CHILLED WATER SYSTEM SEQUENCE OF OPERATIONS
KEY NOTES:
GENERAL NOTES:
EX EXPANSION TANK
PIPE REDUCERS, INCREASERS AND FLANGES ARE NOT SHOWN.
PROVIDE REDUCERS, INCREASERS AND FLANGES AS REQUIRED
TO CONNECT TO EQUIPMENT, VALVES AND OTHER PIPING
SPECIALTIES.
1.
NOT ALL VALVES AND ACCESSORIES ARE INDICATED,
REFER TO "HVAC DETAILS" SHEETS FOR ADDITIONAL
REQUIREMENTS.
2.
EX 2 1/2"
CHWR
EX 2 1/2" CHWR
2 1/2" CHWR
EX 2 1/2" CHWR
PDS
DI
PDS
DI
EX 2 1/2" CHWR
EX 2 1/2" CHWR
EX 2 1/2" CHWR
CHWR
CHWR
M M
FCV
AI
2" BY-PASS
FROM BUILDING
TO BUILDING
DO
FCV
TETT
AI
TI
PI
DO
FCV
TETT
AI
TI
PI
DPT DPT
TI
PI
TE TT
AI
TI
PI
TE TT
AI
AI
C C
CH-1 CH-2
2 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWS
2 1/2" CHWR
BACNET INTEGRATED COMMUNICATION OF THE FOLLOWING
POINTS
CHWS SET-POINT RESET
CHWS TEMPERATURE
CHWR TEMPERATURE
FAULT AND FAULT CODE
ENABLE/ DISABLE
TTTE
EX 2 1/2" CHWS
EX 2 1/2" CHWS
MINIMUM CHILLER FLOW CONTROL VALVE
AI
A. GENERAL:
1. THE TWO (2) EXISTING AIR COOLED CHILLERS SHALL BE REPLACED WITH TWO (2)
2. THE THREE (3) EXISTING PRIMARY CHILLED WATER PUMPS SHALL BE CONTROLLED
3. EACH PRIMARY CHILLED WATER PUMP SHALL INITIALLY BE INDEXED TO THE
AUTOMATIC MODE AT THE H-O-A SWITCH LOCATED ON THE PUMP MOTOR STARTER.
4. EACH CHILLER SHALL INITIALLY BE INDEXED TO THE AUTOMATIC MODE AT THE
CHILLER CONTROL PANEL.
5. THE BAS SHALL DESIGNATE EQUIPMENT LEAD, LAG AND STANDBY ASSIGNMENTS.
THE BAS SHALL ROTATE EQUIPMENT DESIGNATIONS WEEKLY TO EQUALIZE RUNTIME.
PROVIDE OPERATOR INITIATED LOCKOUT TO MANUALLY REMOVE EQUIPMENT FROM
ROTATION FOR MAINTENANCE AND SERVICE. IF EQUIPMENT FAILS TO OPERATE WHEN
COMMANDED ON; AN ALARM SHALL BE ANNUNCIATED, THE FAILED EQUIPMENT SHALL BE
REMOVED FROM ROTATION AND THE ASSOCIATED STANDBY OR LAG EQUIPMENT SHALL
BE ASSIGNED AS THE LEAD. THE BAS SHALL RE-INITIATE THE START SEQUENCE AFTER
THE NEW LEAD EQUIPMENT IS ASSIGNED. THE BAS SHALL MONITOR EQUIPMENT STATUS
AS FOLLOWS:
a. PUMP STATUS: PRESSURE DIFFERENTIAL SWITCHES.
b. CHILLER STATUS: INTEGRATED COMMUNICATIONS WITH THE CHILLER
CONTROL PANEL.
B. THE CHILLED WATER SYSTEM SHALL BE ENABLED WHEN ANY COOLING COIL CONTROL
VALVE IS COMMANDED OPEN 5% (ADJUSTABLE) OR GREATER FOR A PERIOD OF 5 MINUTES
(ADJUSTABLE). WHEN THE CHILLED WATER SYSTEM IS ENABLED, THE FOLLOWING SHALL
OCCUR:
1. THE MINIMUM CHILLER FLOW CONTROL VALVE SHALL BE 100% CLOSED. THE LEAD
CHILLER ISOLATION VALVE SHALL OPEN. THE LEAD CHILLED WATER PUMP SHALL BE
STARTED AND SHALL OPERATE AT ITS MINIMUM SPEED.
2. THE LEAD CHILLED WATER PUMP SPEED SHALL BE MODULATED TO MAINTAIN THE
CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE SET-POINT (ADJUSTABLE).
3. THE LEAD CHILLER WILL BE ENERGIZED WHEN FLOW IS PROVEN BY ITS INTEGRAL
FLOW SWITCH.
H. THE BAS SHALL PROVIDE A CHILLED WATER SUPPLY TEMPERATURE SET-POINT OUTPUT
TO EACH CHILLER CONTROL PANEL. THE CHILLED WATER SUPPLY TEMPERATURE RESET
SCHEDULE SHALL BE FULLY ADJUSTABLE AT THE OPERATOR’S INTERFACE. THE BASE SHALL
RESET THE CHILLED WATER SUPPLY TEMPERATURE SET-POINT AS FOLLOWS:
C. WHEN THE CHILLER EVAPORATOR PRESSURE DROP FALLS BELOW THE MINIMUM FLOW
SET-POINT (BAS CONTRACTOR SHALL OBTAIN SET-POINT FROM THE CHILLER MANUFACTURER),
THE CHILLER MINIMUM FLOW CONTROL VALVE SHALL MODULATE OPEN. WHEN THE CHILLER
EVAPORATOR PRESSURE DROP RISES ABOVE THE MINIMUM FLOW SET-POINT, THE CHILLER
MINIMUM FLOW CONTROL VALVE SHALL MODULATE CLOSED.
D. THE LAG CHILLER SHALL BE ENABLED WHEN THE LEAD CHILLER EVAPORATOR PRESSURE
DROP EXCEEDS 105% (ADJUSTABLE) OF THE EVAPORATOR DESIGN FLOW PRESSURE DROP
(THE BAS CONTRACTOR SHALL OBTAIN THE DESIGN FLOW PRESSURE DROP FROM THE
CHILLER MANUFACTURER) FOR A PERIOD OF 10 MINUTES (ADJUSTABLE). WHEN THE LAG
CHILLER IS ENABLED, THE FOLLOWING SHALL OCCUR:
1. THE LAG CHILLER ISOLATION VALVE SHALL OPEN.
2. THE LAG CHILLER WILL BE ENERGIZED WHEN FLOW IS PROVEN BY ITS INTEGRAL
FLOW SWITCH.
E. THE BAS SHALL MONITOR THE PRESSURE DROP ACROSS EACH CHILLER EVAPORATOR.
WHEN THE LOWEST EVAPORATOR PRESSURE DROP FALLS BELOW THE MINIMUM EVAPORATOR
PRESSURE DROP SET-POINT (BAS CONTRACTOR SHALL OBTAIN SET-POINT FROM THE CHILLER
MANUFACTURER), THE CHILLER MINIMUM FLOW CONTROL VALVE SHALL MODULATE OPEN.
WHEN THE LOWEST CHILLER EVAPORATOR PRESSURE DROP RISES ABOVE THE MINIMUM
EVAPORATOR PRESSURE DROP SET-POINT, THE CHILLER MINIMUM FLOW CONTROL VALVE
SHALL MODULATE CLOSED.
F. THE LAG CHILLER SHALL BE DISABLED WHEN THE LOWEST EVAPORATOR PRESSURE
DROP FALLS BELOW THE MINIMUM EVAPORATOR PRESSURE DROP SET-POINT FOR A PERIOD
OF 10 MINUTES (ADJUSTIVE) OR THE CHILLER MINIMUM FLOW CONTROL VALVE IS OPEN
GREATER THAN 15% (ADJUSTABLE) FOR A PERIOD OF 10 MINUTES (ADJUSTABLE). WHEN THE
LAG CHILLER IS DISABLED, THE FOLLOWING SHALL OCCUR:
1. THE LAG CHILLER SHALL BE DE-ENERGIZED.
2. THE LEAD CHILLED WATER PUMP SHALL BE DE-ENERGIZED.
3. THE LAG CHILLER ISOLATION VALVE SHALL CLOSE.
G. THE LEAD CHILLER SHALL BE DISABLED WHEN ALL COOLING COIL CONTROL VALVES ARE
COMMANDED 100% CLOSED FOR A PERIOD OF 10 MINUTES (ADJUSTABLE). WHEN THE LEAD
CHILLER IS DISABLED, THE FOLLOWING SHALL OCCUR:
1. THE LEAD CHILLER SHALL BE DE-ENERGIZED.
2. THE LEAD CHILLER ISOLATION VALVE SHALL CLOSE.
CHWR TEMP
(°F)
CHWS SET-
POINT (°F)
AO
DPT
AI
INSTALL 2/3
DOWNSTREAM IN
CRITICAL ZONE
DO DO
PDS
DI
M
DO
IN A LEAD/ LAG/ STANDBY ARRANGEMENT.
AIR COOLED CHILLERS.
2 1/2" CHWR
2 1/2" CHWR
EX CHILLED WTR. PUMP
NO SCALE
M-405
B2
AIR COOLED CHILLERS
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
WPL REP DLH WPL
M-407
HVAC CONTROLS &
SCHEMATICS
No Scale
VIBRATION ISOLATOR (TYP.)
HEAT PUMP
SA DUCT
P-TRAP CONDENSATE DRAIN
FLEXIBLE CONNECTION (TYP.)
HANGER ROD SECURED
TO STRUCTURE (TYP.)
AUXILIARY CONDENSATE DRAIN
PAN BELOW UNIT COIL SECTION
RS & RL TO
CONDENSING UNIT
MANUAL VOLUME
DAMPER
RETURN REGISTER WHEN
MOTORIZED OUTSIDE AIR
DAMPER WHEN SHOWN
OA DUCT
CLEAN-OUT
TEE
BOILER
FLOOR
5" CONCRETE PAD
CONDENSATE
NEUTRALIZATION KIT
EXTEND CONDENSATE DRAIN
TO NEAREST FLOOR DRAIN
TRAP LOOP
DRAIN COVER
INTAKE OPENING. 7'-0"
MINIMUM ABOVE GRADE
TURNED DOWN ELBOW W/
SCREENED INLET
EXTERIOR WALL
ROOF THIMBLE W/
3-1/2" AIR SPACE
ROOF
VENT FLASHING
EXHAUST OUTLET STORM COLLAR
WALLSLEEVE
INTAKE VENT - SCHEDULE 40 PVC PIPE
EXHAUST VENT - UL 1738, AL 29-4C OR
316LSS CATEGORY II / IV APPLIANCE VENT
SUPPORT AND CURB
SILICONE CAULK BETWEEN
FLASHING BY GEN. CONTRACTOR
COUNTER FLASHING BY MECH.
CONTRACTOR
MODEL ES-5 PRE-FAB EQUIPMENT
CURB AS MANUF. BY PATE OR
APPROVED EQUAL
ROOF CONSTRUCTION
FASTEN EQUIPMENT CURB TO ROOF
WITH 3/8" DIAMETER STAINLESS
STEEL HILTI HAS RODS EMBEDDED 3
1/2" INTO CONCRETE TOPPING WITH
HILTI HIT-ICE EPOXY (@ 6" O/C)
14" MIN.
CURB
HEIGHT
BOILER
3/4" HED (TYP.)
SAFETY RELIEF VALVE
HWR
HWS
3/4" HED (TYP.)
INTEGRAL BOILER
CIRCULATOR PUMP
EXTEND TO
FLOOR DRAIN
NOTES:
1. PROVIDE, INSTALL AND WIRE INTEGRAL BOILER PUMPS AS IN
ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
TYPICAL ROOF EQUIPMENT SUPPORT CURB
No Scale
CONDENSING BOILER PIPING DETAIL
No Scale
ADJUSTABLE CLEVIS HANGER
No Scale
CONDENSING BOILER INSTALLATION DETAIL
No Scale
SPLIT SYSTEM HEAT PUMP DETAIL
No Scale
NOTES;
1. THIS DETAIL SHALL BE USED AS A GUIDE. ALL SUPPORTS SHALL MEET THE REQUIREMENTS OF THE SPECIFICATIONS.
2. THE STEEL WELDLESS EYENUT SHALL BE INSTALLED TO PIVOT IN OPPOSITE DIRECTION OF ROLLER.
3. HANGERS THAT UTILIZE A TURNBUCKLE WILL REQUIRE THE INSTALLATION AND USE OF BOTH RIGHT AND LEFT HANDED
THREADS.
4. PIPE SIZE NOT INCLUDED IN THE LOAD SCHEDULE WILL NOT BE PERMISSIBLE.
5. THE THICKNESS OF THE INSERT SHALL BE AS REQUIRED TO FIT THE SUPPORT, BUT NOT LESS THAN THE PIPING SYSTEM
SUPPORTED.
MAX SPACING
7'
9'
11'
12'
14'
16'
17'
ROD SIZE
3/8"Ø
3/8"Ø
1/2"Ø
1/2"Ø
5/8"Ø
5/8"Ø
3/4"Ø
THREADED STEEL ROD (REFER TO
LOAD SCHEDULE)
STEEL TURNBUCKLE MSS SP-69
TYPE 13 (REQUIRED ON PIPING
WITH INSULATION 2" THICK AND
GREATER)
HEX NUT, ASTM A194, GRADE 2H
(TYP.)
ADJUSTABLE CLEVIS HANGER MSS
SP-69 TYPE 43
SERVICE PIPE (REFER TO PLANS
FOR SIZE)
METAL SHIELD MSS SP-69 TYPE 40
HIGH DENSITY THERMAL HANGER
INSERT, MIN 12" LONG (SEE NOTE 5)
PIPE SIZE
"-1
"Ø
"-2"Ø
"Ø
3"Ø
4"Ø
5"Ø
6"Ø
NOTE:
HVAC EQUIPMENT, DUCTWORK AND PIPING
SHALL BE SUPPRTED FROM NEW UNISTRUT
FRAME SYSTEM. REFER TO STRUCTURAL
DWG S-207 "TYPICAL DETAIL MEP AND
PARTITION WALL HEAD UNISTRUT
FRAME SUPPORT" AND COORDINATION
NOTE "9" ON DWGS S-100 THROUGH S-107.
AC-310-2 & AC-310-3 EQUIPMENT SUPPORT
No Scale
#10 SCREWS
2' ON CENTER
GASKET
14 GAGE S.M. ANGLE, 6" HIGH x 6"
LONG x ENTIRE LENGTH AND WIDTH
OF ROOF CURB. ATTACH WITH HILTI
- SIZE #12 HWH-24-7/8" LONG
WITH #4 POINT AT 4" O.C.
PROVIDE CANT STRIP AND
RIGID INSULATION (6 PCF)
BLOCKING AS REQUIRED
ROOF DECK AND INSULATION TO BE
CONTINUOUS UNDER UNIT EXCEPT
FOR DUCT OPENING. PROVIDE NEW
6 LB PCF RIGID INSULATION ON
ENTIRE INSIDE OF CURB
3x3x1/4 ANGLE FRAME
UNDER RTU ROOF CURB
BAR JOIST
ROOF INSULATION
NEW ROOFING AT CURB
26 GA. COUNTER FLASHING
NAILER STRIP AND ROOF SUPPORT
FURNISHED WITH ROOF TOP UNIT
SEISMIC RESTRAINT CLIP,
CAMBRIDGEPORT OR EQUAL
ROOF TOP UNIT
NOTE: FIELD MODIFY ROOF CURB IF REQUIRED TO PROVIDE A LEVEL CURB FOR UNIT.
4'
#10 SCREWS
2' ON CENTER
TRANSITION TO DUCT
DIMENSIONS INDICATED
ON FLOOR PLANS
ON FLOOR PLANS
SHOWN ON FLOOR PLANS
CONNECT TO EXISTING
CONDENSATE DRAIN PIPING
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
WPL REP DLH WPL
M-501
HVAC DETAILS
TRANSITION
EQUAL
X
X
X
R =(X+Y)/2
R
Y
X
R
R =X+Y
X
X Y
X
TRANSITIONEQUAL
PROVIDE DOUBLE THICKNESS VANES PER SMACNA DUCT CONSTRUCTION STANDARDS.
VANE REQUIREMENTS FOR TRANSITION ELBOWS VARY FROM EQUAL ELBOWS. VANES
SHALL BE UTILIZED IN ALL MITERED ELLS 45° AND GREATER.
M A
I N
D
U C
T
W
ECCENTRIC TRANSITION
MAX = 30°
(EXCEPT 45° IS PERMITTED AT
ROUND TO FLAT OVAL)
CONCENTRIC TRANSITION MAX = 45°
DIVERGING, 60° CONVERGING
AIR FLOW
BRANCH DUCT
OR RUNOUT
MANUAL DAMPER
L = 1/4 W
MINIMUM 4"
45º
X
EQUAL
X
X
X
TRANSITION
Y
Y
Y
Y
20° MAX.
20° MAX.
X
X
Y
Y
X Y
W
1 1
X = W *
X
X+Y
Y = W *
X+Y
Y
X
Y
W
X+Y
Y = W *
X+Y
Y
X = W *
X
TRANSITION
EQUAL
TYPICAL 90 DEGREE RECTANGULAR TEES
No Scale
TYPICAL ELBOWS
SEE DETAIL
MANUAL VOLUME
DAMPER (TYP.)
TYPICAL ELBOWS
SEE DETAIL
MANUAL VOLUME
DAMPER (TYP.)
MANUAL VOLUME
DAMPER (TYP.)
TYPICAL ELBOWS
SEE DETAIL
MANUAL VOLUME
DAMPER (TYP.)
TYPICAL ELBOWS
SEE DETAIL
LOW VELOCITY BRANCH DUCT, ELBOWS & TRANSITIONS DETAIL
No Scale
GAS METER DETAIL
No Scale
M
GAS METER
EX MAIN SERVICE
METER AND PRV
EX GAS LINE
CONDENSER/ CONDENSING UNIT CONCRETE PAD DETAIL
No Scale
BELOW GRADE WATER METER DETAIL
No Scale
M
WATER METER
SECTION VIEW
ALUMINUM BOTTOM
M
PLAN VIEW
NOTES:
1. VALVE BOX SHALL BE MUELLER EZ SETTER OR EQUAL.
2. METER AND COMMUNICATION CABLE SHALL BE INSTALLED IN
ACCORDANCE WITH THE METER MFR'S WRITTEN INSTRUCTIONS.
3. PROVIDE UNDERGROUND CABLE PULL BOXERS AS REQUIRED.
4. REMOVE EXISTING BELOW GRADE WATER PIPING AS REQUIRED TO
INSTALL VALVE BOX.
COMMUNICATION
CABLE IN PVC
ELECTRICAL CONDUIT
FULL SIZE
BY-PASS
18" DIA
VALVE BOX
18" DIA CAST IRON LID W/
RECESSED TR
18" DIA VALVE
BOX
GRADE
18" DIA INSULATION
PAD BY MFR.
EX WATER PIPING
TO BUILDING
BY-PASS VALVE
NOTES:
1. REMOVE GAS PIPING AS REQUIRED TO INSTALL
GAS METER AND BY-PASS VALVE.
EQUIPMENT PAD
REINFORCING SCHEDULE
2"
2'-0"
(1)-#4 CONT. AT PERIMETER
W/ (1)-#4 x 4'-0" AT EXTERIOR
CORNERS AND (1)-#4 x 4'-0"
DIAGONAL AT INTERIOR
CORNERS.
TOP REINFORCEMENT
SEE SCHEDULE.
BOT.REINFORCEMENT
WHERE SCHEDULED
3/4" CHAMFER (TYP.)
t
4" 6"x 6",W2.9 x W2.9 NONE
BOTTOM
REINF.
TOP REINF.
PAD
THICKNESS
t
C L
E A
R
C O
V E
R
4"
DIMENSIONS SHALL EXTEND 4"
BEYOND EQUIPMENT ON ALL SIDES
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
WPL REP DLH WPL
M-502
HVAC DETAILS
PLAN
MARK
AC-157 - 1
AC-200-1
AC-200-2
AC-200-3
AC-258-1
AC-258-2
NA
AC-310-1
AC-310-2
AC-310-3
AC-958-1
AC-958-2
AC-1060-1
AC-1147-1
AC-1163-1
AC-1163-2
AC UNIT SCHEDULE
INDOOR UNIT OUTDOOR UNIT SUPPLY AIR FAN DATA
MIN OA
(CFM)
DX COIL CLG. COIL DATA
DX COIL HTG. DATA
(HEAT PUMP)
PLAN
MARK TYPE
BASIS OF DESIGN
MFR/MODEL NO.
PLAN
MARK TYPE
BASIS OF DESIGN
MFR/MODEL NO.
TOTAL SA
(CFM)
ESP
(IN. WC) RPM
MOTOR TOTAL CAP.
(MBH)
SENS. CAP.
(MBH)
EAT
(DEG F) CAPACITY
(MBH)
EAT
(DEG F)
BHP HP FLA V/PH/HZ DB WB
AC-157 - 1 NA NA NA ROOFTOP AC W/ ELEC HEAT CARRIER 50VG-A24 600 0.5 208/1/60 50 22.0 15.0 80.0 67.0 NA NA AC-200-1 MINI-SPLIT WALL CARRIER 40MHHQ CU-200-1 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 38MHR 530 0.4 208/1/60 0 18.0 --- 78.0 63.0 10.2 68.0 AC-200-2 MINI-SPLIT WALL CARRIER 40MHHQ CU-200-2 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 38MHR 530 0.4 208/1/60 0 18.0 --- 78.0 63.0 10.2 68.0
AC-200-3
HORIZONTAL AHU W/DX COIL,
MIXING BOX & FLAT FILTER
SECTION (MERV 13)
CARRIER 39S 05 CU-200-3 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 25VNA860 2000 1.5 208/1/60 0 55.0 41.0 78.0 63.0 55.0 68.0
AC-258-1 FLR MTD COMPUTER ROOM
AC UNIT - COOLING ONLY LIEBERT PX018 CU-258-1 AIR COOLED CONDENSING UNIT LIEBERT MC028 2800 4.2 208/3/60 0 63.0 59.4 75.0 61.0 NA NA
AC-258-2
CEILING MTD COMPUTER ROOM
AC UNIT W/ ELEC. HEAT LIEBERT MMD36E CU-258-2 AIR COOLED CONDENSING UNIT LIEBERT PFH037 1250 0.5 208/3/60 0 32.0 28.0 75.0 61.0 NA NA
NA NA NA AC-279-1 OUTDOOR WALL TYPE BARD W24 800 0.30 0.17 1.1 208/1/60 0 20.9 17.6 75.0 62.0 NA NA AC-310-1 MINI-SPLIT WALL CARRIER 40MHHQ CU-310-1 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 38MHR 590 0.45 48 VDC 0 24.0 --- 78.0 63.0 25.0 68.0 AC-310-2 NA NA NA ROOFTOP HEAT PUMP W/ELEC HEAT CARRIER 50VT-C48 1670 1 208/3/60 200 48.0 34.0 80.0 67.0 46.0 64.0 AC-310-3 NA NA NA ROOFTOP HEAT PUMP W/ELEC HEAT CARRIER 50VT-C48 1670 1 208/3/60 200 48.0 34.0 80.0 67.0 46.0 64.0
AC-958-1 VERT. FURNACE/BLOWER
W/DUCT MTD DX COIL
CARRIER
59SP/CNPVP CU-958-1 AIR COOLED CONDENSING UNIT/COOLING ONLY CARRIER 24 AHA460 2400 1.45 115/1/60 0 56.8 44.8 80.0 67.0 NA NA
AC-958-2 HORIZ.FURNACE/BLOWER
W/DUCT MTD DX COIL CARRIER 59SP/CSPH CU-958-2 AIR COOLED CONDENSING UNIT/COOLING ONLY CARRIER 24AHA 675 0.50 115/1/60 0 18.0 14.0 80.0 67.0 NA NA
AC-1060-1 VERT.FURNACE/BLOWER
W/DUCT MTD DX COIL CARRIER 59TP/CNPV CU-1060-1 AIR COOLED CONDENSING UNIT/COOLING ONLY CARRIER 24AHA 675 0.50 115/1/60 0 18.0 14.0 80.0 67.0 NA NA
AC-1147-1 AHU HP CARRIER 40RUQ CU-1147-1 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 38AUQ 2400 2.60 460/3/60 485 74.0 62.0 80.0 67.0 63.0 68.0
AC-1163-1 AHU HP CARRIER FE4AN CU-1163-1 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 25VN 1850 0.75 208/1/60 0 56.0 39.0 78.0 63.0 55.1 68.0 AC-1163-2 AHU HP CARRIER FE4AN CU-1163-1 AIR COOLED CONDENSING UNIT/HEAT PUMP CARRIER 25VN 1850 0.75 208/1/60 0 56.0 39.0 78.0 63.0 55.1 68.0
ELEC. HTG. COIL DATA GAS FURNACE DATA COMPRESSOR
DATA COND.
FAN
TOTAL
FLA
INDOOR UNIT ELECTRICAL OUTDOOR UNIT ELECTRICAL MIN. AHRI EFF.
NOTES
V/PH/HZ MCA
MOCP
(AMPS) V/PH/HZ MCA
MOCP
(AMPS) COOLING HEATING
CAP.
(MBH)
EAT
(DEG F) KW
CAP.
(MBH)
EAT
(DEG F)
MAX
INPUT
(MBH)
RLA LRA
13.0 64.0 3.8 NA NA NA 11.7 58.3 0.7 NA NA NA 208/1/60 27.8 30 15.0 SEER NA (8)
NA NA NA NA NA NA 7.0 --- --- --- --- --- 208/1/60 11.0 15 16.0 SEER 9.0 HSPF (1) (4)(8)
NA NA NA NA NA NA 7.0 --- --- --- --- --- 208/1/60 11.0 15 16.0 SEER 9.0 HSPF (1) (4)(8)
--- --- --- NA NA NA 31.3 --- 1.4 208/1/60 --- --- 208/1/60 40.8 60 17.0 SEER 9.0 HSPF (2) (3) (4)(8)
NA NA NA NA NA NA --- --- --- 208/3/60 37.6 60 208/3/60 3.8 15 --- --- (2) (5)(8)(9)(10)
19.1 68.0 5.6 NA NA NA --- --- --- 208/3/60 24.5 25 208/3/60 16.4 25 --- --- (4)(8)(9)(10)
12.8 68.0 3.75 NA NA NA 6.9 64.0 --- NA NA NA 208/1/60 30.0 30 10.0 SEER (8)(12)
NA NA NA NA NA NA 11.0 --- --- 208/1/60 --- --- 208/1/60 16.0 25 16.8 SEER 9.0 HSPF (1) (4)(8)
38.5 64.0 11.3 NA NA NA 13.7 83.1 1.0 NA NA NA 208/3/60 64.8 70 14.0 SEER NA (8)
38.5 64.0 11.3 NA NA NA 13.7 83.1 1.0 NA NA NA 208/3/60 64.8 70 14.0 SEER NA (8)
NA NA NA 117.0 64.0 120.0 23.7 152.5 1.5 115/1/60 11.9 20 208/1/60 31.1 50 14.0 SEER --- (2) (4)(8)(11)
NA NA NA 25.0 64.0 26.0 9.0 56.3 0.5 115/1/60 5.1 15 208/1/60 11.8 20 15.5 SEER NA (2) (4)(8)(11)
NA NA NA 39.0 68.0 40.0 9.0 56.3 0.5 115/1/60 7.5 15 208/1/60 11.8 20 15.0 SEER NA (2) (4)(8)(11)
15.7 89.7 5 NA NA NA 8.2 66.0 --- 460/3/60 10.8 15 460/3/60 14.0 20 12.6 IEER
11 EER
3.3 COP@47
DEG F (2) (4)(8)
NA NA NA NA NA NA 27.0 42.0 2.9 208/1/60 8.5 15 208/1/60 36.6 50 18 SEER 12.0 HSPF (2) (4)(8)(11)
NA NA NA NA NA NA 27.0 42.0 2.9 208/1/60 8.5 15 208/1/60 36.6 50 18 SEER 12.0 HSPF (2) (4)(8)(11)
PLAN
MARK
NA
CU-200-1
CU-200-2
CU-200-3
CU-258-1
CU-258-2
AC-279-1
CU-310-1
NA
NA
CU-958-1
CU-958-2
CU-1060-1
CU-1147-1
CU-1163-1
CU-1163-1
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
WPL REP DLH WPL
HVAC SCHEDULES
No Scale
M-641
NOTES:
1. SINGLE CIRCUIT SIZED FOR OUTDOOR UNIT SERVES INDOOR AND OUTDOOR UNIT.
2. SEPARATE CIRCUITS SERVE INDOOR AND OUTDOOR UNIT.
3. 450 FPM MAXIMUM DX COIL FACE VELOCITY.
4. SPLIT SYSTEM WITH AIR COOLED OUTDOOR CONDENSING UNIT
5. SELF CONTAINED INDOOR UNIT WITH OUTDOOR AIR COOLED CONDENSER
6. COOLING CAPACITY BASED ON 95 DEG F OUTDOOR AIR TEMPERATURE.
7. HEAT PUMP HEATING CAPACITY BASED ON 17 DEG F OUTDOOR AIR TEMPERATURE.
8. PROVIDE MANUFACTURER'S PROGRAMMABLE THERMOSTAT.
AC UNIT SCHEDULE (CONT.)
INDOOR UNITOUTDOOR UNIT
9. PROVIDE MANUFACTURER'S EQUIPMENT CONTROLLER WITH INTEGRAL BACNET IP COMMUNICATIONS GATEWAY.
10. PROVIDE LOW AMBIENT CONDENSER/ CONDENSING UNIT CONTROL DOWN TO 20 DEG F OUTDOOR AMBIENT.
11. PROVIDE LOW AMBIENT CONDENSING UNIT CONTROL DOWN TO 20 DEG F OUTDOOR AMBIENT.
12. PROVIDE CONDENSER FAN FACTORY INSTALLED LOW AMBIENT FAN CYCLING KIT.
GENERAL NOTES:
1. EXCEPT FOR COMPUTER ROOM AC UNITS, ACCEPTABLE AC UNIT MANUFACTURERS ARE
2. ACCEPTABLE COMPUTER ROOM AC UNITS ARE LIEBERT, DATAAIR, AND APC. NO OTHER
CARRIER, TRANE, AND YORK. NO OTHER MANUFACTURERS ARE ALLOWED.
MANUFACTURERS ARE ALLOWED.
AIR COOLED CHILLER SCHEDULE
PLAN
MARK SERVICE LOCATION
CAPACITY CHILLED WATER DATA
FOULING
FACTOR
REFRIGERANT CAPACITY CONTROL
MAX. SOUND
POWER (dBA)
ELEC. DATA BASIS OF DESIGN
NET
OUTPUT
(TONS)
MAX.
INPUT
(KW)
OUTDOOR
AMBIENT
TEMP.
(ْF)
EWT
(ْF)
LWT
(ْF) GPM
MAX. PD
(FT. WC.)
DESIGN
PRESS.
(PSIG)
MIN.
FLOW
(GPM) TYPE
APPROX.
CHARGE (LBS) STEPS
MINIMUM
CAPACITY (%) MCA MOCP ICF V/PH/HZ MFR MODEL NO.
CH-878-1 FAC#878 CHILLER YARD 19 21.8 95 55 45 45.6 12.5 23 0.0001 R-410A 3 23.7 88 46.1 60 148.7 460/3/60 CARRIER 30RAP020 CH-878-2 FAC#878 CHILLER YARD 19 21.8 95 55 45 45.6 12.5 23 0.0001 R-410A 3 23.7 88 46.1 60 148.7 460/3/60 CARRIER 30RAP020
BOILER SCHEDULE
PLAN
MARK SERVICE LOCATION
CAPACITY HOT WATER DATA CAPACITY CONTROL ELEC. DATA CONNECTION SIZES (INCH) BASIS OF DESIGN
INPUT
(MBH)
OUTPUT
(MBH)
MIN.
THERMAL
EFFICIENCY
EWT
(ْF)
LWT
(ْF) GPM
MAX. PD
(FT. WC.)
DESIGN
PRESS.
(PSIG)
MIN.
FLOW
(GPM) TYPE
MIN. TURN
DOWN FLA MCA V/PH/HZ GAS WATER
FLUE
INLET
FLUE
OUTLET MFR MODEL NO.
B-157-1 FAC#157
GROUND LEVEL
MECHANICAL ROOM 400 351 88 135 160 31 20 150 MODULATING 5:1 2 15 120/1/60 0.75 1.5 4.5 4.5 LAARS NEOTHERM 399 B-984-1 FAC#984 BOILER ROOM #187 1,000 880 88 135 160 70 5 160 MODULATING 5:1 10 20 120/1/60 1 2 6 6 FULTON EDR-750 B-984-2 FAC#984 BOILER ROOM #187 1,000 880 88 135 160 70 5 160 MODULATING 5:1 10 20 120/1/60 1 2 6 6 EDR-750
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
WPL REP DLH WPL
M-642
HVAC SCHEDULES
No Scale
NOTES:
1. PROVIDE INTEGRAL BACNET COMMUNICATION GATEWAY IN CHILLER CONTROLLER.
2. PROVIDE HOT GAS BY-PASS
3. PROVIDE LOW AMBIENT CONTROLS DOWN TO -20 ْF
NOTES:
1. PROVIDE INTEGRAL BACNET COMMUNICATION GATEWAY IN BOILER CONTROLLER.
2. PROVIDE GAS FLUE CONDENSATE PH NUETRALIZATION KIT.
3. PROVIDE FLUE INLET AND OUTLET ADAPTERS AS REQUIRED.
4. THERMAL EFFICIENCY SCHEDULES IS BASED ON SCHEDULED HOT WATER DATA.
UNIT
NO.
LOCATION SERVICE
SYSTEM
MAX.
TEMP (°F)
MAX.
WORKING
PRESSURE
(PSIG)
MIN. TANK
ACCEPTANCE
VOLUME
(GAL)
TANK AIR
CHARGE
(PSIG)
MANUFACTURER
/MODEL NUMBER
NOTES
NOTES:
1. SHALL BE ASME STAMPED FOR SCHEDULED MAX. WORKING PRESSURE.
2. SHALL BE VERTICAL FREE STANDING TYPE WITH HEAVY DUTY REPLACEABLE BLADDER
TANK
DIMENSION
(IN.)
EXPANSION TANK SCHEDULE
LOCATIONTAG
OPERATING
WEIGHT
(POUNDS)
NOTES
BASIS OF DESIGN
MFR. / MODEL NO.
SERVICE
FLOW
RATE
(GPM)
PUMP DATA
TOTAL
HEAD
(FT W.C.)
BHP
MOTOR DATA
HP
STARTER TYPE
(VFD OR MOTOR
STARTER)
ELECTRICAL
SERVICE
(V / PH / HZ)
MIN.
EFF. (%)
PUMP
SPEED
(RPM)
PUMP
TYPE
WATER
TEMP
(B)
(°F)
IMPELLER
SIZE
(INCHES)
NOTES:
STARTER
FURNISHED
BY
PUMP SCHEDULE
HWP-157-1 FAC#157 B-157-1 IN-LINE 30 50 0.64 57.3 3331 3.75 150 1.5 MOTOR STARTER DIV. 26 208/1/60 X BELL & GOSSETT/E-90 1.25 AAB X
ET-157-1 FAC#157 B-157-1 150 125 2.4 12 12" DIA. x 20" H. BELL & GOSSETT/D-15V 1, 2
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
ELECTRICAL SYMBOL LEGEND
JUNCTION BOX
A-1,3,5
HOMERUN TO PANEL "A", 1, 3, 5 ARE CIRCUIT NUMBERS. PROVIDE A NEUTRAL
CONDUIT RUN CONCEALED IN A CEILING OR WALL
DISCONNECT SWITCH 3P = No. OF POLES, 30 = SWITCH RATING SIZE
AND * = FUSED PER MANUFACTURER'S RECOMMENDATIONS
3P
ABOVE FINISH FLOOR
AIR CONDITIONINGA/C
A.F.F.
CONDUITC., COND.
CKT. CIRCUIT
CONT. CONTROLLER
DISC. DISCONNECT
E, EXIST. EXISTING
EQUIP. EQUIPMENT
E.C. EMPTY CONDUIT
F/N FULL NEUTRAL
GND., G. GROUND
LTG. LIGHTING
MCB MAIN CIRCUIT BREAKER
MLO MAIN LUGS ONLY
N.E.C.
Ø, PH
NATIONAL ELECTRICAL CODE
PHASE
N.T.S. NOT TO SCALE
SW. SWITCH
TYPICAL
MACH. MACHINE
VOLT
UNLESS OTHERWISE NOTED
WIRE
CONDUIT RUN EXPOSED
MOTOR
TYP.
V
U.O.N.
W
CONDUIT RUN CONCEALED IN A SLAB OR UNDERGROUND
CONDUCTOR PER CIRCUIT. INSTALL A GROUND WIRE SIZED AS PER N.E.C. ART. 250
IN ALL CONDUIT RUNS.
FLEXIBLE CONDUIT
COMBINATION MAGNETIC STARTER AND MOTOR CIRCUIT PROTECTOR (MCP)
ELECTRICAL ABBREVIATIONS
1. PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THE JOB SITE AND
SHALL FAMILIARIZE HIMSELF WITH ALL THE CONDITIONS AFFECTING THE REMOVAL
OF THE EXISTING ELECTRICAL EQUIPMENT AND DEVICES AND SHALL MAKE
PROVISIONS AS TO THE COST THEREOF. FAILURE TO COMPLY WITH THE INTENT
OF THIS REQUIREMENT WILL IN NO WAY RELIEVE THE CONTRACTOR OF
PERFORMING ALL NECESSARY WORK FOR THE REMOVAL OF ALL ELECTRICAL
EQUIPMENT.
2. PERFORM ALL WORK IN A MANNER THAT WILL NOT DAMAGE PARTS OF THE
STRUCTURE NOT INTENDED TO BE REMOVED. IF IN THE OPINION OF THE OWNER’S
REPRESENTATIVE, THE METHOD USED ON THE DEMOLITION MAY ENDANGER OR
DAMAGE PARTS OF THE STRUCTURE OR AFFECT THE SATISFACTORY OPERATION
OF THE FACILITY, PROMPTLY CHANGE THE METHOD OF DEMOLITION WHEN SO
DIRECTED BY THE OWNERS’ REPRESENTATIVE.
3. ALL OF THE EXISTING ELECTRICAL EQUIPMENT ASSOCIATED WITH THE REMOVAL
OF THE HVAC SYSTEM SHALL BE REMOVED UNLESS OTHERWISE INDICATED. NOT
ALL OF THE EQUIPMENT AND DEVICES TO BE REMOVED ARE SHOWN. ONLY MAJOR
ELECTRICAL EQUIPMENT TO BE REMOVED IS SHOWN. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO VISIT THE JOB SITE TO BECOME FAMILIAR WITH THE
ELECTRICAL ITEMS AND EQUIPMENT TO BE REMOVED, NO ADDITIONAL COST WILL
BE PAID TO THE CONTRACTOR FOR THE FAILURE OF THE CONTRACTOR TO VISIT
THE JOB SITE.
4. UNLESS OTHERWISE INDICATED TO REMAIN, REMOVE ALL OF THE EXISTING
ELECTRICAL EQUIPMENT, MOUNTING HARDWARE AND ASSOCIATED CONDUCTORS
BACK TO THE POWER SOURCE; STARTERS; SAFETY SWITCHES AND ASSOCIATED
HANGERS. CONDUIT IS TO REMAIN WITH A NEW PULL LINE WHERE INDICATED.
5. ELECTRICAL EQUIPMENT INSIDE THE EXISTING ELECTRICAL ROOM SHALL REMAIN.
REVISE PANEL DIRECTORY.
6. DISCONNECT ALL ELECTRICAL SERVICES PRIOR TO THE REMOVAL OF ELECTRICAL
EQUIPMENT AND APPURTENANCES.
7. CONTRACTOR SHALL DISPOSE OF ALL REMOVED ELECTRICAL MATERIAL AND
EQUIPMENT IN A SAFE MANNER IN ACCORDANCE WITH LOCAL AND FEDERAL LAWS
AND REQUIREMENTS AT THEIR OWN EXPENSE.
8. SAFETY SWITCHES, PANELBOARDS AND BRANCH CIRCUIT NUMBER INFORMATION
SHOWN ON THESE DRAWINGS IS BASED ON RECORD DRAWINGS. THE ENGINEER
DOES NOT WARRANT OR GUARANTEE THE SUFFICIENCY, ACCURACY,
COMPLETENESS OR THOROUGHNESS OF THESE RECORD DRAWINGS.
CONTRACTOR SHALL VERIFY IN THE FIELD .
GENERAL DEMOLITION ELECTRICAL NOTES ELECTRICAL GENERAL NOTES
1. PRIOR TO BID, VISIT JOB SITE AND BECOME FAMILIAR WITH THE EXISTING
CONDITIONS. SPECIAL ATTENTION SHALL BE GIVEN TO CONDITIONS OF PANELS
AND SWITCHING EQUIPMENT WHERE NEW WORK IS REQUIRED. MODIFY EXISTING
PANELS AND EQUIPMENT BY THE ADDITION OF CIRCUIT BREAKERS, WIRING, ETC.
AS REQUIRED IN ORDER TO PROVIDE A COMPLETE AND OPERATING SYSTEM. NO
EXTRA COMPENSATION WILL BE ALLOWED FOR FAILURE TO COMPLY WITH THIS
REQUIREMENT.
2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT ADOPTED EDITION
OF THE NATIONAL ELECTRICAL CODE (N.E.C.), AND GOVERNING MUNICIPAL, STATE
OF THE LOCAL CODES, ALL WORK SHALL BE PERFORMED IN A THOROUGH AND
WORKMAN LIKE MANNER BY COMPETENT PERSONAEL.
3. CONTRACTOR SHALL GUARANTEE THE ENTIRE ELECTRICAL WORK, INCLUDING
PARTS AND LABOR FOR A PERIOD OF ONE (1) YEAR AFTER FINAL WRITTEN
ACCEPTANCE BY OWNER.
4. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A
FIRST CLASS MANNER AND SHALL BE COMPLETED AND FULLY OPERATIONAL TO
THE ACCEPTANCE OF OWNER.
5. MAINTAIN A COMPLETE SET OF ELECTRICAL PRINTS FOR INDICATING ALL CHANGES.
USE COLORED PENCILS TO MARK CHANGES AT THE TIME OF EXECUTION AND
DELIVER THE SET TO ARCHITECT / ENGINEER UPON COMPLETION.
6. ALL MATERIALS SHALL BE NEW, OF AMERICAN MANUFACTURE, AND BEAR THE
UNDERWRITER’S LABORATORY AND UNION LABELS AS APPLICABLE. IT IS THE
CONTRACTOR’S RESPONSIBILITY TO COORDINATE DELIVERY SCHEDULES OF
MATERIALS.
7. CIRCUIT BREAKERS SHALL BE MOLDED CASE, BOLT-ON TYPE, OF QUICK-MAKE
ACTION, RATED AT 10,000 (120V), 14,000 (277/480V) AIC RMS. SYMMETRICAL. EACH
MOLDED CASE CIRCUIT BREAKER SHALL HAVE THERMAL MAGNETIC TRIP DEVICE.
8. CONTRACTOR SHALL MAKE ALL NECESSARY EXCAVATIONS, CUTTING AND DO ALL
REATTACHING AS NECESSARY FOR THE PROPER EXECUTION OF THIS WORK.
9. AFTER COMPLETION OF THE INSTALLATION, THE SYSTEM SHALL TEST FREE FROM
SHORT CIRCUITS AND GROUNDS.
10. ALL ELECTRICAL CONDUCTORS SHALL BE INSTALLED IN CONDUIT. CONDUITS
SHALL COMPLY WITH N.E.C. PVC CONDUIT SHALL BE SCHEDULE 40 AND SHALL BE
USED WHERE CONDUIT IS RUN IN CONCRETE SLABS, OR UNDERGROUND.
ELECTRICAL METALLIC TUBING CONDUIT WITH COMPRESSION FITTINGS SHALL BE
USED ON ALL INTERIOR ABOVE GROUND WIRING. GRS CONDUIT SHALL BE USED ON
ALL EXTERIOR WIRING.
11. SHOP DRAWINGS AND MANUFACTURER’S LITERATURE: SUBMIT FOR
APPROVAL, PROPERLY IDENTIFIED MANUFACTURER’S LITERATURE GIVING
MATERIALS, FINISHES, ACCESSORIES AND INSTALLATION DIRECTIONS FOR ALL
ELECTRICAL EQUIPMENT.
12. ALL CONDUCTORS SHALL BE COPPER. NO CONDUCTOR SHALL BE SMALLER THAN
No. 12 AWG. INSTALL A GROUNDING CONDUCTOR IN ALL PVC CONDUITS SIZED PER
N.E.C. INSULATION SHALL BE 600V. RATED AND SHALL BE THWN.
13. VERIFY SERVICE VOLTAGE BEFORE ORDERING ANY ELECTRICAL EQUIPMENT.
14. SPLICES FOR No. 6 AWG OR SMALLER SHALL BE MADE WITH UL LISTED
MECHANICAL PRESSURE CONNECTORS. SPLICES FOR No. 4 AWG OR LARGER
SHALL BE MADE WITH MECHANICAL PRESSURE, SOLDERLESS CONNECTORS, AND
SHALL BE BURNDY SERVITS OR APPROVED EQUAL.
15. ANY EXISTING EQUIPMENT OR DEVICES INADVERTENTLY DE-ENERGIZED OR
DISCONNECTED SHALL BE RE-ENERGIZED AT NOT COST TO THE OWNER.
16. EXISTING EQUIPMENT REMOVED SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM SITE.
17. SAFETY SWITCHES SHALL BE HEAVY DUTY, FUSED OR NON-FUSED AND SIZES AS
INDICATED ,NEMA 3R WHEN INSTALLED OUTDOORS.
18. GROUNDING SHALL BE IN ACCORDANCE WITH ARTICLE 250 OF THE N.E.C.
19. EQUIPMENT SUPPLIED BY MECHANICAL CONTRACTOR SHALL BE CONNECTED BY
ELECTRICAL CONTRACTOR.
20. ELECTRICAL CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES.
21. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER
BEFORE PROCEEDING WITH THE WORK.
22. PRIOR TO INSTALLATION OF ROUGH ELECTRICAL WIRING, CHECK NAMEPLATE DATA
ON A/C EQUIPMENT TO OBTAIN CORRECT WIRE SIZES AND OVERCURRENT
PROTECTION.
23. REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF MECHANICAL
EQUIPMENT.
24. CIRCUIT BREAKERS SERVING HVAC EQUIPMENT WITH A REQUIREMENT FOR HACR
BREAKERS, IN THE RANGE OF 15 - 60 AMPS, UL APPROVED HACR BREAKERS SHALL
BE USED.
25. ALL CONDUIT ROUTES SHOWN ARE APPROXIMATE ONLY. CONTRACTOR SHALL
FIELD VERIFY FINAL ROUTE.
26. CONDUIT RUNS SHOWN ARE SCHEMATIC AND DO NOT INDICATE THE NECESSARY
FITTINGS AND JUNCTION BOXES THAT ARE INCLUDED IN THE SCOPE OF THE WORK.
27. CONTRACTOR SHALL PERMANENTLY IDENTIFY ALL WIRING WITH THE SOURCE AND
CIRCUIT AT ALL ELECTRICAL EQUIPMENT, PULL AND JUNCTION BOXES AND
ELECTRICAL TERMINATIONS PROVIDED OR ASSOCIATED WITH THIS
CONSTRUCTION.
28. ALL METAL RACEWAYS, INCLUDING CONDUIT, WIRE TROUGHS, WIREMOLD, ETC.,
SHALL BE GROUNDED. ALL CONNECTIONS IN METAL RACEWAYS SHALL BE
COMPLETED IN SUCH A MANNER AS TO MAINTAIN A CONTINUOUS PATH TO GROUND
THROUGHOUT THE ENTIRE LENGTH OF THE RACEWAY.
29. UNLESS NOTED OTHERWISE ON THE DRAWINGS OR ON THE EQUIPMENT WIRING
SCHEDULE, EACH BRANCH CIRCUIT HOME RUN SHALL BE THREE (3) #12 AWG
THHN/THWN (1 HOT, 1 NEUTRAL & 1 EQUIPMENT GROUND) IN 3/4" EMT CONDUIT.
PROTECT EACH CIRCUIT WITH A 20 AMPERE, 1-POLE OVERCURRENT DEVICE
UNLESS NOTED OTHERWISE. SHARED NEUTRALS ARE NOT PERMITTED.
FEES, PERMITS AND INSPECTIONS
A. CONTRACTOR SHALL PAY FOR ALL PERMITS AND APPLICATION FEES FOR WORK
UNDER THIS CONTRACT. THIS WILL INCLUDE COMPLETING ALL PERMIT
APPLICATIONS FOR THE PURPOSE OF SUBMITTING DOCUMENTS FOR APPROVAL TO
THE AUTHORITIES HAVING JURISDICTION.
B. CONTRACTOR SHALL COMPLETE ALL ADDITIONAL APPLICATIONS NEEDED TO PULL
AND OBTAIN PERMIT FOR WORK UNDER THIS CONTRACT AS REQUIRED BY THE
AUTHORITIES HAVING JURISDICTION. PROCURE AND DELIVER TO THE ENGINEER
ALL CERTIFICATES ISSUED BY THE AUTHORITIES HAVING JURISDICTION.
C. THE CONTRACTOR SHALL PAY FOR ALL PERMIT INSPECTIONS AND ASSOCIATED
REVIEWS FOR WORK UNDER THIS CONTRACT.
SYMBOL DESCRIPTIONSYMBOL DESCRIPTION
PANEL BOARD
SPECIAL PURPOSE OUTLET
ROOF TOP UNITRTU
TRANSFORMERXFMR
MCP MOTOR CIRCUIT PROTECTOR
PROFESSIONAL SEAL
DATE:
SC No.:
NAME OF REGISTERED PROFESSIONAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
BA C D E F G H
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-2
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
2/6/19
21049
JF AR PLT WPL
E-001
ELECTRICAL LEGEND AND
GENERAL NOTES
| M-407 - HVAC CONTROLS & SCHEMATICS |
| M-501 - HVAC DETAILS |
| M-502 - HVAC DETAILS |
| M-641 - HVAC SCHEDULES |
| M-642 - HVAC SCHEDULES |
| E-001 - ELECTRICAL LEGEND AND GENERAL NOTES |
File details come from the government source that posted it.