Question 1
During site visit, we noticed Lightning Protection devices attached to RTUs. Is recertification of lightning protection going to be required once new units and installed and existing devices are attached to the new units?
Recertification will not be required. New units should be installed so that the lighting protection is not altered. Contractor should remove the lighting protection from existing unit and then reattach once new unit is installed.
Question 2
On Drawing M-104, detail C or in SOW, there is no reference to the existing CHW Pumps or if they might need to be replaced based on the new units’ flow requirements. Are we to assume that these pumps will not need to be replaced?
Contractor is to provide units that are compatible with the existing CHW Pumps.