This federal solicitation seeks construction services for a new maintenance hangar for HC-130J aircraft located at Patrick Air Force Base, Florida. The project has an estimated construction cost between $10-25 million and falls under NAICS code 236220. Responses are due through the System for Award Management website. Funds have not yet been appropriated and no contract award will be made until funds are available. The solicitation requires compliance with HUBZone price evaluation preferences and Central Contractor Registration/Online Representations and Certifications Application requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0012
X 9B. DATED (SEE ITEM 11)
14-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20B0012_Specs-0003
W912QR20B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES AMEND 0003
Solicitation W912QR20B0012 for the Construction of HC-130J General Maintenance Hangar at Patrick Air Force Base, Florida is hereby modified as follows:
1. Offerors must acknowledge all amendments.
2. The due date and time for bid submission is extended from 07 September 2020 at 10:00 AM Eastern Time to 8 September 2020 at 10:00 AM Eastern Time.
3. The method for transmittal has changed from hard copy to electronic submittals. Electronic Submittal Instruction and Call-in information for the Virtual Bid opening has been incorporated.
4. Section 00 70 00 Clause FAR 52.204-25 and Section 00 45 00 Provision FAR 52.204-24 have updated as of August 2020 and have been deleted and replaced with the current version.
5. The period of performance listed under FAR 52.211-10 and Block 11 has been reduced from 720 calendar days to 630 calendar days.
6. Wage Rates:
General Decision Number FL20200001, has updated and is hereby replaced with the current version General Decision Number FL20200001, dated 08/14/2020.
Drawing 1 triangles (Amendment 2) were hidden due to the quantity of drawings that were updated. Please refer to the summary of changes documents to identify the modifications to the drawings for Amendment 2 and Amendment 3 (Triangle 2).
7. DRAWING SUMMARY OF CHANGES
S-009 Revised note B.1 Revised Note B.4 Revised Detail A1
A-123 A1 – Deleted note.
A-124 A1 – Deleted note.
A-201 Legend – Revised note 2.7.
C1 – Added dimension.
A-202 Legend – Revised note 2.7.
A-203
Legend – Revised note 2.7.
A-204
Legend – Revised note 2.7.
A-205
Legend – Revised note 2.7.
A-206
Legend – Revised note 2.7.
A-353
A4 – Deleted note.
A-354
A1 – Revised dimension.
A4 – Relocated Sheet note.
B1 – Revised dimension.
A-355
B1 – Revised dimension.
A-601
Added door 126A to Door Schedule - Base Bid.
Removed doors 140A & 140B from Door Schedule - Base Bid. Doors are part of Bid Option.
A-611
A4 – Revised detail.
B1 – Revised detail.
A-701
REMARKS – Revised note 4.\
E-002
Removed 400Hz Installation Notes.
8. SPECIFICATION SUMMARY OF CHANGES
07 42 63 Clarified wall panel design criteria.
08 34 16.10
1.4.4 - Clarified acceptable manufacturers.
2.1.1 – Clarified general door size requirements.
Clarified steel finishing.
08 60 45
Clarified finish and thermal performance criteria.
23 09 00
Add 45th CES EMCS Automation and Controls Network Systems as Appendix B.
- END OF ‘SUMMARY OF CHANGES’ -
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 03-Sep-2020 10:00 AM to 08-Sep-2020 10:00 AM.
The number of offeror copies required has decreased by 5 from 6 to 1.
The contractor period of performance end date has decreased by 90 days from 720 days to 630 days.
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been added by full text:
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that--
(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--
It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by reference:
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 630 calendar days from issuance of notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
The following have been deleted:
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
DEC 2019
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
(End of Summary of Changes)
Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.
Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.
a. Glenn Moon, Contract Specialist at Glenn.w.moon@usace.army.mil
b. Emily Moore, Contracting Officer at Emily.A.Moore@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two
(2) business days prior to the proposal due date.
3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter
W912QR20B0012-FIRMNAME.
4. Click Upload button to send documents.
5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).
File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
W912QR20B0012-FIRMNAME-VOLUME I
W912QR20B0012-FIRMNAME-VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
Virtual Bid Opening Time and Date: The Virtual Bid opening will be held 1 hour after the Due date and time listed in the solicitation under block 13 of the SF 1442. The bids will be read out via the teleconference number provided below. In addition a bidders list will be posted to the beta.sam.gov website after the bids are read.
Conference Line:
Call IN # (877) 402-9753
ACCESS CODE: 8058307
Security Code: 0012
General Decision Number: FL20200001 08/14/2020
Superseded General Decision Number: FL20190001
State: Florida
Construction Types: Building, Heavy and Highway
County: Brevard County in Florida.
**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY
SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING
CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/31/2020 2 02/21/2020 3 03/27/2020 4 05/15/2020 5 07/03/2020 6 08/14/2020
ASBE0067-001 03/01/2020
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 28.93 16.68
ASBE0067-002 07/01/2017
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not).........$ 16.50 10.90
BOIL0433-001 03/01/2018
Rates Fringes
BOILERMAKER......................$ 30.07 22.71
BRFL0008-001 01/01/2018
Rates Fringes
BRICKLAYER (BRICKLAYERS,
BLOCKLAYERS, PLASTERERS,
TERRAZZO WORKERS, TILE
SETTERS AND CEMENT MASONS)
COMMERCIAL..................$ 22.68 6.31
INDUSTRIAL..................$ 26.08 6.31
INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape Canaveral Air Force Station and Kennedy Space Flight Center.
CARP1000-001 07/01/2014
Rates Fringes
MILLWRIGHT.......................$ 29.48 12.40
* CARP1905-002 06/01/2017
Rates Fringes
Carpenters:
*INDUSTRIAL:
CARPENTERS.................$ 25.25 7.55
PILEDRIVERMEN..............$ 21.75 8.65
COMMERCIAL:
CARPENTERS.................$ 23.11 9.85
PILEDRIVERMEN..............$ 21.75 8.65
ELEC0222-001 09/01/2016
Rates Fringes
Line Construction:
CABLE SPLICER...............$ 35.72 5.00+24.5%
GROUNDMAN...................$ 19.39 5.00+24.5%
LINEMAN; HEAVY EQUIPMENT
OPERATOR....................$ 34.02 5.00+24.5%
ELEC0756-001 09/03/2019
Rates Fringes
ELECTRICIAN
Cable Splicer...............$ 29.33 3%+12.74 Wireman.....................$ 29.33 3%+12.74
ELEV0139-001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 44.12 34.765
FOOTNOTE:
A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.
Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.
ENGI0673-001 05/01/2013
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 26.30 10.85
GROUP 2.....................$ 24.14 10.85
GROUP 3.....................$ 23.00 10.85
GROUP 4.....................$ 20.36 10.85
POWER EQUIPMENT OPERATORS
CLASSIFICATIONS GROUP 1: Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver (incluidng auger and boring machine)
GROUP 2: Mechanic/Welder and operators of: Gantry Crane, Bridge Crane, Clam Shell, Dragline, Backhoe, Gradeall, Grader, Sideboom Cat, Hulti-Drum Hoist, Highlift (10' or higher), Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom
GROUP 3: Bulddozers, Forklifts, Straddle Buggy, Single Drum Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer
GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor boat, Power Boat, Power Sweeper, Welding Machine, Oiler, Mechanic's Helper, Pump, Conveyor, Roller, Watertruck, Asphalt distributor, Concrete Pump (trailer type), Utility Operator
IRON0808-001 01/01/2019
Rates Fringes
IRONWORKER.......................$ 27.28 14.70
LABO0517-001 05/01/2017
Rates Fringes
Laborers:
Asbestos Abatement, Hazardous and Toxic Waste Removal Laborers; (On all mechaincal systems: Lead Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;.......$ 19.45 7.85 Carpenter Tender, Cement
Mason Tender, Block/ Bricklayer Tender Plasterer Tender............$ 19.20 7.85 Demolition Laborers.........$ 19.20 7.85 General Laborer.............$ 19.20 7.85 Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools.......................$ 19.20 7.85
* PAIN0078-001 08/01/2020
Rates Fringes
GLAZIER..........................$ 24.71 14.05
* PAIN0078-002 08/01/2020
Rates Fringes
PAINTER..........................$ 24.71 14.05
PLUM0295-001 01/01/2020
Rates Fringes
Plumber/Pipefitter/Steamfitter INDUSTRIAL: Bulk Plants, Power-houses, Chemical Plants, Missile Sites, (Including all Work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other work which is related to and considered a part of the above type projects....................$ 35.20 20.37 Schools, Hospitals, Shopping Centers, and work not listed as Industrial....$ 35.20 20.37
ROOF0136-001 08/01/2019
Rates Fringes
ROOFER...........................$ 22.79 8.57
SFFL0821-002 01/01/2020
Rates Fringes
SPRINKLER FITTER
Commercial..................$ 29.18 19.75 Industrial..................$ 31.53 19.75
Industrial: Jobs covering sugar mills, power plants, trash burning plants, military installations and Cape Kennedy. All other work shall be commercial rate.
SHEE0015-001 07/01/2020
Rates Fringes
SHEET METAL WORKER...............$ 26.89 8.89
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Louisville District
HC-130J GENERAL MAINTENANCE HANGAR
Patrick AFB, FL
Certified Final – Amendment 0003 Specifications Project Number: SXHT203000 P2 Number: 472236 August 2020
HC-130J General Maintenance Hangar
THIS PAGE INTENTIONALLY LEFT BLANK
107778AM03
PROJECT TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
PROJECT TABLE OF CONTENTS Page 1
107778AM03
DIVISION 08 - OPENINGS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 60 45 TRANSLUCENT PANELS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
THIS PAGE INTENTIONALLY LEFT BLANK
107778AM03
HC-130J General Maintenance Hangar 107778AM03
SECTION 07 42 63
FABRICATED WALL PANEL ASSEMBLIES
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 501.1 (2017) Standard Test Method for Water Penetration of Windows, Curtain Walls and Doors Using Dynamic Pressure
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI S100 (2012) North American Specification for the Design of Cold-Formed Steel Structural Members
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS A5.1/A5.1M (2012) Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D1.2/D1.2M (2014) Structural Welding Code - Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A424/A424M (2009a; R 2016) Standard Specification for Steel Sheet for Porcelain Enameling
SECTION 07 42 63 Page 1
ASTM A463/A463M (2010; R 2015) Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
ASTM A606/A606M (2009a) Standard Specification for Steel Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, with Improved Atmospheric Corrosion Resistance
ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A755/A755M (2016; E 2016) Standard Specification for Steel Sheet, Metallic Coated by the Hot-Dip Process and Prepainted by the Coil-Coating Process for Exterior Exposed Building Products
ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A924/A924M (2017a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM C273/C273M (2016) Shear Properties of Sandwich Core Materials
ASTM C286 (1999; R 2017) Standard Terminology Relating to Porcelain Enamel and Ceramic-Metal Systems
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM D1056 (2014) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1308 (2013) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM D1622/D1622M (2014) Apparent Density of Rigid Cellular Plastics
ASTM D1667 (2017) Standard Specification for Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)
SECTION 07 42 63 Page 2
ASTM D2244 (2016) Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates
ASTM D2247 (2015) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D3363 (2005; E 2011; R 2011; E 2012) Film Hardness by Pencil Test
ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D522/D522M (2014) Mandrel Bend Test of Attached Organic Coatings
ASTM D523 (2014) Standard Test Method for Specular Gloss
ASTM D6226 (2010) Standard Test Method for Open Cell Content of Rigid Cellular Plastics
ASTM D714 (2002; R 2009) Evaluating Degree of Blistering of Paints
ASTM D822 (2013) Filtered Open-Flame Carbon-Arc Exposures of Paint and Related Coatings
ASTM D968 (2017) Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
ASTM E119 (2016a) Standard Test Methods for Fire Tests of Building Construction and Materials
ASTM E136 (2016) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E1592 (2005; R 2012) Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
SECTION 07 42 63 Page 3
ASTM E84 (2018) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM G152 (2013) Operating Open Flame Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
ASTM G153 (2013) Operating Enclosed Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)
MBMA MBSM (2012) Metal Building Systems Manual
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM AMP 500 (2006) Metal Finishes Manual
PORCELAIN ENAMEL INSTITUTE (PEI)
PEI 1001 (1996) Specification for Architectural Porcelain Enamel (ALS-100)
PEI CG-3 (2005) Color Guide for Architectural Porcelain Enamel
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
UNDERWRITERS LABORATORIES (UL)
UL 580 (2006; Reprint Oct 2013) Tests for Uplift Resistance of Roof Assemblies
UL Bld Mat Dir (updated continuously online) Building Materials Directory
1.2 DEFINITIONS
Fabricated Wall Panel Assembly: Metal wall and liner panels, attachment system components, miscellaneous metal framing, thermal insulation, and accessories shop fabricated or field assembled for a complete weather-tight wall system.
SECTION 07 42 63 Page 4
1.3 DESCRIPTION OF FABRICATED WALL PANEL ASSEMBLY SYSTEM
Factory color finished, galvanized metal wall panel system with concealed fastening attachment. Panel profile must be stucco embossed, flush face, recessed bead as shown on Drawings. Interior finish of panel assembly to be stucco embossed.
1.3.1 Metal Wall Panel General Performance
Comply with performance requirements, conforming to AISI S100 , without failure due to defective manufacture, fabrication, installation, or other defects in construction. Wall panels and accessory components must conform to the following standards:
a. ASTM A1008/A1008M .
b. ASTM A123/A123M .
c. ASTM A36/A36M.
d. ASTM A424/A424M , ASTM C286, PEI 1001 , PEI CG-3 for Porcelain and Ceramic Enameling.
e. ASTM A653/A653M .
f. ASTM A463/A463M for aluminum coated steel sheet.
g. ASTM A606/A606M .
h. ASTM A755/A755M for metallic coated steel sheet for exterior coil pre-painted applications.
i. ASTM A780/A780M for repair of damage or uncoated areas of hot-dipped galvanized coating.
j. ASTM A924/A924M for metallic coated steel sheet.
k. ASTM C273/C273M.
l. ASTM D522/D522M for applied coatings.
m. UL Bld Mat Dir .
1.3.2 Structural Performance
Maximum calculated fiber stress must not exceed the allowable value in the AISI or AA manuals; a one third overstress for wind is allowed. Midspan deflection under maximum design loads is limited to L/180. Contract Drawings show the design wind loads and the extent and general assembly details of the metal siding. Contractor must provide design for members and connections not shown on the Drawings. Siding panels and accessories must be the products of the same manufacturer.
Provide metal wall panel assemblies complying with the load and stress requirements in accordance with ASTM E1592. Wind load force due to wind action governs the design for panels.
Wall systems and attachments are to resist the wind loads as determined by UL 580 and ASCE 7 in the geographic area where the construction will take
SECTION 07 42 63 Page 5 place, in pounds per square foot. Submit five copies of wind load tests and seismic tests to the Contracting Officer.
1.3.3 Air Infiltration
Air leakage must conform to the limits through the wall assembly area when tested according to ASTM E283.
1.3.4 Water Penetration Under Static Pressure
No water penetration when tested according to ASTM E331.
1.3.5 Water Penetration Under Dynamic Pressure
No evidence of water leakage when tested according to AAMA 501.1 .
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualification of Manufacturer
Qualification of Installer
Qualifications for Welding Work
SD-02 Shop Drawings
Fabrication and Installation drawings for the following items are to indicate completely dimensioned structural frame and erection layouts, openings in the wall, special framing details, and construction details at corners, building intersections and flashing, location and type of mastic and metal filler strips
Wall Panel Assemblies; G
Flashing and Accessories; G
Anchorage Systems; G
SD-03 Product Data
Certification
Submit Manufacturer's data indicating percentage of recycle material in wall panels to verify sustainable acquisition compliance
Submit Manufacturer's catalog data for the following items:
Factory Color Finish
SECTION 07 42 63 Page 6
Sub-Girts and Formed Shapes
Closure Materials
Insulation
Pressure Sensitive Tape
Sealants and Caulking
Rated Wall Assembly
Galvanizing Repair Paint
Enamel Repair Paint
Aluminized Steel Repair Paint
Accessories
SD-04 Samples
Submit as required each of the following samples:
Wall Panel Assemblies, 12 inches long by actual panel width; G
Fasteners
Metal Closure Strips, 10 inches long of each type
Insulation, approximately 8 by 11 inches
Submit manufacturer's color charts and chips, approximately 4 by 4 inches, showing full range of colors, textures, and patterns available for wall panels with factory applied finishes; G
SD-05 Design Data
Wind Design Analysis
SD-06 Test Reports
Submit test reports for the following in accordance with the referenced articles in this Section.
Leakage Tests
Wind Load Tests
Seismic Tests
Coatings and base metals of metal wall type of test as specified in Paragraphs "Steel Sheet Materials" and in various referenced standards in this Section.
Factory Color Finish Performance Requirements
SD-07 Certificates
SECTION 07 42 63 Page 7
Submit certificates for the following items showing conformance with referenced standards contained in this Section:
Fasteners
Galvanizing Repair Paint
Enamel Repair Paint
Provide evidence that products used within this Specification are manufactured in the United States.
Qualification of Manufacturer
Certify that the manufacturer of the metal wall panel system meets requirements specified under Paragraph "Qualification of Manufacturer".
Qualification of Installer
Certify that the applicator meets requirements specified under Paragraph "Qualification of Installation Contractor".
Submit the Wall System Assembly Wind Load and Fire Rating Classification Listings
SD-08 Manufacturer's Instructions
Installation of Wall Panels
Include detailed application instructions and standard manufacturer drawings altered as required by these Specifications. Explicitly identify in writing, differences between manufacturer's instructions and the specified requirements.
SD-11 Closeout Submittals
Warranty
Instructions To:
Government and/or Contractor Personnel
Safety Data Sheets
Submit 20 year "No-Dollar-Limit" Warranty for Labor and Materials
1.5 QUALITY ASSURANCE
1.5.1 Pre-Installation Conference
After submittals are received and approved but before wall panel and insulation work, including associated work, is performed, the Contracting Officer will hold a pre-siding conference to review the following:
a. The drawings, including Fabrication and Installation drawings,showing complete Wall Panel Assemblies, and Specifications. Include details for the following for review:
SECTION 07 42 63 Page 8
(1) Flashing and accessories.
(2) Anchorage systems.
(3) Manufacturer's catalog data.
(4) Factory Color Finish:
(a) Submit manufacturer's color charts and chips, approximately 4 by 4 inches, showing full range of colors, textures, and patterns available for wall panels with factory applied finishes.
(5) Sub-girts and Formed Shapes.
(6) Closure Materials, including metal closure strips.
(7) Insulation.
(8) Pressure Sensitive Tape.
(9) Rated Wall Assembly test data.
(10) Accessories.
(11) Fasteners.
b. Finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
c. Methods and procedures related to metal wall panel installation, including manufacturer's written instructions for installation of wall panels, and verification of wall system assembly wind load and fire rating classification listings.
d. Support conditions for compliance with requirements, including alignment between and attachment to structural members. Provide details of wind design analysis including wind speed, exposure category, co-efficient, importance factor, designates type of facility, negative pressures for each zone, methods and requirements of attachment. Wind design analysis to include wall plan delineating dimensions and attachment patterns for each zone. Wind design analysis to be prepared and sealed by licensed project engineer in the geographic area where the construction will take place.
e. Flashing, special siding details, wall penetrations, openings, and condition of other construction that will affect metal wall panels.
f. Governing regulations and requirements for insurance, certificates, tests and inspections if applicable. Include certification for sustainable acquisition and wall system assembly wind load and fire rating classification. Safety plan review must include applicable Safety Data Sheets for maintenance/repair materials.
g. Temporary protection requirements for metal wall panel assembly during and after installation.
h. Wall panel observation and repair procedures after metal wall panel
SECTION 07 42 63 Page 9 installation. Include review of sample Galvanizing Repair Paint.
i. Sample 20 year "No-Dollar-Limit" warranty.
1.5.2 Manufacturer's Technical Representative
The representative must have authorization from manufacturer to approve field changes and be thoroughly familiar with the products and installations in the geographical area where construction will take place.
1.5.3 Qualification of Manufacturer
Metal wall panel system manufacturer must have:
a. A minimum of five (5) years experience in manufacturing metal wall system and accessory products.
b. Provide engineering services by an authorized engineer; currently licensed in the geographical area where construction will take place, having a minimum of four (4) years experience as an engineer knowledgeable in wind load design analysis, protocols, and procedures for the MBMA MBSM; ASCE 7, and ASTM E1592.
c. Provide certified engineering calculations using the products submitted for:
(1) Wind load requirements in accordance with FM Wind Design Guide and
ASCE 7.
1.5.4 Qualification of Installer
The Installation Contractor must be approved and certified by the wall panel manufacturer prior to beginning the installation of the metal wall system.
1.5.4.1 Qualifications for Welding Work
Welding procedures must conform to AWS A5.1/A5.1M , AWS D1.1/D1.1M for steel or AWS D1.2/D1.2M for aluminum.
1.5.5 Single Source
Obtain each type of metal wall and liner panels, clips, closures and other accessories from the standard products of…