCONNECT PROVIDED BY ELECTRICAL.
4. SELECTED PUMP SHALL BE NON-OVERLOADING.
5. MOTOR STARTER PROVIDED BY ELECTRICAL.
GLYCOL FEED SYSTEM (G.F.S.) SCHEDULE
MARK LOCATION SERVICE
TANK
CAPACITY
(GAL) TANK MATERIAL
PUMP
FLOW
(GPM)
PUMP
PRESSURE
(PSIG)
ELECTRICAL DATA
NOTESHP RPM V / ɸ / Hz
GFS-1 MECH 145 HEATING WATER (30%
PROPYLENE GLYCOL)
50 POLYETHYLENE 2 30 1/3 1750 120 / 1 / 60 ALL
NOTES:
1. HINGED POLYETHYLENE TANK COVER.
2. 10 - 40 PSI AVAILABLE PRESSURE RANGE.
3. PRESSURE SWITCH AND GAUGE.
4. LOW LEVEL FLOAT SWITCH.
5. PRESSURE RELIEF VALVES.
6. AUDIBLE ALARM AND SILENCE SWITCH ON LOCAL CONTROL PANEL.
7. LOW LEVEL ALARM SIGNAL TO DDC PANEL.
8. PROVIDE HIGH TEMPERATURE HEADER.
9. POWERED BY 8-FT. CORD & PLUG.
NOTES:
1. ASME CERTIFIED VESSEL RATED FOR 125 PSI OR GREATER.
EXPANSION TANK (X.T.) SCHEDULE
MARK TYPE SERVICE
MIN TANK
VOLUME
(GAL)
MIN VOLUME
ACCEPTANCE
(GAL)
SYSTEM FILL
PRESSURE
(PSIG)
MAX SYSTEM
WORKING
PRESSURE (PSIG) NOTES
XT-1 VERTICAL BLADDER HEATING WATER (30% GLYCOL) 31.7 8 30 50 ALL
CONDENSING HOT WATER BOILER (BLR.) SCHEDULE
MARK FLUID
DESIGN
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
MAX
WPD
(PSIG)
MAX
INPUT
(MBH)
MAX
OUTPUT
(MBH) FUEL
ELECTRICAL DATA
NOTESFLA / MOCP V / ɸ / Hz
BLR-1 30% GLYCOL 45 120 160 1.7 600 540 NATURAL GAS 13.1 / 20 120 / 1 / 60 ALL
BLR-2 30% GLYCOL 45 120 160 1.7 600 540 NATURAL GAS 13.1 / 20 120 / 1 / 60 ALL
NOTES:
1. PROVIDE FACTORY-FURNISHED OR FACTORY-INSTALLED COMPONENTS AND ACCESSORIES TO INCLUDE BUT NOT BE LIMITED TO: SUPPLY WATER
TEMPERATURE SENSOR, RETURN WATER TEMPERATURE SENSOR, MANUAL RESET HIGH-LIMIT AQUASTAT, SAFETY RELIEF VALVE, AND LOW WATER
CUTOFF.
2. PROVIDE CONDENSATE TRAP AND NEUTRALIZER (REF. KEYNOTE #34 ON SHEET M-401) BEFORE INDIRECT CONNECTION OF CONDENSATE TO DRAIN.
3. BOILER'S PACKAGED CONTROLLER SHALL HAVE NON-VOLATILE MEMORY THAT RETAINS ITS PROGRAMMING AFTER LOSS OF POWER.
4. BOILER SHALL HAVE MINIMUM 5:1 TURNDOWN OF BURNER.
NOTES:
1. THREADED CONNECTIONS.
2. ASME CERTIFIED VESSEL RATED FOR 125 PSI OR GREATER.
3. FACTORY-FURNISHED TOP-SIDE AUTOMATIC AIR VENT.
4. FACTORY-FURNISHED BOTTOM-SIDE DRAIN VALVE.
5. FACTORY-FURNISHED TANK THERMOMETER.
6. PRIMARY-SECONDARY HEATING WATER SYSTEM BUFFER TANK.
HEATING WATER BUFFER TANK (H.W.B.T.) SCHEDULE
MARK SERVICE
MINIMUM
BOILER
RUNTIME
TANK
CAPACITY
(GAL.)
TANK
INSULATION
THICKNESS
(IN.)
TANK
DIMENSIONS (IN.) SYSTEM
CONNECTIONS
[(QTY.) @ SIZE] NOTES
DIA. (W/
INSUL.) HEIGHT
HWBT-1 HEATING WATER
(30% GLYCOL)
10 MINUTES 60 3 24 64 (4) @ 2" ALL
SUPPLEMENTAL METER SCHEDULE
MARK LOCATION
SYSTEM /
SERVICE
METER
UNITS
NOMINAL
LINE
SIZE (IN.) CONFIGURATION
POWER
SOURCE
METER-1 MECH 145 BUILDING
NATURAL GAS
THERMS 4" INLINE WITH INTEGRAL
DISPLAY & ELECTRONICS
24V
CONTROL
AIR TERMINAL SCHEDULE (TYPES "A" THRU "F")
MARK SERVICE TYPE
FACE SIZE
(IN. X IN.)
NECK SIZE
(IN. x IN. OR
IN. Ø) NC LEVEL NOTES
A-1 SUPPLY SQUARE 3-CONE CEILING DIFFUSER 24X24 6 <35 1,2,3,4
A-2 SUPPLY SQUARE 3-CONE CEILING DIFFUSER 24X24 8 <35 1,2,3,4
A-3 SUPPLY SQUARE 3-CONE CEILING DIFFUSER 24X24 10 <35 1,2,3,4
B-1 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 24X8 22X6 <35 1,2,3,4,5 B-2 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 24X12 22X10 <35 1,2,3,4,5 B-3 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 24X24 22X22 <35 1,2,3,4,5 B-4 RETURN / EXHAUST EGGCRATE GRILLE, 1/2"x1/2"x1/2" GRID 12X12 10X10 <35 1,2,3,4,5
C-1 RETURN / EXHAUST LOUVERED GRILLE, 35° ANGLE, HORIZ.
BLADES, 3/4" SPACING
6X6 6X6 <40 1,2,3,4,5
C-2 RETURN / EXHAUST LOUVERED GRILLE, 35° ANGLE, HORIZ.
BLADES, 3/4" SPACING
12X12 12X12 <40 1,2,3,4,5
D-1 SUPPLY DOUBLE DEFLECTION DIFFUSER, HORIZ.
FRONT BLADES, 3/4" SPACING
12X12 10X10 <40 1,2,3,4,5
E-1 SUPPLY DRUM LOUVER 40X12 40X12 <40 1,2,3,4,5
F-1 SUPPLY ROUND-DUCT MTD. DBL. DEFL. DIFFUSER,
LONG FRONT BLADES, 3/4" SPACING
20X12 18X10 <40 1,2,3,4,5
F-2 RETURN ROUND-DUCT MTD. DBL. DEFL. DIFFUSER,
LONG FRONT BLADES, 3/4" SPACING
24X14 22X12 <40 1,2,3,4,5
NOTES:
1. REFER TO HVAC PLANS FOR DEVICES USED & REFER TO "MECHANICAL CALLOUTS" DESCRIPTIONS ON SHT. M-001.
2. MOUNTING AND BORDER TYPE SHALL MATCH THE ACTUAL CEILING TYPE, SIDEWALL OR DUCT MOUNT AS INSTALLED.
3. WHITE FINISH.
4. MATERIAL IS ALUMINUM.
5. PROVIDE INTEGRAL DAMPER WHERE INDICATED ON PLANS.
GRAVITY ROOF VENTILATOR (G.R.V.) SCHEDULE
MARK SERVICE TYPE
AIRFLOW
(CFM)
AIR VELOCITY
(FPM) WIDTH
(IN.)
LENGTH
(IN.)
PRES.
DROP
(IN. W.C.) NOTESFACE THROAT
GRV-1 AHU-1 RELIEF AIR RELIEF 7,200 1,329 1,152 30 30 0.05 1,2,4-6
GRV-2 AHU-2 RELIEF AIR RELIEF 8,500 1,081 848 38 38 0.14 1,2,4-6
GRV-3 EF-1 RELIEF AIR RELIEF 15,000 1,125 938 48 48 0.18 1-3,5,6
GRV-4 VF-1 RELIEF AIR RELIEF 647 216 647 12 12 0.01 1-3,5,6
GRV-5 VF-2 RELIEF AIR RELIEF 647 216 647 12 12 0.01 1-3,5,6
GRV-6 EF-2 RELIEF AIR RELIEF 562 187 562 12 12 0.02 1-3,5,6
GRV-7 AHU-1 OUTDOOR AIR INTAKE 7,200 505 897 34 34 0.11 1,2,4-6
GRV-8 AHU-2 OUTDOOR AIR INTAKE 8,500 476 848 38 38 0.10 1,2,4-6
GRV-9 MAU-1 OUTDOOR AIR INTAKE 15,000 514 938 48 48 0.12 1,2,4-6
NOTES:
1. MOUNT LEVEL ON SLOPED CURB.
2. 1/2" MESH ALUMINUM BIRD SCREEN.
3. FACTORY-FURNISHED PARALLEL-BLADE CONTROL DAMPER WITH END SWITCH & 120V ACTUATOR.
4. GRAVITY BACKDRAFT DAMPERS MOUNTED WITHIN CURB.
5. STANDARD LORENIZED POWDER COATED FINISH.
6. PROVIDE ROOF CURB TALL ENOUGH TO LEAVE 24" CLEAR FROM UPSLOPE EDGE OF HOOD DOWN TO
ROOF SURFACE.
LOUVER (LVR.) SCHEDULE
MARK SERVICE TYPE
DEPTH
(IN)
WIDTH
(IN)
HEIGHT
(IN)
MINIMUM
FREE
AREA
(SQ. FT.)
AIRFLOW
RATE
(CFM)
FREE
AREA
VELOCITY
(FPM)
PRESS.
DROP (IN.
WC)
ELEVATION
(BOTTOM
FLANGE OF
LOUVER) NOTES
LVR-1 VF-1 OUTSIDE AIR EXTRUDED DRAINABLE 6 17 16 0.83 647 783 0.10 10' - 4 1/2" 1-3 LVR-2 VF-2 OUTSIDE AIR EXTRUDED DRAINABLE 6 17 16 0.83 647 783 0.10 10' - 4 1/2" 1-3 LVR-3 DHU-1 REACTIVATION AIR RELIEF EXTRUDED DRAINABLE 6 17 16 0.83 656 793 0.08 20' - 0 1/2" 1-5 LVR-4 DHU-1 REACTIVATION AIR INTAKE EXTRUDED DRAINABLE 6 17 16 0.83 656 793 0.10 19' - 4 1/2" 1-5
NOTES:
1. INTEGRAL FLANGE.
2. PREFINISHED ALUMINUM LOUVER, ALL FACTORY-WELDED CONSTRUCTION, REFER TO ARCHITECTURAL PLANS FOR COLOR SCHEDULE.
3. BIRD SCREEN.
4. COUNTERBALANCED BACK-DRAFT DAMPER.
5. PRICE BREAKOUT SCHEDULE ITEM "PARACHUTE DRYING TOWER ADDITION".
6. BOTTOM FLANGE OF LOUVER ELEVATION IS RELATIVE TO FIRST FLOOR FINISHED SLAB ELEVATION.
AMBIENT AIR CURTAIN (A.A.C.) SCHEDULE
MARK LOCATION
DOOR SIZE
(FT.)
HEAT
TYPE
INTAKE
ORIENTATION
AIRFLOW
(CFM)
MOTOR ELECTRICAL
WEIGHT
(LBS)
SOUND
(DB) NOTESWIDTH HEIGHT DRIVE QTY.
HP
V / ɸ / Hz
MCA /
MOPEA. TOT.
AAC-1 PACKING/RIGGING 129 14 12 AMBIENT FRONT 6,332 DIRECT 4 0.5 2.0 208 / 3 / 60 14 / 20 394 69 ALL
NOTES:
1. SINGLE-SPEED OPERATION.
2. WALL MOUNTING.
3. GRAY POWDER COATED EXTERIOR WITH SCREEN.
4. PROVIDE CONTROL PANEL FOR THREE-PHASE MOTOR OPERATION.
5. PROVIDE WITH DOOR SWITCH FOR ON/OFF CONTROL, TO ENGAGE UNIT WHEN DOOR IS MORE THAN 12" A.F.F. WITH A TWO (2) SECOND DELAY (ADJ.).
6. PROVIDE ON/OFF STATUS OUTPUT TO U.M.C.S. AND GENERATE ALARM AT U.M.C.S. IF CONTINUOUS RUNTIME EXCEEDS TWO (2) HOURS (ADJ.).
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
AD
D
EN
D U
M
0 0
11 11 1
111 1
/0
1/
A
M E
N D
M E
N T
W
2Q R
R
-0
B
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
D -X
XX
X
W
2Q R
-1 8-
D -0
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
P O
R T
FA
C
IL
IT
Y M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U L
IA
P
AR
S
M
IN
N
ES
O
TA
XX
-X
-X
XX
X
M
A R
C H
FI
LE
N
AM
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
E
ER
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
CERTIFIED FINAL DESIGN SUBMITTAL
C
6/
/2
2:
:2
PM
C :\U se rs
\jl w
\D oc um en ts \M y R ev it\
0_ M ec h_
JW
oo dE ng r4 4.
rv t
M-604
SC
H
ED
U
LE
S
P.
L
IT
TL
E
J.
W
O O
D
J.
W
O O
D
C . N
IC
EK
FLOW CONTROL VALVE SCHEDULE
MARK
ASSOCIATED
EQUIPMENT LOCATION FLUID / SERVICE
FLUID
TEMP
(°F)
FLOW
RATE
(GPM)
NOM.
VALVE
SIZE VALVE TYPE CONFIGURATION ACTION
RANGE
(GPM) Cv
CLOSE-OFF
RATING NOTES
FCV-A BLR-1 MECH 145 HEATING WATER / ISO. VALVE 160 60 2 1/2" BUTTERFLY 2-WAY 2-POSITION N/A 282 100 ALL FCV-A BLR-2 MECH 145 HEATING WATER / ISO. VALVE 160 60 2 1/2" BUTTERFLY 2-WAY 2-POSITION N/A 282 100 ALL FCV-B VAV-1-01 MOBILITY STOR. 139 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-1-03 CORRIDOR 130 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-1-06 CORR 105 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-1-07 CORR 105 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 2-WAY MODULATING 0-2 4.7 200 ALL FCV-B VAV-1-08 PROG/UDT/UTM/SEC 110 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 2-WAY MODULATING 0-2 4.7 200 ALL FCV-B VAV-1-10 CORRIDOR 122 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 2-WAY MODULATING 0-2 4.7 200 ALL FCV-B VAV-2-01 RAMP 121 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-02 PAX 120 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-03 CARGO 119 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-05 TRAINING C 115 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-06 TRAINING B 114 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-B VAV-2-07 TRAINING A 113 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 2-WAY MODULATING 0-3 4.7 200 ALL FCV-C VAV-1-02 PACKING/RIGGING 129 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 3-WAY MODULATING 0-3 4.7 200 ALL FCV-C VAV-1-04 MGR'S 134 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 3-WAY MODULATING 0-2 4.7 200 ALL FCV-C VAV-1-05 CORR 105 HEATING WATER / HEATING VALVE 160 2 3/4" CHAR. BALL 3-WAY MODULATING 0-3 4.7 200 ALL FCV-C VAV-1-09 CORRIDOR 122 HEATING WATER / HEATING VALVE 160 1 3/4" CHAR. BALL 3-WAY MODULATING 0-2 4.7 200 ALL FCV-C VAV-2-04 SPEC/HANDLING 118 HEATING WATER / HEATING VALVE 160 4 3/4" CHAR. BALL 3-WAY MODULATING 0-5 4.7 200 ALL FCV-C VAV-2-08 LOAD PLNG/ATOC 111 HEATING WATER / HEATING VALVE 160 3 3/4" CHAR. BALL 3-WAY MODULATING 0-5 4.7 200 ALL FCV-D AHU-1 MECH PLATFORM 144 HEATING WATER / HEATING VALVE 160 20 1 1/4" CHAR. BALL 2-WAY MODULATING 0-25 25 200 ALL FCV-D AHU-2 MECH PLATFORM 144 HEATING WATER / HEATING VALVE 160 20 1 1/4" CHAR. BALL 2-WAY MODULATING 0-25 25 200 ALL
NOTES:
1. PROVIDE ACTUATOR FOR USE WITH 24V POWER SOURCE.
2. PROVIDE ACTUATOR WITH LIMIT SWITCHES (2-POSITION TYPE) OR POSITION INDICATOR (MODULATING TYPE).
3. REFER TO CONTROL DIAGRAMS FOR NECESSARY ACTUATOR FAILURE POSITIONS.
4. HEATING WATER FLUID IS 30% PROPYLENE GLYCOL.
CONTROL DAMPER SCHEDULE
MARK
ASSOCIATED
EQUIPMENT LOCATION AIR / SERVICE
FLUID TEMP. (°F)
AIRFLOW
(CFM)
NOMINAL
DAMPER
SIZE
BLADE
TYPE ACTION
RANGE
(CFM) NOTESWINTER SUMMER
CD-01 VF-1 MECH 145 OUTSIDE AIR -6 88 650 16x16 PARALLEL 2-POSITION 0-3,000 ALL CD-02 VF-2 MECH 145 OUTSIDE AIR -6 88 650 16x16 PARALLEL 2-POSITION 0-3,000 ALL CD-03 AHU-1 PLATFORM 144 OUTSIDE AIR -6 88 6,800 28x28 OPPOSED MODULATING 0-11,500 ALL CD-04 AHU-1 PLATFORM 144 RETURN AIR 65 81 6,800 28x28 OPPOSED MODULATING 0-11,500 ALL CD-05 AHU-1 PLATFORM 144 RELIEF…