This document contains a justification and approval for other than full and open competition and a solicitation notice for a federal contract opportunity. The justification and approval document relates to a project to replace hydrant fuel lines at Niagara Air Reserve Station in Niagara Falls, New York. The estimated cost of the construction project is between $10 million and $25 million. The solicitation will be a full and open competition under NAICS code 237120 with a size standard of $39.5 million. Offerors must comply with various System for Award Management registration and reporting requirements. Technical inquiries regarding the solicitation should be submitted through the ProjNet website. The contracting agency is the Department of the Army Corps of Engineers Louisville District. The response and award dates and pricing terms are not specified in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912QR21R0023_Specs-0005.pdf | ||
| W912QR21R0023_Plans-0005.pdf | ||
| W912QR21R0023-0004.pdf | ||
| W912QR21R0023_Plans-0003.pdf | ||
| W912QR21R0023_Specs-0003.pdf | ||
| W912QR21R0023_Specs-0002.pdf | ||
| W912QR21R0023_Plans-0002.pdf | ||
| W912QR21R0023_Plans_Vol2-0001.pdf | ||
| W912QR21R0023_Specs_Vol1-0001.pdf | ||
| W912QR21R0023_Plans_Vol1-0001.pdf | ||
| JA - Hydrant Fuel - Andover Continuum (LRL-FY21-69)_Redacted.pdf | ||
| W912QR21R0023_Specs_Vol2-0001.pdf | ||
| W912QR21R0023_Specs_Vol3-0001.pdf | ||
| Sign in Sheet from Site Visit.pdf | ||
| W912QR21R0023_Plans_Vol2-0000.pdf | ||
| W912QR21R0023_Specs_Vol3-0000.pdf | ||
| W912QR21R0023_CID-0000.pdf | ||
| JA - Telemetry and Process Controls (LRL-FY21-06)_Redacted.pdf | ||
| W912QR21R0023_Plans_Vol1-0000R.pdf | ||
| W912QR21R0023_Specs_Vol1-0000.pdf | ||
| W912QR21R0023_Specs_Vol2-0000.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No: LRL-FY21-03
8. Market Research: USACE consulted with the Designer of Record (DOR), the information obtained is that no other equipment, when added/connected to the existing system, is able to maintain the required UL Listing per NFPA standards. Based on this information, no additional market research was conducted.
9. Interested Sources: In accordance with FAR 5.102(a)(6) and FAR 13.106-1(b)(3), the justification shall be posted with the solicitation, redacted as necessary.
10. Other Factors:
a. Procurement History: Unknown
b. Acquisition Data Availability: N/A
c. Unusual and Compelling Urgency: N/A
d. Subcontracting Competition: The Government will ensure the prime contractor competes subcontracted actions as much as possible by reviewing and approving the offeror’s Subcontracting Plan prior to award and by reviewing and accepting semi-annual subcontracting reports in eSRS..
11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date: _______________
12. Requirements Certification: I hereby determine that the supporting data under my cognizance, which are included in this justification, are accurate and complete to the best of my knowledge and belief.
Date: __ _____________
13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. This determination was made utilizing market research and independent government estimates.
Date: _______________
Control No: LRL-FY21-03
14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Date: ________________
15. I have reviewed this J&A and find the justification adequate to support other than full and open competition.
Date: ______________
File details come from the government source that posted it. Updated .