MECHANICAL ROOM
AC UNIT CU1
AND CONCRETE PAD
TO BE REMOVED
S
EXISTING GATEWAY
ATC PANEL
S
M
PP-2
PP-4
EXISTING PANEL 'PP1'
277/480 TO REMAIN
EXISTING PANEL 'PP'
TO REMAIN
EXISTING
AHU TO BE
REMOVED
WOMEN'S TOILET
MEN'S TOILET
OFFICE 1
CORR
AC UNIT AHU
TO BE REMOVED
A-35,37
A-36,38
DIS OPERATIONS
CLASS "A" VAULT
AC UNIT CU
TO BE REMOVED
AC UNIT CU
TO BE REMOVED
A-39,41
A-40,42
ELECTRICAL
EXISTING PANEL 'A'
TO REMAIN 250A MCB
PANEL RS
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
2/6/19
21049
WPL
ED-106
1/4"=1'-0"
1/4" = 1'-0"
ED-106
A
BLDG 1147 - MECHANICAL ROOM 112
1/4" = 1'-0"
ED-106
C
BLDG 1163 - CONDENSING UNIT AREA
1/4" = 1'-0"
ED-106
B
BLDG 1163 - ATTIC PARTIAL PLAN
DEMOLITION NOTES:
ALL EXISTING CONDUITS ARE TO REMAIN U.O.N.
DISCONNECT AND REMOVE SAFETY SWITCH AND ASSOCIATED WIRING BACK TO
PANELBOARD AND CIRCUIT NUMBER INDICATED.
ELECTRICAL DEMOLITION
PARTIAL PLANS
BLDGS. 1147 & 1163
JF AR PLT
1/4" = 1'-0"
ED-106
D
BLDG 1163 - ELECTRICAL ROOM 108
AC-157-1
A-36,38 2#10 &
1#10 G-3/4"C
30A FUSES
MECHANICAL ROOMSTORAGE MECHANICAL ROOMSTORAGE
MAIN ELECTRICAL
DISTRIBUTION PANEL 'A'
CANTEEN ELECTRIC METER
CLUB ELECTRIC METER
AC UNIT
EXISTING PANEL 'LD'
TO REMAIN
ET-157-1
B-157-1
HWP-157-1
LD-11,13
2#12, 1#12 G -3/4"C
LD-20
2#12, 1#12 G -3/4"C
ELECTRICAL ROOM 113
TWO-SECTIONS
MAIN ELECTRICAL
DISTRIBUTION
PANEL PP1
EXISTING
ELECTRIC METER
WORK BAY #2
CU-200-1
CU-200-2
CU-200-3
AC-200-3
AC-200-2
EMCS GATEWAY IN CABINET
2#8, 1#10 G -3/4"C
60A FUSES
CONNECT TO SAME
EXISTING BREAKER
(VERIFY IN THE FIELD)
LP-28,30
AHU ON
ELEVATED
PLATFORM
CONNECT TO SAME
EXISTING CIRCUIT
LP-32,34
2#12, 1#12 G -3/4"C
20A FUSES
2#12, 1#12 G -3/4"C
20A FUSES. CKT-2,4
(PNL IN SECOND FLOOR)
CONNECT TO SAME
EXISTING BREAKER
CONNECT TO SAME
EXISTING BREAKER
LP-24,26
EXISTING CU
NOT IN SCOPE
COMMUNICATIONS BOX
A S
P H
A L
T
S
L O
P E
D
D
O W
N
ELECTRIC
TRANSFORMER
EXISTING PANEL A TO REMAIN
A-17,19
2#10, 1#10 G -3/4"C
WP
AC-279-1
CONCRETE
EQUIPMENT PAD
PROPOSED NEW JB FOR
GATEWAY 50W CKT A-11
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
2/6/19
21049
1/4" = 1'-0"
E-101
A
BLDG 157 - PARTIAL ROOF PLAN
1/4" = 1'-0" E-101
B
BLDG 157 - PARTIAL PLAN
WPL
E-101
1/4"=1'-0"
1/4" = 1'-0"
E-101
C
BLDG 200 - PARTIAL PLAN
1/4" = 1'-0"
E-101
D
BLDG 243 - ELECTRICAL ROOM 113
KEY NOTES:
PROVIDE ELECTRIC METER & INTEGRATE WITH BASE EMS.
NEW 2P-30A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
NEW 2P-60A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
EXISTING CONTACTOR. CONTROLLING PUMP AND BOILER.
JF AR PLT
ELECTRICAL PARTIAL PLANS
BLDGS. 157, 200, 243 & 279
1/4" = 1'-0" E-101
C
BLDG 279 - BARRIER SHED
NOTE:
1. EXISTING GATEWAY (AC CONTROL FED FROM CKT "LD-15"
NOTE:
1. REFER TO BLDG. KEY SHEET FOR PANEL LP LOCATION AND
SECOND FLOOR LAYOUT.
2. EXISTING GATEWAY FED FROM CKT.LP-27
NEW
INFO ASSURANCE OFFICE
VAULT
VAULT
VAULT
OPEN OFFICE AREA
INFO ASSURANCE OFFICE
VAULT
VAULT
VAULT
OPEN OFFICE AREA
ELEC PANEL BP (208V/120V)
ELEC PANEL Q (208V/120V)
ELEC PANEL "RP" (208V/120V)
CRAC AC UNIT
AC-258-1
AC-258-2
CU-258-1
CU-258-2
SA
RA
BP-26,28,30
3#10, 1#10 G -3/4"C
40A FUSES
BP-35,37,39
3#10, 1#10 G -3/4"C
30A FUSES
BP-25,27,29
3#12, 1#12 G -3/4"C
20A FUSES
BP-32,34,36
3#12, 1#12 G -3/4"C
20A FUSES
CONNECT TO SAME
EXISTING BREAKER
CONNECT TO SAME
EXISTING BREAKER
MECHANICAL ROOM 107
SERVER ROOM 108
MECHANICAL ROOM 107
SERVER ROOM 108
MAIN ELECTRICAL
DISTRIBUTION
PANEL "M"
ELECTRICAL
PANEL "A"
EXISTING PANEL D
EXISTING GATEWAY
FED FROM CKT. D-23
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
2/6/19
21049
WPL
E-102
1/4"=1'-0"
1/4" = 1'-0"
E-102
B
BLDG 258 - PARTIAL FIRST FLOOR PLAN
1/4" = 1'-0" E-102
A
BLDG 210 - PARTIAL PLAN
KEY NOTES:
PROVIDE ELECTRIC METER & INTEGRATE WITH BASE EMS.
NEW 3P-30A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
NEW 3P-60A. FUSED SAFETY SWITCH, NEMA 1 ENCLOSURE.
NEW 3P-30A. FUSED SAFETY SWITCH, NEMA 1 ENCLOSURE.
JF AR PLT
ELECTRICAL PARTIAL PLANS
BLDGS. 210 & 258
OFFICE
102D
OFFICE
102C
OFFICE
OFFICE
102B
OFFICE
102A
CLASSROOM
MEN
MEN
MECHANICAL
PAINT SHOP
BAY "A1"
BAY "A1"
BAY "B"
PANEL 'MDP'
TO REMAIN
PANEL 'PP1'
TO REMAIN
PANEL 'EP'
TO REMAIN
AC-310-1
WALL MOUNTED
MINI-SPLIT AC UNIT
AC-310-2 ON ROOF
AC-310-3 ON ROOF
CU-310-1
MDP-31,33,35
3#4 & 1#8G-1"C
HEATER EP-11,13,15
3#4 & 1#8G-1 1/4"
PP1-19,21
2#10 & 1#10G-3/4"C
30A FUSES
TO CU-310-1
(2#12 & 1#12G-3/4"C)
20A FUSES
70A FUSES
70A FUSES
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
2/6/19
21049
WPL
E-103
1/8"=1'-0"
1/8" = 1'-0"
E-103
A
BLDG 310 - PARTIAL PLAN
KEY NOTES:
NEW 2P-30A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
NEW 2P-30D. FUSED SAFETY SWITCH, NEMA 1 ENCLOSURE.
RE-INSTALL THE LIGHTNING PROTECTION AIR TERMINAL AND ROOF
CONDUCTOR ON NEW ROOF TOP UNIT.
NEW 3P-100A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
JF AR PLT
BLDG. 310
BREAK ROOM
MAIN ELEC PANEL
120V/240V, 200 A MAIN
VAULT AREA
EXISTING MAIN SWITCHBOARD
(480V/277V, 600 A RATING,
800 A MAIN) TO REMAIN
MECHANICAL ROOM 112MECHANICAL ROOM 112
B-1
B-2
HWP-1
HWP-2
UH
FCU-1
CHP-1
CHP-2
CHP-3
UH
CH-878-1
CH-878-2
MDS-12
3#3, 1#6G IN
EXISTING 1 1/2" C.
90A FUSES
MDS-11
3#3, 1#6G IN
EXISTING 1 1/2" C.
90A FUSES
EXISTING ELEC.
TO REMAIN
NORMAL ELECTRICAL ROOM
EXISTING MAIN DISTRIBUTION
BOARD 'MDS' TO REMAIN
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
2/6/19
21049
1/4" = 1'-0"
E-104
C
BLDG 878 - PARTIAL PLAN
WPL
E-104
1/4"=1'-0"
1/4" = 1'-0"
E-104
A
BLDG 666 - BREAK ROOM
1/4" = 1'-0" E-104
B
BLDG 858 - VAULT AREA
KEY NOTES:
PROVIDE ELECTRIC METER & INTEGRATE WITH BASE EMS.
NEW 3P-100A., 600V. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
1/4" = 1'-0"
E-104
D
BLDG 878 - ELECTRICAL ROOM 110
JF AR PLT
BLDGS. 666, 858 & 878
MECH/ELEC
TOOL STORAGE
CORRIDOR
EXERCISE ROOM
PALLET STORAGE
MECH/ELEC
TOOL STORAGE
CORRIDOR
EXERCISE ROOM
PALLET STORAGE
ELECTRICAL XFMR
CU-958-2
AC-958-2
CU-958-1
AC-958-1
4Ø
PD-2,4
2#10 & 1#12G-3/4"
20A FUSES
PD-20
2#12 & 1#12G-3/4"
NON FUSED
PD-1,3
2#8 & 1#10G-1"C
50 FUSES
REPLACE EXISTING
20A TOGGLE SWITCH
ABOVE CEILING.
JB
PANEL PD
DISCONNECT FOR
SECOND COIL.
PD-33,35 2#12 & 1#12G
IN 3/4" NON FUSED
PD-33
MECHANICAL ROOM 187
MECHANICAL ROOM 187
EXISTING HDP
DOMESTIC HOT WATER
STORAGE TANK
DOMESTIC HOT
WATER HEATER
AHU
AHU
AHU
AHU
HWP
HWP
CHP
CHP
EXISTING PANEL
'LA1' TO REMAIN
MAIN ELEC DISTRIBUTION
PANEL (480V/277V, 800A
MAIN)
FLUE UP
THRU ROOF
B-984-1
B-984-2
LA1-11
2#12 & 1#12G-3/4"C
20A FUSES
LA1-4
2#12 & 1#12G-3/4"C
LA1-6
2#12 & 1#12G-3/4"C
LA1-9
2#12 & 1#12G-3/4"C
20A FUSES
EXTEND EXISTING CONDUIT
AND PROVIDE NEW HOMERUN
AHU
AHU
AHU
AHU
HWP
HWP
CHP
CHP
MECHANICAL ROOM
RESTROOM
CONCRETE APRON
MECHANICAL ROOM
RESTROOM
CONCRETE APRON
EXISTING PANEL 'A'
TO REMAIN
CU-1060-1
A-24,26
2#12 & 1#12G-3/4"
20A FUSES
A-28
2#12 & 1#12G-3/4"
20A FUSES
AC-1060-1
JB
FOR NEW GATEWAY PROVIDE JB
AND DEDICATED CKT. A-15
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
2/6/19
21049
WPL
E-105
1/4"=1'-0"
1/4" = 1'-0"
BLDG 984 - PARTIAL PLAN
1/4" = 1'-0"
BLDG 958 - PARTIAL PLAN
E-105
A
E-105
B
1/4" = 1'-0"
BLDG 1060 - PARTIAL PLAN
E-105
C
KEY NOTES:
PROVIDE ELECTRIC METER & INTEGRATE WITH BASE EMS.
NEW 3P-60A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
NEW 2P-30A. FUSED SAFETY SWITCH, NEMA 1 ENCLOSURE.
NEW 2P-30A. FUSED SAFETY SWITCH, NEMA 3R ENCLOSURE.
NEW NEMA SIZE 1 COMBINATON STARTER AND MCP, NEMA 3R
ENCLOSURE.
VERTICAL IN-LINE PUMP, 115V, 1-PH.
NEW 2P-60A FUSED SAFETY SWITCH NEMA 3R ENCLOSURE.
NEW 1P-20A TOGGLE SWITCH NEMA 1 ENCLOSURE.
JF AR PLT
ELECTRICAL PARTIAL PLANS
BLDGS. 958, 984 & 1060
| ED-106 - ELECTRICAL DEMOLITION PARTIAL PLANS BLDGS. 1147 & 1163 |
| E-101 - ELECTRICAL PARTIAL PLANS BLDGS. 157, 200, 243 & 279 |
| E-102 - ELECTRICAL PARTIAL PLANS BLDGS. 210 & 258 |
| E-103 - ELECTRICAL PARTIAL PLANS BLDG. 310 |
| E-104 - ELECTRICAL PARTIAL PLANS BLDGS. 666, 858 & 878 |
| E-105 - ELECTRICAL PARTIAL PLANS BLDGS. 958, 984 & 1060 |
File details come from the government source that posted it.