W912QR21R0006Plans_Vol1-0000.pdf
PDF 46 MB Posted
- Solicitation number
- W912QR21R0006
About this file
This solicitation seeks proposals for a construction project to replace and construct a Type III hydrant fuel system at Wright Patterson Air Force Base in Ohio. The project scope includes constructing new aboveground storage tanks, a pump house, hydrant loop piping, and truck offload and hydrant hose stations. Demolition work involves removing underground storage tanks and a Type II pumphouse. The contract will be firm-fixed-price, awarded using best value tradeoff procedures to the technically acceptable offer with the lowest price. The North American Industry Classification System code is 237120. The construction value is estimated between $10-25 million. The Department of the Army Corps of Engineers Engineering District Louisville will serve as the contracting agency. Proposals are due by the date specified in the solicitation, which is available for download on SAM.gov.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B U
R N
S
M c D
O N
N E
L L
W
A R
D
P
A R
K W
A Y
K A
N S
C
I T
Y
O
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
T
E
N G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
H
Y D
R A
F
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
D
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
L
B
M I T
T A
L
\\bmcd\dfs\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_G-000.dwg
9/25/2020 12:39:12 PM
G-000
C O
V E
R
V
O L U
R
B E
T T
M E
N G
J
E I C
H E
N B
E R
G E
R
C
S T
E W
A R
T
US Army Corps of Engineers
VICINITY MAP LOCATION MAP
N
N
TOLEDO
SANDUSKY
LORAIN
EUCLID
ASHTABULA
CLEVELAND
WARREN
YOUNGSTOWN
KENT
AKRON
ALLIANCE
BARBERTON
STRONGSVILLE
ELYRIA
FREMONT
NORWALK
BOWLING GREEN
DEFIANCE
FOSTORIA
FINDLAY
VAN WERT
LIMA
BUCYRUS
ASHLAND
WOOSTER
MASSILLON
CANTON
EAST LIVER POOL
NEW PHILADELPHIA
STEUBENVILLE
MT. VERNON
COSHOCTON
CAMBRIDGE
NEWARK
ZANESVILLE
GAHANNA
LANCASTER
WESTERVILLE
UPPER ARLINGTON
BELLEFONTAINE
SIDNEY
S
C
I O
T
O
MARION
MANSFIELD
GREENVILLE
SPRINGFIELD
DAYTON
BEAVERCREEK
WASHINGTON COURT HOUSE
KETTERING
MIDDLETOWN
HAMILTON
FAIRFIELD
CINCINNATI
HILLSBORO
JACKSON
CHILLICOTHE
ATHENS
GALLIPOLIS
PORTSMOUTH
MARIETTA
M
U
S
K
I
N
G
U
M
R
I
V
E
R
O
H
I O
IRONTON
GRAND
LAKE
COLUMBUS
CIRCLEVILLE
CAMPBELL
HILL 1549
PARMA
PYMATUNING
RESERVOIR
CUYAHOGA FALLS
SITE
LOCATION
PROJECT
LOCATION
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND
ACCEPTANCE OF ALL DRAWINGS IN THIS SET AS SHOWN IN THE INDEX
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND
ACCEPTANCE OF ALL DRAWINGS IN THIS SET AS SHOWN IN THE INDEX
REVIEWED BY:
QUALITY ASSURANCE DATE
ACCEPTANCE RECOMMENDED:*
PROJECT ENGINEER / ARCHITECT DATE
ACCEPTED:*
CHIEF, ENGINEERING DIVISION DATE
* THIS PROJECT WAS DESIGNED UNDER THE SUPERVISION OF THE U.S. ARMY CORPS OF ENGINEERS, LOUISVILLE DISTRICT.
INDIVIDUALS WHOSE SIGNATURE AND REGISTRATION DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT; SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
LOUISVILLE DISTRICT
WRIGHT-PATTERSON AIR FORCE BASE, OHIO (AFMC)
FY 21 REPLACE HYDRANT FUEL SYSTEM
VOLUME 1 OF 2
DESIGN SOLICITATION: P.N. DESC1907
SOLICITATION NO.: --
CONTRACT NO.: W9128F-17-D-0019
P2 NUMBER: 471113
ISSUE DATE: --
20 November 2020
W912QR21R0006
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
DRAWING INDEX - VOLUME I
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_G-001.dwg
10/1/2020 4:23:19 PM
G-001
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
D R
A W
I N
G
I N
D E
X
V
O L U
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
COMPACTED SUBGRADE (DETAIL)
MISCELLANEOUS MATERIAL (DETAIL)
CULVERT WITH END SECTIONS
BUILDINGS AND STRUCTURES
6" DRAINAGE LAYER (DETAIL)
SECTION INDICATORS
SIGN
CENTERLINE
MATCH LINE
END SECTION
LETTER DESIGNATION
OF SECTION/DETAIL
DWG. NO. WHERE
SECTION IS DETAILED
PROPOSED DESCRIPTION
PROPOSED LEGEND
PROPOSED DESCRIPTION
ABBREVIATIONS
EXISTING DESCRIPTION
SURVEY LEGEND
SANITARY SEWER
STORM WATER SEWER
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
FUEL MAIN PIPE
GAS LINE
WATER MAIN
FENCE
CONCRETE (DETAIL)
ASPHALT (DETAIL)
UTILITY EASEMENT
BUILDING LINE
STORM SEWER
S
D
CO
FIRE HYDRANT
GAS VENT PIPE (GVP)
ROOF OVERHANG
FOUND PROPERTY CORNER
SANITARY SEWER
WATERLINE VALVE
SSCO CLEANOUT
GASLINE VALVE
LIGHT POLE
CO
FLUSH MOUNT LIGHT
CLEANOUT
SPOT ELEVATION
SURVEY CONTROL MONUMENT
E
COMMUNICATIONS MANHOLE
SINGLE GRATE DROP INLET
DOUBLE GRATE DROP INLET
EMH - ELECTRIC MANHOLE
C
E
MISCELLANEOUS STRUCTURE
/TREES DEMOLITION
SAWCUT (FULL DEPTH)
MISCELLANEOUS DEMOLITION
UTILITY DEMOLITION
CHAIN-LINK FENCE
SEEDED AREA
GRAVEL SERVICE DRIVE
SITE CONCRETE
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED SURFACE SLOPE
PROPOSED SPOT ELEVATION
LIMITS OF WORK
SF SILT FENCE
-0.50%
1277.16
SF SILT FENCE
1277.16
-0.50%
LIMITS OF WORK
PROPOSED SPOT ELEVATION
PROPOSED SURFACE SLOPE
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
TEMPORARY ASPHALT
CONSTRUCTION ACCESS ROAD
SITE ASPHALT PAVEMENT
GRANULAR MATERIAL (DETAIL)
AGGREGATE (DETAIL)
X
ELECTRIC OR TELEPHONE
JUNCTION BOX
CATHODIC PROTECTION
TEST STATION
OH
F
X
DESCRIPTION
STORM INLET PROTECTION
(SILT FENCE)
EXISTING MAJOR CONTOUR815
815.5 EXISTING MINOR CONTOUR
ST
MILL / OVERLAY DEMOLITION
ASPHALT DEMOLITION
CONCRETE DEMOLITION
CLEARING AND GRUBBING
MILL / OVERLAY AND
CONCRETE RUBBLIZATION
MILL / OVERLAY AND RUBBLIZE
CONCRETE RUNWAY KEEL SECTION
AAFM ASSISTANT AIRFIELD MANAGER
ABC AGGREGATE BASE COURSE
AC ADVISORY CIRCULAR
AC ACRE
ACM
ASBESTOS CONTAINING
MATERIAL
AFB AIR FORCE BASE
AFI AIR FORCE INSTRUCTIONS
AGL ABOVE GROUND LEVEL
ASTM
AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ATFP
ANTI-TERRORISM/FORCE
PROTECTION
ATAC
AIRBORNE TACTICAL
ADVANTAGE COMPANY
ATCT AIR TRAFFIC CONTROL TOWER
BBL BARREL
B/C BACK OF CURB
BCE BASE CIVIL ENGINEERING
BLDG BUILDING
B/L BUILDING LINE
BM BENCHMARK
CATV CABLE TELEVISION
C/COMM COMMUNICATIONS
CB CATCH BASIN
C-C CENTER TO CENTER
CDV CONTAINMENT DRAIN VALVE
CE CIVIL ENGINEER
CEG CIVIL ENGINEER GROUP
CEIEA
CIVIL ENGINEERING
INSTALLATION ENVIRONMENTAL
ASSESSMENT
CD CONTAINMENT DRAIN
CL C/L CENTER LINE
CMH COMMUNICATIONS MANHOLE
COE CORPS OF ENGINEERS
CONC CONCRETE
CPNODE
CATHODIC PROTECTION
SYSTEM NODE
CI CURB INLET OR CAST IRON PIPE
CGI CURB/GUTTER INLET
C.L. FEN CHAIN-LINK FENCE
CO CLEAN OUT
COMM COMMUNICATION
CONC CONCRETE
COR
CONTRACTING OFFICER'S
REPRESENTATIVE
DCW DOMESTIC COLD WATER
DEPT DEPARTMENT
DI DUCTILE IRON OR DROP INLET
DIA DIAMETER
DS DOWNSPOUT
DWG DRAWING
E EAST
E ELECTRICAL
ECP ENTRY CONTROL POINT
EFSO EMERGENCY FUEL SHUT OFF
ELEC ELECTRICAL
EL/ELEV ELEVATION
EMH ELECTRICAL MANHOLE
EPDS
ELECTRICAL POWER
DISTRIBUTION SYSTEM
FAA
FEDERAL AVIATION
ADMINISTRATION
FD FOUND
FDC
FIRE DEPARTMENT
CONNECTION
FES FLARED END SECTION
FH FIRE HYDRANT
FHWA
FEDERAIL HIGHWAY
ADMINISTRATION
F/FL FINISH FLOOR
FL FLOW LINE
FM FORCE MAIN
FOD FOREIGN OBJECT DEBRIS
FT FOOT
FW FIREWATER
G GAS
GAS REG GAS REGULATOR
GCA
GRANULAR COARSE
AGGREGATE
GI GRATED INLET
GM GAS METER
GOVT GOVERNMENT
GPM GALLONS PER MINUTE
GSV GAS SERVICE VALVE
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
HQ HEADQUARTERS
INV INVERT
IW INDUSTRIAL WASTE
IWFM INDUSTRIAL WASTE FORCE MAIN
IWLS
INDUSTRIAL WASTE LIFT
STATION
IWMH INDUSTRIAL WASTE MANHOLE
IWTP
INDUSTRIAL WASTE TREATMENT
PLANT
IV IRRIGATION VALVE
JF JET FUEL
LEV LOW-EMITTING VEHICLE
MAX MAXIMUM
MCD MIAMI CONSERVANCY DISTRICT
MH MANHOLE
MIN MINIMUM
MUTCD
MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
MW MONITORING WELL
N NORTH
NAVAID NAVIGATIONAL AIDS
NIC NOT IN CONTRACT
NO NUMBER
NOTAM NOTICE TO AIRMEN
NPW NON-POTABLE WATER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPS OPERATIONS
OSHA
OCCUPATIONAL SAFETY &
HEALTH ADMINISTRATION
PBX PULL BOX
PCAN PULL CAN
PCC PORTLAND CEMENT CONCRETE
PE POLYETHYLENE
PED PEDESTAL
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
P/L PROPERTY LINE
PM PROJECT MANAGER
PMT PAD MOUNT TRANSFORMER
POL
PETROLEUM, OIL, AND
LUBRICANTS
POV PRIVATELY OWNED VEHICLE
PRT PROCESS RECOVERY TANK
PVC POLYVINYL CHLORIDE
PWU PUBLIC WORKS & UTILITIES
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RD ROAD
RFDC
REMOTE FIRE DEPARTMENT
CONNECTION
R/W RIGHT OF WAY
SAN SANITARY SEWER
SD STORM DRAIN
SDI STORM DRAIN INLET
STD STORM DRAIN TANK
S.R. FEN SPLIT-RAIL FENCE
SS SANITARY SEWER
SSFM SANITARY SEWER FORCE MAIN
SSHO
SITE AND SAFETY AND HEALTH
OFFICER
SSLS SANITARY SEWER LIFT STATION
SSMH SANITARY SEWER MANHOLE
ST, SD
STORM SEWER, STORM DRAIN,
STREET
STM STORM
SWP3
STORM WATER POLLUTION
PREVENTION PLAN
SWPP
STORM WATER POLLUTION
PREVENTION
TBM TEMPORARY BENCHMARK
T/C TOP OF CURB
TELE TELEPHONE
TEMP TEMPORARY
TW TAXIWAY
TYP TYPICAL
UD UNDERDRAIN
UFC UNIFIED FACILITIES CRITERIA
UG UNDERGROUND
USAF UNITED STATES AIR FORCE
USC UNITED STATES CODE
UST UNDERGROUND STORAGE TANK
UXO UNEXPLODED ORDINANCE
W, WA
WATER
WM WATER METER
WPAFB
WRIGHT PATTERSON AIR FORCE
BASE
WSV WATER SERVICE VALVE
WV WATER VALVE
WWF WELDED WIRE FABRIC
XFMER ELECTRICAL TRANSFORMER
DESCRIPTION DESCRIPTION
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_GC001.dwg
9/30/2020 10:13:23 PM
GC001
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
C I V
I L
L E
G E
B
R E
V I A
T I O
N S
X-XXX
X#
X#
XXXXX
EDPS SYMBOL
COMMUNICATION LINE
LIGHT POLE
FOUNDATION/FIXTURE
COMM
EPDS
LIGHT POLE
FOUNDATION/FIXTURE
COMPACTED SUBGRADE (DETAIL)
EU
ABOVE GROUND HOT WATER
LINE
FIRE WATER LINE
WATER LINE
DOMESTIC WATER LINE
CONTAINMENT DRAIN LINE
STORM DRAIN LINE
SANITARY SEWER LINE
BELOW GRADE FUEL LINE
ABOVE GRADE FUEL LINE
6" CD
6" SS
12" JF
2" DCW
8" W
6" SD
10" FW
CONTAINMENT DRAIN VALVE
STORM CONCRETE HEADWALL
STORM MANHOLE
CONTAINMENT DRAIN INLET
CATCH BASIN
FIRE HYDRANT
WATER GATE VALVE AND VALVE
BOX
CDT-1
SDI-1
CDV-1
HW-1
U/E
B/L
ROH
SGDI
DGDI
SWALE / DRAINAGEWAY
E
C
DOWELED CONSTRUCTION JOINT
DOWELED CONTRACTION JOINT
CDT CONTAINMENT DRAIN TANK
SDMH STORM DRAIN MANHOLE
10/29/20
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
M
W
E
FF
C
EPDS
E
C
EPDS
EPDS
PP#_
CO
CP
W
W
CC
W
W
C
C
C
C
W
C
C
S
E
E
C
C
C
C
M
W
C
C
S
C
C
C
C
C
TBM 1
TBM
WEST RAMP FLANGE
CONNECTION PIT
TOP EL. = 816.91
EMERGENCY FUEL
SHUT OFF (TYP)
UNDERGROUND
HOT WATER LINES
MH NOT FOUND
UPSTREAM
C
B
CB
C
B
CB
CB
C
B
C
B
C
B
CB
C
B
CB
C
B
CB
C
B
CB
CB
CB
E
E
E
E
E
E
E
CB
C
B
M
100N 673466.92
E 1535270.49
ELEV 816.26
101N 673234.21
E 1535063.08
ELEV 816.01
N
673505.54
E 1535457.42
ELEV 817.00
W
P3
N 673517.54
E 1535428.71
ELEV 816.78
W
P4N 673324.63
E 1535198.98
ELEV 816.14
W
P5N 673185.02
E 1535030.49
ELEV 815.06
W
P6
N 673398.56
E 1534821.21
ELEV 815.60
SCHWIENFORT AVE
V A
N D
E N
B U
G
A
D
B U
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
SCALE 1"=1000'
LOCATION PLAN
A1
RUNWAY 5R-23L
TW B
PROJECT LOCATION
OLD GATE 26A (CLOSED)
GATE 16A
RUNWAY 5L-23R
TW A
TW A
WEST RAMP
LO
O
P R O
AD
D
O
U
G
L
C
H
A
M
B
E
R
S
B
U
S
T
A
AIRFIELD TRAFFIC CONTROL
TOWER (ATCT) AIR OPERATIONS
AIRFIELD MANAGEMENT (BUILDING 206)
FIRE DEPARTMENT
S
K
E
V
E
MEDICAL CENTER
GATE 12A
STATE ROUTE 844
PASS AND
REGISTRATION
(BUILDING 286)
F
R
E
E
D
M
O
R
I
G
H
W
T
A
H
E
B
B
E
K
R
I V
E
R
V
I
M A
D R
IV
E
R
V
A
L
L
P
K
E
(STATE RT 4)
FIRE DEPARTMENT
A
P
R
O
N
N
2000'0 1000'
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_GC002.dwg
7/23/2020 3:13:44 PM
GC002
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
L O
C A
T I O
N
P
L A
N
GATE 26A
POL / OPS
BUILDING
10/29/20
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
GENERAL NOTES:
1. WRIGHT PATTERSON AFB BASE CIVIL ENGINEERING FORM AF-103 DIG PERMIT
SHALL BE OBTAINED FROM THE 88TH AIR BASE WING CE OFFICE FOR APPROVAL
SIGNATURES. THIS MAY TAKE APPROXIMATELY 3 WEEKS OR MORE TO COMPLETE.
UPON COMPLETION CONTRACTOR SHALL CALL OHIO UTILITY PROTECTION SERVICE
FOR UTILITY LOCATE SERVICES AT 1-800-862-2764.
2. CONTRACTOR IS REQUIRED TO FILE FAA FORM 7460 IN REFERENCE TO THE
CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT. SEE TEMPORARY
CONSTRUCTION CRANE AND STOCKPILE HEIGHT NOTES ON GC004. CONTRACTOR
SHALL COORDINATE WITH WRIGHT PATTERSON BASE CE OFFICE FOR ANY
TEMPORARY AIRFIELD WAIVERS. REQUEST LOCAL AIRFIELD CONSTRUCTION
WAIVERS FROM 88TH ABW/CENP COMMUNITY PLANNING AT LEAST 45-60 DAYS
PRIOR TO CONSTRUCTION ACTIVITY START DATE. LOCAL AIRFIELD CONSTRUCTION
WAIVERS WILL BE APPROVED AFTER THE CONTRACTOR HAS RECEIVED FAA
APPROVAL/DETERMINATION.
3. REFER TO THE PLANS AND SPECIFICATIONS FOR DETAILS ON STORMWATER
POLLUTION PREVENTION MEASURES FOR THIS PROJECT. CONTRACTOR IS
RESPONSIBLE FOR FOLLOWING THE SWPPP AND FOLLOWING ALL OHIO
ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS FOR EROSION CONTROL.
4. THE STABILIZED CONSTRUCTION ACCESS ROAD ENTRANCE LOCATION, AS SHOWN
ON THE PLANS, SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED
AND APPROVED BY THE CONTRACTING OFFICER AND AIRFIELD OPERATIONS.
5. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT AIRFIELD
MANAGEMENT, EXTERIOR ELECTRIC OR COMMUNICATIONS SHOPS, AND
CONTRACTING OFFICER, IF A UTILITY LINE OR COMMUNICATIONS CABLE IS
DISTURBED.
6. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF CONSTRUCTION
DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL PROVIDE EQUIPMENT AND
PERSONNEL TO CLEAN ANY STREETS AS REQUESTED BY THE CONTRACTING
OFFICER. CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING
AREAS, AND BASE OR GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR
CONSTRUCTION ACTIVITIES. PRIOR TO THE START OF CONSTRUCTION, DOCUMENT
THE CONDITION OF ALL HAUL ROUTES WITH THE CONTRACTING OFFICER USING
VIDEO AND PHOTOGRAPHS. ACCESS POINTS, HAUL ROUTES, LAYDOWN AREA AND
ANY OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO
THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER.
CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR A
PRE-CONSTRUCTION VIDEO DETAILING THE EXISTING CONDITION OF ACCESS
POINTS, HAUL ROUTES, AND LAYDOWN AREAS TO BE PERFORMED. THESE AREAS
INCLUDE BUT ARE NOT LIMITED TO, THE STAGING AREA, VEHICLE HAUL ROUTES
AND AIRFIELD HAUL ROUTES, AND ANY ACCESS ROADS. FOR ADDITIONAL
INFORMATION CONTACT 88 CEG/CEIEA AIR PM, CHRIS TUMBUSCH AT 937-257-2455
OR CHRISTOPHER.TUMBUSCH@US.AF.MIL.
7. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF
STATE, LOCAL, AND GOVERNMENT REGULATORY AGENCIES AND THE
CONTRACTING OFFICER.
8. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS, STATE, LOCAL, AND GOVERNMENT CODES, ORDINANCES, AND
REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN
REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST
STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST
STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CONTRACTING OFFICER IN
WRITING. THE DECISION OF THE CONTRACTING OFFICER SHALL BE CONSIDERED
FINAL.
9. INSTALL A TEMPORARY FENCE AROUND THE CONSTRUCTION STAGING AREA AND
LAYDOWN AREAS FOR SECURITY OF EQUIPMENT AND MATERIALS AS DIRECTED BY
CONTRACTING OFFICER.
10. CONSTRUCTION SITE PERIMETER FENCE SHALL BE 4 FOOT TALL ORANGE SAFETY
FENCE AND SHALL BE PROPERLY SECURED. THE CONTRACTOR SHALL INSTALL A 7
FOOT CHAIN LINK FENCE AND DOUBLE LEAF SECURITY GATE FOR ACCESS INTO THE
AOA.
11. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE CONTRACTING
OFFICER. DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN BASE APPROVAL IS
RECEIVED. ALL EXISTING UTILITIES ARE TO BE TERMINATED AT THEIR POINT OF
CONNECTION TO THE MAINS. WHERE CONNECTIONS OF NEW UTILITIES TO EXISTING
UTILITIES ARE SHOWN ON THE PLANS, THE CONTRACTOR SHALL EXPOSE THE
EXISTING LINES AT THE PROPOSED CONNECTIONS TO VERIFY THE LOCATIONS AND
DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
12. THE CONTRACTOR SHALL EXPOSE, VERIFY AND BACKFILL ALL EXISTING
UNDERGROUND UTILITIES AND STRUCTURES AT UTILITY CROSSINGS PRIOR TO
EXCAVATION OF PIPELINE TRENCH. UTILITY CROSSINGS AT A DEPTH GREATER
THAN 12-INCHES BELOW TRENCH BOTTOM DO NOT NEED TO BE EXPOSED. UTILITY
ALIGNMENT AND GRADE MAY BE CHANGED IF THERE ARE CONFLICTS WITH ANY
EXISTING UNDERGROUND UTILITIES AND STRUCTURES, WHETHER SHOWN ON THE
PLANS OR NOT. COORDINATE WITH THE CONTRACTING OFFICER AND DESIGN
ENGINEER.
13. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND ANY
MATERIAL STOCK PILES AS NECESSARY TO CONTROL EROSION AND STORM WATER
RUNOFF, IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS.
ACCESS AND SAFETY NOTES:
1. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL, VEHICLES, AND
EQUIPMENT IS ILLUSTRATED ON THE DRAWINGS. ACCESS ROUTES MAY BE
SUBJECT TO CHANGE BASED ON OPERATIONAL REQUIREMENTS ON WRIGHT
PATTERSON AFB. POTENTIAL SCHEDULE IMPACTS SHALL BE COORDINATED WITH
THE CONTRACTING OFFICER.
2. THE EXISTING BASE ROAD SPEED LIMITS AND LOAD LIMITS ARE STRICTLY
ENFORCED. ALL OVERWEIGHT VEHICLES, PER THE FEDERAL HIGHWAY
ADMINISTRATION, SHALL PUT DOWN EXTRA AXLES WHEN TRAVELING ON WRIGHT
PATTERSON AFB PROPERTY.
3. CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY PAINTED SIGN,
MEETING CONTRACTING OFFICER APPROVAL, AT THE TEMPORARY CONSTRUCTION
ENTRANCE TO THE STAGING AREA TO DIRECT MATERIAL SUPPLIERS AND
EMPLOYEES TO THE CONSTRUCTION SITE. CONTRACTOR SHALL PROVIDE A
MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER REGARDING
OVERSIZED OR CONSTRUCTION DELIVERIES TO THE WRIGHT PATTERSON AFB
TRUCK GATE PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE SCHEDULED
MONDAY - FRIDAY, 0600 TO 1800. CONTRACTOR SHALL COORDINATE DELIVERIES
WITH BASE SECURITY FORCES BY SUBMISSION OF THE CORRECT ENTRY PASS
PAPERWORK VIA THE CONTRACTING OFFICER.
4. CONTRACTOR'S STAGING AREA AND POV EMPLOYEE PARKING WILL BE LOCATED AS
INDICATED ON SHEETS GC006 AND GC007, AND AS DIRECTED BY THE CONTRACTING
OFFICER. CONTRACTOR MAY SUBMIT ALTERNATIVES TO STAGING AREA LOCATIONS
AS SHOWN. CONTRACTOR'S STAGING AREA SHALL BE SUBJECT TO APPROVAL OF
CONTRACTING OFFICER. SUBMIT PROJECT OFFICE/MATERIAL STAGING AREA
REQUEST TO 88TH ABW/CENP COMMUNITY PLANNING
(88THABW.CEAO.COMMUNITY@US.AF.MIL) AT LEAST 30 DAYS PRIOR TO REQUIRED
OCCUPANCY DATE.
5. EXISTING BASE ROADS USED AS HAUL ROADS SHALL BE MAINTAINED SUCH THAT
UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES FROM THE ROAD TO
THE STAGING AREA AND FROM THE STAGING AREA TO THE WORK SITE AND
FACILITATE GOVERNMENT ACCESS TO THE BASE AT ALL TIMES. THE HAUL ROAD
LOCATIONS SHALL BE AS INDICATED IN SHEETS GC006, AND GC007 AND APPROVED
BY THE CONTRACTING OFFICER.
6. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A
MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL
TIMES WITHOUT DELAYS TO EMERGENCY VEHICLE'S RESPONSE TIME.
7. ALL AREAS DISTURBED BY ANY CONSTRUCTION ACTIVITIES INCLUDING BORROW
AREAS, STOCKPILE AREAS, MATERIAL LAYDOWN , EQUIPMENT PARKING,
CONTRACTOR PARKING, EARTHWORK ACTIVITIES, UTILITY TRENCHING, ETC. SHALL
BE RESTORED TO EQUAL OR BETTER THAN EXISTING CONDITIONS. ALL AREAS NOT
DESIGNATED FOR PAVEMENT OR GRAVEL SURFACING SHALL BE COVERED WITH A
MINIMUM 4-INCHES OF TOPSOIL, SEEDED, AND IRRIGATED/MAINTAINED FOR A
MINIMUM OF 12 MONTHS OR UNTIL 95% COVERAGE OF GROUND COVER PER THE
UFGS SECTION 32 92 19.
8. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY WRIGHT
PATTERSON AFB SECURITY POLICE WHEN ENTERING THE BASE AND MAY
EXPERIENCE DELAYS. ALL PERSONNEL ENTERING WRIGHT PATTERSON AFB MUST
HAVE A VALID PHOTO ID PER BASE SECURITY REQUIREMENTS. ALL VEHICLES
ENTERING THE BASE MUST HAVE CURRENT/VALID REGISTRATION, CURRENT/VALID
INSURANCE, AND CURRENT/VALID DRIVER'S LICENSE FOR THE OPERATOR. ALL
CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR
COORDINATING WITH THE BASE SECURITY OFFICER IN OBTAINING PROPER
SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING SECURE AREAS.
9. MISCELLANEOUS CONTRACTOR ACCESS PROCEDURES: PERIODIC AIR FORCE
EXERCISES MAY OR MAY NOT IMPACT DAILY ENTRY PROCEDURES TO WORK AREAS
ON WRIGHT PATTERSON AFB. IN ADDITION, ALL CONTRACTOR PERSONNEL MAY BE
REQUIRED TO LEAVE AN AREA AND RE-ACCOMPLISH ENTRY PROCEDURES. IN THE
EVENT OF AN EMERGENCY THAT REQUIRES EVACUATION FROM THE AREA,
CONTRACTOR SHALL COMPLY WITH THE INSTRUCTIONS FROM SECURITY FORCES
AND AIRFIELD MANAGEMENT AS APPLICABLE.
10. CONTRACTOR SHALL PROVIDE ALL NECESSARY WATER AND TOILET FACILITIES FOR
HIS WORKERS WITHIN THE CONSTRUCTION ZONE. CONTRACTOR WORKERS SHALL
NOT USE GOVERNMENT FACILITIES UNLESS SPECIFICALLY INDICATED OTHERWISE.
LOCATIONS OF FACILITIES SHALL BE COORDINATED WITH CONTRACTING OFFICER.
11. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, THE CONTRACTOR'S
CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE PARKED WITHIN THE WORK
AREA/STAGING AREA.
12. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE CONCERNING ANY GOVERNMENT OWNED EQUIPMENT
REQUIRING RELOCATION TO COMPLETE THE PROJECT.
13. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION
ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, POLICE,
LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE.
14. THE CONTRACTOR SHALL ATTEND THE PRE-CONSTRUCTION MEETING, WEEKLY
CONSTRUCTION PROGRESS MEETINGS, AND DAILY CONSTRUCTION OPERATIONS
MEETINGS AT A LOCATION TO BE DETERMINED BY THE CONTRACTING OFFICER.
15. THE GOVERNMENT WILL ALLOW THE CONTRACTOR TO OBTAIN WATER AND
ELECTRIC SERVICE AT NO COST FOR THE CONSUMABLE COMMODITY. THE
CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH EQUIPMENT,
TRANSMISSION CONNECTIONS, ETC. ALL OTHER UTILITY CONNECTIONS MUST BE
ARRANGED AND PAID FOR DIRECTLY BY THE CONTRACTOR WITH THE
APPROPRIATE UTILITY AGENCY. DETERMINE THE AVAILABILITY OF UTILITIES AND
COORDINATE SETUP AND ACTIVATION OF THOSE UTILITIES WITH THE CONTRACTING
OFFICER.
16. THE CONTRACTOR IS RESPONSIBLE FOR TRANSPORTATION OF CONTRACT
EMPLOYEES TO AND FROM THE PROJECT SITE IN A CONTRACTOR MARKED VEHICLE
WITH A VEHICLE PASS. PERSONAL VEHICLES CANNOT BE PARKED IN THE
CONTRACTORS AIRFIELD WORK AREA.
TRAFFIC CONTROL:
1. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY
DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE.
CONTRACTOR SHALL PROVIDE EACH CRANE WORKING INSIDE THE AIRFIELD
SECURITY FENCE WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD BE AT
LEAST 3-FOOT SQUARE HAVING INTERNATIONAL ORANGE AND WHITE CHECKERED
PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
2. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO
SOUND AN ALARM WHEN MOVING IN REVERSE.
3. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING
PAVEMENT-TO-REMAIN. STEEL BUCKETS FROM CONSTRUCTION EQUIPMENT SHALL
NOT BE PLACED IN DIRECT CONTACT WITH ANY PAVEMENT TO REMAIN.
4. CONTRACTOR SHALL PROVIDE A MINIMUM 21 DAY NOTICE TO WRIGHT PATTERSON
AFB AND THE CONTRACTING OFFICER PRIOR TO ANY REQUESTED ROAD CLOSURE.
THE 21 DAY ADVANCE NOTICE DOES NOT MEAN THE REQUEST WILL BE
AUTOMATICALLY APPROVED. THE 21 DAYS PROVIDES NECESSARY TIME FOR THE
COR TO COORDINATE AND VERIFY IF CLOSURE IS ACCEPTABLE. CONTRACTOR
SHALL WORK WITH THE BASE CE AND CONTRACTING OFFICER TO FINALIZE DATES
IF THE BASE HAS CONFLICTS WITH OTHER ACTIVITIES AND AIRFIELD MANAGEMENT.
5. CONTRACTOR SHALL ATTEND CONTROLLED AREA TRAINING AND AIRFIELD DRIVING
COURSE AS REQUIRED/DETERMINED BY THE AIRFIELD MANAGER (AFM) OR
ASSISTANT AIRFIELD MANAGER (AAFM). COORDINATE WITH AFM/AAFM FOR
SCHEDULING.
5.a. AIRFIELD TRAINING WILL CONSIST OF AIRFIELD DRIVING TRAINING TO QUALIFY
PERSONNEL TO DRIVE ON THE AIRFIELD. DEPENDING ON WHETHER OR NOT
THE CONTRACTOR WILL BE REQUIRED TO CONTACT THE TOWER WILL
DETERMINE THE LENGTH OF THE COURSE. IF RADIO COMMUNICATIONS IS
REQUIRED, CLASS CAN LAST UP TO 8 HOURS DEPENDING ON THE SIZE OF THE
CLASS. IF NOT, TRAINING CAN BE ACCOMPLISHED IN APPROXIMATELY 4 HOURS.
AGAIN, BASED ON THE SIZE OF THE CLASS. CONTRACTOR TO ASSUME 8 HOUR
TRAINING SESSION FOR THE PERSONNEL INDICATED BELOW.
5.b. ADDITIONAL TRAINING WILL CONSIST OF A 30-MINUTE BRIEF REGARDING
PROCEDURES AND PROTOCOLS WHILE WORKING IN THE AIRFIELD
CONTROLLED AREA. ALL PERSONNEL WHO WILL BE WORKING ON THE AIRFIELD
PRIOR TO THE ESTABLISHMENT OF THE FREE ZONE WILL NEED TO
ACCOMPLISH THIS TRAINING.
5.c. PERSONNEL WHO TYPICALLY ATTEND THIS TRAINING ARE:
PRIME AND/OR SUBCONTRACTOR SUPERINTENDENT
PRIME AND/OR SUBCONTRACTOR FOREMAN
PRIME SSHO AND QUALITY CONTROL
ALTERNATE PERSONNEL SHALL ATTEND IF ANY OF THE ABOVE ARE UNABLE TO
COMPLETE THIS TRAINING. SUBCONTRACTORS ARE NOT REQUIRED TO ATTEND
BUT HIGHLY RECOMMENDED, BUT THE PRIME CONTRACTOR SUPERINTENDENT,
FOREMAN, SSHO AND QC ARE REQUIRED TO ATTEND. IF THEY WOULD LIKE TO
ADD PERSONNEL, THEY CAN COORDINATE WITH USACE/AIRFIELD
MANAGEMENT PRIOR TO CLASS DATE.
6. CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS DEPOSITED ON
ADJACENT AIRFIELD PAVEMENTS, HAUL ROUTES, ONTO SITE, ETC. FROM
CONTRACTOR'S EQUIPMENT OR OPERATIONS. MATERIAL DROPPED WITHIN THESE
AREAS SHALL BE CONTINUOUSLY REMOVED BY SURFACE SWEEPERS OR OTHER
APPROVED METHODS DURING WORKING HOURS. CONTRACTOR TO MAINTAIN ONE
FULLY OPERATIONAL STREET SWEEPER/VAC TRUCK ON SITE AT ALL TIMES (WITH
ADDITIONAL ON-SITE BACK UP VEHICLE.)
7. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT
MOVEMENT RESULTING FROM AIRCRAFT PROP WASH OR JET BLAST.
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_GC003.dwg
7/29/2020 3:59:46 PM
GC003
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
A C
C E
F
E T
Y
N
O T
H
E E
T
O
F
10/29/20
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
AIRFIELD OPERATIONS COORDINATION
NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS INDICATED IN
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC)
150/5370-2G, OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION
(CURRENT EDITION).
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS AREA
WITHOUT CLEARANCE FROM AIRFIELD MANAGEMENT AND THE
CONTRACTING OFFICER, AND SHALL CONDUCT WORK IN SUCH A MANNER
TO ENSURE A MINIMUM HINDRANCE TO AVIATION OPERATIONS.
CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 21 DAYS TO AIRFIELD
MANAGEMENT FOR ACCESS TO AN AIRCRAFT OPERATIONS AREA.
PEDESTRIAN TRAFFIC AND PRIVATELY OWNED VEHICLES SHALL NOT BE
ALLOWED IN THE AIRCRAFT OPERATIONS AREA. CONSTRUCTION ACTIVITY
AFFECTING AIRCRAFT MOVEMENT AREAS AND AIRFIELD SAFETY
REQUIREMENTS SHALL BE COORDINATED WITH BASE AIRFIELD
OPERATIONS AND THE CONTRACTING OFFICER. NO AIRCRAFT OPERATIONS
AREA SHALL BE CLOSED, TEMPORARY OBSTRUCTIONS ERECTED OR ANY
OTHER CONSTRUCTION ACTIVITY POTENTIALLY HAZARDOUS TO AIRCRAFT
OPERATIONS TO TAKE PLACE WITHOUT A MINIMUM 21 DAY NOTICE,
COORDINATION WITH AND APPROVAL FROM THE AIRFIELD MANAGER AND
CONTRACTING OFFICER.
3. VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY AN APPROPRIATELY
SIZED FLASHING OR STEADY BURNING AMBER BEACON MOUNTED ON THE
UPPER MOST PART OF THE VEHICLE OR EQUIPMENT SUCH THAT IT IS
CONSPICUOUS FROM ANY DIRECTION INCLUDING FROM THE AIR.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 21 DAYS TO THE
CONTRACTING OFFICER AND AIRFIELD MANAGER REGARDING THE NEED
FOR ISSUE OF NOTICES TO AIRMEN (NOTAM) TO APPRAISE THE FLYING
COMMUNITY OF ALL AIRFIELD/AIRSPACE CLOSURES AND/OR RESTRICTIONS
AND ANY POTENTIALLY HAZARDOUS CONDITIONS FOR AIRCRAFT
OPERATIONS DUE TO CONTRACTOR ACTIVITIES. NOTAMS SHALL BE ISSUED
IN ACCORDANCE WITH AC 150/5370-2G OPERATIONS SAFETY ON AIRPORTS
DURING CONSTRUCTION, AND AC 150/5200-28F NOTICES TO AIRMEN FOR
AIRCRAFT OPERATORS. CONTRACTOR SHALL NOT COMMENCE WORK
ACTIVITIES ON AIRFIELD AREAS UNTIL CONFIRMATION THAT APPROPRIATE
NOTAMS HAVE BEEN ISSUED AND APPROVAL FROM THE AIRFIELD
MANAGER.
5. APRON CLEARANCE AREAS SHALL BE MARKED IN THE FIELD BY THE
CONTRACTOR, WITH APPROVAL FROM THE CONTRACTING OFFICER AND
AIRFIELD MANAGER, TO SERVE AS AN AID TO KEEP EQUIPMENT AND
PERSONNEL FROM INADVERTENTLY ENTERING THESE AREAS.
CONTRACTOR SHALL REFER TO UFC 3-260-01 AND AFI 32-1042.
6. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING DAMAGE TO
AIRCRAFT SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT OPERATION
AREAS. CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS
CARRIED ONTO AIRFIELD FROM CONTRACTOR'S EQUIPMENT OR
OPERATIONS TO PREVENT FOREIGN OBJECT DAMAGE (FOD). MATERIAL
DROPPED WITHIN THESE AREAS SHALL BE CONTINUOUSLY REMOVED BY
APPROVED METHODS DURING WORKING HOURS. STOCKPILED MATERIAL
SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING
FROM AIRCRAFT PROP WASH OR JET BLAST. CONTRACTOR SHALL HAVE A
FULLY OPERATIONAL VACUUM TRUCK OR STREET SWEEPER ON SITE AT
ALL TIMES (WITH ADDITIONAL ON-SITE BACK-UP VEHICLE) TO CLEAN
ADJACENT AIRFIELD PAVEMENTS ON A DAILY BASIS AND AS REQUIRED BY
AIRFIELD MANAGEMENT.
7. ANY DAMAGE TO EXISTING AIRFIELD OR APRON LIGHTING, AIRCRAFT
NAVIGATIONAL AIDS (NAVAIDS), OR AIRFIELD PAVEMENTS-TO-REMAIN DUE
TO CONSTRUCTION SHALL BE COMMUNICATED TO THE CONTRACTING
OFFICER AND AIRFIELD MANAGER AND SHALL BE REPAIRED OR REPLACED
BY THE CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING
OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. HAVE ON SITE AT ALL TIMES, TWO PEOPLE CAPABLE OF OPERATING A
RADIO AND CAPABLE OF FLUENTLY SPEAKING AND COMPREHENDING THE
ENGLISH LANGUAGE TO COMMUNICATE WITH THE CONTROL TOWER AND
AIRFIELD MANAGEMENT. THIS PERSON MUST CONTINUALLY MONITOR THE
RADIO FOR NOTIFICATION OF AIRCRAFT EMERGENCIES, ADVERSE
WEATHER CONDITIONS, OR OTHER SITUATIONS THAT MAY REQUIRE THE
CONTRACTOR TO TEMPORARILY STOP WORK. THIS PERSON MAY PERFORM
OTHER DUTIES; HOWEVER, THOSE DUTIES MUST OCCUR IN AN AREA
WHERE NOISE WILL NOT PREVENT OR HINDER RADIO COMMUNICATION.
WHILE ONE PERSON MUST BE MONITORING THE RADIO AT ALL TIMES, A
SECOND PERSON CAPABLE OF HANDLING THIS DUTY MUST BE AVAILABLE
AT ALL TIMES AS BACKUP.
TEMPORARY CONSTRUCTION CRANE
AND STOCKPILE HEIGHT:
1. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND
LIGHTED IN ACCORDANCE WITH FAA AC 70/7460. ALL HAZARDOUS AREAS
(SUCH AS EXCAVATIONS OR STOCKPILED MATERIALS) ON THE AIRFIELD
MUST BE DELINEATED WITH LIGHTED BARRICADES ON ALL EXPOSED
(VISIBLE OR ACCESSIBLE) SIDES. CONTRACTOR SHALL PROVIDE ALL
NECESSARY INFORMATION TO THE BASE CE FOR CONSTRUCTION CRANES,
EQUIPMENT, AND RELATED EQUIPMENT, AND RELATED ACTIVITIES. ALL
FORMS SHALL BE APPROVED PRIOR TO USING OR BRINGING EQUIPMENT ON
SITE. BASE CE TO SUBMIT 7460 FORMS TO FAA FOR PERMANENT BUILDING.
CONTRACTOR TO SUBMIT 7460 FORMS TO FAA FOR ALL TEMPORARY
CONSTRUCTION.
2. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA AC
150/5370-2GAND AC 150/5300-13A (CURRENT EDITIONS). TEMPORARY
OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 200'-0" IN
HEIGHT REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA 7460
APPROVAL. COORDINATE WITH WRIGHT-PATTERSON BASE CE OFFICE FOR
LOCAL OBSTRUCTION APPROVAL. WHEN EQUIPMENT IS EXPECTED TO
PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN CRANES WILL
BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 45
DAYS TO THE CONTRACTING OFFICER AND BASE AIRFIELD OPERATIONS
PRIOR TO THE START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL
OF FAA FORM 7460 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE
CRANES SHALL BE ISSUED BY BASE AIRFIELD OPERATIONS AND THE
CONTRACTING OFFICER AFTER APPROVAL BY THE FAA.
3. OBSTRUCTION LIGHT FIXTURES SHALL BE AVIATION RED INCANDESCENT
STEADY BURNING FAA AC 150/5345-43, TYPE L-810. AIR FORCE POLICY DOES
NOT ALLOW USE OF LED FIXTURES FOR OBSTRUCTION LIGHTING.
4. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE
BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
5. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS,
OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD PENETRATE
AVIATION SURFACES. A 360 DEGREE RED OBSTRUCTION LIGHT SHALL BE
PLACED AT THE HIGHEST POINT OF THE STOCKPILE. STOCKPILING OF
MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS PROHIBITED.
OTHER SAFETY REQUIREMENTS:
1. IN CASE OF ON-BASE EMERGENCY AND NEED OF AMBULANCE, FIRE
DEPARTMENT, OR SECURITY FORCES RESPONSE DIAL 937-257-9111.
2. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO
THE REQUIREMENTS OF USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENTS MANUAL.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS DAILY AND
PRIOR TO LEAVING THE SITE EACH DAY TO REMEDY ANY SAFETY
CONCERNS IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY
TEMPORARY WASTE AREA 10 DAYS OR LESS SHALL BE APPROVED BY THE
CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY CONDITION.
THE CONTRACTOR SHALL REMOVE WASTE THAT IS NOT PROPERLY
MAINTAINED AT THE DIRECTION OF THE CONTRACTING OFFICER.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION AND SALVAGE OF ANY
GOVERNMENT OWNED EQUIPMENT WITH THE CONTRACTING OFFICER.
6. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO
CONTROL/PREVENT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A
LIMIT ACCEPTABLE TO AIRFIELD MANAGER. THE CONTRACTOR SHALL
CONTROL/PREVENT BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL
ROUTE OR WORK AREA REGARDLESS OF SOURCE.
7. GASOLINE, DIESEL FUEL, OIL, JET FUEL, AND HAZARDOUS WASTE
RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE
PROPERLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND
LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE
PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR
UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
8. FAILURE TO COMPLY WITH AIRFIELD SAFETY AND THE CONTRACTING
OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF
CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE
ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
9. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN
OR AIRFIELD SAFETY REQUIREMENTS SHALL IMMEDIATELY BE REMOVED
FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN
THROUGHOUT THE REMAINDER OF THE PROJECT.
10. ALL TEMPORARY CONSTRUCTION LIGHTING SHALL BE COORDINATED WITH
WRIGHT-PATTERSON AFB SECURITY AND AIRFIELD MANAGER FOR
APPROVAL OF LOCATIONS, HEIGHT, AND DIRECTION.
SECURITY REQUIREMENTS NOTES:
1. ACCESS TO WRIGHT-PATTERSON AIR FORCE BASE IS RESTRICTED AND
SUBJECT TO SPECIFIC SECURITY REQUIREMENTS. UPON NOTICE TO
PROCEED, IMMEDIATELY BEGIN COORDINATION WITH THE CONTRACTING
OFFICER TO ENSURE THE PRE-CLEARANCE OF PERSONNEL AND
EQUIPMENT IS COMPLETED AS REQUIRED BY THE SPECIFICATIONS.
ANYONE WITH AN ACTIVE WARRANT WILL BE APPREHENDED BY SECURITY
FORCES AND TURNED IN TO LOCAL AUTHORITIES.
2. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS AND
PROCEDURES OF “IAW AFFAR 5353.242-9000, CONTRACTOR ACCESS TO AIR
FORCE INSTALLATIONS”, IN ACCORDANCE WITH THE SITE ACCESS AS
INDICATED ON GC006 CONSTRUCTION ACCESS.
3. ALL CONTRACTOR EMPLOYEES SHALL CARRY CONTRACTOR PHOTO
IDENTIFICATION AT ALL TIMES WHILE WORKING INSIDE THE
WRIGHT-PATTERSON AFB SECURE PERIMETER.
4. CONTRACTOR EMPLOYEES SHALL COMPLY WITH ANY INTEGRATED
DEFENSE MEASURES THAT MAY BE NECESSARY DURING CONTINGENCY
OPERATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE
INSPECTIONS, IDENTIFICATION CHECKS, ETC.
5. CONTRACTOR AND EMPLOYEE IDENTIFICATION CREDENTIALS: DUE TO THE
NATURE OF THE MILITARY MISSION AT WRIGHT-PATTERSON AFB,
STRINGENT SECURITY PROCEDURES ARE ESTABLISHED TO ENSURE
MISSION SUCCESS. PART OF THE MISSION ASSURANCE PIECE IS TO
CONDUCT IDENTITY PROOFING AND VETTING OF ALL CONTRACTORS WHO
ENTER THE INSTALLATION. THE VETTING PROCESS INCLUDES AN
EXTENSIVE CRIMINAL HISTORY CHECK TO DETERMINE THE INDIVIDUAL'S
FITNESS FOR AUTHORIZATION TO ENTER THE INSTALLATION. THE PRIMARY
CONTRACTOR WILL ENSURE ALL EMPLOYEES WORKING AT THE
WRIGHT-PATTERSON AFB POSSESS PROPER CREDENTIALS ALLOWING
THEM TO WORK IN THE UNITED STATES. EXECUTIVE ORDER 12989
REQUIRES CONTRACTORS TO USE THE DEPARTMENT OF HOMELAND
SECURITY'S E-VERIFY SYSTEM FOR ALL EMPLOYEES WORKING ON FEDERAL
CONTRACTS. SEE PROJECT SPECIFICATIONS AND WRIGHT-PATTERSON AFB
SECURITY FOR FULL LISTING OF ALL REQUIREMENTS.
6. EMPLOYEES WILL BE IDENTITY-PROOFED AND VETTED EACH TIME A PASS
AND/OR CREDENTIAL IS ISSUED. SECURITY FORCES PERSONNEL MAY ALSO
CONDUCT RANDOM SCREENING AT ANY TIME. IF DISQUALIFYING
INFORMATION IS FOUND, EMPLOYEES MAY BE DENIED ACCESS TO THE
INSTALLATION AND THE CONTRACTING OFFICER OR CONTRACT
ADMINISTRATOR WILL BE NOTIFIED OF THE DENIAL. DUE TO MANDATES OF
USC 552A (B) (3) AS RELATED TO PRIVACY ACT 1974 AS AMENDED, THE
INFORMATION CAN ONLY BE DISCUSSED WITH THE EMPLOYEE AND WILL
NOT BE EXPRESSED OUTSIDE OF LAW ENFORCEMENT.
7. BASE ACCESS CREDENTIALS: THE CONTRACTOR SHALL SUBMIT ALL
WRIGHT-PATTERSON AFB FORMS AT LEAST 7 DAYS PRIOR TO START OF
ANY WORK ON THE WPAFB PROPERTY, IF THE EMPLOYEE WILL BE
REQUIRED TO DRIVE ON THE INSTALLATION, HE/SHE MUST PRESENT A
VALID DRIVER'S LICENSE, STATE VEHICLE REGISTRATION AND PROOF OF
INSURANCE. FURTHER, THE VEHICLES AND EQUIPMENT MAY BE ESCORTED
DURING EXERCISE OPERATIONS AND MAY BE RENDERED IMMOBILE WHEN
NOT IN OPERATION BY THE REMOVAL OF IGNITION KEYS OR BY OTHER
READILY REVERSIBLE MEANS. CONTRACTOR VEHICLES ARE SUBJECT TO
SEARCH PRIOR TO ENTERING, WHILE TRANSITING AND/OR WHILE EXITING
THE INSTALLATION.
CONTRACTOR SAFETY PLAN
SUBMITTALS:
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN AND
PROPOSED PROJECT SCHEDULE TO THE CONTRACTING OFFICER FOR
ACCEPTANCE. THE SAFETY PLAN SHALL IDENTIFY THE FOLLOWING ITEMS:
A. PROPOSED ACCESS POINTS, HAUL ROUTES, AND STAGING AREA.
B. TEMPORARY MARKING AND SIGNAGE TO BE USED.
C. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC CONTROL
DEVICES.
D. METHODS BY WHICH THE CONTRACTOR SHALL COMMUNICATE WITH
THE WRIGHT-PATTERSON AFB AND THE CONTRACTING OFFICER.
E. CONSTRUCTION SUPERINTENDENT
F. SITE SAFETY MANAGER
CONTRACTOR PERMITTING
REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER PERMIT
FOR LAND DISTURBANCE OF MORE THAN 1 ACRE PRIOR TO CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE
CONTRACTING OFFICER TO COMPLETE AND SUBMIT THE STORM WATER
POLLUTION PREVENTION PLAN (SWP3) TO THE STATE OF OHIO FOR
APPROVAL.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY
WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY REQUIREMENTS. THE
PERMITTING PROCESS MAY INCLUDE BUT IS NOT LIMITED TO THE
SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
A. EROSION AND SEDIMENT CONTROL.
B. STORMWATER MANAGEMENT.
C. MONITORING WELLS.
D. SOLID AND HAZARDOUS WASTE.
E. DIGGING.
F. TRAFFIC.
G. WELDING PERMIT FOR ANY WELDING OR CUTTING OPERATIONS CAN BE
OBTAINED AT THE WRIGHT-PATTERSON AFB FIRE STATION.
H. FAA FORM 7460
RECORD DRAWING NOTES:
1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES
THROUGH THE DURATION OF THE PROJECT. CONSTRUCTION RECORD
DRAWINGS IN CADD AND GIS FORMAT, SHALL BE SUBMITTED TO THE
CONTRACTING OFFICER. AS-BUILTS FOR ALL UTILITY SYSTEMS AND
BUILDING STRUCTURES SHALL BE FIELD SURVEYED AND STAMPED BY A
LICENSED SURVEYOR IN THE STATE OF OHIO.
2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE
RESPONSIBLE FOR KEEPING TRACK OF ANY CONTRACTING OFFICER
APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON
APPROVED CONSTRUCTION DRAWINGS. THESE REVISIONS SHALL BE USED
TO PREPARE RECORD DRAWINGS OF COMPLETED CONSTRUCTION.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND
CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM THE
INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION
DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED
CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING
CONSTRUCTION.
4. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION ON
AS-BUILTS.
COORDINATION AND COMMUNICATION:
1. CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT,
SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER, WHO SHALL
BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING
HOURS WHILE JOB IS IN PROGRESS. THE SUPERINTENDENT SHALL BE
DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO
SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL
PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO
THE CONTRACTING OFFICER PRIOR TO THE START OF CONSTRUCTION
ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT
COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE CONTRACTING
OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR
SHALL BE REVIEWED AND APPROVED BY THE CONTRACTING OFFICER.
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_GC003.dwg
7/29/2020 3:59:46 PM
GC004
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
A C
C E
F
E T
Y
N
O T
H
E E
T
O
F
10/29/20
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
J G
W C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_GC003.dwg
7/29/2020 3:59:46 PM
GC005
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
E N
V I R
O N
M E
N T
A L
N
O T
E S
ENVIRONMENTAL NOTES:
1. ANY USE OF RADIOACTIVE MATERIALS, INCLUDING MOISTURE DENSITY GAUGES, MUST BE
APPROVED BY THE WPAFB RADIATION SAFETY OFFICER A MINIMUM OF 30 DAYS PRIOR TO BEING
BROUGHT ONTO WPAFB IN ACCORDANCE WITH SECTION 01 02 20, AND 40-201.
2. WPAFB IS A HABITAT FOR THE ENDANGERED EASTERN MASSASAUGA RATTLESNAKE (SHOWN IN
FIG.1). IF AN EASTERN MASSASAUGA RATTLESNAKE IS ENCOUNTERED ON THE PROJECT, HALT
WORK ACTIVITIES THAT MAY ENDANGER THE SNAKE AND CONTACT THE CONTRACTING OFFICER
IMMEDIATELY. PROTECT THE AREA UNTIL THE APPROPRIATE AUTHORITIES ARRIVE TO IDENTIFY
AND REMOVE THE SNAKE.
3. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE OF
SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR PROJECTS
THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE OHIO
EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION PREVENTION
PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM MIKE
VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) FOR ADDITIONAL INFORMATION.
4. THIS PROJECT IS WITHIN THE HUFFMAN WATERSHED AND REQUIRES THE CONTRACTOR TO
COORDINATE WITH AND TO ABIDE BY ALL MIAMI CONSERVANCY DISTRICT (MCD) REGULATIONS.
ANY STRUCTURE, FILL , CONCRETE, PAVEMENT, OR OTHER MATERIAL PLACED WITHIN THE
HUFFMAN RETARDING BASIN REQUIRES COORDINATION WITH THE MIAMI CONSERVATION DISTRICT
AND REQUIRES COMPLETION OF A STORAGE COMPENSATION AGREEMENT. THE CONTRACTOR IS
RESPONSIBLE FOR COMPLETING THE COMPENSATION AGREEMENT, INCLUDING PAYING ALL FEES
AND ASSOCIATED COSTS. FILL MATERIAL OBTAINED FROM ELSEWHERE WITHIN THE RETARDING
BASIN MAY ALLEVIATE THE NEED TO PURCHASE FILL CREDITS OR REMOVE EQUAL AMOUNT OF FILL
ELSEWHERE. CREDITS FOR FILL MAY BE AVAILABLE FOR PURCHASE FROM AGENTS
APPROVED/SUPPLIED BY MCD. FOR OFFERING PROVIDE A MINIMUM $15,000 ALLOWANCE FOR
PURCHASE OF OFF-SITE COMPENSATORY VOLUME CREDITS AS INDICATED ON THE CLIN
SCHEDULE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING FILL CREDIT COSTS
ASSOCIATED WITH MATERIAL MANAGEMENT AND TEMPORARY STOCKPILES. CONTACT THE 88
CEG/CEIEA NATURAL RESOURCES PM, DARRYN WARNER, BY E-MAIL AT
DARRYN.WARNER@US.AF.MIL OR BY PHONE AT 937-257-4857 FOR ADDITIONAL INFORMATION. SEE
EARTHWORK CALCULATIONS ON THIS SHEET FOR APPROXIMATE ESTIMATIONS OF MATERIAL
MANAGEMENT.
5. LOCATION OF THE BATCH PLANT MUST BE APPROVED BY THE REGIONAL AIR POLLUTION CONTROL
AGENCY, FOR ADDITIONAL INFORMATION, CONTACT CHRIS TUMBUSCH AT
CHRISTOPHER.TUMBUSCH@US.AF.MIL OR 937-257-2455.
6. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL AND LEAD CONTAINING PAINT IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20. THE CONTRACTOR SHALL
COORDINATE DISPOSITION OF EXCESS RADIOACTIVE COMMODITIES, E.G. IONIZATION TYPE SMOKE
DETECTORS, RADIOLUMINESCENT EMERGENCY EXIT SIGNS, OR ANY OTHER RADIOACTIVE
COMMODITY AND/OR RADIOACTIVE CONTAMINANT THROUGH THE INSTALLATION RADIATION
SAFETY OFFICER, 88 AMDS/SGPB. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE
TREATED AS CONTAINING ASBESTOS UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.
7. MINIMIZE THE GENERATION OF FUGITIVE EMISSION BY APPROVED DUST SUPPRESSION METHODS
SUCH AS WATER SPRAYS. COORDINATE WITH THE 88 CEG/CEIEA AIR PM, CHRIS TUMBUSCH BY
PHONE AT 937-257-2455 OR MY E-MAIL AT CHRISTOPHER.TUMBUSCH@US.AF.MIL.
8. THE AREA KNOWN AS MU897 BOMB TARGET AND PISTOL RANGE ALONG RUNWAY 05L GENERALLY
BOUNDED TO THE WEST BY TAXIWAY A, TO THE EAST BY TAXIWAY B, AND TO THE NORTH BY
TAXIWAY D WAS PREVIOUSLY USED AS A TARGET RANGE AND MAY CONTAIN UNEXPLODED
ORDNANCE (UXO). HOWEVER, WPAFB CONSIDERS THE UNCOVERING OF ORDNANCE UNLIKELY DUE
TO THE EXTENSIVE PAST REMEDIATION AND CONSTRUCTION. IF SUSPICIOUS MATERIALS OR
ORDNANCE IS UNCOVERED, CEASE THE ACTIVITY IMMEDIATELY AND NOTIFY THE CONTRACTING
OFFICER AND AIRFIELD MANAGEMENT.
9. ANY REMOVAL OF HAZARDOUS WASTE MUST BE PERFORMED IAW WPAFB SPECIFICATION SECTION
01 02 20. BULK FUEL, FUEL-CONTAMINATED SOIL, AND DEBRIS SHALL BE CHARACTERIZED,
MANIFESTED AND TRANSPORTED BY THE CONTRACTOR FOR DISPOSAL. TRANSPORTATION AND
DISPOSAL FACILITIES SHALL BE APPROVED BY WPAFB CE ENVIRONMENTAL BRANCH.
10. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20.
11. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
12. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB MORE THAN AN ACRE, A
NOTICE OF INTENT (NOI) AS WELL AS A STORM WATER POLLUTION PREVENTION PLAN (SP3) SHALL
BE APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM KAREN BEASON
BY EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR ADDITIONAL
INFORMATION.
13. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION
02 09 10.
14. ALL HAZARDOUS MATERIALS MUST BE PROPERLY MANAGED, LABELED AND STORED. ANY
HAZARDOUS WASTE GENERATED FROM THIS CONSTRUCTION ACTIVITY MUST BE PROPERLY
CHARACTERIZED, LABELED AND MANAGED BY TRAINED EMPLOYEE OF THE CONTRACTOR WITH
KNOWLEDGE OF THE ACTIVITY / PROCESS WHERE THE WASTE WAS GENERATED. ALL HAZARDOUS
WASTE WILL BE TURNED OVER TO THE GOVERNMENT FOR DISPOSAL. IN ADDITION, PROPER
COORDINATION IS NEEDED WITH 88 CEG/CEIEC. QUESTIONS CONCERNING THE REQUIREMENTS
FOR STORAGE AND DISPOSAL OF ANY HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88
CEG/CEIEC HAZARDOUS MATERIALS PM, MIKE VAUGHN, (937-257-8028 OR
MICHAEL.VAUGHN.3@US.AF.MIL) OR 88 CEG/CEIEC HAZARDOUS WASTE PM, EMILY EDREI (937-257-
0023 OR EMILY.ERDEI@US.AF.MIL).
15. ALL METAL AND WIRING SHALL BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER. THE
WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE DISPOSAL.
ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING CENTER. ALL
RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02
20. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT 937-257-5060 TO CONFIRM WHAT
MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN. THE CONTRACTOR SHALL SUBMIT A
QUARTERLY SUMMARY REPORT TO THE GOVERNMENT CONTRACT REPRESENTATIVE IAW WPAFB
SPECIFICATION SECTION 01 02 20 STATING (1) THE COST TO RECYCLE AND THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS RECYCLED, (2) THE COST TO DIVERT/REUSE THE
TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS DIVERTED/REUSE, (3) THE COST TO
MULCH AND THE TONNAGE AND COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED,
(4) THE COST FOR WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION
MATERIALS CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE
OF CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO INCINERATE AND
THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED, AND (7)
EXPLANATION OF THE DIVERSION RATE IF LESS THAN 60%. THE QUARTERLY SUMMARY REPORTS
SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND JANUARY 7 COVERING THE THREE
MONTHS PRIOR. THE QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB DIVERSION FORM.
FOR ADDITIONAL INFORMATION CONTACT THE RECYCLING PM, DAVE DALTON, AT 937-257-5060 OR
DAVID.DALTON.2@US.AF.MIL.
16. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 FOR RECYCLING.
17. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
18. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
19. 30 DAYS PRIOR TO START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE SAMPLE
OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY INTO THE
SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH OF THE
FOLLOWING: CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY, MOLYBDENUM, NICKEL, SILVER, ZINC AND SULFIDE. THE LAB PERFORMING THE ANALYSES MUST BE CERTIFIED BY OHIO
EPA TO ANALYZE FOR THESE PARAMETERS. PROVIDE A COPY OF THE LAB'S REPORT TO THE
CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88 CEG/CEIEA FOR A DETERMINATION
ON THE WASTEWATER DISPOSAL METHOD.
(FIGURE 1)
EASTERN MASSASAUGA RATTLESNAKE
(SEE ENVIRONMENTAL NOTE 3)
HUFFMAN RETARDING BASIN VOLUME
CALCULATIONS:
TOTAL VOLUME DISPLACED BY IMPORTED MATERIALS AND ITEMS: 2,714 CY
TOTAL EXISTING SOILS TO BE EXCAVATED THAT MAY BE AVAILABLE FOR USE AS
EMBANKMENT ON…
This is the start of the file's text. The full file is on GovTribe.