W912QR21R0023_Specs_Vol1-0001.pdf

PDF 6 MB Posted

Attached to
Hydrant Fuel Replacement at Niagara ARS, Niagara Falls
Solicitation number
W912QR21R0023
Issued by

About this file

This document outlines the requirements for a federal construction project solicitation. The project involves repair of fuel hydrants at Niagara Falls Air Reserve Station in New York, with an estimated cost between $10-25 million. The solicitation is full and open, requiring a HUBZone 10% price evaluation. Offerors must register in the System for Award Management, which combines previous CCR and ORCA systems. Technical questions must be submitted through ProjNet. The U.S. Army Corps of Engineers Engineering District Louisville is the contracting agency. The NAICS code is 237120 and size determination is $39.5 million. Funds have not been appropriated and no award will be made until funding is available. The closing date is not specified.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Replacement Fuel Bulk Storage Facility Hydrant Repair Niagara Falls ARS, NY

P2: 488039, 488040, 488041, 495422

Design Bid Build

Specifications - Vol. 1 of 3 Certified Final Design Submittal

17 June 2021

W912QR21R0023

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR21R0023-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0023

X 9B. DATED (SEE ITEM 11)

21-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jun-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR21R0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0001 SUMMARY OF CHANGES

Solicitation: W912QR21R0023

Project: Fuel Hydrant Repair Location: Niagara Falls Air Reserve Station, New York

SECTION 00 10 00 – SOLICITATION:

1. The Due date for this solicitation is extended to 10:00 AM (Eastern) on Wednesday, 30 June 2021.

2. Please note, the acceptance period stated in block 13 of the SF 1442 will restart with your response to this amendment.

SECTION 00 73 00 – WAGE RATES:

3. The following wage rates have been REVISED as follows:

a. General Decision NY11 (Heavy and Highway), Modification 01 has been replaced by General

Decision NY11 (Heavy and Highway), Modification 03, effective 21 May 2021 and must be adhered to.

PLANS & SPECIFICATIONS

4. The following PLAN SHEETS have been REPLACED in their entirety:

a. C-111 HYDRANT FUELS AREA OVERALL DEMOLITION PLAN

b. C-113 TANK AREA SITE/UTILITY PLAN

c. C-115 TANK AREA COORDINATE STAKING PLAN

d. C-117 COORDINATE POINT TABLE

e. C-122 TANK AREA GRADING AND DRAINAGE PLAN

f. C-123 TRUCK OFFLOAD GRADING AND DRAIANGE PLAN

g. C-411 ENLARGED TRUCK OFFLOAD AREA DRAINAGE / JOINT LAYOUT PLAN

h. C-509 CIVIL CONSTRUCTION DETAILS

i. C-510 CIVIL CONSTRUCTION DETAILS

j. C-512 CIVIL CONSTRUCTION DETAILS

k. C-704 FINAL EROSION & SEDIMENT CONTROL PLAN

l. C-705 FINAL EROSION & SEDIMENT CONTROL PLAN

m. C-706 FINAL EROSION & SEDIMENT CONTROL PLAN

n. C-711 FINAL EROSION & SEDIMENT CONTROL DETAILS

o. S-001 STRUCTURAL GENERAL NOTES

p. S-102 PLAN – PUMP HOUSE

q. S-202 CROSS OVER STAIR (S1) PLAN, SECTION, & DETAILS

r. S-203 CROSS OVER STAIR (S2) PLAN, SECTION, & DETAILS

s. SB151 ROOF FRAMING PLAN

t. SB201 STRUCTURAL FRAMING ELEVATIONS

u. SB321 FRAMING SECTIONS

v. SB322 FRAMING SECTIONS

w. A-002 PUMPHOUSE LIFE SAFETY PLAN AND CODE SUMMARY

x. A-003 FIRE PROTECTION LIFE SAFEY PLAN CHECKLIST

y. IB-101 INTERIOR FINISH PLAN

z. IB-601 ROOM FINISH SCHEDULE & GENERAL NOTES

aa. M-101 MECHANICAL PUMP HOUSE PLAN

bb. MB101 FUELS LAB ADDITION MECHANICAL PLAN

cc. MB601 MECHANICAL SCHEDULES

dd. MB701 MECHANICAL CONTROLS

ee. FM111 NEW WORK – OVERALL SITE PLAN

ff. FM405 EX/DEMO ENLARGED PLAN – TANK 2 (FAC.2523)

gg. FM406 EX/DEMO ENLARGED PLAN – TANK 1 (FAC.2524)

hh. FM415 NEW WORK ENLARGED PLAN TANK 2 (FAC.2523)

ii. FM416 NEW WORK ENLARGED PLAN TANK 1 (FAC.2524)

jj. ES101 OVERALL SITE PLAN

kk. ES102 ELECTRICAL SITE PLAN SHEET 1 OF 2

ll. ES104 ELECTRICAL SITE PLAN SHEET 2 OF 2

mm. EP402 ENLARGED TANK 3 PLAN

nn. EP408 MCC/LFM BUILDING 919

oo. EP602 NEW ONE LINE DIAGRAM

pp. EP610 PANEL SCHEDULE

qq. EP611 CABLE AND CONDUIT SHEET 1

rr. EP612 CABLE AND CONDUIT SHEET 3

ss. EP613 CABLE AND CONDUIT SHEET 4

tt. EI605 CONTROL SYSTEM I/O SHEET 4

uu. EB121 POWER PLAN

vv. EB501 ELECTRICAL DETAILS

ww. EB503 ELECTRICAL DETAILS

xx. EB612 MECHANICAL EQUIPMENT SCHEDULE

5. The following PLAN SHEETS have been ADDED:

a. EP414 ENLARGED WATER PUMP (WP-1) PLAN

b. EP415 ENLARGED WATER PUMP (WP-2) PLAN

c. EP416 ENLARGED WATER PUMP (WP-3) PLAN

d. EP504 WATER PUMP (WP-X) EQUIPMENT RACK

e. EP616 WATER PUMP WIRING DIAGRAM

6. The following SPECIFICATION SECTIONS have been REPLACED in their entirety:

a. 00 80 00.00 06 SPECIAL PROVISIONS

b. 01 57 20.00 10 ENVIRONMENTAL MANAGEMENT AND PROTECTION

c. 31 00 00.00 06 EARTHWORK

d. 32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD

PAVEMENTS

e. 32 05 23 LANDSCAPE ESTABLISHMENT

f. 32 12 16.16 ROAD-MIX ASHPALT PAVING

7. The following SPECIFICATION SECTIONS have been ADDED:

a. APPENDIX C SWPPP

- END ‘SUMMARY OF CHANGES’ -

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 21-Jun-2021 10:00 AM to 30-Jun-2021 10:00 AM.

(End of Summary of Changes)

General Decision Number: NY20210011 05/21/2021

Superseded General Decision Number: NY20200011

State: New York

Construction Types: Heavy and Highway

County: Niagara County in New York.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 03/12/2021 2 04/02/2021 3 05/21/2021

BOIL0007-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 33.00 28.15

BRNY0045-002 07/01/2020

Rates Fringes

Bricklayer, Stonemason...........$ 31.72 29.18 Marble mason.....................$ 32.25 28.15 Pointer, cleaner and caulker.....$ 31.72 29.18 Tile & Terrazzo Worker...........$ 32.25 28.15 Tile, Marble & Terrazzo Finisher.........................$ 29.31 15.44

CARP0276-015 07/01/2019

Rates Fringes

CARPENTER

CARPENTER...................$ 34.60 26.35

MILLWRIGHT..................$ 34.60 26.35

PILEDRIVER..................$ 34.60 26.35

ELEC0237-001 05/27/2019

Rates Fringes

Electricians:

Cable Splicers..............$ 37.40 27.44 Electricians................$ 35.80 28.64

ELEC1249-003 05/04/2020

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 27.72 6.75%+33.90 Groundman (Truck Driver)....$ 36.96 6.75%+33.90 Groundman Truck Driver (tractor trailer unit)......$ 39.27 6.75%+33.90 Lineman & Technician........$ 46.20 6.75%+33.90 Mechanic....................$ 36.96 6.75%+33.90

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/04/2020

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 32.10 6.75%+33.90 Groundman digging machine operator...................$ 48.15 6.75%+33.90 Groundman truck driver (tractor trailer unit).....$ 45.48 6.75%+33.90 Groundman Truck driver.....$ 42.80 6.75%+33.90 Lineman and Technician.....$ 53.50 6.75%+33.90 Mechanic...................$ 42.80 6.75%+33.90 Substation:

Cable Splicer..............$ 58.85 6.75%+33.90 Flagman....................$ 32.10 6.75%+33.90 Ground man truck driver....$ 42.80 6.75%+33.90 Groundman digging machine operator...................$ 48.15 6.75%+33.90 Groundman truck driver (tractor trailer unit).....$ 45.48 6.75%+33.90 Lineman & Technician.......$ 53.50 6.75%+33.90 Mechanic...................$ 42.80 6.75%+33.90 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 60.30 6.75%+33.90 Flagman....................$ 32.89 6.75%+33.90 Groundman Digging Machine Operator...................$ 49.34 6.75%+33.90 Groundman Truck Driver (tractor-trailer unit).....$ 46.60 6.75%+33.90 Groundman Truck Driver.....$ 43.86 6.75%+33.90 Lineman & Technician.......$ 54.82 6.75%+33.90 Mechanic...................$ 43.86 6.75%+33.90

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/03/2021

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 34.78 3%+5.14 Groundman..................$ 17.50 3%+5.14 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 33.01 3%+5.14

Tree Trimmer................$ 27.36 3%+9.98

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ENGI0463-001 07/01/2016

Rates Fringes

Power Equipment Operator

HEAVY AND HIGHWAY

CONSTRUCTION

GROUP A....................$ 36.29 28.10

GROUP A1...................$ 39.29 28.10

GROUP B....................$ 34.58 28.10

Master Mechanic............$ 38.06 28.10

Notes:

Hazardous Waste 3.00

ZONE PAY: crane boom premium for boom and jib 100-199 ft (1.00 over group A) crane boom premium for boom and jib 100-199 ft (1.50 over group A) crane boom premium for boom and jib 100-199 ft (2.00 over group A)

GROUP A1: Backfillers, backhoes, automatic batch plant operator, black-top spreaders, bulldozers, CMI grading machines, cableways, clambuckets, combination hoe boom or shovel boomattached (except farm type crawler or rubber tired tractor unless used with hydraulic back-hoe), compressor (with paing breaker attached), concrete mixers (one yard and over), concrete planner, concrete pump (truck mounted), concrete spreader operator, crane work, cranes (overhead or bridge), crane operator (over 100, 200, 300 feet booms earn premiums as noted herein), derricks, draglines, Euclid type belt loaders, finishing machine operators, fork-lifts and hoists 9 when lifting material at an elevation higher than twenty-five feet), form puller, generator and compressor (power driven-when used simultaneously and for any make of portable concrete batching machine), graders, graders (with bulldozer blades), hoists (multiple drum with air compresor when used simultaneously for more than one purpose), hoists - single drum when used to hoist steel), hydraulic concrete joint hammers, hydraulic rock drill (Ingersoll-Rand LM 500 type), hydro-axe, Kolman Loaders, loaders (front & back - except small type), lubrication engineers, mechanic, pavement breaker (except hand operated pavement breakers), pile driving rigs, pipe pushing rigs, pipe pushing machines (mechanicl and hydraulic), post drivers (except truck mounted post drivers), reapir work on maintenance work under the supervision of a master mechanic, rollers (all) (on finish blacktop), scoopmobiles (all), scrapter (either double or single bowl), S-240 Lazer-Guided screed, shovels, snow-loader, steel erection, stone crushers (portable), stone spreaders (power driven), tractors use din conjunction with scraper wagons (all), tree bandit or similar chipper, tranchers (when excavation over six feet in depth), tunnel mucking machines, vibrators (self-propelled riding), welder

GROUP A2: crane boom premium for boom and jib 100-199 ft (1.00 over group A) GROUP A3: crane boom premium for boom and jib 100-199 ft (1.50 over group A) GROUP A4: crane boom premium for boom and jib 100-199 ft (2.00 over group A)

GROUP B: air compresors (over 165 cu. ft), bobcat type skid loader, compressors when used in banks of two and not over three within a fifty foot radius and if fuel is stored, it would be stored within the same radius, concrete blowers, concrete pumps, conveyors, crawler or rubber tire tractor (small farm typewith blade or bucket not to exceed 0.5 yd capacity), earth drills (all), elevators (all), forklift while used to lift material not over 25 ft, gunnite machines, heaters (gasoline -use in banks of two and not over three within an area of one hudnred foot radius, highlift hoists while used to lift material not over 25 ft, material hoists, single drum hoist for hoisting materials other than steel, Latourneau turnatrailers, light and power systems 9 gas or diesel driven - temporary 25 KW capacity or over), Loaders 9 small front or back), locomotive, parts room - when a parts room is manned it shall be an engineer, pavement busters, pin pullser, post drivers 9 truck mounted), pug machine, pums over 4 Inches, (road rollers except on finish balcktop, road widener mounted on a loader, rolles (self propelled - not on finish blacktop and under 7 tons), scoopmobiles - when used as a station ary hoist, or one used to lift material not in excess of 25 feet, snow-go, stone crushers and winch hoists mounted on trucks, tractors, trenchers excavating up to 6 ft deep), trenchers on the back of a jeep, welding machines (for 2 but not over 3 gasoline or diesel driven), winch tractors

ENGI0463-002 07/01/2016

POWER EQUIPMENT OPERATOR:

(TUNNEL AND SHAFT)

GROUP A.....................$ 36.29 28.10

GROUP A1....................$ 39.29 28.10

GROUP B.....................$ 34.58 28.10

GROUP C.....................$ 28.53 28.10

Master Mechanic.............$ 38.06 28.10

NOTES: Hazmat premium 3.00

ZONE PAY:

Add $1.00 to GROUP A - long boom crane premium 100 ft - 199 ft Add $1.50 to GROUP A- long boom crane premium 200 ft - 299 ft Add $2.00 to GGROUP A - long boom crane premium 300 ft and over

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas Day provided employee works the day before and the day after the holiday.

TUNNEL AND SHAFT CLASSIFICATIONS

GROUP A1: Crane (underground), front end loader (tunnel and shaft), hoist (2 or 3 drum), maintenance engineer (tunnel and shaft), mining machine (mole and similar types), motor man, mucking machine, shovel, tripper/maintenance engineer (tunnel and shaft), tunnel shovel

GROUP B: automated central mix concrete plant, backhoe (topside), boring machine, compressors (4 or less, exceeding 2,000 C.F.M. combined capacity, but not to exceed 5,000 C.F.M. with a distance not to exceed 1,500 feet), concrete pump, crane (topside, front end loader (topside), Grayco epoxy machine, hoist (2 or 3 drum -- topside), maintenance engineer (topside), maintenance grease man, personnel hoist, pump crete, shotcrete machine, shovel (topside)

GROUP C: comrpessors (4 not to exceed 2,000 C.F.M. combined capacity or 3 or less with more than 1,200 C.F.M. but not to exceed 2,000 C.F.M. with a distance for compressors), dust collectors, generators, pumps, welding machines (4 of any type or combination) with a distance not to exceed

1,500 feet; conveyor, electric pump used inconjunction with well point system grout pump over 5 cubic feet (manufacturer's rating), hydro-blaster, motorized form carrier, truck crane oiler, well point

GROUP D: Compressors (3 or less not to exceed 1,200 C.F.M.

combined capacity with a distance not to exceed 1,500 feet;

comrpessors (any size but subject to other provisions for compressors), dust collectors, generators, pumps, welding machines (three or less of any type or combination) with a distance not to exceed 1,500 feet; fireman, grease man, IRON0009-003 07/01/2019

Rates Fringes

Ironworkers:

IRONWORKER..................$ 30.75 27.50

SHEETER.....................$ 30.75 27.50

LABO0091-002 07/01/2017

Rates Fringes

LABORER

COMPRESSED AIR

GROUP 1....................$ 26.00 35.96+a GROUP 2....................$ 29.90 34.41+a GROUP 3....................$ 31.20 34.41+a GROUP 4....................$ 32.50 34.41+a GROUP 5....................$ 33.80 34.41+a GROUP 6....................$ 35.10 34.41+a

HEAVY & HIGHWAY

CLASSIFICATIONS

GROUP 1....................$ 26.00 35.96+a GROUP 2....................$ 26.30 35.96+a GROUP 3....................$ 26.50 35.96+a GROUP 4....................$ 26.60 35.96+a GROUP 5....................$ 26.85 35.96+a GROUP 6....................$ 27.00 35.96+a GROUP 7....................$ 28.00 35.96+a GROUP 8....................$ 28.60 35.96+a GROUP 9....................$ 31.00 35.96+a

TUNNEL FREE AIR

CONSTRUCTION

GROUP 1....................$ 32.50 34.41+a GROUP 2....................$ 26.59 34.41+a GROUP 3....................$ 33.80 34.41+a GROUP 4:...................$ 35.10 34.41+a

GROUP 5:...................$ 46.59 34.41+a

LABORERS CLASSIFICATIONS

GROUP 1: Common Laborers, Multi-Trade Tender, Decontamination of all Machines, Horizontal Directional Drill/Locator; All terrain Vehicles with Attachments/All wheel or Track Types

GROUP 2: Potman, Pipelayers, Pavement Breakers or Busters, Jackhammer Operators; Barco Rammers; Chain Saw; Powder Monkey; Black Top Rakers; Scalers; Drill Tenders; Mortar Mixers; Concrete Polishing Machine; Operation & Maintenance of all Robotic Remote Systems in Hazardous Environment; Men Working from Swinging Scaffold Bo'sns Chair, suspended cage or bucket; All Other Operators of Mechanical Tools, Including Vibrators Regardless of Type of Power and Boat Men; Operation of All Types of Video Machinery Used in the Inspection of Pipe; Work in Caissons below 8 feet; Concrete Motor Buggy

GROUP 3: Respirator Required for Busting

GROUP 4: Form Setter; Road Finisher; Gunnite Nozzleman;

Sandblasters; Burning Torch; Concrete Saw Operators;

Utility Pile Driver; Tree Topper; Grout Machine and Grout Pump Operator

GROUP 5: Laser Beam Operator

GROUP 6: Welders; Wagon Drill & Air Track Drill; Self Contained Drill; Respirator Required due to Atmospheric Conditions (Excluding Respirators Required for Hazardous Waste & Toxic Materials, Asbestos Abatement or Lead Abatement)

GROUP 7: Chemical Waste - Men Working with Hazardous Waste & Toxic Materials or in Areas of Radioactive Material & Asbestos; The Removal of Asbestos from Roofs, Ceilings, Pipes, Walls, Boilers etc., and All Machinery, & the Recovering of Same; Removal of Lead

GROUP 8: Grade Checker & Blaster

GROUP 9: Supplied Air Respirators

For TUNNEL FREE AIR CLASSIFICATIONS

GROUP 1: General Laborer; Mole Nipper (one per shift); Top

Laborer

GROUP 2: Tenders for Divers

GROUP 3: Tunnel Workers; Miners; Drill Runners; Conveyor Men; Powder Carriers; Chuck Tenders; Trackmen; Nippers;

Burners; Brake Men; Derail Men; Cable Men; Hosemen; Grout Men; Gravel Men; Form Men; Bottom Bell; Top Bell; Signal Men; Movers; Shaft Men; Tunnel Laborers

GROUP 4: Blasters; Welders; Steel Erectors; Piledrivers;

Riggers; Ironmen

GROUP 5: Divers

For COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Top Laborers

GROUP 2: Top Bell; Signal Men; Shaft Men; Outside Man; Lock Tender; Gauge Tender; Outside Muck Lock Tender

GROUP 3: Top Nipper

GROUP 4: Bottom Bell; Mole Nippers per Working Shaft per Shift up to and Including Two Moles

GROUP 5: All Tunnel Workers Including Miners; Drill Runners;

Ironmen; Muck Men; Inside Mucklock Tender; Pumpmen;

Hydrualic Men; Shield Drivers; Monorail Operators;

Motormen; Conveyor Men; Powdermen; Pan Men; Chuck Tenders;

Track Men; Nippers; Brakemen; Derail Men; Cable Men; Hose Men; Grout Men; Gravel Men; Tunnel Laborers

GROUP 6: Blasters; Mucking Machine Operators

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day, Christmas Day, and Election Day

PAIN0004-002 05/01/2019

TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE,

PENDLETON, ROYALTON, SOMERSET and the eastern halves of CAMBRIA and WILSON

Painters: (HEAVY & HIGHWAY

CONSTRUCTION)

HEAVY & HIGHWAY

CONSTRUCTION

BRIDGES....................$ 38.50 28.40

PAINTERS

BRUSH & ROLLER.............$ 26.45 24.94

DRYWALL/TAPING.............$ 26.95 24.94

WALLCOVERING...............$ 26.45 24.94

PAIN0004-005 05/01/2019

TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD and the western halves of CAMBRIA and WILSON

Rates Fringes

Painters:

HEAVY & HIGHWAY

CONSTRUCTION

Bridge Painting............$ 38.50 28.40 Lead Abatement..............$ 26.45 23.54 Painters....................$ 25.95 23.54 Spraying, Paperhangers, Sand-Blasting, Swinging scaffold....................$ 26.45 23.54 Tapers......................$ 26.45 23.54

PAIN0004-011 05/01/2019

Rates Fringes

GLAZIER..........................$ 27.12 22.25

PLAS0111-002 07/01/2018

Rates Fringes

CEMENT FINISHER..................$ 30.00 33.17

PLUM0022-005 05/04/2020

Rates Fringes

Plumber and Steamfitter

ZONE 1......................$ 37.48 26.32

ROOF0074-002 06/18/2020

Roofers:

Composition.................$ 29.96 22.93 Slate & Tile................$ 30.11 22.93

* SFNY0669-001 04/01/2021

Rates Fringes

SPRINKLER FITTER.................$ 38.96 25.37

SHEE0071-002 05/27/2019

Rates Fringes

Sheet metal worker...............$ 34.38 25.04

TEAM0449-003 07/01/2016

Heavy & Highway

Rates Fringes

Truck drivers: (Includes Single Axle Dump and Off-Highway Dump Trucks).........$ 36.59 5.00+a+b

Work on a hazardous waste site then additional $2.00 per hour.

FOOTNOTE: a. Pension $54.00 per day

b. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and after the holiday

TEAM0449-006 06/01/2020

Heavy & Highway

Rates Fringes

Truck drivers: (Dump Truck Only, Excludes Single Axle Dump and Off-Highway Dump

Trucks)..........................$ 23.25 3.75+a

FOOTNOTE: a. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and after the holiday

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

REPLACEMENT FUEL BULK STORAGE FACILITY

HYDRANT REPAIR

NIAGARA FALLS AIR RESERVE STATION, NY

CERTIFIED FINAL DESIGN SUBMITTAL

SPECIFICATIONS VOLUME 1 OF 3

JUNE 10, 2021

CONTRACT NO.: W912QR-18-D-0011| TASK ORDER NO.: W912QR21F0109

P2#: 488039, 488040, 488041, and 495422

A/E PROJECT NO.: 1210132

REPLACEMENT FUEL BULK STORAGE FACILITY – HYDRANT REPAIR

NIAGARA FALLS AIR RESERVE STATION, NEW YORK

CERTIFIED FINAL DESIGN SUBMITTAL P2 # 488039, 488040, 488041, 495422

ARCHITECTURAL CIVIL

STRUCTURAL

FIRE PROTECTION FUELING

MECHANICAL

FUELING

ELECTRICAL

INTERIORS

BUILDING MECHANICAL

COA: Pond & Company

COA #: PEF000802

EXP: 06/30/2022

BUILDING ELECTRICAL

Repair of Fuel Hydrant System

Niagara Falls ARS, NY

PROJECT TABLE OF CONTENTS Page 1

FINAL DESIGN SUBMITTAL

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

00 80 00.00 O6A1 SIGN DETAIL

00 80 00.00 O6A2 SUBMITTAL REGISTER

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 46 00.00 06 TOTAL BUILDING COMMISSIONING

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL MANAGEMENT AND PROTECTION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL

SYSTEMS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 61 23 REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 83 13.00 06 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 07

THERMAL AND MOISTURE PROTECTION

07 14 00

FLUID-APPLIED WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

DIVISION 08 - OPENINGS

DIVISION 09 - FINISHES

DIVISION 10 - SPECIALTIES

07 21 29 SPRAYED INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COILING DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

09 29 00

GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL

09 97 13.27

PETROLEUM FUEL TANKS

HIGH PERFORMANCE COATING FOR STEEL STRUCTURES

10 14 00.20 INTERIOR SIGNAGE

10 26 00 WALL AND DOOR PROTECTION

10 44 16 FIRE EXTINGUISHERS

10 73 00 PRE-MANUFACTURED ALUMINUM CANOPIES

PROJECT TABLE OF CONTENTS Page 3

DIVISION 11 - EQUIPMENT

11 53 00 LABORATORY EQUIPMENT AND FUMEHOODS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 36 00 COUNTERTOPS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 48.19 BRACING FOR HVAC

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 82 46.00 40 ELECTRIC UNIT HEATERS

PROJECT TABLE OF CONTENTS Page 4

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 20 00 ELECTRICAL DISTRIBUTION SYSTEM

26 24 19.00 40 MOTOR CONTROL CENTERS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 13.00 20 CATHODIC PROTECTION BY GALVANIC ANODES

26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 06 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 01 29.61 PARTIAL DEPTH PATCHING OF RIGID PAVING

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 ROAD-MIX ASPHALT PAVING

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 13 15.20 CONCRETE PAVEMENT FOR CONTAINMENT DIKES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

PROJECT TABLE OF CONTENTS Page 5

DIVISION 33 - UTILITIES

33 01 50.31 LEAK DETECTION FOR FUELING SYSTEMS

33 01 50.55 CLEANING OF PETROLEUM STORAGE TANKS

33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

33 08 53A1 EQUIPIMENT TESTS

33 08 53A2 PERFORMANCE TESTING

33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 40 00 STORM DRAINAGE UTILITIES

33 52 23.15 POL SERVICE PIPING WELDING

33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT

33 52 43.13 AVIATION FUEL PIPING

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 52 43.23 AVIATION FUEL PUMPS

33 52 80 LIQUID FUELS PIPELINE COATING SYSTEMS

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 56 10A1 PETROLEUM BULK STORAGE APPLICATION

33 56 19 FUEL IMPERMEABLE LINER SYSTEM

33 56 21.17 SINGLE WALL ABOVEGROUND FIXED ROOF STEEL POL STORAGE TANK

33 56 21.17A1 API-653 OUT-OF-SERVICE INSPECTION

33 56 21.18 SINGLE WALL POL TANK UNDERTANK INTERSTITIAL SPACE

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

APPENDICES

APPENDIX A HAZARDOUS MATERIALS ASSESSMENT

APPENDIX B PRE-WORK NOTIFICATION

APPENDIX C STORMWATER POLLUTION PREVENTION PLAN

-- End of Project Table of Contents --

SECTION 00 80 00.00 0 6

SPECIAL PROVISIONS

AMENDMENT 001

PART 1 GENERAL

Attachments to this specification are as follows:

Construction Project Sign Details Project Submittal Register

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1153 (2010 R15) Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-600-01 (2016; with Change 2, 2018) Fire Protection Engineering for Facilities

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2019) Standard for Safeguarding Construction, Alteration, and Demolition Operations

U.S. ARMY (DA)

AR 530-1 Operation Security

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule

ER 415-1-15 Construction Time Extensions for Weather

ERDC/ITL TR-12-1 (2015) A/E/C Graphics Standard, Release 2.0

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926.59 Hazard Communication

40 CFR 260-265 Protection of Environment, Environmental

DOCUMENT 00 80 00.00 06 Page 1

CERTIFIED FINAL DESIGN SUBMITTAL

Protection Agency, Solid Waste

40 CFR 268 Land Disposal Restrictions

1.2 SUBMITTALS

Government approval/acceptance is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00.00 06

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Labor, Equipment, and Material Report ; G

Daily Equipment Report ; G

Radioactive Material/Equipment ; G

SD-02 Shop Drawings

Mechanical/Electrical Room Layout ; G

SD-04 Samples

Equipment Warranty Identification Tags ; G

SD-05 Design Data

SF1413 Statement and Acknowledgement

Local Agency Check

Progress Photographs

SD-07 Certificates

Warranty of Construction

NO ASBESTOS - CONTAINING MATERIAL (ACM) CERTIFICATION ; G

Insurance

Sales and Use Tax

SD-11 Closeout Submittals

Preliminary (Working) As-Built Drawings ; G

Final As-Built Drawings ; G

CAD Working As-Built Drawings ; G

Equipment-in-Place List

Maintenance and Parts Data

DOCUMENT 00 80 00.00 06 Page 2

Warranty Management Plan ; G

Waste Test Results

Storage Tanks - Fuels/Hazardous Materials Requirements

1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

Refer to clause 52.211-12 "LIQUIDATED DAMAGES" in Section 00 70 00 for the amount of Liquidated Damages for the project.

Refer to clause 52.211-10 "Commencement, Prosecution, and Completion of Work" in Section 00 70 00 for a notification of significant contract dates.

1.3.1 Additional Requirements/Clarifications of Work Included Within the Contract

a. The time stated in clause 52.211-10 "Commencement, Prosecution, and Completion of Work" in Section 00 70 00 for completion shall include as-built drawings, O&M manuals, operational tests/reports/training/instructions, equipment lists.

Milestones of Construction: In addition to complete the contract in accordance with Section 00 70 00, the work for all base bid items and exercised bid options, shall be required to meet the following milestones and shall be completed within the time specified for each milestone as follows:

Part 1: Complete concrete mix design for airfield pavement to the Contracting Officer's Representative (COR) and USACE Omaha District Transportation Systems Center within 135 days after NTP. COR will provide contact person for submittal of the mix design to TSC.

Part 2: Commencement of all construction activities associated with Phase 1 of the airfield pavement work as shown in the construction documents within 181 days after NTP. Contractor shall have written approval from the COR for the commencement of this work.

Part 3: Commencement of all construction activities associated with Phase 2 of the airfield pavement work as shown in the construction documents within 273 days after NTP. Contractor shall have written approval from the COR for the commencement of this work.

b. Those areas of the building receiving Government-furnished furniture and IT/Telecom equipment shall be made available for Government installation to begin no less than 90 calendar days prior to the contractor's accepted scheduled Construction Completion Date updated in accordance with clause 52.211-10 "Commencement, Prosecution, and Completion of Work" in Section 00 70 00. The Contractor shall participate in a Furniture Pre-Installation Building Inspection, Daily Furniture Installation Building Inspections, and a Final Furniture Installation Building Inspection along with the furniture installation supervisor and a Government representative.

1.3.2 Requirements for Completion of Designated Areas Prior to Furniture Installation

NOT USED.

DOCUMENT 00 80 00.00 06 Page 3

1.4 NOT USED

1.5 NOT USED

1.6 CONTRACT DRAWINGS AND SPECIFICATIONS

In addition to DFARS 252.236-7001 "Contract Drawings and Specifications" in Section 00 70 00 the following will apply:

a. After Award or no later than Notice to Proceed (NTP), the Government will furnish the Contractor a compact disk containing all technical contract documents in electronic media only. This disk will include a complete set of drawing files and technical specification files which have all amendments included. The disk will contain drawing files in PDF format along with technical specifications in PDF format. These PDF files are the contract documents that represent the construction requirements of the contract, and are being provided for the Contractor's use in printing paper copies of contract documents.

b. In addition, native CAD files(this includes, but not limited to, all source files, models, custom fonts and linestyles, plot files, and images used to create the contract drawings) are provided in accordance with the "AS-BUILT DOCUMENTS" paragraph for the Contractor's use in maintaining and preparing as-built plans. If another CAD Program is used other than the Using Agency's System, all native CAD files that were generated with that software and all support files will also be included. Only native files are to be used for As-Built preparation and information.

c. Native files are to be used for As-Built preparation only. The PDF files are the contract documents that represent the construction requirements of the contract.

1.7 AS-BUILT DOCUMENTS FOR DESIGN BID BUILD PROJECTS

1.7.1 General

This section covers the completion of final as-built drawings , as a requirement of the contract. The Contractor is responsible for maintaining paper copy working as-built drawings during the construction phase. These paper copy drawings will be used by the Contractor to prepare, maintain and submit the final as-built drawings

1.7.1.1 As-Built Drawings

An as-built drawing is a contract construction drawing revised to reflect the final as-built conditions of the project because of modifications, changes, corrections to the project design required during construction, submittals and extensions of design. The terms "drawings," "contract drawings," "drawing files," "working as-built drawings" and "final as-built drawings" refer to contract drawings that are revised to be used for the "RECORD DRAWING AS-BUILTS".

1.7.1.2 Government-Furnished Files

a. The Contractor will be provided electronic files at the beginning of construction for use during the construction phase which are to be maintained during construction for the preparation of as-builts. The

DOCUMENT 00 80 00.00 06 Page 4

Contractor shall be responsible to print two full size paper copies.

The Contractor shall enter changes and corrections on two sets of paper full size construction plans on a weekly basis in accordance with Paragraph "Maintenance of Working As-Built Drawings" in this section.

b. The Contractor is required to prepare final as-built drawings utilizing the native files provided by the Government. If translation is required, the original design models (CAD) shall be updated to As-Built conditions and then appropriately translated. Updating translated drawings will not be accepted. The contractor shall update the CAD working as-built drawings , in accordance with paragraph "Maintenance of Working As-Built Drawings", on a quarterly basis and submit them for independent Government review. Both paper and electronic documents shall be available at all times and shall be provided promptly to the Contracting Officer's Representatives when requested. The Contractor shall be responsible for backup of electronic files during construction and for controlling release of information.

c. The Contractor shall submit completed working paper as-built drawings to the Contracting Officer's Representative for completion of digital as-built drawings by others based on the paper copy markups maintained by the Contractor during construction.

1.7.2 Withholding

Maintenance of working as-builts is considered part of the value of the facilities being constructed and will not be paid for as a separate line item. All costs in conjunction with periodic as-built maintenance and final preparation shall be considered a subsidiary obligation of the Contractor.

1.7.2.1 Failure to Maintain

If the Contractor fails to maintain the working as-built drawings as specified herein, the Contracting Officer will deduct from the monthly progress payment an amount up to 10% or which, in the Contracting Officer's judgment, represents the estimated cost of bringing the as-built documents up to date. This monthly deduction will continue until an agreement can be reached between the Contracting Officer and the Contractor regarding the accuracy and completeness of working as-built documents. This includes conversion of submittals and other miscellaneous documents.

1.7.2.2 As-Builts Prepared by Contractor

The Contractor is required to prepare and provide final as-built drawings. The Contractor shall include an activity in the cost-loaded schedule for the final As-Built drawing submittal in the amount defined in the following paragraph. See LRL Section 01 32 01.00 06 , PROJECT SCHEDULE, para "Basis for Payment and Cost Loading". This amount shall be withheld and not paid until the final As-Built drawing submittal has been accepted by the Government.

Withholding for the final as-built drawing submittal shall be in the amount of: 1% for contract awards less than $5,000,000; $50,000 for contracts awarded from $5,000,000 to $10,000,000; or $100,000 for contracts awarded greater than $10,000,000. Withholding shall be withheld

DOCUMENT 00 80 00.00 06 Page 5 until the final as-built drawing submittal has been approved and accepted by the Government.

1.7.3 Maintenance of Working As-Built Drawings

The Contractor shall revise two (2) sets of paper drawings by red-line process to show the as-built conditions during the prosecution of the project.