ELECTRICAL MECHANICAL EQUIPMENT SCHEDULE

TAG

DESCRIPTION

LOAD

VOLTS Φ POWER SYSTEM

CIRCUIT

BREAKER

BRANCH CIRCUITRY

PANEL CKT DEVICE

SWITCH/FUSE

SIZE

NEMA

ENCLOSURE LOCATION

KEY

NOTE

NAME

AHU

HP

HEAT

KW

MOTORS

FLA

WIRE GROUND CONDUIT

AC-157 - 1

AC-200-1

AC-200-2

AC-200-3

AC-258-1

AC-258-2

AC-310-1

AC-310-2

AC-310-3

AC-958-1

AC-958-2

AC-1060-1

AC-1147-1

AC-1163-1

AC-1163-2

208 1 NORMAL 30A-2P 2-10 AWG 1-10 AWG 3/4" C A 36,38 30AS/30AF 3R REFER TO ELECT FLOOR PLANS0.5ROOFTOP AC W/ ELEC HEAT

MINI-SPLIT WALL

AC UNIT- COOLING ONLY

HORIZONTAL AHU W/DX COIL

ROOFTOP HEAT PUMP W/ELEC HEAT

ROOFTOP HEAT PUMP W/ELEC HEAT

VERTICAL FURNACE/BLOWER - DX COIL

AHU/HP

AHU/HP

1 NORMAL

1 NORMAL

0.4

0.4

208 3

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

208 1

208 3 208 3

48VDC 0

115 1

NORMAL120 1

NORMAL120 1

480 3 NORMAL

NORMAL208 1

NORMAL208 1

AC-279-1 OUTDOOR WALL TYPE

0.45 6.9

1.45

0.50

0.50

2.60

1.0 1.0

0.75

0.75

1.5

4.2

0.5

2-12 AWG 1-12 AWG 3/4" C 20A 1 REFER TO ELECT FLOOR PLANS

2-12 AWG 1-12 AWG 3/4" C

20A-2P

20A-2P

40A-2P 2-8 AWG 1-10 AWG 3/4" C LP 28,30 60AS/40AF 1 REFER TO ELECT FLOOR PLANS

40A-3P 3-10 AWG 1-10 AWG 3/4" C BP 26,28,30 60AS/40AF 1 REFER TO ELECT FLOOR PLANS

30A-3P 3-10 AWG 1-10 AWG 3/4" C BP 35,37,39 30AS/30AF 1 REFER TO ELECT FLOOR PLANS

CU-200-1 AIR COOLED CONDENSING UNIT/HEAT PUMP

CU-200-2 AIR COOLED CONDENSING UNIT/HEAT PUMP

CH-878-1 WATER CHILLER

CH-878-2 WATER CHILLER

CU-1163-2 AIR COOLED CONDENSING UNIT/HEAT PUMP NORMAL208 1

CU-1163-1 AIR COOLED CONDENSING UNIT/HEAT PUMP NORMAL208 1

AHU/HP

MINI-SPLIT WALL

AIR COOLED CONDENSING UNIT/HEAT PUMPCU-200-3

AIR COOLED CONDENSING UNITCU-258-1

CU-258-2

AC UNIT- WITH HEAT

AIR COOLED CONDENSING UNIT

AIR COOLED CONDENSING UNIT/HEAT PUMP

MINI-SPLIT WALL

CU-310-1

CU-958-1 AIR COOLED CONDENSING UNIT/COOLING ONLY

HORIZONTAL FURNACE/BLOWER - DX COIL

CU-958-2 AIR COOLED CONDENSING UNIT/COOLING ONLY

CU-1060-1 AIR COOLED CONDENSING UNIT/COOLING ONLY

VERTICAL FURNACE/BLOWER - DX COIL

CU-1147-1 AIR COOLED CONDENSING UNIT/HEAT PUMP

208 1 NORMAL

TOGGLE/S

30AS/20AF 3R REFER TO ELECT FLOOR PLANS2,42-12 AWG 1-12 AWG 3/4" C 2ND FLOOR20A-2P

20A 1 REFER TO ELECT FLOOR PLANSTOGGLE/S

30AS/20AF 3R REFER TO ELECT FLOOR PLANS2-12 AWG 1-12 AWG 3/4" C LP 24,2620A-2P208 1 NORMAL

32.7 208 1 NORMAL 60A-2P 2-8 AWG 1-10 AWG 3/4" C LP 28,30 60AS/40AF REFER TO ELECT FLOOR PLANS3R

208 3 NORMAL 60A-3P 3-12 AWG 1-12 AWG 3/4" C BP 25,27,29 30AS/20AF 3R REFER TO ELECT FLOOR PLANS

7.0

7.0

25.2

9.5

9.5

8.2

29.9

29.9

480 3

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

NORMAL

20A-3P

20A-1P 30A-2P 20A-1P 20A-2P 20A-3P 20A-3P 15A-2P 60A-2P 15A-2P 60A-2P

30A-2P

20A-2P 70A-3P 70A-3P 90A-3P 90A-3P 20A-1P 50A-2P

3-12 AWG 1-12 AWG

2-10 AWG 1-10 AWG

2-12 AWG 1-12 AWG

2-8 AWG 1-10 AWG

2-12 AWG 1-12 AWG

2-12 AWG 1-12 AWG

2-12 AWG 1-12 AWG

3-12 AWG 1-12 AWG

3-10 AWG 1-10 AWG

2-12 AWG 1-12 AWG

2-6 AWG 1-10 AWG

2-12 AWG 1-12 AWG

2-6 AWG 1-10 AWG

3-3 AWG 1-6 AWG

3-3 AWG 1-6 AWG

3-4 AWG 1-8 AWG

3-4 AWG 1-8 AWG

2-10 AWG 1-12 AWG

460 3 460 3

208 3

2-10 AWG 1-10 AWG

2-12 AWG 1-12 AWG

1 1/4" C 1 1/4" C

3/4" C 3/4" C 3/4" C 3/4" C

3/4" C 3/4" C 3/4" C 3/4" C

3/4" C 3/4" C 3/4" C 3/4" C 3/4" C 3/4" C 3/4" C 3/4" C

1 1/2" C 1 1/2" C

BP 32,34,36

A 17,19

PP1 19,21

PP1 19,21

MDP 31,33,35

EP 11,13,15

MDS 3

MDS 5

PD 20

PD 1,3

20A 1TOGGLE/S

PD 2,4

A 28 A 24,26

PP 2

PP 4

A 35,37

A 39,41

A 36,38

A 40,42

30AS/20AF

30AS/30AF

30AS/30AF

60AS/60AF

60AS/60AF

100AS/90AF

100AS/90AF

20A

60AS/50AF

30AS/20AF

20A

30AS/20AF

30AS/20AF

30AS/20AF

30AS/15AF

60AS/60AF

30AS/15AF

60AS/60AF

3R

3R

3R 3R

3R

3R

3R

3R

3R

3R

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

17.8

11.0

14.0 15.0 2.4

25.0

11.0 19.3 19.3

7.6

7.6

B-157-1 BOILER NORMAL120 12.0 20A-1P 2-12 AWG 1-12 AWG 3/4" C LD 20 DISCONNECT 30AS/20AF 1 REFER TO ELECT FLOOR PLANS

B-984-1 BOILER

B-984-2 BOILER

NORMAL120 110.0

NORMAL120 110.0

20A-1P 2-12 AWG 1-12 AWG 3/4" C

20A-1P 2-12 AWG 1-12 AWG 3/4" C

LA1 9 DISCONNECT 30AS/20AF 1

LA1 11 DISCONNECT 30AS/20AF 1

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANS

REFER TO ELECT FLOOR PLANSHWP-157-1 PUMP -B&G MODEL E-90 1.5 NORMAL208 1 20A-2P 2-12 AWG 1-12 AWG 3/4" C LD 11,13 DISCONNECT 30AS/20AF 1

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

TOGGLE/S

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

TOGGLE/S

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

DISCONNECT

2,42ND FLOOR

LP 24,26

208 1

30AS/20AF 1

3.8

5.6

5.0

11.3 11.3

3.75

PD

PROFESSIONAL SEAL

DATE:

SC No.:

NAME OF REGISTERED PROFESSIONAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

BA C D E F G H

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-2

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

2/6/19

21049

JF AR PLT WPL

E-002

ELECTRICAL MECHANICAL

EQUIPMENT SCHEDULE

No Scale

RTU

TO BE REMOVED

A-36,38

MECHANICAL ROOMSTORAGE

BOILER TO BE

REMOVED

MAIN ELECTRICAL

DISTRIBUTION PANEL 'A'

CANTEEN ELECTRIC METER

CLUB ELECTRIC METER

AC UNIT

PUMP TO BE

REMOVED AND

REPLACED

EXISTING PANEL 'LD'

TO REMAIN

WORK BAY #2

AHU ON ELEVATED PLATFORM

TO BE REMOVED

CU ON GRADE

TO BE REMOVED

EXISTING CU

TO REMAIN

COMMUNICATIONS BOX

A S

P H

A L

T

S

L O

P E

D

D

O W

N

ELECTRIC

TRANSFORMER

EXISTING PANEL A TO REMAIN

LP-24,26

LP-28,30

LD-11,13

LP-28,30

CTK-2,4

SECOND FLOOR PANEL

LD-20

PROFESSIONAL SEAL

DATE:

SC No.:

NAME OF REGISTERED PROFESSIONAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

BA C D E F G H

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-2

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

2/6/19

21049

1/4" = 1'-0"

ED-101

A

BLDG 157 - PARTIAL ROOF PLAN

1/4" = 1'-0"

ED-101

B

BLDG 157 - PARTIAL FIRST FLOOR PLAN

WPL

ED-101

1/4"=1'-0"

1/4" = 1'-0"

ED-101

C

BLDG 200 - PARTIAL FIRST FLOOR PLAN

1/4" = 1'-0"

ED-101

D

BLDG 279 - BARRIER SHED

ELECTRICAL DEMOLITION

PARTIAL PLANS

BLDGS. 157, 200 & 279

JF AR PLT

ALL EXISTING CONDUITS ARE TO REMAIN. U.O.N.

REMOVE POWER AND CONTROL LIQUID TIGHT FLEXIBLE METAL CONDUIT AND CONDUCTORS FROM OUTSIDE OF AC UNIT

TO BUILDING .

DISCONNECT AND REMOVE SAFETY SWITCH AND ASSOCIATED WIRING TO PANEL AND CIRCUIT NUMBER INDICATED.

DEMOLITION NOTES:

INFO ASSURANCE OFFICE

VAULT

VAULT

VAULT

OPEN OFFICE AREA

CRAC AC UNIT TO

BE REMOVED

CU ON GRADE TO BE REMOVED

ELEC PANEL BP (208V/120V)

ELEC PANEL Q (208V/120V)

ELEC PANEL "RP" (208V/120V)

CONCRETE PAD TO BE REMOVED

BP-26,28,30

BP-25,27,29

PROFESSIONAL SEAL

DATE:

SC No.:

NAME OF REGISTERED PROFESSIONAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

BA C D E F G H

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-2

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

2/6/19

21049

1/4" = 1'-0"

ED-102

B

BLDG 258 - PARTIAL FIRST FLOOR PLAN

WPL

ED-102

1/4"=1'-0"

DEMOLITION NOTES:

ALL EXISTING CONDUITS ARE TO REMAIN U.O.N.

DISCONNECT AND REMOVE SAFETY SWITCH AND

ASSOCIATED WIRING BACK TO PANEL AND CIRCUIT

NUMBER INDICATED.

ELECTRICAL DEMOLITION

PARTIAL PLANS

BLDG. 258

JF AR PLT

OFFICE

102D

OFFICE

102C

OFFICE

OFFICE

102B

OFFICE

102A

CLASSROOM

MEN

MEN

MECHANICAL

PAINT SHOP

BAY "A1"

BAY "A1"

BAY "B"

RTU ON ROOF

TO BE REMOVED

RTU ON ROOF

TO BE REMOVED

WALL MOUNTED

MINI-SPLIT AC UNIT

TO BE REMOVED

CU TO BE REMOVED

PANEL 'MDP'

TO REMAIN

PANEL 'PP1'

TO REMAIN

PANEL 'EP'

TO REMAIN

PP1-28,30

MDP-31,33,35

EP-11,13,15

PP1-19,21

PROFESSIONAL SEAL

DATE:

SC No.:

NAME OF REGISTERED PROFESSIONAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

BA C D E F G H

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-2

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

2/6/19

21049

WPL

ED-103

ELECTRICAL DEMOLITION

PARTIAL PLANS

BLDG. 310

1/8"=1'-0"

1/8" = 1'-0"

ED-103

A

BLDG 310 - PARTIAL PLAN

DEMOLITION NOTES:

ALL EXISTING CONDUITS ARE TO REMAIN U.O.N.

DISCONNECT AND REMOVE SAFETY SWITCH AND

ASSOCIATED WIRING TO PANEL AND CIRCUIT NUMBER

INDICATED.

TEMPORARILY REMOVE THE LIGHTNING PROTECTION

AIR TERMINAL AND ROOF CONDUCTOR FOR

REINSTALLATION ON NEW ROOF TOP UNIT.

MECHANICAL ROOM 112

AIR COOLED CHILLER

TO BE REMOVED

B-1

B-2

HWP-1

HWP-2

UH

FCU-1

CHP-1

CHP-2

CHP-3

UH

# 1

MDS-3

AIR COOLED CHILLER

TO BE REMOVED

# 2

MDS-5

EXISTING ELEC.

TO REMAIN

NORMAL ELECTRICAL ROOM

EXISTING MAIN DISTRIBUTION

BOARD 'MDS' TO REMAIN

PROFESSIONAL SEAL

DATE:

SC No.:

NAME OF REGISTERED PROFESSIONAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

BA C D E F G H

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-2

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

2/6/19

21049

1/4" = 1'-0"

ED-104

C

BLDG 878 - PARTIAL PLAN

WPL

ED-104

1/4"=1'-0"

ELECTRICAL DEMOLITION

PARTIAL PLANS

BLDG. 878

JF AR PLT

DEMOLITION NOTES:

ALL EXISTING CONDUITS ARE TO REMAIN.

DISCONNECT AND REMOVE SAFETY SWITCH AND

ASSOCIATED WIRING BACK TO MAIN DISTRIBUTION

SWITCHBOARD "MDS" IN MAIN ELECTRICAL ROOM,

CIRCUIT NUMBER INDICATED.

1/4" = 1'-0"

ED-104

D

BLDG 878 - PARTIAL PLAN

MECH/ELEC

TOOL STORAGE

CORRIDOR

EXERCISE ROOM

PALLET STORAGE

CU ON GRADE

TO BE REMOVED

GAS FURNACE

TO BE REMOVED

DUAL FURNACE

TO BE REMOVED

DX COOLING COIL

TO BE REMOVED

CU LOCATION

TO BE FIELD

VERIFIED UNIT TO

BE REMOVED

ELECTRICAL XFMR

PD-2,4

PD-33

PD-20,22

PD-1,3,5

MECHANICAL ROOM 187

EXISTING HDP

DOMESTIC HOT WATER

STORAGE TANK

DOMESTIC HOT

WATER HEATER

AHU

AHU

AHU

AHU

HWP

HWP

CHP

CHP

BOILER TO BE

REMOVED

VERTICAL

INLINE PUMP

(TYP. OF 2)

TO BE REMOVED

BOILER TO BE

REMOVED

LA1-9

LA1-11

LA1-4

LA1-6

EXISTING PANEL

'LA1' TO REMAIN

MAIN ELEC DISTRIBUTION

PANEL (480V/277V, 800A

MAIN)

MECHANICAL ROOM

RESTROOM

CONCRETE APRON

AC UNIT

(FURNACE & DX COIL)

TO BE REMOVED

EXISTING PANEL 'A'

TO REMAIN

A-28

A-24,26

AC UNIT CU

TO BE REMOVED

PANEL PD

PROFESSIONAL SEAL

DATE:

SC No.:

NAME OF REGISTERED PROFESSIONAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

BA C D E F G H

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-2

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

2/6/19

21049

WPL

ED-105

1/4"=1'-0"

1/4" = 1'-0"

BLDG 984 - PARTIAL PLAN

1/4" = 1'-0"

BLDG 958 - PARTIAL PLAN

ED-105

A

ED-105

B

1/4" = 1'-0"

BLDG 1060 - PARTIAL PLAN

ED-105

C

DEMOLITION NOTES:

ALL EXISTING CONDUITS ARE TO REMAIN U.O.N.

DISCONNECT AND REMOVE SAFETY SWITCH AND ASSOCIATED WIRING BACK TO

PANELBOARD AND CIRCUIT NUMBER INDICATED.

ELECTRICAL DEMOLITION

PARTIAL PLANS

BLDGS. 958, 984 & 1060

E-002 - ELECTRICAL MECHANICAL EQUIPMENT SCHEDULE
ED-101 - ELECTRICAL DEMOLITION PARTIAL PLANS BLDGS. 157, 200 & 279
ED-102 - ELECTRICAL DEMOLITION PARTIAL PLANS BLDG. 258
ED-103 - ELECTRICAL DEMOLITION PARTIAL PLANS BLDG. 310
ED-104 - ELECTRICAL DEMOLITION PARTIAL PLANS BLDG. 878
ED-105 - ELECTRICAL DEMOLITION PARTIAL PLANS BLDGS. 958, 984 & 1060