W912QR20B0012_Specs-0004.pdf
PDF 1018 KB Posted
- Solicitation number
- W912QR20B0012
About this file
This solicitation is for the construction of a new HC-130J General Maintenance Hangar at Patrick Air Force Base in Florida. The project has an estimated cost between $10-25 million and involves the construction of a hangar facility according to specifications. The solicitation is full and open to all contractors. As this is a federal project, contractors must comply with System for Award Management registration requirements and other federal acquisition regulations. Funding is not yet available and no award will be made until appropriations are in place. The North American Industry Classification System code for this project is 236220. The size status of contractors will be determined based on this NAICS code as listed in SAM. In accordance with FAR 19.1307, this project requires a 10% price evaluation preference for HUBZone small businesses. The response due date is extended to September 15, 2020.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: GLENN W MOON
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0012
X 9B. DATED (SEE ITEM 11)
14-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Sep-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20B0012_Specs-0004
W912QR20B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES AMEND 0004
Solicitation W912QR20B0012 for the Construction of HC-130J General Maintenance Hangar at Patrick Air Force Base, Florida is hereby modified as follows:
1. Offerors must acknowledge all amendments.
2. The due date and time for bid submission is extended from 08 September 2020 at 10:00 AM Eastern Time to 15 September 2020 at 2:00 PM Eastern Time.
3. Wage Rates:
General Decision Number FL20200001, has updated and is hereby replaced with the current version General Decision Number FL20200001, dated 08/28/2020.
4. DRAWING SUMMARY OF CHANGES
A-101
General Notes – Added splash block note.
A1 – Added splash blocks at downspouts.
A-102
B4 – Added splash blocks at downspouts.
A-103
A-104
A-130
General Notes – Revised Note 5.
A-401
A1 – Removed Toilet Accessory TA-08 from Men’s Restrooms #110 & #116.
A-402
Clarified extent of wall finishes (painting, ceramic tile, wall base) at all elevations.
Added “typical” split finish wall elevation.
A-551
Base Details B1 & B2 – Revised height of base to match schedules and elevations.
W912QR20B0012
A-701
Added REMARK #5 Revised wall finishes at Room #111.
Added REMARK #5 to Rooms #109, 110, 112, 113, 116 & 117.
S-007
Revised Typical Floor Slab Joint Details
S-431
Revised weld callout on Detail A1
M-601
Clarified FCU-06 is Option C and FCU-07 is Option A.
5. SPECIFICATION SUMMARY OF CHANGES
10 14 00.20 Deleted sentence in Clause 1.3 EXTRA MATERIALS.
- END OF ‘SUMMARY OF CHANGES’ -
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 08-Sep-2020 10:00 AM to 15-Sep-2020 02:00 PM.
(End of Summary of Changes)
General Decision Number: FL20200001 08/28/2020
Superseded General Decision Number: FL20190001
State: Florida
Construction Types: Building, Heavy and Highway
County: Brevard County in Florida.
**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY
SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING
CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
1 01/31/2020
2 02/21/2020
3 03/27/2020
4 05/15/2020
5 07/03/2020
6 08/14/2020
7 08/28/2020
ASBE0067-001 03/01/2020
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 28.93 16.68
ASBE0067-002 07/01/2017
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not).........$ 16.50 10.90
BOIL0433-001 03/01/2018
BOILERMAKER......................$ 30.07 22.71
BRFL0008-001 01/01/2018
BRICKLAYER (BRICKLAYERS,
BLOCKLAYERS, PLASTERERS,
TERRAZZO WORKERS, TILE
SETTERS AND CEMENT MASONS)
COMMERCIAL..................$ 22.68 6.31
INDUSTRIAL..................$ 26.08 6.31
INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape
Canaveral Air Force Station and Kennedy Space Flight Center.
CARP1000-001 07/01/2014
MILLWRIGHT.......................$ 29.48 12.40
* CARP1905-002 06/01/2017
Carpenters:
*INDUSTRIAL:
CARPENTERS.................$ 25.25 7.55
PILEDRIVERMEN..............$ 21.75 8.65
COMMERCIAL:
CARPENTERS.................$ 23.11 9.85
PILEDRIVERMEN..............$ 21.75 8.65
ELEC0222-001 09/01/2016
Line Construction:
CABLE SPLICER...............$ 35.72 5.00+24.5%
GROUNDMAN...................$ 19.39 5.00+24.5%
LINEMAN; HEAVY EQUIPMENT
OPERATOR....................$ 34.02 5.00+24.5%
ELEC0756-001 09/03/2019
ELECTRICIAN
Cable Splicer...............$ 29.33 3%+12.74
Wireman.....................$ 29.33 3%+12.74
ELEV0139-001 01/01/2020
ELEVATOR MECHANIC................$ 44.12 34.765
FOOTNOTE:
A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.
Paid Holidays: New Year's Day; Memorial Day; Independence
Day; Labor Day; Thanksgiving Day; The Friday after
Thanksgiving Day; and Christmas Day.
ENGI0673-001 05/01/2013
Power equipment operators:
GROUP 1.....................$ 26.30 10.85
GROUP 2.....................$ 24.14 10.85
GROUP 3.....................$ 23.00 10.85
GROUP 4.....................$ 20.36 10.85
POWER EQUIPMENT OPERATORS
CLASSIFICATIONS GROUP 1: Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver
(incluidng auger and boring machine)
GROUP 2: Mechanic/Welder and operators of: Gantry Crane, Bridge Crane, Clam Shell, Dragline, Backhoe, Gradeall, Grader, Sideboom Cat, Hulti-Drum Hoist, Highlift (10' or higher), Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom
GROUP 3: Bulddozers, Forklifts, Straddle Buggy, Single Drum
Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating
Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer
GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor boat, Power Boat, Power
Sweeper, Welding Machine, Oiler, Mechanic's Helper, Pump, Conveyor, Roller, Watertruck, Asphalt distributor, Concrete
Pump (trailer type), Utility Operator
IRON0808-001 01/01/2019
IRONWORKER.......................$ 27.28 14.70
LABO0517-001 05/01/2017
Laborers:
Asbestos Abatement, Hazardous and Toxic Waste
Removal Laborers; (On all mechaincal systems: Lead
Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;.......$ 19.45 7.85
Carpenter Tender, Cement
Mason Tender, Block/
Bricklayer Tender
Plasterer Tender............$ 19.20 7.85
Demolition Laborers.........$ 19.20 7.85
General Laborer.............$ 19.20 7.85
Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools.......................$ 19.20 7.85
PAIN0078-001 08/01/2020
GLAZIER..........................$ 24.71 14.05
PAIN0078-002 08/01/2020
PAINTER..........................$ 24.71 14.05
* PLUM0295-001 01/01/2020
Plumber/Pipefitter/Steamfitter
INDUSTRIAL: Bulk
Plants, Power-houses, Chemical Plants, Missile
Sites, (Including all Work at Cape Canaveral Air
Force Station and Kennedy
Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other work which is related to and considered a part of the above type projects....................$ 35.70 21.66
Schools, Hospitals, Shopping Centers, and work not listed as Industrial....$ 35.20 20.37
ROOF0136-001 08/01/2019
ROOFER...........................$ 22.79 8.57
* SFFL0821-002 07/01/2020
SPRINKLER FITTER
Commercial..................$ 29.88 19.75
Industrial..................$ 31.53 19.75
Industrial: Jobs covering sugar mills, power plants, trash burning plants, military installations and Cape Kennedy. All other work shall be commercial rate.
SHEE0015-001 07/01/2020
SHEET METAL WORKER...............$ 26.89 8.89
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
HC-130J General Maintenance Hangar 107778AM04 Patrick AFB, FL
SECTION 10 14 00.20
INTERIOR SIGNAGE
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this Specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z97.1 (2015) Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
Amdt. #0002
SD-02 Shop Drawings
Detail Drawings; G
SD-03 Product Data
Installation; G
Warranty; G
SD-04 Samples
Interior Signage; G
Software; G
SD-10 Operation and Maintenance Data
SECTION 10 14 00.20 Page 1
Approved Manufacturer's Instructions; G
Protection and Cleaning; G
Amdt. #0002
Amdt. #0004
1.3 EXTRA MATERIALS
Provide 5 extra frames and extra stock of the following: 5 changeable message strips for sign type A and C. Provide cardstock paper inserts and one copy of the software for user produced signs and inserts after Project Completion and equipment necessary for removal of signage parts and pieces.
Amdt. #0004
1.4 QUALITY ASSURANCE
1.4.1 Samples
Submit interior signage samples of each of the following sign types showing typical quality, workmanship, and color: Directional sign, standard room sign, changeable message strip sign. The samples may be installed in the Work, provided each sample is identified and location recorded.
1.4.2 Detail Drawings
Submit Detail Drawings showing elevations of each type of sign, dimensions, details, and methods of mounting or anchoring, mounting height, shape and thickness of materials, and details of construction.
Include a schedule showing the location, each sign type, and message.
1.5 DELIVERY, STORAGE, AND HANDLING
Materials must be packaged to prevent damage and deterioration during shipment, handling, storage and installation. Product must be delivered to the Job Site in manufacturer's original packaging and stored in a clean, dry area in accordance with manufacturer's instructions.
1.6 WARRANTY
Warrant the interior signage for a period of 2 years against defective workmanship and material. Warranties must be signed by the authorized representative of the manufacturer. Submit warranty accompanied by the document authenticating the signer as an authorized representative of the guarantor. Guarantee that the signage products and the installation are free from any defects in material and workmanship from the date of delivery.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Signs, plaques, directories, and dimensional letters must be the standard
SECTION 10 14 00.20 Page 2 product of a manufacturer regularly engaged in the manufacture of such products that essentially duplicate signs that have been in satisfactory use at least 2 years prior to bid opening. Obtain signage from a single manufacturer with edges and corners of finished letterforms and graphics true and clean.
2.2 ROOM IDENTIFICATION/DIRECTIONAL SIGNAGE SYSTEM
2.2.1 Standard Room Signs
Signs must consist of acrylic plastic 0.080 inch thickness minimum conforming to ANSI Z97.1 and must conform to the following:
a. Units must be frameless. Corners of signs must be squared.
2.2.2 Changeable Message Strip Signs
Changeable message strip signs must be of same construction as standard room signs to include a clear sleeve that will accept a paper or plastic insert identifying changeable text. The insert must be prepared typeset message mounted on paper card stock. Provide paper and software for creating text and symbols for computers identified by owner for Owner production of paper inserts after Project Completion. Furnish one device to assist in removing sheet.
2.2.3 Type of Mounting For Signs
Provide extruded aluminum brackets for hanging, projecting, and double-sided signs. Mounting for framed, hanging, and projecting signs must be by mechanical fasteners. Surface mounted signs must be mounted with 1/16 inch thick closed cell vinyl foam with adhesive backing.
Adhesive must be transparent, long aging, high tech formulation on two sides of the vinyl foam.
2.2.4 Graphics
Signage graphics for modular signs must conform to the following:
2.2.4.1 Subsurface Copy with Embossed
Copy is transferred to the back face of clear acrylic sheeting forming the panel face to produce precisely formed opaque image. This method bonds all sign elements (color, graphics, lettering, Braille and substrate) into a single unit.
2.2.5 Character Proportions and Heights
Letters and numbers on signs conform to 36 CFR 1191 .
2.2.6 Tactile Letters, Symbols and Braille
Raised letters and numbers on signs must conform to 36 CFR 1191 .
2.3 BUILDING DIRECTORIES
Building directories must be lobby directories or floor directories, and must be provided with a changeable directory listing consisting of the areas, offices and personnel located within the facility. Dimensions, details, and materials of sign and message content must be as shown on the
SECTION 10 14 00.20 Page 3
Drawings.
2.3.1 Header Panel
Header panel must have background metal to match frame.
2.3.2 Non-Illuminated Unit
Directory must consist of a non-illuminated unit with vinyl or screen printed lettering on plastic film held in interchangeable plastic carriers or screen printed or vinyl copy laminated to magnetic tape. Design of unit must be as shown in the Drawings.
2.3.2.1 Message Strips
Message strips must be updatable by user. Message strips must be sized in accordance with manufacturer's standard. Letters and numbers must be provided in accordance with the Drawings.
2.4 FABRICATION AND MANUFACTURE
2.4.1 Factory Workmanship
Holes for bolts and screws must be drilled or punched. Drilling and punching must produce clean, true lines and surfaces. Exposed surfaces of work must have a smooth finish and exposed riveting must be flush.
Fastenings must be concealed where practicable.
2.4.2 Dissimilar Materials
Where dissimilar metals are in contact, the surfaces will be protected to prevent galvanic or corrosive action.
2.5 COLOR, FINISH, AND CONTRAST
Color must be in accordance with Section 09 06 00 SCHEDULES FOR FINISHES.
Finish of all signs must be eggshell, matte, or other non-glare finish as required in handicapped-accessible buildings.
2.6 TYPEFACE
ADA-ABA compliant font for Room Signs as indicated on Drawings.
PART 3 EXECUTION
3.1 INSTALLATION
Signs must be installed plumb and true and in accordance with approved manufacturer's instructions at locations shown on the Detail Drawings.
Submit six copies of operating instructions outlining the step-by-step procedures required for system operation. The instructions must include simplified diagrams for the system as installed, the manufacturer's name, model number, service manual, parts list, and brief description of all equipment and their basic operating features. Each set must be permanently bound and must have a hard cover. The following identification must be inscribed on the covers: The words "OPERATING AND MAINTENANCE INSTRUCTIONS", name and location of the facility, name of the Contractor, and Contract number. Mounting height and mounting location must conform to 36 CFR 1191 . Required blocking must be installed. Signs
SECTION 10 14 00.20 Page 4 on doors or other surfaces must not be installed until finishes on such surfaces have been installed. Signs installed on glass surfaces must be installed with matching blank back-up plates in accordance with manufacturer's instructions.
Do not install items that show visual evidence of biological growth.
3.1.1 Anchorage
Anchorage must be in accordance with approved manufacturer's instructions. Anchorage not otherwise specified or shown must include slotted inserts, expansion shields, and powder-driven fasteners when approved for concrete; toggle bolts and through bolts for masonry; machine carriage bolts for steel; lag bolts and screws for wood. Exposed anchor and fastener materials must be compatible with metal to which applied and must have matching color and finish.
a. Signs mounted to painted gypsum board surfaces must be removable for painting maintenance.
b. Mount signs mounted to lay-in ceiling grids with clip connections to ceiling tees.
c. Install signs mounted on metal surfaces with magnetic tape.
d. Install signs mounted on fabric surfaces with hook and loop tape or pin mount.
3.1.2 Protection and Cleaning
Protect the Work against damage during construction. Hardware and electrical equipment must be adjusted for proper operation. Glass, frames, and other sign surfaces must be cleaned at completion of sign installation in accordance with the manufacturer's approved instructions and the requirements of Section 01 78 23 OPERATION AND MAINTENANCE DATA, Package 1. Submit six copies of maintenance instructions listing routine procedures, repairs, and guides.
-- End of Section --
SECTION 10 14 00.20 Page 5
HC-130J General Maintenance Hangar
THIS PAGE INTENTIONALLY LEFT BLANK
107778AM04
HC-130J General Maintenance Hangar
THIS PAGE INTENTIONALLY LEFT BLANK
107778AM04
| SF30 |
| SUMMARY OF CHANGES |
| 00 10 00 |
| General Decision Number: FL20200001 08/28/2020 |
| 10 14 00.20 - INTERIOR SIGNAGE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 EXTRA MATERIALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Samples |
| 1.4.2 Detail Drawings |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.6 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 STANDARD PRODUCTS |
| 2.2 ROOM IDENTIFICATION/DIRECTIONAL SIGNAGE SYSTEM |
| 2.2.1 Standard Room Signs |
| 2.2.2 Changeable Message Strip Signs |
| 2.2.3 Type of Mounting For Signs |
| 2.2.4 Graphics |
| 2.2.4.1 Subsurface Copy with Embossed |
| 2.2.5 Character Proportions and Heights |
| 2.2.6 Tactile Letters, Symbols and Braille |
| 2.3 BUILDING DIRECTORIES |
| 2.3.1 Header Panel |
| 2.3.2 Non-Illuminated Unit |
| 2.3.2.1 Message Strips |
| 2.4 FABRICATION AND MANUFACTURE |
| 2.4.1 Factory Workmanship |
| 2.4.2 Dissimilar Materials |
| 2.5 COLOR, FINISH, AND CONTRAST |
| 2.6 TYPEFACE |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Anchorage |
| 3.1.2 Protection and Cleaning |
File details come from the government source that posted it. Updated .