W912QR21R0006Plans-0001.pdf
PDF 4 MB Posted
- Solicitation number
- W912QR21R0006
About this file
This solicitation requests proposals for a firm-fixed-price construction contract to replace and construct a Type III hydrant fuel system at Wright-Patterson Air Force Base in Ohio. The project scope includes constructing a new Type III hydrant system with two 5,000-barrel aboveground storage tanks, a 2,400 GPM pump house, and 12-inch hydrant loop. Demolition work will remove four 50,000-gallon underground storage tanks and a Type II pumphouse. Additional features are an emergency/secondary truck offload stand, hydrant hose truck checkout stand, product recovery tank, access roads, containment structures, and utility provisions. The contract is valued between $10-25 million. Proposals will be evaluated using best value tradeoff, with technical, past performance, and price factors considered approximately equal in importance to cost. Discussions are not anticipated but may be held if in the government's best interest. The solicitation is available at SAM.gov and amendments will be posted there. Offerors must register in SAM to be eligible for award.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B U
R N
S
M c D
O N
N E
L L
W
A R
D
P
A R
K W
A Y
K A
N S
C
I T
Y
O
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
T
E
N G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
H
Y D
R A
F
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
D
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_GC003.dwg
12/4/2020 10:51:50 AM
GC005
R
B E
T T
M E
N G
J
E I C
H E
N B
E R
G E
R
C
S T
E W
A R
T
E N
V I R
O N
M E
N T
A L
N
O T
E S
ENVIRONMENTAL NOTES:
1. ANY USE OF RADIOACTIVE MATERIALS, INCLUDING MOISTURE DENSITY GAUGES, MUST BE
APPROVED BY THE WPAFB RADIATION SAFETY OFFICER A MINIMUM OF 30 DAYS PRIOR TO BEING
BROUGHT ONTO WPAFB IN ACCORDANCE WITH SECTION 01 02 20, AND 40-201.
2. WPAFB IS A HABITAT FOR THE ENDANGERED EASTERN MASSASAUGA RATTLESNAKE (SHOWN IN
FIG.1). IF AN EASTERN MASSASAUGA RATTLESNAKE IS ENCOUNTERED ON THE PROJECT, HALT
WORK ACTIVITIES THAT MAY ENDANGER THE SNAKE AND CONTACT THE CONTRACTING OFFICER
IMMEDIATELY. PROTECT THE AREA UNTIL THE APPROPRIATE AUTHORITIES ARRIVE TO IDENTIFY
AND REMOVE THE SNAKE.
3. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE OF
SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR PROJECTS
THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE OHIO
EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION PREVENTION
PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM MIKE
VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) FOR ADDITIONAL INFORMATION.
4. THIS PROJECT IS WITHIN THE HUFFMAN WATERSHED AND REQUIRES THE CONTRACTOR TO
COORDINATE WITH AND TO ABIDE BY ALL MIAMI CONSERVANCY DISTRICT (MCD) REGULATIONS.
ANY STRUCTURE, FILL , CONCRETE, PAVEMENT, OR OTHER MATERIAL PLACED WITHIN THE
HUFFMAN RETARDING BASIN REQUIRES COORDINATION WITH THE MIAMI CONSERVATION DISTRICT
AND REQUIRES COMPLETION OF A STORAGE COMPENSATION AGREEMENT. THE CONTRACTOR IS
RESPONSIBLE FOR COMPLETING THE COMPENSATION AGREEMENT, INCLUDING PAYING ALL FEES
AND ASSOCIATED COSTS. FILL MATERIAL OBTAINED FROM ELSEWHERE WITHIN THE RETARDING
BASIN MAY BE REQUIRED SINCE PURCHASING FILL CREDITS THROUGH THE MCD IS NOT
CURRENTLY AN OPTION. THE CONTRACTOR IS RESPONSIBLE FOR MATERIAL MANAGEMENT AND
TEMPORARY STOCKPILES. THE STORAGE COMPENSATION AGREEMENT SHALL BE COORDINATED
THROUGH THE 88 CEG/CEIEA NATURAL RESOURCES PM, DARRYN WARNER, BY E-MAIL AT
DARRYN.WARNER@US.AF.MIL OR BY PHONE AT 937-257-4857. SEE EARTHWORK CALCULATIONS ON
THIS SHEET FOR APPROXIMATE ESTIMATIONS OF MATERIAL MANAGEMENT.
5. LOCATION OF THE BATCH PLANT MUST BE APPROVED BY THE REGIONAL AIR POLLUTION CONTROL
AGENCY, FOR ADDITIONAL INFORMATION, CONTACT CHRIS TUMBUSCH AT
CHRISTOPHER.TUMBUSCH@US.AF.MIL OR 937-257-2455.
6. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL AND LEAD CONTAINING PAINT IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20. THE CONTRACTOR SHALL
COORDINATE DISPOSITION OF EXCESS RADIOACTIVE COMMODITIES, E.G. IONIZATION TYPE SMOKE
DETECTORS, RADIOLUMINESCENT EMERGENCY EXIT SIGNS, OR ANY OTHER RADIOACTIVE
COMMODITY AND/OR RADIOACTIVE CONTAMINANT THROUGH THE INSTALLATION RADIATION
SAFETY OFFICER, 88 AMDS/SGPB. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE
TREATED AS CONTAINING ASBESTOS UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.
7. MINIMIZE THE GENERATION OF FUGITIVE EMISSION BY APPROVED DUST SUPPRESSION METHODS
SUCH AS WATER SPRAYS. COORDINATE WITH THE 88 CEG/CEIEA AIR PM, CHRIS TUMBUSCH BY
PHONE AT 937-257-2455 OR MY E-MAIL AT CHRISTOPHER.TUMBUSCH@US.AF.MIL.
8. THE AREA KNOWN AS MU897 BOMB TARGET AND PISTOL RANGE ALONG RUNWAY 05L GENERALLY
BOUNDED TO THE WEST BY TAXIWAY A, TO THE EAST BY TAXIWAY B, AND TO THE NORTH BY
TAXIWAY D WAS PREVIOUSLY USED AS A TARGET RANGE AND MAY CONTAIN UNEXPLODED
ORDNANCE (UXO). HOWEVER, WPAFB CONSIDERS THE UNCOVERING OF ORDNANCE UNLIKELY DUE
TO THE EXTENSIVE PAST REMEDIATION AND CONSTRUCTION. IF SUSPICIOUS MATERIALS OR
ORDNANCE IS UNCOVERED, CEASE THE ACTIVITY IMMEDIATELY AND NOTIFY THE CONTRACTING
OFFICER AND AIRFIELD MANAGEMENT.
9. ANY REMOVAL OF HAZARDOUS WASTE MUST BE PERFORMED IAW WPAFB SPECIFICATION SECTION
01 02 20. BULK FUEL, FUEL-CONTAMINATED SOIL, AND DEBRIS SHALL BE CHARACTERIZED,
MANIFESTED AND TRANSPORTED BY THE CONTRACTOR FOR DISPOSAL. TRANSPORTATION AND
DISPOSAL FACILITIES SHALL BE APPROVED BY WPAFB CE ENVIRONMENTAL BRANCH.
10. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20.
11. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
12. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB MORE THAN AN ACRE, A
NOTICE OF INTENT (NOI) AS WELL AS A STORM WATER POLLUTION PREVENTION PLAN (SP3) SHALL
BE APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM KAREN BEASON
BY EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR ADDITIONAL
INFORMATION.
13. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION
02 09 10.
14. ALL HAZARDOUS MATERIALS MUST BE PROPERLY MANAGED, LABELED AND STORED. ANY
HAZARDOUS WASTE GENERATED FROM THIS CONSTRUCTION ACTIVITY MUST BE PROPERLY
CHARACTERIZED, LABELED AND MANAGED BY TRAINED EMPLOYEE OF THE CONTRACTOR WITH
KNOWLEDGE OF THE ACTIVITY / PROCESS WHERE THE WASTE WAS GENERATED. ALL HAZARDOUS
WASTE WILL BE TURNED OVER TO THE GOVERNMENT FOR DISPOSAL. IN ADDITION, PROPER
COORDINATION IS NEEDED WITH 88 CEG/CEIEC. QUESTIONS CONCERNING THE REQUIREMENTS
FOR STORAGE AND DISPOSAL OF ANY HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88
CEG/CEIEC HAZARDOUS MATERIALS PM, MIKE VAUGHN, (937-257-8028 OR
MICHAEL.VAUGHN.3@US.AF.MIL) OR 88 CEG/CEIEC HAZARDOUS WASTE PM, EMILY EDREI (937-257-
0023 OR EMILY.ERDEI@US.AF.MIL).
15. ALL METAL AND WIRING SHALL BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER. THE
WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE DISPOSAL.
ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING CENTER. ALL
RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02
20. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT 937-257-5060 TO CONFIRM WHAT
MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN. THE CONTRACTOR SHALL SUBMIT A
QUARTERLY SUMMARY REPORT TO THE GOVERNMENT CONTRACT REPRESENTATIVE IAW WPAFB
SPECIFICATION SECTION 01 02 20 STATING (1) THE COST TO RECYCLE AND THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS RECYCLED, (2) THE COST TO DIVERT/REUSE THE
TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS DIVERTED/REUSE, (3) THE COST TO
MULCH AND THE TONNAGE AND COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED,
(4) THE COST FOR WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION
MATERIALS CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE
OF CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO INCINERATE AND
THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED, AND (7)
EXPLANATION OF THE DIVERSION RATE IF LESS THAN 60%. THE QUARTERLY SUMMARY REPORTS
SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND JANUARY 7 COVERING THE THREE
MONTHS PRIOR. THE QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB DIVERSION FORM.
FOR ADDITIONAL INFORMATION CONTACT THE RECYCLING PM, DAVE DALTON, AT 937-257-5060 OR
DAVID.DALTON.2@US.AF.MIL.
16. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 FOR RECYCLING.
17. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
18. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
19. 30 DAYS PRIOR TO START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE SAMPLE
OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY INTO THE
SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH OF THE
FOLLOWING: CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY, MOLYBDENUM, NICKEL, SILVER, ZINC AND SULFIDE. THE LAB PERFORMING THE ANALYSES MUST BE CERTIFIED BY OHIO
EPA TO ANALYZE FOR THESE PARAMETERS. PROVIDE A COPY OF THE LAB'S REPORT TO THE
CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88 CEG/CEIEA FOR A DETERMINATION
ON THE WASTEWATER DISPOSAL METHOD.
(FIGURE 1)
EASTERN MASSASAUGA RATTLESNAKE
(SEE ENVIRONMENTAL NOTE 3)
HUFFMAN RETARDING BASIN VOLUME
CALCULATIONS:
TOTAL VOLUME DISPLACED BY IMPORTED MATERIALS AND ITEMS: 2,714 CY
TOTAL EXISTING SOILS TO BE EXCAVATED THAT MAY BE AVAILABLE FOR USE AS
EMBANKMENT ON THIS PROJECT: 4293 CY
TOTAL AMOUNT OF EMBANKMENT/FILL NEEDED FOR THE PROJECT: 1,435 CY
NOTES:
1. PER MCD: THE PROPOSED TANKS ARE CONSIDERED STRUCTURES, AND THERFORE DO
NOT HAVE TO BE ACCOUNTED FOR AS DISPLACED VOLUMES.
2. THESE ROUGH CALCULATIONS INDICATE THAT AT LEAST 1,279 CY OF EXCAVATED
MATERIAL WILL NEED TO BE HAULED OFF-SITE AND REMOVED FROM THE HUFFMAN
RETARDING BASIN AREA. THIS NUMBER CAN BE REDUCED OR ELIMINATED BY USING
FILL MATERIALS FROM SOURCES WITHIN THE HUFFMAN RETARDING BASIN.
2. THE CALCULATIONS ALSO INDICATE THAT APPROXIMATELY 2,858 CY OF REMAINING
EXCAVATED MATERIAL WILL BE AVAILABLE TO REMOVE FROM THE SITE IF THE
MATERIAL EXCAVATED IS USED AS FILL ON SITE.
3. THESE NUMBERS ARE FOR INFORMATION ONLY. THE CONTRACTOR IS RESPONSIBLE
FOR PERFORMING INDEPENDENT CALCULATIONS TO DETERMINE CONFORMANCE
WITH MCD REGULATIONS.
C
E R
T I F
I E
D
F
I N
L
B
M I T
T A
L
J G
W
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
J G
W
12/10/2012/10/20
W
2Q R
R
-0
M
W
E
FF
C
E
P
D
S
E
C
E
P
D
S
E
P
D
S
P
P
C
O
C
P
ST
W
W
CB
CB
W
W
CB
CB
CB
CB
W
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
CO
S
E
E
C
CO
CO
C
CO
CO
S
CO
S
T
ST ST
S T
S T
S T
S
T
S
T
S
T
S
T
C
O
M
M
C
O
M
M
CB
CB
CB
CB
S
T
S
T
S
T
ST
ST
S
T
S T
S T
S T
S T
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
COMM
COMMCOMMCOMMCOMMCOMMCOMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W W W W W W W
W
W W
W W
W
W
W
W
W
W
W W
W W
W W
W W W W W W W W W W W W W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W
W
W W
W W
W
W
W
S
T
WEST RAMP FLANGE
CONNECTION PIT
TOP EL. = 816.91
EMERGENCY FUEL
SHUT OFF (TYP)
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
E
E
E
E
E
E
E
C
B
ST
ST
ST
ST
ST
ST
ST
C
B
M
SCHWIENFORT AVE
V A
N D
E N
B U
R G
A
D
X
X
X
X
F
M
E
T
P
T
T
W
T
S
G
S
W
C
F F
F F
F F
F F
F
F
W
W W W W W W W W W W W W W
F F
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
(G
IS)
G
I
S
G
I S
G
I
S
(GIS)
(GIS) (GIS)
G
I S
G
I S
(GIS)
(GIS)
G
I
S
G
I S
(GIS) (GIS)
G
I S
G
I S
G
I S
G
I S
(GIS)
W W
F F F F
F F
W W
W W
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W W
F F
F F
W W W
W W W W
W
C O
M M
COMM
COMM
C
O
M
M
COMMCOMM
C O
M M
C O
M M
S S
SS SS SS
S
T
S
T
S
T
S
T
S T
S T
S T
S T
S T
S T
ST ST
ST
ST
S
T
S
T
S
T
ST
ST
S
T
S
T
S T
S T
S T
S T
S T
ST ST ST
ST ST ST ST ST
ST
STST
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S T
S
T
S T
S T
STST
ST
W
W
W
W
W
W
WW
W W
F
F F
F F
F F
F F
F F
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I
S
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I S
G
I S
G
I S
G
I S
G
I
S
(GIS)
(GIS)
G
I S
(GIS)
(GIS)
G
I
S
(GIS)
G
I S
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I
S
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
G
I S
G
I S
G
I
S
G
I S
G
I S
G
I
S
G
I
S
(GIS)
(GIS)
(GIS)
G
I S
(GIS)
G
I S
(G
IS)
(GIS)
(GIS)
G
IS
G
I
S
G
I S
(GIS)
(GIS)
G
IS
G
I S
G
I S
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
G
I S
BUILDING
B U
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
A1
OVERALL DEMOLITION PLAN
SCALE: 1" = 40'
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS
SHALL BE DISPOSED OF OFF SITE IN ACCORDANCE WITH ALL LOCAL,
STATE, AND FEDERAL REGULATIONS.
2. LOCATIONS NOTED FOR REMOVAL MAY CONTAIN ANY OF THE
FOLLOWING MATERIALS: AGGREGATE, CONCRETE, ASPHALT,
MASONRY, FOUNDATIONS, REBAR, FENCE MATERIAL, PIPING, AND
MISCELLANEOUS STRUCTURES. LARGE PIECES OF MATERIAL MAY
NEED TO BE CRUSHED AND/OR BROKEN UP FURTHER IN ORDER TO
BE HAULED AWAY TO THE WASTE DISPOSAL SITE.
3. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND
PAVEMENT REMOVAL WITH PROPOSED PAVEMENT LAYOUT.
PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT FULL
DEPTH. EXISTING PAVEMENT EDGES SHALL BE SAWCUT IN
LOCATIONS SHOWN TO PROVIDE CLEAN EDGE FOR CONSTRUCTION
OF PROPOSED PAVEMENT.
4. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF PAVEMENT AND
ANY SUBBASE MATERIAL PRESENT.
5. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL
BE REPAIRED OR REMOVED AND REPLACED AT THE CONTRACTOR'S
EXPENSE. REPAIRED/REPLACED PAVEMENT SECTION SHALL MATCH
ADJACENT SECTION.
6. EXISTING FACILITIES WHICH ARE NOT INDICATED TO BE REMOVED
SHALL BE PROTECTED FROM DEMOLITION OR OTHER CONSTRUCTION
ACTIVITIES.
7. SPECIAL HANDLING AND CONSIDERATION SHALL BE REQUIRED FOR
EXCAVATED SOILS THOUGHT TO CONTAIN PETROLEUM-BASED /
CONTAMINATED / HAZARDOUS SUBSTANCES. CONTRACTOR SHALL
MONITOR EXCAVATED SOILS. SOILS SHALL BE DISPOSED OF
PROPERLY IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
REQUIREMENTS AND THE PROJECT SPECIFICATIONS. CONTRACTOR
SHALL COORDINATE REMOVAL OF PETROLEUM-BASED /
CONTAMINATED / HAZARDOUS MATERIALS WITH CONTRACTING
OFFICER.
8. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER
PRIOR TO REMOVAL OF EXISTING UTILITIES IN SERVICE. RELOCATED
UTILITIES SHALL BE CONSTRUCTED BEFORE REMOVAL OF EXISTING
UTILITIES TO ENSURE UNINTERRUPTED SERVICE TO THE FACILITIES
SERVED BY THE UTILITY. ALL RELOCATIONS SHALL BE COORDINATED
WITH THE CONTRACTING OFFICER.
9. UTILITY CAPPING METHODS SHALL BE IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS FOR SPECIFIC PIPE MATERIAL
IN SERVICE. ALL CAPPING SHALL BE INSPECTED AND APPROVED BY
THE CONTRACTING OFFICER.
10. ALL STRUCTURES, VALVES, ETC. TO REMAIN SHALL BE PROTECTED
AND ADJUSTED TO FINISH GRADE IF NEEDED.
11. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE REMOVED IN
ACCORDANCE WITH SPECIFICATION SECTION 02 41 00 AND
BACKFILLED IN ACCORDANCE WITH SPECIFICATION SECTION
31 00 00.00 06.
12. UTILITIES AND BELOW GRADE ITEMS EXIST THAT ARE NOT SHOWN
ON THE PLANS. THE CONTRACTOR SHALL CHASE AND REMOVE
THE UTILITIES AND FEATURES DURING DEMOLITION AND NEW
CONSTRUCTION WORK.
13. CLEAR AND GRUB ALL VEGETATION AND PREPARE SUBGRADE FOR
SITE EARTHWORK WITHIN LIMITS SHOWN ON THE DRAWINGS.
STOCKPILE ALL MATERIAL CLASSIFIED AS TOPSOIL FOR LATER USE
ON SITE.
14. IN AREAS OF UTILITY REMOVAL OF ABANDONED LINES, THE PORTION
OF EXISTING ABANDONED LINES TO REMAIN SHALL BE CAPPED OR
PLUGGED AT REMOVAL INTERFACE.
15. SEE EXISTING CONDITION NOTES ON V-100, AND SHEET GC003 FOR
GENERAL CIVIL NOTES.
16. SEE SHEET M-003 MECHANICAL PHASING FOR SPECIFIC
DEMOLITION/CONSTRUCTION SEQUENCING AND PHASING
INFORMATION.
17. ALL DEMOLITION WORK IS WITHIN THE
SCOPE OF THE GENERAL CONTRACTOR.
THE CONTRACTOR SHALL COORDINATE
WITH AMERICAN WATER PRIOR TO
DEMOLITION ACTIVITIES.
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_CD100.dwg
12/4/2020 11:02:09 AM
CD100
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
O V
E R
A L L
D
E M
O L I T
I O
N
P
L A
N
CD101 CD102
40' 80'0
CD103
N
C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
J G
W
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
J G
W
12/10/2012/10/20
W
2Q R
R
-0
M
W
E
FF
C
E
P
D
S
E
C
E
P
D
S
E
P
D
S
P
P
C
O
C
P
ST
OH OH OH OH OH OH
W
W
CB
CB
W
W
CB
CB
CB
CB
W
C
CO
S
E
E
C
CO
CO
C
M
W
CO
CO
S
CO
S
T
ST
ST
S T
S T
S T
S
T
S
T
U E
U E
U E
U E
U E
U E
U E
U E
U E
S
T
S
T
CB
CB
CB
CB
S
T
S
T
S
T
T
OH
OH
OH
OH
ST
ST
U
E
U
E
U
E
U
E
S
T
S T
S T
S T
S T
S
T
WEST RAMP FLANGE
CONNECTION PIT
TOP EL. = 816.91
EMERGENCY FUEL
SHUT OFF (TYP)
UNDERGROUND
HOT WATER LINES
MH NOT FOUND
UPSTREAM
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
E
E
E
E
E
E
E
C
B
ST
ST
ST
ST ST
ST
ST
C
B
M
0N
.9
E
.4
E
L
E
V
.2
N
.2
E
.0
E
L
E
V
.0
N
.5
E
.4
E
L
E
V
.0
W
P
N
.5
E
.7
E
L
E
V
.7
W
P
N
.6
E
.9
E
L
E
V
.1
W
P
N
.0
E
.4
E
L
E
V
.0
W
P
6N
.5
E
.2
E
L
E
V
.6
SCHWIENFORT AVE
V A
N D
E N
B U
A
D
X
X
X
X
W W
F F F F
F F
W W
W W
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W W
F F
F F
W W W
W W W W W
W
C O
M M
COMM
COMM
C
O
M
M
COMMCOMM
C O
M M
C O
M M
S S
SS SS SS
S
T
S
T
S
T
S
T
S T
S T
S T
S T
S T
S T
ST ST
ST ST
S
T
S
T
S
T
S T
ST
ST
S
T
S
T
S T
S T
S T
S T
S T
ST ST ST
ST ST ST ST ST
ST
STST
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S T
S
T
S T
S T
STST
ST
W
W
W
W
W
W
WW
W W
F
F F
F F
F F
F F
F F
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I
S
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I S
G
I S
G
I S
G
I S
G
I
S
(GIS)
(GIS)
G
I S
(GIS)
(GIS)
G
I
S
(GIS)
G
I S
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I
S
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
G
I S
G
I S
G
I
S
G
I S
G
I S
G
I
S
G
I
S
(GIS)
(GIS)
(GIS)
G
I S
(GIS)
G
I S
(G
IS)
(GIS)
(GIS)
G
IS
G
I
S
G
I S
(GIS)
(GIS)
G
IS
G
I S
G
I S
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
G
I S
XXXXX
X
XXXXX
X X
X X
X X X X
X
X X X X X X
X X
X X
U E
U E
U E
U E
U E
U E
U E
U E
U E
U
E
U
E
U
E
UE
U
E
UE/UC UE/UC
UE/UC UE/UC
UE UE UE UE UE UE
U
C
U
C
U
C
U
C
U
C
U C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U E
U E
U E
8" W
8" W
8" W
8" W
W
W
2" DCW
F
W
10" FW
F
W
S
S
J
J F
8" JF
8" JF
6" C
D 6" CD
C
D
C
D
C
D
S
D
6" CD
S
D
C
D
6" CD12" SD
S
D
6" SD
S
D
10" FW
B U
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
A1
OVERALL SITE UTILITY PLAN
SCALE: 1" = 40'
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_CU100.dwg
9/29/2020 12:38:00 PM
CU100
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
O V
E R
A L L
S
I T
E
U
T I L I T
Y
P
L A
N
CU101
CU111
CU102
CU112
40' 80'0
PUMP
HOUSE
TRUCK OFFLOAD /
HHTC STAND
REMOTE SPILL CONTAINMENT
BASIN (8200 GALLON
CAPACITY, SEE STRUCTURAL
DRAWINGS)
PRODUCT
RECOVERY TANK
JET FUEL
TANK 1
(4.7K BBL)
BOWSER
PARKING
JET FUEL
TANK 2
(4.7K BBL)
FH-1
FH-2
N
CONNECT TO EXISTING
COMM LINE (SEE
ELECTRICAL PLANS)
CU103
GENERAL UTILITY NOTES:
1. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING
CONNECTIONS WITH BUILDING CONTRACTOR AND THE
INFORMATION PROVIDED ON MECHANICAL AND ELECTRICAL
DRAWINGS FOR EACH FACILITY.
3. CONTRACTOR SHALL CONTACT THE ALL ASSOCIATED UTILITY
COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF
UTILITIES PRIOR TO COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL COORDINATE ALL REQUIRED UTILITY
SHUTDOWNS FOR UTILITY CONNECTIONS.
5. CONNECTION TO EXISTING WATER, SEWER, AND STORM MAINS
SHALL BE CONSTRUCTED IN ACCORDANCE WITH ALL
REQUIREMENTS OF ASSOCIATED UTILITY COMPANIES AND
AGENCIES.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING
ALL UTILITY CONNECTION FEES AND OBTAINING ALL PERMITS
REQUIRED FOR THE UTILITY CONSTRUCTION AND CONNECTIONS.
7. THE MINIMUM DEPTH OF COVER FOR UTILITIES SHALL BE AS
FOLLOWS UNLESS INDICATED OTHERWISE:
- WATER: 48 INCHES
- ELECTRICAL AND COMMUNICATION: 24 INCHES
- ALL OTHER UTILITIES: 30 INCHES
8. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, INSPECTED,
AND APPROVED BEFORE BACKFILLING.
9. ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE
TESTING AND INSPECTION METHODS DETAILED IN THE
SPECIFICATIONS, WHICH MAY INCLUDE VIDEO CAMERA INSPECTION.
10. CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY
THE CONTRACTING OFFICER.
11. AMERICAN WATER IS RESPONSIBLE FOR THE UTILITY WORK FROM
THE WATER VALVE (INCLUDING THE VALVE) AND FOR THE
SANITARY SEWER CLEANOUT (TO INCLUDE THE CLEANOUT) TO THE
CONNECTION POINT FOR ALL WATER AND SANITARY SERVICES.
THE PRIME CONTRACTOR SHALL COORDINATE ALL SITE ACTIVITY
WITH AMERICAN WATER. AMERICAN WATER SHALL ALSO PROVIDE
ALL SURFACE RESTORATION OUTSIDE THE FENCING FOR THE FIRE
WATER AND SANITARY LINES ONLY. THE CONTRACTORS SHALL
COORDINATE THE CONNECTION POINTS, CONSTRUCTION PHASING,
AND ALL ASPECTS OF THE PROJECT EXECUTION.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL
TEES, BENDS, OR ELBOWS OF PRESSURIZED PIPING IN
ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, AND
MANUFACTURER'S RECOMMENDATIONS.
2. CONTRACTOR SHALL COORDINATE THE INSTALLATION, TESTING,
AND INSPECTION OF ALL DOMESTIC WATER AND FIRE WATER
SYSTEMS WITH THE ASSOCIATED UTILITY COMPANIES AND
AGENCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS
ON WATER UTILITY TESTING AND INSPECTION.
3. WATER LINE INSTALLATION SHALL CONFORM TO AMERICAN WATER
STANDARDS AND SPECIFICATIONS.
SANITARY UTILITY NOTES:
1. ALL SANITARY SEWER BUILDING CONNECTIONS ARE TO BE MADE
USING 6 INCH LINES UNLESS INDICATED OTHERWISE.
2. ALL SANITARY SEWER LINES ARE TO BE LAID AT A UNIFORM SLOPE
FROM THE BUILDING CONNECTIONS TO THE CONNECTING SEWER
AND BETWEEN UTILITY STRUCTURES.
3. IF MANHOLES ARE INDICATED ON SANITARY SEWER LINES, A 2.00
INCH DROP IN ELEVATION BETWEEN THE INCOMING AND OUTGOING
SEWER SHALL BE PROVIDED IN EACH MANHOLE UNLESS INDICATED
OTHERWISE. INVERT FLOW CHANNELS SHALL BE CONSTRUCTED TO
PROVIDE SMOOTH AND UNIFORM SLOPE WITH GRADUAL
TRANSITION SECTIONS.
4. USE SDR 26 PVC SEWER PIPE CONFORMING TO ASTM D1784 AND
ASTM D3034.
5. SANITARY LINE INSTALLATION SHALL CONFORM TO AMERICAN
WATER STANDARDS AND SPECIFICATIONS.
UTILITY STRUCTURE NOTES:
1. ALL UTILITY STRUCTURES ARE TO BE H-20 RATED UNLESS
INDICATED OTHERWISE.
2. IF A MANHOLE IS LOCATED IN PAVEMENT AREAS, RIM ELEVATION
SHALL BE FLUSH WITH FINAL GRADE. IF A MANHOLE IS LOCATED
OUTSIDE OF PAVEMENT AREAS, RIM
ELEVATION SHALL BE 2” MINIMUM ABOVE
ADJACENT FINISH GRADE.
3. ANY LIFT LOOPS FOR UTILITY STRUCTURES
SHALL BE GROUTED FLUSH AFTER
INSTALLATION.
4. PIPE SHALL EXTEND 2” BEYOND INTERIOR
MANHOLE WALL.
LEGEND:
ABOVE GROUND HOT WATER LINE
FIRE WATER LINE
WATER LINE
DOMESTIC WATER LINE
CONTAINMENT DRAIN LINE
STORM DRAIN LINE
SANITARY SEWER LINE
BELOW GRADE FUEL LINE
ABOVE GRADE FUEL LINE
BURIED ELECTRICAL LINE
(SEE ELECTRICAL DRAWINGS)
COMMUNICATIONS LINE
CONTAINMENT DRAIN VALVE
PRECAST SPLASH PAD
SANITARY SEWER MANHOLE
CONTAINMENT DRAIN INLET
CATCH BASIN
FIRE HYDRANT
WATER GATE VALVE AND VALVE BOX
UC UC
UE UE
6" CD
6" SS
12" JF
2" DCW
8" W
6" SD
10" FW
CDT-1
SDI-1
CDV-1
STORMWATER
BIORETENTION BASIN
WEIR
SP-1
BUILDING
SSMH
C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
J G
W
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
J G
W
12/10/2012/10/20
W
2Q R
R
-0
FF
E
P
D
S
E
C
C
P
OH OH OH OH OH OH OH OH OH OH OH OH
S
T
S
T
S
T
S
T
ST
SQUARE TYPE SDCB
RIM ELEV. = 812.71
INV. OUT (NW) = 807.68
R
C
P
SQUARE TYPE SDCB
RIM ELEV. = 814.00
INV. IN (NE) = 806.33
INV. IN (SE) = 807.60
INV. OUT (SW) = 806.33
SQUARE TYPE SDCB
RIM ELEV. = 816.29
TOP OF PIPE BUSTED OUT
INV. EL (NE) = 806.58
NO SW PIPE SURVEYED
P
I P
Z
D
M
A
T
E
R
I
U
N
K
N
O
W
N
SQUARE TYPE SDCB
RIM ELEV. =817.32
APPROX. C/L 808.06'
S
T
S
T
S
T
WEST RAMP FLANGE
CONNECTION PIT
TOP EL. = 816.91
SQUARE TYPE SDCB
RIM ELEV. = 815.50
NO INVERTS SURVEYED
C
B
C
B
C
B
E
E
E
E
C
B
ST
C
B
E
L
V
SCHWIENFORT AVE
V A
N D
E N
B U
A
D
F F F F F F F F
F F
W W
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W W
W W
F
F
W W W W W W W W W
C O
M M
C O
M M
S T
S T
S T
S T
S T
S T
S T
S T
S T
S T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S T
ST
W
F F
F F
F F
F
F
F F
F
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
(GIS)
G
I S
G
I S
G
I S
G
I S
G
I S
G
I
S
(GIS)
(GIS)
G
I S
(GIS)
(GIS)
G
I
S
(GIS)
G
I S
G
I S
G
I S
G
I S
(GIS)
(GIS)
(GIS)
G
I S
(GIS)
XXXXXXXXXXX
X X X X X X X X X X X
X X
X X
X X
X X
TRUCK OFFLOAD /
HHTC STAND
REMOTE SPILL CONTAINMENT
BASIN (8200 GALLON CAPACITY,
SEE STRUCTURAL DRAWINGS)
8" W
EX SDCB-1
SDI-1
SDI-2
CDI-3
CDI-4
PUMP
HOUSE
A1
CU300
S
S
U
E
U
E
U
E
UE/UC UE/UC UE/UC UE/UC
UE UE UE UE UE UE UE
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
U
C
A1
CU305
D1
CU305
E 1535583.98
CONNECT TO EXISTING
WATER LINE WITH 45° FITTING
N 673344.03
E 1535578.81
45° FITTING
N 673282.72
E 1535443.61
PIPE TEE
N 673168.58
E 1535583.75
WATER VALVE
N 673341.22
E 1535447.39
WATER VALVE
N 673164.11
E 1535335.22
SSCO-1
N 673303.58
E 1535371.09
SSCO-2
POINT OF
DEMARCATION (POD)
N 673261.10
8" W 8" W
8" W
8" JF
J F
8" JF
6" CD
6" CD
S
D
C
D
12" SD
6" CD
8" JF
8" JF
J F
S
D
GENERATOR
CDV-3
S
D
4+00 5+00
E
P
P I
E P
EP: 2+16.22
PI: 1+60.62
D1
CU302
D1
CU300
A6
CU300
D6
CU300
E 1535508.28
N 673494.43
E 1535508.52
N 673497.25
B U
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTALREADY TO ADVERTISE
A1
SITE WATER AND SANITARY - AREA 2
SCALE: 1" = 20'
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_CU101.dwg
12/4/2020 10:57:59 AM
CU102
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
S I T
E
W
A T
N
I T
A R
Y
A
R E
A
20' 40'0
M A
T C
H L I N
E
S
F
N
T I N
U A
T I O
N
KEY MAP
N
NOTES:
1. ALL WATER LINES AND ASSOCIATED APPURTENANCES
SHALL BE PER AMERICAN WATER.
2. ALL WATER UTILITIES SHALL BE INSPECTED PRIOR TO
BACKFILLING. THIS INCLUDES ALL UTILITY CONNECTIONS
TO EXISTING SYSTEMS. CONTACT AMERICAN WATER AT
937 623-9786 (CORY KINNISON).
KEYED NOTE:
INSTALL 6" X 6" X 6" CLEANOUT 5 FEET FROM THE
BUILDING. THE CLEANOUT IS THE POINT OF
DEMARCATION FOR THE SANITARY SEWER LINE
SERVING THE BUILDING MECHANICAL. COORDINATE
THE CONNECTION WITH AMERICAN WATER AND
WRIGHT PATTERSON AFB.
LEGEND:
ABOVE GROUND HOT WATER LINE
FIRE WATER LINE
WATER LINE
DOMESTIC WATER LINE
CONTAINMENT DRAIN LINE
STORM DRAIN LINE
SANITARY SEWER LINE
BELOW GRADE FUEL LINE
ABOVE GRADE FUEL LINE
BURIED ELECTRICAL LINE
(SEE ELECTRICAL DRAWINGS)
COMMUNICATIONS LINE
CONTAINMENT DRAIN VALVE
PRECAST SPLASH PAD
SANITARY SEWER MANHOLE
CONTAINMENT DRAIN INLET
CATCH BASIN
FIRE HYDRANT
WATER GATE VALVE AND VALVE BOX
UC UC
UE UE
6" CD
6" SS
12" JF
2" DCW
8" W
6" SD
10" FW
CDT-1
SDI-1
CDV-1
SP-1
SSMH
C1
CU508
D4
CU507
D1
CU504
C6
CU508
D3
CU503
A1
CU505
B1
CU507
C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
J G
W
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
J G
W
CERTIFIED FINAL SUBMITTAL
12/10/2012/10/20
W
2Q R
R
-0
D1
FIRE HYDRANT DETAIL
SCALE: NTS
NOTES:
1. ALL HYDRANTS SHALL STAND PLUMB AND SHALL
HAVE THE PUMPER NOZZLE FACING THE ROAD.
2. HYDRANT BONNETS SHALL BE PAINTED TO
INDICATE AVAILABLE FIRE FLOW IN
ACCORDANCE WITH AMERICAN WATER
SPECIFICATIONS.
3. IF HYDRANT LATERAL IS NOT RESTRAINED,
CONTRACTOR SHALL PROVIDE A THRUST BLOCK
BEHIND HYDRANT SHOE.
4. RESTRAIN ALL JOINTS ON HYDRANT TEE,
HYDRANT VALVE, AND HYDRANT LEAD.
5. AMERICAN WATER RESERVES THE RIGHT TO
WAIVE STRICT COMPLIANCE WITH THIS DETAIL IN
THE EVENT THAT FIELD CONDITIONS OR O&M
WORK REQUIRE A WAIVER.
6. CONTACT AW ENGINEER PRIOR TO
CONSTRUCTION IF PROPOSED HYDRANT IS
LOCATED IN AN AREA SUBJECT TO HIGH
GROUNDWATER, FLOODING, CONTAMINANT, OR
IN AREAS WHERE SURFACE WATER PONDS. AW
ENGINEER SHALL DETERMINE IF THE HYDRANT
SHALL BE RELOCATED OR THE DRAIN PORT
PLUGGED.
7. THE FIRE HYDRANTS SHALL BE MUELLER MODEL
SUPER CENTURION 250 MODEL A3423 WITH 5"
STORZ CONNECTION.
PAINT LID BLUE
2" WATER SERVICE LINE
SOLID 6" THICK BY 12" X 12"
CONCRETE/MASONRY BLOCK
SERVICE
MAIN
CORPORATION STOP
FINISHED GRADE
FILTER FABRIC
NOTES:
1. INSTALL CORPORATION STOP WITH APPROPRIATE FITTINGS.
2. SUBMIT SHOP DRAWINGS FOR APPROVAL.
3. INSTALL PER AMERICAN WATER REQUIREMENTS.
4. POINT OF DEMARCATION FOR SERVICE LINE OWNERSHIP PER
PRIME CONTRACT BETWEEN AMERICAN WATER AND THE
GOVERNMENT IS LOCATED AT THE VALVE OUTSIDE THE BUILDING.
FIBER REINFORCED
CONCRETE PAD
2" DCW (TYPE K COOPER)
CURB BOX
A1
2" WATER SERVICE INSTALLATION
SCALE: NTS
MINIMUM COVER PER
AW OR INSULATE PER
DETAIL ## ON SHEET ##
B U
R N
D
O N
N E
L L
R
D
P
A R
K W
A Y
K A
N S
T
Y
US ARMY CORPS
OF ENGINEERS ®
D
2 3
C
A
B
D A
T E
A P
P R
D R
A W
I N
G
C
O D
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
S C
A L
E
SHEET
REFERENCE
NUMBER:
6 7 8 9
***SAFETY PAYS***
D A
T E
D E
S C
R I P
T I O
N S
Y M
B O
L
R E
V I S
I O
N S
E
F
***SUPPORT VALUE ENGINEERING - IT PAYS***
FILE:
DATE:
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
P R
O J E
G
I N
E E
R A
R C
H I T
E C
T
LOUISVILLE DISTRICT
P N
D
E S
C
P
R E
P L A
D
R A
E
L
S
Y S
T E
M
W R
I G
H T
P
A T
T E
R S
Y
T O
N
O
H
D I C
A T
E D
CERTIFIED FINAL SUBMITTAL
Z:\Clients\ANF\USCOE\NwO\107620_WPAFBHYDRANT\Design\Civil\Sheets\107620_CS500.dwg
12/4/2020 10:55:31 AM
CU504
R
B
E T
T M
E N
G
J
E
I C
H E
N B
E R
G E
R
C
S
T E
W A
R T
U T
I L I T
Y
D
E T
A I
C
E R
T I F
I E
D
F
I N
B
M I T
T A
L
J G
W
R
E V
I S
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
J G
W
12/10/2012/10/20
W
2Q R
R
-0
| GC005 |
| CD100 |
| CU100 |
| CU102 |
| CU504 |
File details come from the government source that posted it. Updated .