McEntire_JNGB_Repair_HVAC_-_100__Drawings_Part3.pdf

PDF 3 MB Posted

Attached to
Repair HVAC Base Wide
Solicitation number
W912QG-19-B-5001
Issued by

About this file

Drawings Part 3/9

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPEN OFFICE AREA

VAULT

VAULT

VAULT

INFO ASSURANCE OFFICE

10x16

Ø

12Ø

12Ø

Ø

Ø

Ø

RX THE CRAC

RX CU ON GRADE

RX RS & RL

RX AC PUMPED CONDENSATE

ELEC PANEL BP (208V/120V)

ELEC PANEL Q (208V/120V)

ELEC PANEL "RP" (208V/120V)

RX RS & RL

RX SA DUCT

RX CONCRETE PAD

PROFESSIONAL SEAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-3

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

1/4" = 1'-0"

MD-102

B

BLDG 258 - PART FIRST FLOOR PLAN

WPL REP DLH WPL

MD-102

HVAC DEMOLITION PART PLANS

FAC#258

1/4"=1'-0"

DEMOLITION NOTES:

REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES,

AND GRID FOR ACCESS TO RS & RL PIPING ABOVE CEILING.

EXISTING CRAC UNIT SHALL NOT BE REMOVED UNTIL NEW

CEILING CRAC UNIT IS INSTALLED AND FULLY FUNCTIONING.

REFER TO NEW WORK DRAWINGS.

1.

GENERAL NOTES:

PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB

CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:

· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE

· UNIT RETURN AIR FLOW AND INLET PRESSURE

· UNIT OUTSIDE AIR FLOW

2.

OFFICE

102D

OFFICE

102C

OFFICE

OFFICE

102B

OFFICE

102A

CLASSROOM

MEN

MEN

MECHANICAL

PAINT SHOP

BAY "A1"

BAY "A1"

BAY "B"

RX SA DUCT

RX RTU ON ROOF

RX RA DUCT

RX 18x12 SA

RX RTU ON ROOF

RX 25x12 RA

RX WALL MOUNTED

MINI-SPLIT AC UNIT

RX CU

RX

RS & RL

RX PREFAB PAD

EX CU

PROFESSIONAL SEAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-3

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

WPL REP DLH WPL

MD-103

HVAC DEMOLITION PART PLANS

FAC#310

1/8"=1'-0"

1/8" = 1'-0"

MD-103

A

BLDG 310 - PART PLAN

DEMOLITION NOTES:

REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES,

AND GRID FOR ACCESS TO RS & RL PIPING ABOVE CEILING.

REMOVE ROOF CURB.

DISCONNECT CONDENSATE DRAIN PIPING FROM AC UNIT.

GENERAL NOTES:

PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB

CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:

· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE

· UNIT RETURN AIR FLOW AND INLET PRESSURE

1.

MECHANICAL ROOM 112

CHWR

CHWS

C H

W R

C H

W S

RX AIR COOLED CHILLER

RX AIR COOLED CHILLER

3/4"

1-1/2"

2-1/2"

HWS

HWR

CHWS

CHWR

2-1/2"

B-1 B-2

HWP-1

HWP-2

UH

FCU-1

CHP-1

CHP-2

CHP-3

UH

EX CH-1

EX CH-2

M

EX GAS

METER

EX CONC. PAD

TO REMAIN

EX CONC. PAD

TO REMAIN

PROFESSIONAL SEAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-3

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

1/4" = 1'-0"

MD-104

C

BLDG 878 - PART PLAN

WPL REP DLH WPL

MD-104

HVAC DEMOLITION PART PLANS

FAC#878

1/4"=1'-0"

1.

GENERAL NOTES:

EACH EXISTING CHILLER SHALL BE REPLACED ONE AT A TIME.

THE FIRST CHILLER SHALL BE REMOVED, REPLACED AND FULLY

OPERATIONAL PRIOR TO REMOVAL OF THE SECOND CHILLER. THE

CHILLER REPLACEMENT WORK SHALL BE PERFORMED BETWEEN

NOVEMBER 1 AND FEBRUARY 28.

2. PRIOR TO THE REMOVAL OF THE CHILLERS, THE TAB CONTRACTOR

SHALL MEASURE AND RECORD THE CHILLED WATER SYSTEM

OPERATION AS FOLLOWS:

a. OPERATE EACH CHILLED WATER PUMP (CHP-#) INDIVIDUALLY

WITH CH-1 OPEN TO FLOW AND CH-2 CLOSED TO FLOW. RECORD

PUMP GPM, HEAD AND BRAKE HORSEPOWER. RECORD CHILLER

EVAPORATOR FLOW AND PRESSURE DROP.

b. REPEAT "a" ABOVE WITH CH-1 CLOSED TO FLOW AND CH-2 OPEN

TO FLOW.

c. OPERATE TWO (2) CHILLED WATER PUMPS WITH BOTH CHILLERS

OPEN TO FLOW. RECORD PUMP GPM, HEAD AND BRAKE

HORSEPOWER. RECORD CHILLER EVAPORATOR FLOW AND

PRESSURE DROP. REPEAT FOR ALL COMBINATIONS OF TWO PUMP

OPERATION.

PALLET STORAGE

OFFICE

CORRIDOR

TOOL STORAGE

MECH/ELEC

CONCRETE APRON

x

Ø

10Ø

Ø x x x

Ø

Ø

RX 8Ø

COMBUSTION

AIR MAKE-UP

RX CU ON GRADE

RX GAS

FURNACE

RX 6" FLUE

UP THRU ROOF

RX RS & RL

RX DX

COOLNG COIL

20x18

16x30

20x18RX DUAL FURNACE

RX DX COOLING COIL

RX 24" HIGH RA

PLENUM EXTENDED

UNDER FURNACE

1"

G

RX 3/4" G

DN TO FURNACE

(TYPICAL OF 2)

RX CU LOCATION

TO BE FIELD VERIFIED

6" PVC CONDUIT

UNDERGROUND

RX RS & RL

IN UNDERGROUND

CONDUIT

ELECTRICAL XFMR

MAIN ELECTRICAL

DISTRBUTION PANEL

RX RS & RL

RX 5" DIAMETER

FLUE UP THRU ROOF

3/4" G

RX SA DUCT

EX CONCRETE PAD

EX CONC. PAD

TO REMAIN

MECHANICAL ROOM 187

3"

1-1/2"

2"

2"

4"

CWR

CWS

2"

4"

1"

4'

4"

C W

R

H W

R

1"

3/4"

3/4"

2"

1-1/4"

4"

3"

3"

2-1/2"

3"

1"

3"

2"

2"

3"

2-1/2"

3"

G

HWS

HWR

HWS

2"

C W

S

C W

R

H W

S

MAIN ELEC DISTRIBUTION

PANEL (480V/277V, 800 A MAIN)

DOMESTIC HOT WATER

STORAGE TANK

DOMESTIC

WATER HEATER

AHU

AHU

AHU

AHU

HWP

HWP

CHP

CHP

RX BOILER

RX 14Ø FLUE

UP THRU ROOF

RX

HWR

RX

HWS

RX 2-1/2" G

(TYP. OF 2)

RX

VERTICAL

INLINE PUMP

(TYP. OF 2)

RX BOILER

HWR

EX CONC. PAD TO

REMAIN (TYP. OF 2)

EX BAS CABINET

EX BTU METER

MECHANICAL ROOM

RESTROOM

CONCRETE APRON

6x6

RX AC UNIT

(FURNACE & DX COIL)

RX AC UNIT CU

1/2" G

RX

RS & RL

1" CD DRAIN

12Ø RA

Ø

S

A

RX SA

DUCTWORK

RX RA DUCTWORK

RX

1/2" G

RX 1" CD

PROFESSIONAL SEAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-3

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

WPL REP DLH WPL

MD-105

HVAC DEMOLITION PART PLANS

FAC#958, 984, 1060

1/4"=1'-0"

1/4" = 1'-0"

BLDG 984 - PART PLAN

1/4" = 1'-0"

BLDG 958 - PART PLAN

MD-105

A

MD-105

B

1/4" = 1'-0"

BLDG 1060 - PART PLAN

MD-105

C

REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES, AND GRID FOR ACCESS

TO EQUIPMENT, DUCTWORK AND PIPING ABOVE CEILING.

EX HEATING WATER SYSTEM BTU METER SHALL BE RE-USED. REMOVE, PROTECT

AND STORE BTU METER HWS TEMPERATURE SENSOR, HWR TEMPERATURE SENSOR

AND FLOW METER FOR RE-USE.

DISCONNECT CONDENSATE DRAIN PIPING FROM AC UNIT AHU.

EACH EXISTING BOILER SHALL BE REPLACED ONE AT A TIME. THE FIRST

BOILER SHALL BE REMOVED, REPLACED AND FULLY OPERATIONAL PRIOR

TO REMOVAL OF THE SECOND BOILER. THE BOILER REPLACEMENT WORK

SHALL BE PERFORMED BETWEEN APRIL 1 AND JUNE 30.

1.

GENERAL NOTES:

PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB

CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:

· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE

· UNIT RETURN AIR FLOW AND INLET PRESSURE

· UNIT OUTSIDE AIR FLOW

2.

DEMOLITION NOTES:

MECHANICAL ROOM

RX CONCRETE PAD

RX RS & RL

18x16 x x x

SD

S

ATC PANEL

S

SD

x

18x16

M

10x10

CU-1

DOMESTIC

WATER

HEATER

RX HEAT

PUMP AHU

EX CONCRETE

PAD

RX CONDENSING UNIT

OFFICE 1

CORR

MEN'S TOILET

WOMEN'S TOILET

CLASS "A" VAULT

DIS OPERATIONS

RX AC

UNIT AHU

RX AC

UNIT AHU

6Ø

6Ø

8Ø

8Ø

6Ø

6Ø

Ø

Ø

Ø

Ø

18Ø

24x12

RX RS & RL

RX RS & RL

RX AC UNIT CU

RX AC UNIT CU

CONCRETE PAD

PROFESSIONAL SEAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-3

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

WPL REP DLH WPL

MD-106

HVAC DEMOLITION PART PLANS

FAC#1147, 1163

1/4"=1'-0"

1/4" = 1'-0"

MD-106

A

BLDG 1147 - MECHANICAL ROOM 112

1/4" = 1'-0"

MD-106

B

BLDG 1163 - PART PLAN A

DEMOLITION NOTES:

REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES, AND GRID FOR ACCESS

TO EQUIPMENT, DUCTWORK AND PIPING ABOVE CEILING.

REMOVE WALL AS REQUIRED FOR ACCESS AND REMOVAL OF HVAC ABOVE THE

GYPSUM BOARD CEILING.

REMOVE CONDENSATE DRAIN PIPING.

DISCONNECT CONDENSATE DRAIN PIPING FROM AC UNIT AHU.

GENERAL NOTES:

PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB

CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:

· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE

· UNIT RETURN AIR FLOW AND INLET PRESSURE

1.

LOW ROOF

HIGH ROOF

LOW ROOF

HIGH ROOF

14x14 SA BELOW HIGH

ROOF TO REMAIN

14x14 RA BELOW HIGH

ROOF TO REMAIN

AC-157-1

SHEET METAL

DUCT COVER

14x14 SA ABOVE

LOW ROOF

14x14 RA ABOVE

LOW ROOF

AC-157-1

EQUIPMENT

CURB

EX 14x14 RA

(FIELD VERIFY SIZE)

EX BUILT UP ROOF

W/2" OF INSULATION

MECHANICAL ROOM

STORAGE

MECHANICAL ROOM

STORAGE

MAIN ELECTRICAL

DISTRIBUTION PANEL

CANTEEN ELECTRIC METER

CLUB ELECTRIC METER

AC UNIT

1-1/2" HWS & HWR

GAS METER

ET-157-1

CONCRETE PAD. EXTEND

4" BEYOND EQUIPMENT

OUTLINE ON ALL SIDES

CHEMICAL

FEEDER

3/4" G

B-157-1

1/2" HWS & HWR

HWP-157-1

6Ø FLUE

EMCS GATEWAY IN

CABINET

ELECTRICAL ROOM 113

MAIN ELECTRICAL

DISTRIBUTION

PANEL PP1

MAIN ELECTRICAL

DISTRIBUTION

PANEL PP1

ELECTRIC METER

RS & RL

RA PLENUM - FULL SIZE

OF UNIT RA OPENING

RS & RL TO AC-200-1

CU-200-1

CU-200-2

CU-200-3

AC-200-3

CONCRETE PAD - EXTEND 4" BEYOND

EQUIPMENT ALL SIDES

WORK BAY #2

EX CU

Ø

Ø

Ø

Ø

Ø

Ø

SA PLENUM - FULL SIZE

OF UNIT SA OPENING

3/4" CONDENSATE DRAIN

AC-200-2

RS & RL

EMCS GATEWAY IN CABINET

FEMALE TOILET 107

MALE TOILET 110

MALE VESTIBULE 109

MALE LOCKERS 108

FEMALE LOCKERS 108

FEMALE VESTIBULE 106

FEMALE TOILET 107

MALE TOILET 110

MALE VESTIBULE 109

MALE LOCKERS 108

FEMALE LOCKERS 108

FEMALE VESTIBULE 106

2" DOMESTIC

WATER SERVICE

M

MECHANICAL ROOM 112

GAS METER

1-1/2" G DN

TO OUTDOOR

AC UNIT

2" G TO DOMESTIC

WATER HEATERS

MECHANICAL ROOM 112

2-1/2" G

2-1/2" G

26x46 x

Ø x

2-1/2" G

G

AC-200-1

RS & RL DN

PROFESSIONAL SEAL

I n c h e s

Rev. Date Description By Chk'd App'd

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Drawn Checked Authorized

Client

Original Size

Suitability

Drawing Number Revision www.atkinsglobal.com

Copyright © Atkins Limited (2016)

+1 703 535 3008

+1 703 535 1031

Tel:

Fax:

2318 Mill Road Suite 1040

Alexandria

VA 22314

Client Project Number PSTE152605

McEntire JNGB HVAC REPAIR

HVAC SYSTEMS BASE WIDE

02/06/2019

TYPE B-3

South Carolina Air National Guard

169th Civil Engineer Squadron, McEntire JNGB

TRUE

NORTH

1/4" = 1'-0" M-101

A

BLDG 157 - PART ROOF PLAN

1/4" = 1'-0" M-101

B

BLDG 157 - PART PLAN

WPL REP DLH WPL

M-101

1/4"=1'-0"

1/4" = 1'-0"

M-101

C

BLDG 200 - WORK BAY #2 MEZZANINE PART PLAN

1/4" = 1'-0"

M-101

E

BLDG 243 - ELECTRICAL ROOM 113

1/4" = 1'-0"

M-101

F

BLDG 243 - MECHANICAL ROOM 112

1/4" = 1'-0" M-101

D

BLDG 243 - TOILET/LOCKER ROOMS

KEY NOTES:

PROVIDE ELECTRIC METER & INTEGRATE WITH BASE EMS.

PROVIDE WATER METER & INTEGRATE WITH BASE EMS.

PROVIDE NATURAL GAS METER & INTEGRATE WITH BASE EMS.

RE-INSTALL AND/OR REPLACE ACOUSTICAL CEILING TILES & GRID.

RE-INSTALL LIGHT FIXTURES.

NOT USED.

REPAIR ROOFING AND FLASH AT EQUIPMENT ROOF CURB.

3/4" CONDENSATE DRAIN. PROVIDE FIBERGLASS SPLASH BLOCK AT

GRADE AND TERMINATE CONDENSATE DRAIN OVER SPLASH BLOCK.

GENERAL NOTES:

THE BOILER REPLACEMENT WORK SHALL

BE PERFORMED BETWEEN APRIL 1, 2019

AND JUNE 28, 2019.

1.

1/4" = 1'-0"

M-101

A1

BLDG 157 - ROOF SECTION

1/8" = 1'-0"

M-101

C1

BLDG 200 - SECOND FLOOR PART PLAN

HVAC PART PLANS

FAC#157, 200, 243

MD-102 - HVAC DEMOLITION PART PLANS FAC#258
MD-103 - HVAC DEMOLITION PART PLANS FAC#310
MD-104 - HVAC DEMOLITION PART PLANS FAC#878
MD-105 - HVAC DEMOLITION PART PLANS FAC#958, 984, 1060
MD-106 - HVAC DEMOLITION PART PLANS FAC#1147, 1163
M-101 - HVAC PART PLANS FAC#157, 200, 243

File details come from the government source that posted it.