About this file
This document package includes plans for a fire protection system and information on a related federal contract opportunity for construction services. The plans outline the design of a wet-pipe sprinkler system for a new aerial port facility located at Minneapolis-St Paul Air Reserve Station in Minnesota. Key project elements in the plans include a 6-inch fire water service lateral, fire pump, fire department connection, and sprinkler risers for warehouse and office areas. The federal contract opportunity is a full and open solicitation for the design/build construction of the aerial port facility with an estimated cost between $10-25 million. The solicitation number is W912QR21R0039 and is issued by the Department of the Army Corps of Engineers Louisville District. The NAICS code is 236220 and businesses must meet the size standard of $39.5 million to qualify as other than small. The solicitation requires compliance with systems such as SAM, CCR, and ORCA and notes that this project requires a 10% price evaluation preference for HUBZone small businesses.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J P
C F
P C
SEE SHEET F-001 FOR GENERAL NOTES AND LEGEND.
FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH UFC 3-600-01
AND NFPA 13. THE ORDER OF PREFERENCE OF CODE SHALL BE:
1. UFC 3-600-01
2. NFPA 13
QUICK RESPONSE SPRINKLERS WILL BE USED THROUGHOUT THE SYSTEM.
CONTRACTOR SHALL COORDINATE ALL SPRINKLER WORK WITH OTHER TRADES.
GENERAL NOTES
A.
B.
C.
D.
1. NEW 6" FIRE WATER SERVICE LATERAL SERVING FIRE SUPPRESSION SYSTEM. SEE CIVIL
SHEET C-130 FOR CONTINUATION.
2. FIRE DEPARTMENT CONNECTION WITH (6) 2-1/2" CONNECTIONS.
3. FIRE PUMP TEST HEADER WITH (6) 2-1/2" CONNECTIONS.
4. VERTICAL DOUBLE CHECK BACKFLOW PREVENTER.
5. 1,500-GPM @ 100-PSI ELECTRIC FIRE PUMP. CONTRACTOR TO CONFIRM SIZE OF FIRE
PUMP DURING PRODUCTION OF SHOP DRAWINGS.
6. SWING TYPE CHECK VALVE.
7. OS&Y GATE VALVE WITH TAMPER SWITCH.
8. WAREHOUSE AREA WET-PIPE RISER WITH OS&Y GATE VALVE WITH TAMPER SWITCH,
CONTROL VALVE, FLOW SWITCH, AND COMBINATION MAIN DRAIN/ INSPECTOR'S TEST
CONNECTION.
9. OFFICE AREA WET-PIPE RISER WITH OS&Y GATE VALVE WITH TAMPER SWITCH CONTROL
VALVE, FLOW SWITCH, AND COMBINATION MAIN DRAIN/ INSPECTOR'S TEST CONNECTION.
10. FIRE PUMP CONTROLLER WITH VARIABLE FREQUENCY DRIVE. COORDINATE POWER WITH
ELECTRICAL CONTRACTOR. SEE E-101 FOR MORE INFO.
11. JOCKEY PUMP CONTROLLER. COORDINATE POWER WITH ELECTRICAL CONTRACTOR. SEE
E-101 FOR MORE INFO.
12. DRY PIPE VALVE ASSEMBLY WITH PRESSURE SWITCH, APPURTENANCES, AND DRY PIPE
SYSTEM DRAIN WITH VALVE. (BID OPTION)
13. INSTALL NITROGEN GENERATION SYSTEM SIZED FOR SUPERVISION OF DRY-PIPE SYSTEM.
(BID OPTION)
14. COORDINATE INCOMING WATER LINE WITH STRUCTURAL FOOTING IN ACCORDANCE WITH
NFPA 13 SECTION 6.4.3.1.1.
15. FLOW METER
16. 20-GPM @ 110-PSI JOCKEY PUMP. CONTRACTOR TO CONFIRM SIZE AND SET POINTS OF
JOCKEY PUMP DURING PRODUCTION OF SHOP DRAWINGS.
17. MECHANICAL PLATFORM IS PROTECTED BY ROOF LEVEL SPRINKLER PROTECTION.
18. PROVIDE ORDINARY HAZARD SPRINKLER PROTECTION BENEATH MECHANICAL PLATFORM.
19. 3" DOMESTIC WATER LINE CONNECTION. COORDINATE LOCATION WITH PLUMING
CONTRACTOR
20. WALL MOUNTED PIV. FIRST VALVE OF BACKFLOW PREVENTER CAN BE USED AS WALL
MOUNTED PIV IF SPACING PERMITS.
SHEET KEYNOTES
A2
F-501
FF
FIRE PUMP
F D
C
P U
M P
T E
S T
H
E A
D E
R
GROUND FLOOR
100' - 0"
LOW EAVE
115' - 0"
FF
FIRE PUMP
FDC
BYPASS
PUMP TEST HEADER
DISCHARGE
55.5
F
E
D
C
HI
STO
1 2 3 4 5
A
B
C
D
SHEET ID
P a rk w a y L a n e
S u it e
P e a c h tr e e C o rn e rs
G
A
P h o n e
-7
F a x
(6
-7
S
IZ
E
A N
S I D
F
IL
E N
A M
E
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
U M
B E
R
NORTH
US Army Corps of Engineers ®
Louisville District
W Q
R -1
-D
W Q
R -1
-D
-0
P R
O J E
C T
N O
Q
J K
L
P
M S
P A
E R
IA
L P
O R
T F
A C
IL
IT
Y
M
IN
N E
A P
O L
IS
-S A
IN
T
P A
U L I
A P
A R
S
M
IN
N E
S O
T A
X X
-X -X
X X
X
M
A R
C H
FINAL DESIGN SUBMITTAL
F
IL
E N
A M
E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
C T
IR
C
T
/1
/2
:0
:5
A
M C
U s e rs
\b ra c e d \D o c u m e n ts
\1 A e ro p o rt
F
IR
E v B ra c e D
F S
T L G
.r v t
F-501
F
IR
E P
R O
T E
C T
IO
N
E N
G L A
R G
E D
P L A
N S
M O
W E
N S
B Y
D B
R A
C E
J C
A H
IL
L
B H
O F
S T
E A
D
SCALE: 1/2" = 1'-0"A4
FIRE PUMP ROOM ENLARGED PLAN
SCALE: 1/2" = 1'-0"A2
FIRE PUMP ROOM SECTION PLAN
SCALE: 1/8" = 1'-0"A1
MECH PLATFORM FIRE PROTECTION PLAN
SCALE: = 1'-0"
0 8 168
1/8"
SCALE: = 1'-0"
0 2 42
1/2"
M A
R K
D E
S C
R
IP
T I O
N D
A T
E
A m e n d m e n t
/1
/2
W
2Q R
R
_P la ns -0
| Sheets |
| F-501 - FIRE PROTECTION ENGLARGED PLANS |
File details come from the government source that posted it. Updated .