W912QR20B0012_Plans-0004.pdf
PDF 11 MB Posted
- Solicitation number
- W912QR20B0012
About this file
This document outlines a federal contract solicitation for construction services. The solicitation is for the construction of a new HC-130J maintenance hangar at Patrick Air Force Base in Florida, with an estimated construction cost between $10-25 million under NAICS code 236220. The contract is a full and open procurement that requires a 10% price evaluation preference for HUBZone small businesses. Offerors must comply with System for Award Management registration requirements and funds are not presently available, with no award until appropriated funds are released. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R
P R
O J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S O
F
E N
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
S X
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y
K
M
O L
A C
E K
9/2/2020 11:17:45 AM
A
S N
E T
H E
N
A
S N
E T
H E
N K
M
O L
A C
E K
107778-00
-0
C O
V E
R S
H E
E T
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/1 /2
A
M E
N D
M E
N T
/0 /2
PATRICK, FLORIDA
HC-130J GENERAL MAINTENANCE HANGAR
PROJECT P2 NO. 472236
PROJECT NO. SXHT203000
ISSUE DATE: 07/30/20
CERTIFIED FINAL - AMENDMENT 0004
W
2Q R
B0
2_
Pl an s-
STOP ALTERNATE
HORIZONTAL REBAR
AT CONTROL JOINT
PROVIDE CONTROL JOINTS IN CONCRETE STEM WALLS AT 20'-0" MAX.
MAXIMUM LENGTH WALL POUR BETWEEN CONSTRUCTION JOINTS 100'-0"
3/4 /8
NOTE:
SAWED JOINT FACE
INITIAL
SAWCUT/FORMED
JOINT
BACKER ROD
SEALANT PER
DIV 07 SPECS
WIDTH PER SLAB SCHEDULE
D E
P T
H P
E R
S L A
B S
C H
E D
U L E
BACKER ROD
SEALANT PER
DIV 07 SPECS
WIDTH = 1/2"
JOINT FILLER
CTJ/CJ
EJ-H
THICKNESS H
SLAB
(SMOOTH BARS)
DIA. x LENGTH SPACING
(NOTE 2)
NOTES
1. START DOWELS NO CLOSER THAN 2'-0" FROM SLAB JOINTS.
2. COORDINATE JOINTS WITH DIVISION 07 SPECS AND FLOOR FINISH REQUIREMENTS.
CJ
DOWELS
TYPICAL FLOOR CONSTRUCTION SLAB JOINT
AT 13" SLAB SEE CIVIL FOR
SUBBASE REQUIREMENTS;
FOR OTHER SLABS, 6"
CLEAN SAND DRAINAGE
LAYER (PER FDOT 902-4)
13" 15"
DOWELS-
PAINT AND GREASE ONE
END - SEE SCHEDULE
VAPOR BARRIER, COORDINATE
FINAL LOCATION WITH ACTUAL
COATING PROVIDED.
H
H /2
(FORMED)
SLAB REINFORCMENT
AS INDICATED
C2
S-007
8"
1 1/4" x 20"
1" x 16" 12"
H /4
WIDTH PER SCHEDULE, SEALED
SLAB SCHEDULE
JOINT (NOTE 1)
1/8" TO 1/4"
3/8"
WIDTH
H/4 + 1/2"
3"
DEPTH OF
SAWCUT
TYPICAL FLOOR CONTRACTION SLAB JOINT
CTJ
SLAB REINFORCMENT
AS INDICATED
DOWELS -
PAINT AND GREASE ONE
END - SEE SCHEDULE
VAPOR BARRIER, COORDINATE
FINAL LOCATION WITH ACTUAL
COATING PROVIDED.
WIDTH PER SCHEDULE, SEALED
(SAWED)
H /2
H /4
M
IN
/2
3" MAX
0' - 0"
/4
H
C2
S-007
AT 13" SLAB SEE CIVIL FOR
SUBBASE REQUIREMENTS;
FOR OTHER SLABS, 6"
CLEAN SAND DRAINAGE
LAYER (PER FDOT 902-4)
CONSTRUCTION JOINT
PROVIDE SEALANT AT HANGAR
BAY
SEE SECTIONS
FOR FOOTING
DETAILS
. LAP SPLICE
T
1'-0" MIN
T
S E
E P
L A
N
L E
S S
T H
A N
R
E C
E S
S
LAP REINF
PROVIDE DIAGONAL #4x3'-0"
TOP OR #4 CORNER BAR TOP
AT ALL CORNERS OF RECESS.
T/CONC EL
SEE PLAN
LENGTH
DEVELOPMENTNOTE:
ADD #4 X 3'-0" T&B CENTER
ON INTERSECTING JOINTS
TYPICAL ADD BARS AT INTERSECTING JOINTS
JOINT
TH
ETA
JOINT
2"
2"
(2) #4 X 3'-0" T&B, HOOK ENDS WHERE
BAR EXTENDS TO
EDGE OF CONCRETE.
TYPICAL RE-ENTRANT CORNER BARS IN SLAB
FOR ANY THETA LESS THAN 170 DEGREES
PROVIDE #4 x 3'-0". TRIM BARS
AT RE-ENTRANT CORNERS -
TYPICAL
30# FELT,
TYP.
. 2" C
LR
CONCRETE
FDN WALL
CONCRETE
FDN WALL DOOR OPENING
TYPICAL EXPANSION JOINT
3/8"EXPANSION
JOINT MATERIAL
EJ
TYPICAL ISOLATION JOINT
2 LAYERS 30# FELT
IJ
SEE SLAB JOINT
DETAIL
NOTE: DISCONTINUE REINFORCEMENT AT JOINT UNO
6" CAPILLARY
WATER BARRIER
U N
O
.5
H H
EXPANSION JOINT AT HANGAR SLAB EDGE
VAPOR
BARRIER
SLOPE 1:10
SEE SECTION C2 / S-007
FOR JOINT DETAIL
EJ-H
AT HANGAR SEE CIVIL FOR AIRSIDE
CONCRETE PAVEMENT SECTION
FOR ADDITIONAL LAYERS BELOW
DAMAGE LAST
THREAD TO
PREVENT REMOVAL
OF BOLT
TOC EL
A B
P
D
WASHER SIZE PER AISC
325 14th EDITION TABLE 14-2
HEAVY HEX NUT
ANCHOR OR
MACHINE BOLT
D
3/4"
1"
7/8"
1 1/8"
1 1/4"
1 3/8"
1 3/4"
2"
SCHEDULE
A*
2"
3"
3"
3"
3"
4"
4"
4"
B
1'-2"
8"
1'-4"
1'-6"
1'-10"
REMARKS
1. * NOT REQUIRED FOR MACHINE
BOLTS
2. CONTRACTOR HAS OPTION OF
USING HEADED MACHINE BOLTS
IN LIEU OF THREADED RODS.
3. FULLY THREADED RODS ARE NOT
PERMITTED.
4. ANCHOR AND MACHINE BOLTS
SHALL CONFORM TO ASTM F1554,
GRADE 55, UNLESS NOTED ON
PLANS.
1 1/2" 4" 2'-0"
2'-5"
1'-10"
TYPE VII ANCHOR BOLT
THREADED ROD OR MACHINE BOLT
D = BOLT DIAMETER
K = THREADS (2D+3" SINGLE NUT)
P = BOLT PROJECTION, PER PLAN
WELD 3 PTS
K
1'-10"
NOTE:TOC EL
TYPE V ANCHOR BOLT
HOOKED BOLT
1/2"
1'-0"7/8"
1" 1'-2"
3/4"
5/8"
10"
8"
6"
D B
11"
1'-1"
9"
7"
6"
REMARKS
SCHEDULE
E
R = 3D
P
.E
B
K
D
ASTM F1554
GRADE 36
3/8" 5" 5"
WELD 3 PTS
B = EMBEDDED LENGTH
D = BOLT DIAMETER
E = THREAD LENGTH
K = THREADS (2D+2")
P = BOLT PROJECTION AS
REQUIRED
WASHER SIZE PER AISC 325
14th EDITION TABLE 14-2
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
K
M
O L
A C
E K
9/2/2020 9:57:18 AM
A s in d ic a te d
W . B
A
IL
E Y
C
M C
G E
E N
M
U N
C Y
107778-S-007
-S
-0
S-007
S T
A N
D A
R D
C O
N C
R E
T E
D E
T A
IL
S
(S H
E E
T
NTSSCALE:A3
TYP CONCRETE STEM WALL CONTROL JOINT
NTSSCALE:C2
DETAIL
NTSSCALE:A4
TYPICAL FTG CONSTRUCTION JOINT (CJ-F)
NTSSCALE:B3
TYPICAL SLAB RECESS AND SLAB EDGE DETAILS
NTSSCALE:A2
REINF IN SLABS
NTSSCALE:B4
TYP. SLAB REINFORCING AT DOOR OPENING
NTSSCALE:A1
JOINTS
NTSSCALE:C3
ANCHOR BOLTS
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
T
/2
/2
A
M E
N D
M E
/0
/2
09/02/2020
W
2Q R
B0
2_
Pl an s-
SLOPING CONCRETE
BOND BEAM
SEE DETAIL A3 / S-010
BP-4
WALL PER ARCH
12" CMU WALL
TOS EL 119' - 7 39/64"
B/DECK EL VARIES
1/4" BENT PL CONT, 1/4" DIA.
SELF THREADING SCREW @
6" OC THROUGH DECK
P E
R A
R C
H
4"
ROOF DECK
PER PLAN
PER PLAN
GRID
1' - 2 1/2"
L3X3, SEE B3/S-013
C4
S-431
7"
OF WALL (3) CELLS WIDE
GROUT SOLID FULL HEIGHT
O F
W A
L L
C
E L
L S
W
ID
E
G R
O U
T S
O L
ID
F
U L
L H
E
IG
H T
8" CMU
1' - 1"
BP-5
PL CL
E Q
E Q
PL CL
EQ EQ
BEAM PER PLAN
HSS4X4X1/4,
1/4" PL EA SIDE
ROOF DECK PER PLAN
8" CMU WALL
T/WALL EL 112' - 8 3/4"
HSS 6X6X3/8
3/16 6
EA PL
BP-5
A1
S-431 1' - 6" 1"
1/4" STIFFENER PL, BOTH
SIDES, TO ALIGN W/ W6 FLG
ED-2
3/16 3
EA SIDE
3 COURSE BOND BEAM
H
C2
S-431
BEAM PER PLAN TYP
COLUMN PER SCHEDULE
COPE BEAM FLG AS REQD
INTERSECTING BEAM NOT SHOWN
PL 3/8X3 1/2 W/(4) 1" DIA. A490 BOLTS
ROOF DECK PER PLAN
3" TYP 2" TYP
1/2"
2"2"
T Y
P
2"
1/2" PL W/(4) 1" A490 BOLTS
B/DECK EL 126' - 0 3/8"
1/2" PL W/(4) 1"
DIA. A490 BOLTS
3/8" STIFFENER, T&B, EF, TYP
WP
3/16
3/16
1/4
1/4 TYP 3
SIDES
T/STL EL 125' - 7 7/8"
B1
S-431
T/STL EL 125' - 7 7/8"
BEAM PER PLAN TYP
COLUMN PER SCHEDULE
1.8
1/2" PL W/(7) 1" DIA. A490 BOLTS IN SHORT
SLOTTED HOLES, FINGER TIGHTEN,
DAMAGE LAST TWO THREADS
ROOF DECK PER PLAN, TYP
ED-1 JOIST PER PLAN
3/8" STIFFENER, TYP
1/2" 2"2"
T Y
P
T Y
P
1/2" PL W/(4) 1" DIA. A490 BOLTS
IN SHORT SLOTTED HOLES,
FINGER TIGHTEN, DAMAGE
LAST TWO THREADS
1/4
1/4
STIFFENER CL, TYP
CJP
SEE GENERAL NOTE E.6
T/STL EL 125' - 7 7/8"
BEAM PER PLAN, TYP
ED-1
ROOF DECK PER PLAN, TYP
12" CMU
10 3/8"
WALL PER ARCH
BP-3
C1
S-437
3/16 8
3/16 8
4" 4"T/STL EL VARIES
3/8" BENT
PL, TYP
P E
R A
R C
H
4"
3/16 4-12
1/4" DIA. SELF THREADING
SCREW @ 6" OC
THROUGH DECK
GROUT BEAM INTO WALL
HSS4X4
T/WALL EL 123' - 1 3/8"
1/4" CONT BENT PL
1/4" BENT PL
X 12" LONG
/8
4"
4"
MATCH ROOF SLOPE
1/8 4
P E
R A
R C
H
6"
MATCH
ROOF SLOPE
T Y
P
GRID
BEAM PER ELEV, TYP
COL PER SCHEDULE
1/2" PL W/(6) 1" DIA. A490 BOLTS,TYP
1/4
1/4
TYP
B/STL EL 140' - 3 1/2"
1/2"
3"
1/4" STIFFENER PL, TYP 3-12
TYP
ROOF DECK
PER PLAN
COPED W14
1 1/4" SOLID ROD (GR 50)X3'-0"
2"
"3
"2
1"
BEAM PER ELEV, TYP
COL PER SCHED
W12X40X1'-8"
PL 1/2"X11 1/2"X1'-8 1/2" W/
(12) 1" DIA. A490-SC-OVS-
BOLTS, 7 1/2" GAGE, TYP
CJP UT
CJP UT
PL 1/2" W/(6) 1" DIA.
A490 BOLTS
SEE A2/S-431 FOR
CONNECTION 5/16
5/16
1/4
TYP WEB
AND FLG
3" TYP2" TYP
B/STL EL 140' - 3 1/2"
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
K
M
O L
A C
E K
9/2/2020 9:57:18 AM
A s in d ic a te d
W . B
A
IL
E Y
C
M C
G E
E N
M
U N
C Y
107778-S-431
-S
-4
S-431
F R
A M
IN
G
D E
T A
IL
S
(S H
E E
T -2
SCALE: 3/4" = 1'-0"C1
SECTION
SCALE: 3/4" = 1'-0"B3
DETAIL
SCALE: 3/4" = 1'-0"C4
SECTION
SCALE: 3/4" = 1'-0"B1
SECTION
SCALE: 3/4" = 1'-0"C2
SECTION
SCALE: 3/4" = 1'-0"B4
SECTION
0 1' 2' 3'
0 1' 2' 3'
0 1' 2' 3'
0 1' 2' 3'
0 1' 2' 3'
0 1' 2' 3'
SCALE: 3/4" = 1'-0"A1
SECTION
0 1' 2' 3' SCALE: 3/4" = 1'-0"A2
DETAIL
0 1' 2' 3' SCALE: 1 1/2" = 1'-0"A4
SECTION
0 1/2' 1' 1 1/2'SCALE: 3/4" = 1'-0"A3
SECTION
0 1' 2' 3'
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
/2
/2
A
M E
N D
M E
/0
/2
09/02/2020
W
2Q R
B0
2_
Pl an s-
1 2 3 4 5
E
G
A-202
C1
A-201
A1
20' - 11" 1' - 10" 19' - 10" 19' - 10" 19' - 10"
A1
A-401
3'
F.5
C4
A-101
FIRE PUMP
COMPOSITES
MECH
ANTE ROOM
CORROSION
CONTROL
AIR SHOWER 2
WOMEN'S
RESTROOM
(DIRTY)
MEN'S
RESTROOM
(DIRTY)
AIR SHOWER 1
MEN'S SHOWER
(DIRTY)
WOMEN'S
SHOWER
(DIRTY)
WOMEN'S
RESTROOM
(CLEAN)
MEN'S
RESTROOM
(CLEAN)
HALL
CLEANING
ROOM
PAINT MIXING
ELEC
COMM
JANITOR 2
MEN'S AIRLOCK
(DIRTY)
WOMEN'S
AIRLOCK
(DIRTY)
112 117
116B113B
116A113A
105D
114C 119B
114A
110109
114B
119A
111 118
105C 3' - 4" 3' - 4"
1' - 10"
8'
8'
1.8
M1CD
20' - 0" 37' - 0" 16' - 0" 11' - 4"
9' - 4" 3' - 4"
M1CB
M1CB
M1CB
M1CB
M1CB
M1CB
CHILLERS
H
101H
STEEL
BOLLARDS -
TYPICAL.
A3
A-358
C3
A-358
ABOVE
J
8' - 0"
METAL CANOPY ABOVE
4'
/8
/8
A-206
A3
108B 108A
106A
106B
/8
R E
: S T
R U
C U
T R
A L
F
LO
O R
S
LO
P E
M1CB
2' - 5 5/8"
2'
7'
3'
5'
3'
DSDSDSDS
DS
DS
DS
DS
DS
6" 6' - 6" 3' - 4" 5' - 0" 16' - 0"
101G
EXPANSION JOINT
DSM1CB
M1CD
M1CD
A1
A-357
1' - 0" 17' - 3"
ABOVE
METAL CANOPY ABOVE
103B
F
LO
O R
S
LO
R
: S
T R
U C
T U
R A
L F
LO
O
R S
LO
: S T
R U
C T
U R
A L
1'
9'
6'
38' - 0" 6' - 4" 16' - 8" 6' - 4" 7' - 4" 6' - 4" 16' - 8" 1' - 4" 6"
122 119C121
105B
8'
2'
3'
13' - 4"
105A
M1CD
M1CD
M1CD
ENLARGED FLOOR PLAN GENERAL NOTES:
1.
2.
3.
4.
5.
6.
REFERENCE DRAWING A-501 FOR PARTITION TYPES.
REFERENCE A-600 SERIES DRAWINGS FOR DOOR SCHEDULE,
WINDOW SCHEDULE, LOUVER SCHEDULE AND FINISH SCHEDULE.
FINISH FLOOR ELEVATION.
REFER TO DWG A-202 FOR EXTERIOR FINISH LEGEND.
PROVIDE EXPANSION JOINT FILLER (SIZE PER DETAILS) EACH
SIDE. REFER TO DETAILS.
PROVIDE PRECAST CONCRETE SPLASH BLOCKS AT ROOF
DOWNSPOUTS WHERE SHOWN.
J
METAL WALL PANEL
MP-3
2" RIGID INSULATION
8" NOMINAL CMU
12" NOMINAL CMU
AIR SPACE
1'
0"
1' - 4" 6"
PERIMETER OF SOFFIT ABOVE
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
N
A
KEYPLAN
B
C D
K
M O
L A
C E
K
9/1/2020 3:28:17 PM
A s in d ic a te d
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-101
-A
-1
A-101
E N
L A
R G
E D
F L O
O R
P L A
N
A R
E A
A
SCALE: 1/8" = 1'-0"A1
ENLARGED FLOOR PLAN - AREA 'A'
SCALE IN FEET
0 4' 8' 16'
SCALE: 3/4" = 1'-0"C4
PLAN DETAIL
SCALE IN FEET
0 1' 2' 3'
N
N
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
8 9
E
G
A-206
A1
F.5
STRUCTURES
TOOL ROOM
METALS TECH
SHOP
VESTIBULE
3'
3'
A1
A-323
A5
A-323
138A125A 125B
139B
139E
139C
126B
139A
126A
138C
9.2
3'
"2
8'
6' - 4" 13' - 4" 3' - 4"
1' - 0"
3' - 4" 7' - 2"
M1CB
M1CB
M1CB
M1DB
M1CB
M1CB12' - 2"
A-202
C1
1' - 0"
H
STEEL BOLLARDS -
TYPICAL.
A3
A-358
C3
A-358
OPP OPP
ABOVE
J
STEEL FIXED LADDER
FROM FLOOR TO
MECHANICAL PLATFORM
A1
A-322
/8
/8
6'
4' - 4"
R E
: S T
R U
C U
T R
A L
RE: A4 / A-102 FOR
MECHANICAL
PLATFORM PLAN
/8
F
LO
O
R S
LO
P
E
ALIGN
125D
8' - 9 5/8" 8' - 0" 8' - 8"
5' - 0"
101G
DS
DS DS DS
DS
DS
EXPANSION
JOINT
8'
RECESSED WALK-OFF MAT.
RE: A2/A-602 & STRUCTURAL.
EXTERIOR
BOLLARDS RE:
CIVIL
19' - 10" 19' - 10" 19' - 10" 1' - 10" 20' - 11" 17' - 3"
1'
2'
RE: B4 / A-102 FOR BID
OPTION B FLOOR PLAN
A1
A-357
OPP
A-203
A2
METAL CANOPY
ABOVE
A-202
A1
METAL
CANOPY
ABOVE
A-203
C2
F
LO
O R
S
LO
: S
T R
U C
T U
R A
L F
LO
O
R S
LO
: S T
R U
C T
U R
A L
OPTION B
55' - 4" 44' - 8"
8'
0" 3'
4"
3'
4"
14' - 10"
8'
0" 3'
4"
139D
6' - 2 3/4"
4'
3/
8"
M1CD
M1CD
M1CD
21' - 4"
2 2 2
ENLARGED FLOOR PLAN GENERAL NOTES:
1.
2.
3.
4.
5.
6.
REFERENCE DRAWING A-501 FOR PARTITION TYPES.
REFERENCE A-600 SERIES DRAWINGS FOR DOOR SCHEDULE,
WINDOW SCHEDULE, LOUVER SCHEDULE AND FINISH SCHEDULE.
FINISH FLOOR ELEVATION.
REFER TO DWG A-202 FOR EXTERIOR FINISH LEGEND.
PROVIDE EXPANSION JOINT FILLER (SIZE PER DETAILS) EACH
SIDE. REFER TO DETAILS.
PROVIDE PRECAST CONCRETE SPLASH BLOCKS AT ROOF
DOWNSPOUTS WHERE SHOWN.
9 10
G
TOOL ROOM
CHIEF OFFICE
STRUCTURES
BULL PEN
CONFERENCE
ROOM
METALS TECH
BULL PEN
UNISEX 2
UNISEX 1
CORRIDOR
A3
A-403
JANITOR 1
STORAGE
F.5
125C 136
9.2
READY ROOM
7' - 10"
M1DB
S1AB
S2AB
S2AB
S1AB
S2AB
S2AB
S2AB
S2AB
S2AB
S2AB
S2AB
S2AB
S2AB
S1AF
S1AC
S2AB
HM1DB
VESTIBULE
J
138B
130 134
127B
RECESSED
WALK-OFF MAT.
RE: A2/A-602 &
STRUCTURAL.
S2AB
F1CA
1' - 10" 20' - 11" 17' - 3"
A-202
A1
A-203
A2
METAL CANOPY
ABOVE
5' - 0" 2' - 4" 5' - 0" 4' - 8" 6' - 0" 4' - 8" 6' - 0" 10' - 0"
5'
4" 6'
0"
6'
0"
6'
0"
7'
8"
127A
10' - 0"
DSDS
DS
DS
W01 W02 W02
W02
W02
W02
DS2
8 9
F
G
F.5
A1
A-323
9.2
M
IN
4'
MIN.
2' - 0"
MIN.
2' - 0"
111' - 9"STEEL FIXED
LADDER
STEEL
GUARD RAIL
MECHANICAL
PLATFORM
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
N
A
KEYPLAN
B
C D
K
M O
L A
C E
K
9/1/2020 3:28:21 PM
/8
'-0
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-102
-A
-1
A-102
E N
L A
R G
E D
F L O
O R
P L A
N
A R
E A
B
SCALE: 1/8" = 1'-0"A1
ENLARGED FLOOR PLAN - AREA 'B'
SCALE IN FEET
0 4' 8' 16'
SCALE: 1/8" = 1'-0"B4
ENLARGED FLOOR PLAN - AREA 'B' (OPTION B)
SCALE: 1/8" = 1'-0"A4
MECHANICAL PLATFORM PLAN
SCALE IN FEET
0 4' 8' 16'
SCALE IN FEET
0 4' 8' 16'
N
N
N
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
1 2 3 4 5
B
C
D
E
A-201
C1
B1
A-610
TRENCH DRAIN.
RE: MECH.
101A
HANGAR BAY
CORROSION
CONTROL
CLEANING
ROOM
PAINT MIXING
A-204
B1
M1CB
M1CB
M1CB
HC-130J
105D
B1
A-359
B4
A-359
ABOVE
EXPANSION JOINT
/8
/8
F
LO
O
R S
LO
P
E
R E
: S T
R U
C T
U R
A L
CONCRETE STOOP
STEEL BOLLARDS
TYP
2'
1'
"4'
3'
DS
DS
A-201
A1
105E
103B
6' - 4"
20' - 6" 8' - 8"
A-204
A1
OPTION C
METAL
CANOPY
ABOVE
105B
105A
101C
4"
3'
4"
2'
8" 8'
0"
1' - 4"
31' - 0"
2' - 4"
RE: B4 / A-103 FOR BID
OPTION C FLOOR PLAN
M1CD
5' - 0"
ENLARGED FLOOR PLAN GENERAL NOTES:
1.
2.
3.
4.
5.
6.
REFERENCE DRAWING A-501 FOR PARTITION TYPES.
REFERENCE A-600 SERIES DRAWINGS FOR DOOR SCHEDULE,
WINDOW SCHEDULE, LOUVER SCHEDULE AND FINISH SCHEDULE.
FINISH FLOOR ELEVATION.
REFER TO DWG A-202 FOR EXTERIOR FINISH LEGEND.
PROVIDE EXPANSION JOINT FILLER (SIZE PER DETAILS) EACH
SIDE. REFER TO DETAILS.
PROVIDE PRECAST CONCRETE SPLASH BLOCKS AT ROOF
DOWNSPOUTS WHERE SHOWN.
1 2
C
D
1.80
A-206
C1
A1
A-324
102A
102D
102C
102B
101A
STEEL BOLLARDS
AT RAMP
RE: C2 / A-351
DS
DS
DS
103B
2' - 4" 3' - 4" 33' - 0"
C2
A-358
EXPANSION JOINT
OPP
8' - 0" 20' - 6" 8' - 8"
7'
0"
4'
5'
1' - 0" 17' - 3" 20' - 5" 2' - 4"
1'
7'
4' - 0" 3' - 4" 22' - 8" 6' - 4" 6"
A-206
C3
M1DB
A3
A-303
PAINT BOOTH
ENCLOSURE
CLEANING
ROOM
PAINT MIXING
CORROSION
CONTROL
/8
STEEL BOLLARDS -
TYPICAL.
FUTURE PAINT
BOOTH NOT SHOWN
M1CD
M1CD
M1CB
M1CB
M1CB
3'
4" 4'
4"
8'
8'
/8
/8
38' - 8" DS
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
N
A
KEYPLAN
B
C D
K
M O
L A
C E
K
9/1/2020 3:28:24 PM
/8
'-0
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-103
-A
-1
A-103
E N
L A
R G
E D
F L O
O R
P L A
N
A R
E A
C
SCALE: 1/8" = 1'-0"A1
ENLARGED FLOOR PLAN - AREA 'C'
SCALE IN FEET
0 4' 8' 16'
SCALE: 1/8" = 1'-0"B4
ENLARGED FLOOR PLAN - AREA 'C' (OPTION C)
SCALE IN FEET
0 4' 8' 16'
N
N
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
8 9
B
C
D
E
A-201
C1
TRENCH DRAIN.
RE: MECH.
101F
HANGAR BAY
METALS TECH
SHOP
A-204
B3
M1DB
B1
A-610
HC-130J
139C
1'
A-204
A3
5'
CONCRETE STOOP
/8
F
LO
O
R S
LO
P
E
R E
: S T
R U
C T
U R
A L
3'
DS
DS
DS
3'
4" 19
A-203
C2
METAL
CANOPY
ABOVE
OPTION A
101D
OPP
139D
4" 4'
8"
1'
0"
2'
4"
2' - 4"
5' - 0"
38' - 8"
1' - 4" 21' - 5" 17' - 3" 1' - 0"
19' - 10" 19' - 10" 19' - 10" 22' - 9" 17' - 3"
DRAIN GRATES
RE: PLUMBING
RE: B4 / A-104 FOR BID
OPTION A FLOOR PLAN
M1CD
2'
8" 3'
4"
8'
4"
139B
B1
A-359
B4
A-359
OPPOPP/ABOVE
EXPANSION JOINT
ENLARGED FLOOR PLAN GENERAL NOTES:
1.
2.
3.
4.
5.
6.
REFERENCE DRAWING A-501 FOR PARTITION TYPES.
REFERENCE A-600 SERIES DRAWINGS FOR DOOR SCHEDULE,
WINDOW SCHEDULE, LOUVER SCHEDULE AND FINISH SCHEDULE.
FINISH FLOOR ELEVATION.
REFER TO DWG A-202 FOR EXTERIOR FINISH LEGEND.
PROVIDE EXPANSION JOINT FILLER (SIZE PER DETAILS) EACH
SIDE. REFER TO DETAILS.
PROVIDE PRECAST CONCRETE SPLASH BLOCKS AT ROOF
DOWNSPOUTS WHERE SHOWN.
9 10
C
D
STEEL BOLLARDS -
TYPICAL.
METAL
CANOPY
ABOVE
8'
0"
2'
6"
3'
4"
7'
8"
WELDING
10' - 6" 10' - 8" 16' - 0"
9'
0"
ALIGN
14' - 8" 8' - 0" 14' - 6"
M1DB
M1CBM1CB
140C
140A
140B
A-204
A4
M1CD
C2
A-358
SIM
EXPANSION JOINT
/8
38' - 8"
DS
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
N
A
KEYPLAN
B
C D
K
M O
L A
C E
K
9/1/2020 3:28:27 PM
/8
'-0
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-104
-A
-1
A-104
E N
L A
R G
E D
F L O
O R
P L A
N
A R
E A
D
SCALE: 1/8" = 1'-0"A1
ENLARGED FLOOR PLAN - AREA 'D'
SCALE IN FEET
0 4' 8' 16'
N
SCALE: 1/8" = 1'-0"B4
ENLARGED FLOOR PLAN - OPTION A
SCALE IN FEET
0 4' 8' 16'
N
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
1 2 3 4 5 8 9
B
F
C
D
E
G
A-202
C1
A-201
C1
A-206
A1
F.5
GUTTERS AND DOWNSPOUTS - TYPICAL
GUTTERS AND
DOWNSPOUTS -
TYPICAL
GUTTERS AND
DOWNSPOUTS -
TYPICAL
S
LO
P E
-1
/2
P E
R F
O O
T
SLOPE 3" PER FOOT
SLOPE 3" PER FOOT
S
LO
P E
P E
R F
O O
T
S
LO
P E
P E
R F
O O
T
S
LO
P E
-1
/2
P E
R F
O O
T
S
LO
P E
-1
/2
P E
R F
O O
T
GUTTERS AND DOWNSPOUTS TO DISCHARGE
AT LOWER ROOF. PROVIDE METAL SPLASH
PAN AT ROOF SURFACES.
1.8 9.2
A-204
B3
H
STANDING SEAM METAL
ROOF - TYPICAL.
STANDING SEAM METAL
ROOF - TYPICAL.
STANDING SEAM METAL
ROOF - TYPICAL.
C1
A-357
C1
A-357
J
0 11
A-206
A3
A-204
A3
A4
A-357
A4
A-357
OPP.
OPTION B
RE: C4 / A-130
C1
A-521
ROOF PENETRATIONS. REFER
TO DETAILS. PROVIDE CURBS
FOR MECHANICAL EQUIPMENT.
RE: MECHANICAL.
A-204
A1
OPTION C
A-203
C2
METAL CANOPY
METAL CANOPY
METAL CANOPY
METAL CANOPY
A-201
A1
RE: B4 / A-130
OPTION A
RE: A4 / A-130
A-204
B1
GUTTERS AND
DOWNSPOUTS -
TYPICAL
MINIMUM GUTTER SIZE SHALL BE 8"(W) X 8"(H).
PROVIDE RECTANGULAR DOWNSPOUTS. MINIMUM DOWNSPOUT SHALL BE
6" (L) X 5" (W).
PROVIDE HYDROSTATIC ROOF SYSTEM PER UFC 3-110-03, 5-3.
ROOF SHALL HAVE FIXED POINT AT MIDSPAN OF ROOF. ALLOW THERMAL
MOVEMENT AT PEAK AND EAVE.
PROVIDE METAL SPLASH PAN WHERE STORM WATER IS DISCHARGED TO
LOWER ROOF. WATER SHALL SPREAD OUT TO MINIMUM 3 ROOF PANELS.
1.
2.
3.
4.
ROOF PLAN GENERAL NOTES:
UNLESS NOTED OTHERWISE, DOWNSPOUTS DISCHARGE TO GRADE WITH
PRECAST CONCRETE SPLASH BLOCKS. REFERENCE CIVIL DRAWINGS FOR
DOWNSPOUTS THAT CONNECT TO UNDERGROUND STORM WATER PIPES AND
DOWNSPOUT BOOT DETAILS.
GUTTER, GUTTER BRACKET, GUTTER STRAP, DOWNSPOUT, AND CONDUCTOR
SHALL BE DESIGNED TO MEET SMACNA - ARCHITECTURAL SHEET METAL
MANUAL REQUIREMENTS.
PROVIDE HURRICANE STRAPS TO ALL GUTTERS. SPACING AND INSTALLATION
PER DETAILS.
SEE A-521 AND A-522 FOR ROOF DETAILS.
TYPCIAL ROOF CONSTRUCTION FROM TOP OF ROOF:
+ STANDING SEAM METAL ROOF
+ AIR/VAPOR BARRIER
+ 1/2" EXTERIOR GYPSUM SHEATHING
+ MIN 2 LAYERS RIGID INSULATION WITH STAGGERED PATTERN,
- SHOPS -- 5" THICK / R-25 MIN
- HANGAR BAY -- 4" THICK / R-20 MIN
+ 1/2" GYP SHEATHING THERMAL BARRIER
+ GALVANIZED STEEL DECKING.
ROOF AIR/VAPOR BARRIER SHALL BE EXTENDED AND OVERLAP W/ WALL
AIR/VAPOR BARRIER.
5.
6.
7.
8.
9.
10.
F
G
F.5
9.2
SLOPE 3" PER FOOT
H
STANDING SEAM
METAL ROOF -
TYPICAL.
J
OPP.S
LO
P E
P E
R F
O O
T
C1
A-521
1 2
C
D
1.80
A-206
C1
A1
A-324
GUTTERS AND
DOWNSPOUTS -
TYPICAL
SLOPE 1" PER FOOT
ROOF PENETRATIONS. REFER
TO DETAILS. PROVIDE CURBS
FOR MECHANICAL EQUIPMENT.
RE: MECHANICAL.
A-206
C3
9 10
C
D
9.2 11
METAL CANOPY
BELOW
SLOPE 3" PER FOOT
STANDING SEAM
METAL ROOF TYP. P
A T
R
IC
K
F L
O R
ID
A
H C
-1 J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
N
A
KEYPLAN
B
C D
K
M O
L A
C E
K
9/1/2020 3:28:31 PM
A s in d ic a te d
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-130
-A
-1
A-130
O V
E R
A L L R
O O
F P
L A
N
SCALE: 1/16" = 1'-0"A1
OVERALL ROOF PLAN (BASE BID)
SCALE IN FEET
0 8' 16' 32'
SCALE: 1/16" = 1'-0"C4
ROOF PLAN (OPTION B)
SCALE IN FEET
0 8' 16' 32'
SCALE: 1/16" = 1'-0"B4
ROOF PLAN (OPTION C)
SCALE IN FEET
0 8' 16' 32'
N
N N
SCALE: 1/16" = 1'-0"A4
ROOF PLAN (OPTION A)
SCALE IN FEET
0 8' 16' 32'
N
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
2 3
8'
8'
8'
4'
5'
7' - 4" 29' - 8"
8'
13' - 4"
1'
3'
4'
6' - 2" 5' - 4"
16' - 8"
10' - 0"
7'
7'
A-402C2 A-402 C1
A-402 C3 A-402C4
6"6"
112 117
116B113B
116A113A
114C
114A
ANTE ROOM
AIR SHOWER 2
106 WOMEN'S
RESTROOM
(DIRTY)
MEN'S
RESTROOM
(DIRTY)
AIR SHOWER 1
MEN'S SHOWER
(DIRTY)
WOMEN'S
SHOWER
(DIRTY)
WOMEN'S
RESTROOM
(CLEAN)
MEN'S
RESTROOM
(CLEAN)
HALL
JANITOR 2
110109
MEN'S AIRLOCK
(DIRTY)
WOMEN'S
AIRLOCK
(DIRTY)
114B
111 118
8'
8'
1.8
M1CB
M1BA
M1BA
M1BA
M1CB
M1CB
M1CB
M1CB
M1CB
M1CB
M1BA M1BA
M1CB
M1BAM1BA
M1BA
M1BA
M1CB
M1CB
M1CB
M1CB
M1BA
M1BA
M1BA
M1BA
8' - 0" 6' - 0"
6"
6" 6"
H
M1BA
M1BA
3' - 1" 3' - 1"
6"
6"
5' - 4"
1'-6" MIN.
1' - 6" 5' - 6" 2' - 8" 3' - 4" 5' - 2"
2'
1'
1'
9' - 10"
6' - 0" 8' - 0"
TA-03TA-03
TA-04
TA-07TA-07
TA-03
TA-07
TA-07
TA-03
B5
TA-04
TA-01
TA-01
TA-01
TA-01
PREMANUFACTURED AIR
SHOWER. RE: SPEC
SECTION 23 00 00.
108B 108A
106B
106A
PREMANUFACTURED AIR
SHOWER. RE: SPEC
SECTION 23 00 00.
CMU WALL ABOVE
AIR SHOWER.
RE: STRUCTURAL.
CMU WALL ABOVE
AIR SHOWER.
RE: STRUCTURAL.
18 GA. PAINTED SHEET METAL
TRIM EACH END. ADJUST TO
FIT AIR SHOWER BOOTH.
18 GA. PAINTED SHEET METAL
TRIM EACH END. ADJUST TO
FIT AIR SHOWER BOOTH.
TA-09
TA-09
TA-06
TA-06
TA-05 TA-05
TA-12
CONCRETE BASE AT ALL
LOCKERS. RE: DETAIL A-551
(6) LOCKERS
(2) LOCKERS
(4) LOCKERS
A1 A1
A1
COMPOSITES
CORROSION
CONTROL
5'
TA-03TA-03TA-03
TA-14
TA-04
TA-04
A8
A8
TA-13 TA-13
TA-13
TA-13
TA-13
TA-13 TA-13
TA-04 TA-04
TA-08
TA-02TA-02
TA-14
TA-08
TA-14
TA-14
3'
C L
4'
C L
A1 A1
A8
TA-12 X2 X2
WASHER/DRYER (GFGI)
A-402A1
A2
TA-12TA-12
TA-10
TA-10
FRAMELESS
MIRROR
TA-03
S1AC
8"
A-402 A1
A2
OPP.
OPP.
24" X 60"
24" X 60"
TA-13
A-402
A3
TA-11
BOTTOM OF MIRROR TA-04
TO BE MOUNTED AT 15"AFFBOTTOM OF MIRROR TA-04 TO
BE MOUNTED AT 15"AFF
6"6"
8' - 0" ±
FIELD VERIFY
6' - 8 3/8" CLEAR
F
IE
LD
V
E R
IF
Y
6'
3/
8" C
LE
A
R
REFER TO AG003 FOR TOILET FIXTURE AND ACCESSORY MOUNTING HEIGHTS.
GRAB BARS ON TOILET PARTITION WALL SHALL BE MOUNTED WITH THRU-BOLTS
AND MIN 16GA STAINLESS STEEL FLANGE PLATE AT EACH SIDE OF PARTITION WALL.
REFER TO SPECIFICATION 10 51 13 FOR LOCKER TYPES.
1.
2.
3.
TOILET ROOM GENERAL NOTES:
9.2
H
A-402 B1
A-402 B3
UNISEX 1
UNISEX 2
7'
0"
8' - 2 3/4" 1' - 9 5/8"
3"
4'
1"
7' - 2"
1' - 4"
3"
TA-01
TA-07
TA-07
B4
B2 8'
TA-03 TA-04
TA-04TA-03
8" MAX.
A1
A1
TA-13
TA-13
A13" 3"
10' - 0 3/8"
4' - 7 1/2" 5' - 0" 4'
/8
TA-11
TA-08
TA-08
TA-01
TA-14
TA-14
JANITOR 1
TA-13
A-402 A3
STORAGE
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
K
M
O L
A C
E K
9/1/2020 3:28:35 PM
/8
'-0
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-401
-A
-4
A-401
E N
L A
R G
E D
T O
IL
E
T P
L A
N S
SCALE: 3/8" = 1'-0"A1
ENLARGED TOILET PLANS
TOILET ACCESSORIES LEGEND
TA-01 GRAB BAR, 36" REAR X 42" SIDE X 18" VERTICAL
TA-02 GRAB BAR, SHOWER STALL
TA-03 SOAP DISPENSER - WALL MOUNT
TA-04 FRAMED MIRROR - SIZES AS INDICATED
TA-05 SOAP HOLDER, SHOWER
TA-06 SHOWER CURTAIN ROD, HOOKS, AND CURTAIN
TA-07 TOILET PAPER DISPENSER - TWIN JUMBO
TA-08 SANITARY NAPKIN DISPOSAL
TA-09 FOLDING SHOWER SEAT
TA-10 FLOOR MOUNTED BENCH
TA-11 36" MOP AND BROOM HOLDER W/ UTILITY SHELF
TA-12 TOWEL PIN
TA-13 PAPER TOWEL DISPENSER
TA-14 TOILET SEAT COVER DISPENSER
SCALE: 3/8" = 1'-0"B4
ENLARGED PLAN AT TOILETS (OPTION B)
N
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
N
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
TA-04
TA-03
TA-07
2' - 0"
TA-01
PAINTED CMU, PE-1
TA-14
TLC-2
TLC-1
TA-13
5'
2'
0"
3'
3'
EF-1
TA-04
TA-03
2' - 0"
TA-07TA-01
PAINTED CMU, PE-1
TA-14
TLC-2
TLC-1
5'
2'
0"
3'
3'
EF-1
2' - 0"
TA-04
PAINTED CMU, PE-1
TA-14
TA-01 TA-07
TLC-1
TLC-2
TA-03
TA-13
TC-1
SSF-1 5'
"4"
2'
0"
3'
3'
EF-1
PAINTED CMU, PE-1
TA-14
TA-01TA-07
TLC-1
TC-1
TC-1
5'
1'
TLC-2
5'
EF-1
TLC-2
PE-1
TA-01
TA-07
TA-14
TLC-1
EF-1
TLC-2
PE-1
TA-07
TA-01
TA-14
5'
TLC-1
1'
EF-1
TA-03
PAINTED
CMU, PE-1
PE-1
4' - 6"
TLC-2
TA-03
A2
A-541
TLC-1
TA-13TA-13
SSF-1
5'
"4"
2'
0"
3'
3'
FRAMELESS
GLASS MIRROR
1' - 0" 1' - 8"
EF-1
PE-1
TA-04
TA-03
TLC-2
2' - 0"
A2
A-541
TLC-2
TA-13
1'
SSF-1
5'
2'
0"
4"
3'
3'
4' - 0"
EF-1
PE-1
TLC-1TA-04
TA-03
2' - 0"
A2
A-541
TLC-2
TA-13
SSF-1
1'
5'
"4"
2'
0"
3'
3'
4' - 0"
EF-1
4"4"
PAINTED
CMU, PE-1
TLC-2
TLC-1
SSF-2
(3-WALLS)
7'
TA-12TA-12 X2TA-05
TA-02
TA-06
TA-09
TA-10
EF-1
PAINTED
CMU, PE-1
TLC-2
TLC-1
SSF-2
(3-WALLS)
7'
5'
TA-06
TA-02
TA-05
TA-10
EF-1
4'
TA-13
A1
TA-11
PAINTED
CMU, PE-1
FRP-1
MOP SINK.
RE: PLUMBING.
9"
RB-1
TLC-1
TLC-2
5'
EF-1
PE-1
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
K
M
O L
A C
E K
9/1/2020 3:28:45 PM
/8
'-0
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-402
-A
-4
A-402
E N
L A
R G
E D
T O
IL
E
T R
O O
M E
L E
V A
T
IO
N S
SCALE: 3/8" = 1'-0"C2
MENS RR (DIRTY) ELEV
SCALE: 3/8" = 1'-0"C1
WOMENS RR (DIRTY) ELEV
SCALE: 3/8" = 1'-0"C3
WOMENS RR (CLEAN) ELEV
SCALE: 3/8" = 1'-0"C4
MENS RR (CLEAN) ELEV
TOILET ACCESSORIES LEGEND
TA-01 GRAB BAR, 36" REAR X 42" SIDE X 18" VERTICAL
TA-02 GRAB BAR, SHOWER STALL
TA-03 SOAP DISPENSER - WALL MOUNT
TA-04 FRAMED MIRROR - SIZES AS INDICATED
TA-05 SOAP HOLDER, SHOWER
TA-06 SHOWER CURTAIN ROD, HOOKS, AND CURTAIN
TA-07 TOILET PAPER DISPENSER - TWIN JUMBO
TA-08 SANITARY NAPKIN DISPOSAL
TA-09 FOLDING SHOWER SEAT
TA-10 FLOOR MOUNTED BENCH
TA-11 36" MOP AND BROOM HOLDER W/ UTILITY SHELF
TA-12 TOWEL PIN
TA-13 PAPER TOWEL DISPENSER
TA-14 TOILET SEAT COVER DISPENSER
SCALE: 3/8" = 1'-0"B1
UNISEX RR 1 ELEV EAST
SCALE: 3/8" = 1'-0"B3
UNISEX RR 2 ELEV EAST
SCALE: 3/8" = 1'-0"B5
MENS RR (CLEAN) ELEV EAST
SCALE: 3/8" = 1'-0"B2
UNISEX RR 1 ELEV SOUTH
SCALE: 3/8" = 1'-0"B4
UNISEX RR 2 ELEV NORTH
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE: 3/8" = 1'-0"A1
MENS SHOWER 117 WEST
SCALE: 3/8" = 1'-0"A2
MENS SHOWER 117 SOUTH
SCALE IN FEET
0 2' 4' 6'
SCALE IN FEET
0 2' 4' 6'
SCALE: 3/8" = 1'-0"A3
JANITOR CLOSET
SCALE IN FEET
0 2' 4' 6'
1. WHERE TOILET ACCESSORIES ARE LOCATED ABOVE A PLUMBING
FIXTURE, A CENTERLINE GRAPHIC INDICATES ACCESSORIES ARE TO
BE CENTERED ABOVE THE APPLICABLE FIXTURE.
OPTION B OPTION B OPTION B OPTION B
GENERAL NOTE:
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
SCALE: 3/8" = 1'-0"C5
TYPICAL TILE PATTERN
SCALE IN FEET
0 2' 4' 6'
2 2
W
2Q R
B0
2_
Pl an s-
CONCRETERESINOUS FLOORING
CONCRETE FLOOR SLAB
RESINOUS FLOORING
(NOT TO EXCEED 1:12
SLOPE)
SAW-CUT KERF (DEPTH AND
WIDTH SUFFICIENT TO
ALLOW RESINOUS FLOORING
TO TAPER AT FULL SPECIFIED
THICKNESS OR GREATER)
FACE OF FLOOR SLAB
COVED CORNER -
COVER MORTAL JOINT
MORTAR JOINT
FACE OF FINISHED FLOOR
RE: ROOM FINISH SCHEDULE
RESINOUS BASE
METAL EDGE TRIM
BACKER ROD AND SEALANT
INDUCED SAW CUT
RE: SPECIFICATIONS
6"
FACE OF FLOOR SLAB
FACE OF FINISHED FLOOR
RE: ROOM FINISH SCHEDULE
CEMENT BACKER BOARD
FLUSH W/ GYP BD ABOVE
RESINOUS BASE
METAL EDGE TRIM
BACKER ROD
COVED CORNER
6"
RE: SPECIFICATIONS
SCHEDULED PARTITION -
RE: PLANS
4" 6'
6"
1' - 6"
1x4 BLOCKING
(TYP.)
SLOPED SHEET
METAL TOP
COAT HOOKS
PREFINISHED
METAL SHELF
WALL PER PLANS
1' - 6"
LOCKER BASE PER
SPECS AND DETAILS.
1' - 0"
6'
4"
SLOPED SHEET
METAL TOP
PROVIDE FILLER
PANEL AND CLOSURE
TRIM AT END OF
LOCKER RUN
WALL PER PLAN
LOCKER BASE PER
SPECS AND DETAIL
B3/A-551.
METAL LOCKER
(ML-1) REFERENCE
FINISH SCHEDULE
CONT. 3/4" F.R.T.
PLYWOOD BLOCKING
CONCRETE FLOOR SLAB.
CONCRETE LOCKER BASE.
METAL LOCKER
PER SPECS.
4"
1' - 6" ±
1"
(VERIFY WITH MANUF.)
1' - 6"
FLOOR FINISH PER SCHEDULE.
RESINOUS FLOOR
SYSTEM.
PARTITION RE: PLAN
GROUT PITCHED
1/4"/FT TO DRAIN.
CONCRETE SLAB.
RE: STRUCTURAL FLOOR DRAIN.
RE: PLUMBING
RECESSED FLOOR SLAB
SOLID SURFACE
SHOWER SURROUND.
2"
WALK-OFF MAT
RECESSED INTO SLAB
VERIFY RECESS DEPTH WITH
WALK-OFF MAT MANUFACTURER
ADJACENT FLOOR FINISH
/4
CONCRETE
FLOOR SLAB
CAST-IN ALUM. WALK OFF
MAT FRAME AT PERIMETER
CERAMIC WALL TILE
/8
0' - 0 1/8"
STAINLESS STEEL
CERAMIC TILE TRIM
(MT-1), REFERENCE
SPECIFICATION 09 30 10
WALL - REFERENCE
PARTITION TYPE PLANS
GROUT
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
K
M
O L
A C
E K
9/1/2020 3:28:47 PM
A s in d ic a te d
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-551
-A
-5
A-551
IN
T
E R
IO
R
D E
T A
IL
S
B
SCALE: NTSA4
FLOOR TRANSITION
SCALE: NTSB1
FLOORING DETAIL
SCALE: NTSB2
RESINOUS BASE DETAIL
SCALE: 3/4" = 1'-0"C4
METAL LOCKER DETAIL
SCALE: 1 1/2" = 1'-0"B3
LOCKER BASE DETAIL
SCALE IN FEET
0 1/2' 1' 1 1/2'
SCALE IN FEET
0 1' 2' 3'
SCALE: NTSC3
SHOWER FLOOR DETAIL
SCALE: NTSB4
DETAIL AT WALK-OFF-MAT
SCALE: NTSA3
CERAMIC TILE TRIM DETAIL
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
ROOM FINISH SCHEDULE GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
REFER TO SPECIFICATION 09 06 00 SCHEDULE OF FINISHES. BASIS OF DESIGN
OR EQUIVALENT COLOR AND FINISH CODES ARE AS INDICATED ON THE ROOM
FINISH SCHEDULE.
REFER TO INTERIOR ELEVATIONS, REFLECTED CEILING DRAWINGS, WALL
FINISH DRAWINGS, ENLARGED PLAN DRAWINGS AND INTERIOR DETAIL
DRAWINGS FOR ADDITIONAL FINISH PLACEMENT INFORMATION.
REFER TO ELECTRICAL DRAWINGS, MECHANICAL DRAWINGS, STRUCTURAL
DRAWINGS AND COMMUNICATION DRAWINGS FOR COORDINATION OF
BUILDING FINISHES TO BUILDING SYSTEMS.
REFER TO WALL FINISH DRAWINGS AND INTERIOR ELEVATIONS FOR WALL
FINISH EXTENTS, AND SIGNAGE, LOCATIONS.
REFER TO REFLECTED CEILING DRAWINGS FOR CEILING HEIGHTS AND CEILING
MATERIAL EXTENTS.
REFER TO ENLARGED TOILET DRAWINGS, WALL FINISH PLANS AND INTERIOR
ELEVATIONS FOR PLACEMENT OF INTERIOR FINISHES IN TOILET/LOCKER
ROOMS.
REFER TO MILLWORK DETAIL DRAWINGS AND INTERIOR ELEVATIONS FOR
ASSIGNMENT OF SOLID SURFACE AND PLASTIC LAMINATE FINISHES AND
ADDITIONAL INFORMATION.
PROVIDE BLOCKING AS REQUIRED TO SECURE ALL WALL MOUNTED ITEMS
INCLUDING TOILET FIXTURES, TOILET ACCESSORIES, TOILET PARTITIONS,
MILLWORK, SHELVES, COUNTERTOP SUPPORTS, MARKERBOARDS,
TACKBOARDS, AND ANY OTHER WALL MOUNTED OBJECT.
UNLESS NOTED OTHERWISE, ALL EXPOSED STEEL TO BE PAINTED TO MATCH
ADJACENT SURFACE.
UNLESS NOTED OTHERWISE, ALL EXTERIOR / PERIMETER WINDOWS TO
RECEIVE RS-1. REFER TO SPEC SECTION 12 24 13.
ALL WINDOW SILLS TO BE SSF-1.
ALL INTERIOR HOLLOW METAL DOORS AND DOOR FRAMES TO BE PA-4.
ALL METAL FABRICATIONS AND HANDRAILS TO BE PA-4.
INTERIOR CAULKING TO MATCH ADJACENT WALL FINISH COLOR.
ALL EXPOSED CONCRETE FLOORS SHALL BE SEALED.
WALL CORNER GUARDS TO BE INSTALLED STARTING AT THE TOP OF THE
SCHEDULED WALL BASE AND EXTEND A MINIMUM OF 4'.
AT GYPSUM BOARD SOFFITS AND BULKHEADS, PAINT ALL EXPOSED SURFACES.
PAINT ALL EXPOSED STRUCTURAL STEEL ELEMENTS, MISCELLANEOUS STEEL,
PIPING, HANGERS, VALVES AND CONDUITS EXCEPT PRE-FINISHED LINER PANELS
AND FOAM GENERATORS. THE PAINT COLOR SHALL BE AS INDICATED ON
SCHEDULE.
ALL EXPOSED MECHANICAL AND ELECTRICAL EQUIPMENT AND ASSOCIATED
SUPPORTING EQUIPMENT TO BE PAINTED PA-5 UNLESS OTHERWISE REQUIRED
BY CODE. COORDINATE WITH MECHANICAL / ELECTRICAL FOR FINISHES ON
MECHANICAL OR ELECTRICAL EQUIPMENT.
DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING
PARTS, LABELS OR WARNINGS.
REFER TO AND COORDINATE WITH FURNITURE DRAWINGS AND TYPICAL
MOUNTING HEIGHTS DRAWING FOR WALL MOUNTING HEIGHTS OF FF&E, VISUAL
DISPLAYS AND AUDIO VISUAL EQUIPMENT.
SHOWER SURROUNDS TO BE SSF-2, 3-SIDES TO HEIGHT OF 7' 0".
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
REMARKS
1.
2.
3.
4.
5.
OPTION A: THIS ROOM TO BE PART OF WELDING ROOM OPTION
OPTION B: THIS ROOM TO BE PART OF ADMINISTRATIVE AREA OPTION
OPTION C: THIS ROOM TO BE PART OF PAINT BOOTH ENCLOSURE OPTION.
RE: SPECIFICATION 09 97 13.27 FOR PAINTING OF EXPOSED STEEL
STRUCTURE INSIDE AND OUTSIDE OF HANGAR BAY, INCLUDING STEEL
SLIDING HANGAR DOOR FRAMING. HANGAR DOOR MOVING PARTS AND
GUIDE RAILS ARE EXCLUDED FROM PAINTING AND SHALL BE FINISHED PER
HANGAR DOOR SPECIFICATION 08 34 16.10.
REFER TO C5/A-402 FOR TYPICAL WALL TILE PATTERN FOR WALLS NOT
ELEVATED.
P A
T R
IC
K
F
L O
R
ID
A H
C -1
J G
E N
E R
A L M
A
IN
T E
N A
N C
E H
A N
G A
R P
R O
J E
C T
N O
S
X H
T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
P A
T R
IC
K
F
L O
R
ID
A
Louisville District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R P
S
G
IN
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
FILE:
DATE:
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y
M O
B U
R N
S
M c D
O N
N E
L L
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L E
S
IZ
E x
F
IL
E N
A M
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
U M
B E
R
P R
O J E
C T
N U
M B
E R
C A
D D
C O
D E
J U
L Y
W
Q R
-1
-D -0
H T
A F
-2
-1
-0
CERTIFIED FINAL SUBMITTAL
JU
L
Y , 2
K
M
O L
A C
E K
9/1/2020 3:28:50 PM
/8
'-0
E . T
O R
N E
D E
N
L
S L
E D
G E
T
K
IM
107778-A-701
-A
-7
A-701
R O
O M
F
IN
IS
H
S C
H E
D U
L E
ROOM FINISH SCHEDULE
ROOM
NUMBER ROOM NAME FLOOR
BASE WALLS
CEILING REMARKSMATERIAL NORTH EAST SOUTH WEST
GROUND FLOOR
101 HANGAR BAY CH-1 - PE-5 PE-5 PE-5 PE-5 PE-5 4
102 PAINT BOOTH ENCLOSURE CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5 3
103 PAINT MIXING CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
104 CLEANING ROOM CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
105 CORROSION CONTROL CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
106 AIR SHOWER 2 CH-1 - PA-1 PA-1 PA-1 PA-1 PA-5
107 ANTE ROOM CH-1 RB-1 PE-1 PE-1 PE-1 PE-1 PE-5
108 AIR SHOWER 1 CH-1 - PA-1 PA-1 PA-1 PA-1 PA-5
109 WOMEN'S RESTROOM (DIRTY) EF-1 EF-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 5
110 MEN'S RESTROOM (DIRTY) EF-1 EF-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 5
111 WOMEN'S AIRLOCK (DIRTY) CH-1 RB-1 PE-1 PE-1 PE-1 PE-1 PE-5
112 WOMEN'S SHOWER (DIRTY) EF-1 EF-1 PE-1 PE-1/SSF-2/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 5
113 WOMEN'S RESTROOM (CLEAN) EF-1 EF-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 5
114 HALL CH-1 RB-1 PA-1 PA-1 PA-3 PA-1 PA-5
115 JANITOR 2 CH-1 RB-1 PE-1/FRP-1 PE-1 PE-1 PE-1/FRP-1 PE-1
116 MEN'S RESTROOM (CLEAN) EF-1 EF-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 5
117 MEN'S SHOWER (DIRTY) EF-1 EF-1 PE-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/SSF-2/TLC-1/2 PE-5 5
118 MEN'S AIRLOCK (DIRTY) CH-1 RB-1 PE-1 PE-1 PE-1 PE-1 PE-5
119 COMPOSITES CH-1 RB-1 PA-1/2 PA-1 PA-1 PA-1/2 PA-5
120 CHILLERS CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
121 MECH CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
122 FIRE PUMP CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
123 COMM CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
124 ELEC CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
125 STRUCTURES CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
126 TOOL ROOM CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
127 VESTIBULE WOM-1 RB-1 PA-1 PA-1 PA-1 PA-3 ACT-1 2
128 CORRIDOR CH-1 RB-1 PA-1 PA-1 PA-1 PA-3 ACT-1 2
129 CHIEF OFFICE CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 ACT-1 2
130 JANITOR 1 CH-1 RB-1 PE-1/FRP-1 PE-1/FRP-1 PE-1 PE-1 ACT-1 2
131 UNISEX 1 EF-1 EF-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 2
132 UNISEX 2 EF-1 EF-1 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-1/TLC-1/2 PE-5 2
133 READY ROOM CH-1 RB-1 PA-1 PA-3 PA-1/TLC-3 PA-1/TLC-3 ACT-1 2
134 STORAGE CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 ACT-1 2
135 STRUCTURES BULL PEN CH-1 RB-1 PA-1 PA-1 PA-3 PA-1 ACT-1 2
136 CONFERENCE ROOM CH-1 RB-1 PA-2 PA-1 PA-1 PA-1 ACT-1 2
137 METALS TECH BULL PEN CH-1 RB-1 PA-3 PA-1 PA-1 PA-1 ACT-1 2
138 VESTIBULE CH-1 RB-1 PA-1 PA-1 PA-1 PA-3 ACT-1
139 METALS TECH SHOP CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5
140 WELDING CH-1 RB-1 PA-1 PA-1 PA-1 PA-1 PA-5 1
MECHANICAL PLATFORM
141 MECHANICAL PLATFORM CH-1 - - - - - PA-5
FINISH LEGEND - BASIS OF DESIGN OR EQUIVALENT
MATERIAL DESCRIPTION/SIZE MANUF.
MODEL
NAME/NUMBER PRODUCT NAME/NUMBER COLOR NAME/NUMBER REMARKS
PE-1/FRP-1 FIBERGLASS REINFORCED PLASTIC PANOLAM FRP - WHITE -
ACOUSTICAL CEILING TILE
ACT-1 24" X 24" x 3/4" BEVELED TEGULAR ARMSTRONG ULTMA 1911 ULTIMA 1911 WHITE 1911 SUSPENSION SYSTEM 15/16" PRELUDE
WHITE
CORNER GUARD
CG-1 CORNER GUARD - RESILIENT CONSTRUCTION SPECIALTIES SM-20N - ACROVYN DRIFTWOOD 262 -
FIBERGLASS REINFORCED PLASTIC
FRP-1 FIBERGLASS REINFORCED PLASTIC PANOLAM FRP - WHITE -
FLOORING
CH-1 CONCRETE - HARDENED EUCLID CHEMICAL SURFHARD - CLEAR RE: SPECIFICATION 03 30 00.00 10
EF-1 3 COAT RESINOUS FLOORING SYSTEM SHERWIN WILLIAMS - - MULTI COLORED, SW6229, SW7673, SW7674, SW7005
GROUT
GR-1 GROUT TEC POWER GROUT - SILVERADO 949 *USE WITH TLC-1/2
LAMINATE
PLAM-1 PLASTIC LAMINATE WILSONART HPL - PEWTER MESH 4878-38 VELVET FINISH
MISCELLANEOUS
ML-1 LOCKERS LYON SINGLE TIER 5022 5022 3E GREEN BLUE -
MT-1 METAL TRIM SCHLUTER JOLLY A 80 AT 2.3 SHLUTER JOLLY A 80 AT SATIN NICKEL ANODIZED ALUMINUM -
PAINT
PA-1/PE-1 ACRYLIC/EPOXY SHERWIN WILLIAMS - - AGREEABLE GRAY SW7029 -
PA-2 ACRYLIC SHERWIN WILLIAMS - - WHIRLPOOL SW9135 -
PA-3 ACRYLIC SHERWIN WILLIAMS - - PEWTER CAST SW7673 -
PA-4 ACRYLIC SHERWIN WILLIAMS - - PEPPERCORN SW7674 -
PA-5/PE-5 ACRYLIC/EPOXY SHERWIN WILLIAMS - - PURE WHITE SW7005 PE-5: RE: SPECIFICATION 09 97 13.27
PA-6 ACRYLIC SHERWIN WILLIAMS - - TRICORN BLACK SW6258 -
PE-7 EPOXY SHERWIN WILLIAMS - - MATCH PAFB CONCH RE: SPECIFICATION 09 97 13.27
RESILIENT BASE
RB-1 RESILIENT BASE 4" X 120' JOHNSONITE BASEWORKS - SILVER GREY 55 -
SOLID SURFACE FABRICATION
SSF-1 SOLID SURFACE DUPONT CORIAN - LAVA ROCK -
SSF-2 SOLID SURFACE SWANSTONE BATH WALL PANELS - ARCTIC GRANITE 035 -
TILE
TLC-1 CERAMIC 6" x 12" DALTILE NATURAL HUES QH83 LACE QH83 MATTE FINISH
TLC-2 CERAMIC 6" x 12" DALTILE NATURAL HUES QH08 CINDER QH08 MATTE FINISH
TLC-3 CERAMIC 3" x 6" DALTILE NATURAL HUES QH83 LACE QH83 MATTE FINISH
TOILET PARTITIONS
TC-1 TOILET PARTITIONS/URINAL SCREEN GLOBAL PARTITOINS - - STAINLESS STEEL -
WALK-OFF MAT
WOM-1 WALK OFF MAT CONSTRUCTION SPECIALTIES PEDIMAT M1 WITH
MONOTUFT HD
M1 WITH MONOTUFT HD PEWTER 9321 LEVEL BASE FRAME
WINDOW COVERING
RS-1 ROLLER SHADE MECHOSHADE 600 SERIES - SILVER BIRCH 6006 3% OPEN WEAVE
NOTE: MANUFACTURERS REFERENCED ARE INTENDED TO ESTABLISH DESIGN INTENT ONLY AND ARE NOT INTENDED TO LIMIT SELECTIONS FROM OTHER MANUFACTURERS.
WHEN ALTERNATE SELECTIONS ARE SUBMITTED, SUBMITTAL SHALL INCLUDE COLOR SAMPLES OF MATERIALS LISTED FOR COMPARISON.
C
E R
T
IF
IE
D
F
IN
A L
/0 /2
A
M E
N D
M E
N T
/2 /2
A
M E
N D
M E
N T
/1 /2
A
M E
N D
M E
N T
/0 /2
W
2Q R
B0
2_
Pl an s-
W
2Q R
B0
2_
Pl an s-
| 00 - COVER SHEET |
| S-007 - STANDARD CONCRETE DETAILS (SHEET -2) |
| S-431 - FRAMING DETAILS (SHEET-2) |
| A-101 - ENLARGED FLOOR PLAN -AREA A |
| A-102 - ENLARGED FLOOR PLAN -AREA B |
| A-103 - ENLARGED FLOOR PLAN -AREA C |
| A-104 - ENLARGED FLOOR PLAN -AREA D |
| A-130 - OVERALL ROOF PLAN |
| A-401 - ENLARGED TOILET PLANS |
| A-402 - ENLARGED TOILET ROOM ELEVATIONS |
| A-551 - INTERIOR DETAILS B |
| A-701 - ROOM FINISH SCHEDULE |
| M-601 - MECHANICAL SCHEDULES |
File details come from the government source that posted it. Updated .