W912QR21R0023_Specs_Vol1-0000.pdf

PDF 6 MB Posted

Attached to
Hydrant Fuel Replacement at Niagara ARS, Niagara Falls Federal contract opportunity
Solicitation number
W912QR21R0023
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

About this file

This federal solicitation seeks proposals for a fuel hydrant repair project located at Niagara Falls Air Reserve Station, New York. The project includes replacing an existing fuel hydrant system, constructing a new 10,000-barrel above-ground fuel storage tank and 1,000 square foot building addition. The estimated cost is between $10-25 million. Proposals are due through the DoD SAFE system by June 21, 2021. The agency is the Department of the Army Corps of Engineers Engineering District Louisville. The NAICS code is 237120 and small business size standard is $39.5 million. This is a full and open procurement subject to HUBZone price evaluation and CCR/ORCA requirements through SAM.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Replacement Fuel Bulk Storage Facility Hydrant Repair Niagara Falls ARS, NY

P2: 488039, 488040, 488041

Design Bid Build

Specifications - Vol. 1 of 3 Corrected Final Design Submittal

21 May 2021

W912QR21R0023

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR21R0023-0000

Fuel Hydrant Repair located at Niagara Falls Air Reserve Station, New York.

The estimated cost of this construction project is betw een $10,000,000.00 and $25,000,000.00, in accordance w ith DFARS 236.204.

This is a Full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.

NAICS code 237120. Size determination: $39.5 Million.

Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available

Central Contractor Registration and ORCA are now available through the System for Aw ard Management (SAM), available at w w w .sam.gov

Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.

PLEASE NOTE: SAM is completely free of charge for both registrants and users

Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at:

http://projnet.org/projnet. Please see Section 00 21 00, Projnet Instructions for further instructions.

GLENN W MOON 502.315.6177

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

21-May-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________485 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Jun 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE 964860

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: GLENN W MOON

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: 502.315.6177 FAX:

W912QR21R0023 69

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912QR21R0023

Section SF 30 - Block 14 Continuation Page (SF 30)

BLOCK TEN CONTINUATION

An organized site visit will be conducted. Please see FAR 52.236-27 ALT 1 for Site Visit information.

The term bid and proposal are used interchangeably in industry and may be used interchangeably throughout this solicitation.

Please note, page numbering in this document may not be accurate.

Electronic Submittal Instructions

Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.

Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:

1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.

a. Glenn Moon, Contract Specialist at Glenn.w.moon@usace.army.mil

b. Emily Moore, Contracting Officer at Emily.A.Moore@usace.army.mil

2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two

(2) business days prior to the proposal due date.

3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter

W912QR21R0023-FIRMNAME.

4. Click Upload button to send documents.

5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).

File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912QR21R0023-FIRMNAME-VOLUME I

W912QR21R0023-FIRMNAME-VOLUME II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

Searchable – for the purpose of this solicitation searchable is defined as a pdf document allowing for the “Find” function to be used. (The shortcut command is Ctrl+F)

Section 00 10 00 - Solicitation

PRICE BREAKOUT SCHEDULE

PRICE BREAKOUT SCHEDULE

PROJECT:__________________________________

LOCATION:_________________________________

OFFEROR’S NAME:____________________________

Item Description No. Quantity Unit Amount

Base 0001 Repair Aircraft Fuel Pumphouse/ Distribution Lines/Storage Tanks 1 Job _____________

0002 Repair Aircraft Refueling Pits/ Service Lines 1 Job _____________

TOTAL BASE ______________

PROPOSAL OPTIONS

Item Description No. Quantity Unit Amount

0003 1 Job ______________

0004 1 Job ______________

0005 1 Job ______________

0006 1 Job ______________

0007 1 Job ______________

0008 1 Job ______________

0009 1 Job ______________

Option 1 - Petroleum, Oil, Lubricant Contaminated Soil Removal The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. This option may be exercised in writing by the Contracting Officer up to 5 times.

Option 2 - Hazardous Contaminated Soil Removal The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. This option may be exercised in writing by the Contracting Officer up to 15 times.

Option 3 - Petroleum, Oil, Lubricant Contaminated Groundwater Removal The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. This option may be exercised in writing by the Contracting Officer up to 10 times.

Option 4 - Hazardous Contaminated Groundwater Removal The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. This option may be exercised in writing by the Contracting Officer up to 10 times.

Option 5 - 6th Hydrant Fuel Pit The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed

Option 6 - Miscellaneous Repair During Commissioning The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed

Option 7 - Building Addition for Building 918 The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed

0010 Option 8 - Commercial Offload and 10,000 1 Job ______________ BBL Tank The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed

0011 Option 9 - Repair/Replace Aircraft Fuel Bulk 1 Job ______________ Storage Transfer Line The Contracting Officer may exercise the option by written notice to the Contractor within days 180 of notice to proceed

Option 1 multiplied by 4 ______________

Option 2 multiplied by 14 ______________

Option 3 multiplied by 9 ______________

Option 4 multiplied by 9 ______________

TOTAL OPTIONS (Total amount for Fully Exercised) ______________

TOTAL PROPOSAL (Base and All Options) ______________

GENERAL:

This section compromises an explanation of the items identified in the Price Breakout Schedule. This section is a general scope of work for the items described in the Price Breakout Schedule and is not intended to be all-encompassing in the description. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings.

The contractor shall price each type of work under the applicable item in the Price Breakout Schedule. Measurement for payment shall not be made. Payment described for various items shall be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any items of work described in the contract but not specifically listed in the Price Breakout Schedule shall be included in the payment for the item of work to which it is made subsidiary.

BASE

2. Payment under Item No. 0001 "Repair Aircraft Fuel Pumphouse/Distribution Lines/Storage Tanks" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements for the 914th Air Reserve Wing hydrant fuel area to the edge of the airfield apron as required by the contract document drawings and specifications.

3. Payment under Item No. 0002 "Repair Aircraft Refueling Pits/Service Lines" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements for all work located on the airfield apron as required by the contract document drawings and specifications.

OPTIONS

1. Payment under Item No. 0003 Option 1 "Petroleum, Oil, Lubricant Contaminated Soil Removal" shall constitute full compensation for furnishing all materials, tools, labor costs, testing, and other associated incidentals necessary for handling, removal, hauling, and disposal of POL contaminated soil from the NFARS Installation. This option may be exercised up to five (5) times for a total of 125 cubic yards (CY). The basis of estimate and price evaluation is a single 25 CY job. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. Exercising this option does not extend the period of performance.

2. Payment under Item No. 0004 Option 2 "Hazardous Contaminated Soil Removal" shall constitute full compensation for furnishing all materials, tools, labor costs, testing, and other associated incidentals necessary for handling, removal, hauling, and disposal of hazardous contaminated soil from the NFARS Installation. This option may be exercised up to fifteen (15) times for a total of 1,500 cubic yards (CY). The basis of estimate and price evaluation is a single 100 CY job. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. Exercising this option does not extend the period of performance.

3. Payment under Item No. 0005 Option 3 "Petroleum, Oil, Lubricant Contaminated Groundwater Removal" shall constitute full compensation for furnishing all materials, tools, labor costs, testing, and other associated incidentals necessary for containerization, handling, removal, hauling, and disposal of POL contaminated groundwater from the NFARS Installation. Contaminated groundwater must be stored in double walled tank. This option may be exercised up to ten (10) times for a total of 210,000 gallons (GAL). The basis of estimate and price evaluation is a single 21,000 GAL. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. Exercising this option does not extend the period of performance.

4. Payment under Item No. 0006 Option 4 "Hazardous Contaminated Groundwater Removal" shall constitute full compensation for furnishing all materials, tools, labor costs, testing, and other associated incidentals necessary for handling, removal, hauling, and disposal of hazardous contaminated groundwater from the NFARS Installation.

Contaminated groundwater must be stored in double walled tank. This option may be exercised up to ten (10) times for a total of 210,000 gallons (GAL). The basis of estimate and price evaluation is a single 21,000 GAL. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed.

Exercising this option does not extend the period of performance.

5. Payment under Item No. 0007 Option 5 "6th Hydrant Fuel Pit" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary for the installation of a 6th hydrant fuel pit on the airfield apron as required by the contract document drawings and specifications. The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed. Exercising this option does not extend the period of performance.

6. Payment under Item No. 0008 Option 6 "Miscellaneous Repair During Commissioning" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary for the repair and replacement of ten (10) valves, gaskets, washers, and bolts (for valves ranging from 1/2” to 4” in size) during the commissioning of the fuel system. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days of notice to proceed. Exercising this option does not extend the period of performance.

7. Payment under Option Item No. 0007 "Building Addition for Building 918" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements for the building addition adjacent to Building 918 as required by the contract document drawings and specifications. The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed. Exercising this option does not extend the period of performance.

8. Payment under Option Item No. 0008 "Commercial Offload and 10,000 BBL Tank " shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary complete the design requirements for the commercial offload area, new 10,000 BBL Tank, and associated piping as required by the contract document drawings and specifications. The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed. Exercising this option does not extend the period of performance.

9. Payment under Option Item No. 0009 "Repair/Replace Aircraft Fuel Bulk Storage Transfer Line" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements for the area from the 914th Air Reserve Wing Bulk Storage Area to the 914th Air Reserve Wing pump house at the hydrant fuel area as required by the contract document drawings and specifications. The Contracting Officer may exercise the option by written notice to the Contractor within 180 days of notice to proceed. Exercising this option does not extend the period of performance.

NOTES FOR PRICE BREAKOUT SCHEDULE

1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest price breakout schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to proposal items, all proposers should state their revised prices for each item. The company name should be indicated on the face of the price breakout schedule to preclude being misplaced.

2. Proposers must insert a price on all numbered items of the Price Breakout Schedule. The price may be zero dollars or a deduct amount. Failure to do so may disqualify the proposal.

3. If a modification to a proposal is submitted which provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price in the price breakout schedule must be stated or, if it is not stated, the proposer agrees that the lump-sum adjustment shall be applied on a pro-rata basis to every proposal item in the price breakout schedule.

4. CONDITIONS GOVERNING EVALUATION OF PROPOSALS AND AWARD OF CONTRACT.

One contract only will be awarded on this project and evaluation will be made on the Total Base Plus Option Amounts exercised fully, in accordance with the paragraph entitled "Evaluation Of Options" in section 00 22 12.

The Government may require the delivery of the numbered line items, identified in the schedule as Additive items, in the quantity and at the price stated in the schedule.

5. Description of Proposal Items - The general outline of the principal features of each item as listed does not in any way limit the responsibility of the proposer for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the proposal form.

Section 00 21 00 - Instructions

PROJNET INSTRUCTIONS

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.

Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Number is: W912QR21R0023

The Bidder Inquiry Key is: 82B763-8H25Q8

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) days prior to the closing date stated in the solicitation.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

U.S. Army Corps of Engineers – LRL ATTN: Emily Moore, Rm 821 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Primary Site Visits are scheduled for Tuesday, 1 June 2021 from 9:00am-12:00pm Eastern Time (ET). Face masks are 100% required to attend the site visit.

(c) Participants will meet at—

Participants will meet at the Niagara Falls ARS Visitors Center (right next to entrance gate).

Please RSVP to the POC below by noon (Eastern) Friday, 28 May 2021 with the following information: Name, Company, License #, and date of birth.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

The full text of FAR clauses and provisions can be found at https://www.acquisition.gov/

The full text of DFARS clauses and provisions can be found at https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 00 - Supplementary Instructions

EVALUATION CRITERIA

SECTION 00 22 12

PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA

1. Overview.

1.1 The intent of this solicitation W912QR21R0023 is to select one contractor for Design-Bid-Build Fuel

Hydrant Repair located at Niagara Falls Air Reserve Station, New York. The basis of award is the Best Value Trade-Off process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award a firm-fixed-price contract to the responsible offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.2 This project includes repairing an existing fuel hydrant system and construction of a new 10,000-barrel above-ground fuel storage tank; a 1,000-square-foot addition to Building 919 for fuel laboratory and classroom space. It also includes demolition and the relocation of existing apron fuel pits, repairing existing tanks, and repairing the existing pumphouse. Finally, it includes demolition of the existing east fuel yard, including all above-ground components and abandonment of the existing fuel transfer line in place.

1.3 The target ceiling for contract award is $20,895,000.00 based on the funds made available for this project.

The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.

2. Submittal of offers.

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.

2.2 Offerors shall submit their proposals electronically in accordance with the Electronic Submittal Instruction via DoD Safe to the US Army Corps of Engineers, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2267 no later than the time and date specified in Block 13 of Standard Form 1442.

Mark your proposal submission to the attention of Glenn Moon Glenn.w.moon@usace.army.mil. NOTE:

The Louisville District is in the Eastern Time Zone. Hard copy proposals will not be accepted. Offerors are encouraged to save a copy of their confirmation of upload in the event there is a technical issue to show proof of upload.

2.3 Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified herein.

2.4 Volume I shall include the following information:

Volume I – Factor I: Past Performance Volume I – Factor II: Management Plan Volume I – Factor III: Schedule Narrative Volume I – Factor IV: Small Business Participation Plan (All Offerors)

*NOTE: The complete Volume I shall be submitted in Electronically via DoD Safe. Failure to place the required submission information under the appropriate tab (factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit(s) will not be evaluated.

2.5 Volume II shall be submitted as a separate file from Volume I and shall include the following information:

Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan (Large Businesses)

NOTE: Volume II shall be submitted in Electronically via DoD Safe. Failure to place the required submission information under the appropriate tab (factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.

3. Proposal Evaluation Process.

3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals (Volume I) will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.

Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.

3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.

3.2.1 Proposal Compliance/Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete, that both a technical and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the offeror’s performance. Factor II – Management Plan and Factor III – Schedule Narrative will be rated using Table 3 below. Factor IV – Small Business Participation Plan will be rated using Table 4.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.

3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Proposals will be evaluated in accordance with the factors and subfactors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

4.2 Volume I – Factor I – Past Performance 1st

4.3 Volume I – Factor II – Management Plan 2nd

4.4 Volume I – Factor III – Schedule Narrative 3rd

4.5 Volume I – Factor IV – Small Business Participation Plan 4th

4.6 Volume II - Price and Pro Forma Information

Tab A Standard Form 1442 and Price Breakout Schedule Not Rated

Tab B Joint Venture Agreement Not Rated

Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability

Tab D Pre-Award Information Not Rated

Tab E Subcontracting Plan Acceptable / Unacceptable

4.7 Ratings

Evaluators will apply the l rating for the definition that most closely matches the evaluation.

TABLE 1

Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

TABLE 2

Performance Confidence Assessments

Substantial Confidence Based on the offeror’s recent/relevant performance record, the

Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

TABLE 3

Management Plan and Schedule Narrative Ratings

Adjectival Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

TABLE 4

Small Business Ratings

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet the small business objectives.

4.8 Definitions

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.

5.0 Volume I – Factor I: Past Performance

5.1 Submission Requirements:

5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime

Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.

5.1.2 Projects considered similar in size to this project include projects for: (1) new installation of underground fuel piping of at least 5,000 Linear Feet (lf), reconditioning of a fuel “pump house” facility, and construction of a new above-ground storage tank with capacity of at least 10,000 barrels or (2) replacement of underground fuel piping of at least 5,000 Linear Feet (lf), reconditioning of a fuel “pump house” facility, and construction of a new above-ground storage tanks with capacity of at least 10,000 barrels.

NOTE: “Pump House” for purposes of Paragraph 5.1.2 is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .