OPEN OFFICE AREA
VAULT
VAULT
VAULT
INFO ASSURANCE OFFICE
10x16
Ø
12Ø
12Ø
Ø
Ø
Ø
RX THE CRAC
RX CU ON GRADE
RX RS & RL
RX AC PUMPED CONDENSATE
ELEC PANEL BP (208V/120V)
ELEC PANEL Q (208V/120V)
ELEC PANEL "RP" (208V/120V)
RX RS & RL
RX SA DUCT
RX CONCRETE PAD
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
1/4" = 1'-0"
MD-102
B
BLDG 258 - PART FIRST FLOOR PLAN
WPL REP DLH WPL
MD-102
HVAC DEMOLITION PART PLANS
FAC#258
1/4"=1'-0"
DEMOLITION NOTES:
REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES,
AND GRID FOR ACCESS TO RS & RL PIPING ABOVE CEILING.
EXISTING CRAC UNIT SHALL NOT BE REMOVED UNTIL NEW
CEILING CRAC UNIT IS INSTALLED AND FULLY FUNCTIONING.
REFER TO NEW WORK DRAWINGS.
1.
GENERAL NOTES:
PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB
CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:
· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE
· UNIT RETURN AIR FLOW AND INLET PRESSURE
· UNIT OUTSIDE AIR FLOW
2.
OFFICE
102D
OFFICE
102C
OFFICE
OFFICE
102B
OFFICE
102A
CLASSROOM
MEN
MEN
MECHANICAL
PAINT SHOP
BAY "A1"
BAY "A1"
BAY "B"
RX SA DUCT
RX RTU ON ROOF
RX RA DUCT
RX 18x12 SA
RX RTU ON ROOF
RX 25x12 RA
RX WALL MOUNTED
MINI-SPLIT AC UNIT
RX CU
RX
RS & RL
RX PREFAB PAD
EX CU
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
WPL REP DLH WPL
MD-103
HVAC DEMOLITION PART PLANS
FAC#310
1/8"=1'-0"
1/8" = 1'-0"
MD-103
A
BLDG 310 - PART PLAN
DEMOLITION NOTES:
REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES,
AND GRID FOR ACCESS TO RS & RL PIPING ABOVE CEILING.
REMOVE ROOF CURB.
DISCONNECT CONDENSATE DRAIN PIPING FROM AC UNIT.
GENERAL NOTES:
PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB
CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:
· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE
· UNIT RETURN AIR FLOW AND INLET PRESSURE
1.
MECHANICAL ROOM 112
CHWR
CHWS
C H
W R
C H
W S
RX AIR COOLED CHILLER
RX AIR COOLED CHILLER
3/4"
1-1/2"
2-1/2"
HWS
HWR
CHWS
CHWR
2-1/2"
B-1 B-2
HWP-1
HWP-2
UH
FCU-1
CHP-1
CHP-2
CHP-3
UH
EX CH-1
EX CH-2
M
EX GAS
METER
EX CONC. PAD
TO REMAIN
EX CONC. PAD
TO REMAIN
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
1/4" = 1'-0"
MD-104
C
BLDG 878 - PART PLAN
WPL REP DLH WPL
MD-104
HVAC DEMOLITION PART PLANS
FAC#878
1/4"=1'-0"
1.
GENERAL NOTES:
EACH EXISTING CHILLER SHALL BE REPLACED ONE AT A TIME.
THE FIRST CHILLER SHALL BE REMOVED, REPLACED AND FULLY
OPERATIONAL PRIOR TO REMOVAL OF THE SECOND CHILLER. THE
CHILLER REPLACEMENT WORK SHALL BE PERFORMED BETWEEN
NOVEMBER 1 AND FEBRUARY 28.
2. PRIOR TO THE REMOVAL OF THE CHILLERS, THE TAB CONTRACTOR
SHALL MEASURE AND RECORD THE CHILLED WATER SYSTEM
OPERATION AS FOLLOWS:
a. OPERATE EACH CHILLED WATER PUMP (CHP-#) INDIVIDUALLY
WITH CH-1 OPEN TO FLOW AND CH-2 CLOSED TO FLOW. RECORD
PUMP GPM, HEAD AND BRAKE HORSEPOWER. RECORD CHILLER
EVAPORATOR FLOW AND PRESSURE DROP.
b. REPEAT "a" ABOVE WITH CH-1 CLOSED TO FLOW AND CH-2 OPEN
TO FLOW.
c. OPERATE TWO (2) CHILLED WATER PUMPS WITH BOTH CHILLERS
OPEN TO FLOW. RECORD PUMP GPM, HEAD AND BRAKE
HORSEPOWER. RECORD CHILLER EVAPORATOR FLOW AND
PRESSURE DROP. REPEAT FOR ALL COMBINATIONS OF TWO PUMP
OPERATION.
PALLET STORAGE
OFFICE
CORRIDOR
TOOL STORAGE
MECH/ELEC
CONCRETE APRON
x
Ø
10Ø
Ø x x x
Ø
Ø
RX 8Ø
COMBUSTION
AIR MAKE-UP
RX CU ON GRADE
RX GAS
FURNACE
RX 6" FLUE
UP THRU ROOF
RX RS & RL
RX DX
COOLNG COIL
20x18
16x30
20x18RX DUAL FURNACE
RX DX COOLING COIL
RX 24" HIGH RA
PLENUM EXTENDED
UNDER FURNACE
1"
G
RX 3/4" G
DN TO FURNACE
(TYPICAL OF 2)
RX CU LOCATION
TO BE FIELD VERIFIED
6" PVC CONDUIT
UNDERGROUND
RX RS & RL
IN UNDERGROUND
CONDUIT
ELECTRICAL XFMR
MAIN ELECTRICAL
DISTRBUTION PANEL
RX RS & RL
RX 5" DIAMETER
FLUE UP THRU ROOF
3/4" G
RX SA DUCT
EX CONCRETE PAD
EX CONC. PAD
TO REMAIN
MECHANICAL ROOM 187
3"
1-1/2"
2"
2"
4"
CWR
CWS
2"
4"
1"
4'
4"
C W
R
H W
R
1"
3/4"
3/4"
2"
1-1/4"
4"
3"
3"
2-1/2"
3"
1"
3"
2"
2"
3"
2-1/2"
3"
G
HWS
HWR
HWS
2"
C W
S
C W
R
H W
S
MAIN ELEC DISTRIBUTION
PANEL (480V/277V, 800 A MAIN)
DOMESTIC HOT WATER
STORAGE TANK
DOMESTIC
WATER HEATER
AHU
AHU
AHU
AHU
HWP
HWP
CHP
CHP
RX BOILER
RX 14Ø FLUE
UP THRU ROOF
RX
HWR
RX
HWS
RX 2-1/2" G
(TYP. OF 2)
RX
VERTICAL
INLINE PUMP
(TYP. OF 2)
RX BOILER
HWR
EX CONC. PAD TO
REMAIN (TYP. OF 2)
EX BAS CABINET
EX BTU METER
MECHANICAL ROOM
RESTROOM
CONCRETE APRON
6x6
RX AC UNIT
(FURNACE & DX COIL)
RX AC UNIT CU
1/2" G
RX
RS & RL
1" CD DRAIN
12Ø RA
Ø
S
A
RX SA
DUCTWORK
RX RA DUCTWORK
RX
1/2" G
RX 1" CD
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
WPL REP DLH WPL
MD-105
HVAC DEMOLITION PART PLANS
FAC#958, 984, 1060
1/4"=1'-0"
1/4" = 1'-0"
BLDG 984 - PART PLAN
1/4" = 1'-0"
BLDG 958 - PART PLAN
MD-105
A
MD-105
B
1/4" = 1'-0"
BLDG 1060 - PART PLAN
MD-105
C
REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES, AND GRID FOR ACCESS
TO EQUIPMENT, DUCTWORK AND PIPING ABOVE CEILING.
EX HEATING WATER SYSTEM BTU METER SHALL BE RE-USED. REMOVE, PROTECT
AND STORE BTU METER HWS TEMPERATURE SENSOR, HWR TEMPERATURE SENSOR
AND FLOW METER FOR RE-USE.
DISCONNECT CONDENSATE DRAIN PIPING FROM AC UNIT AHU.
EACH EXISTING BOILER SHALL BE REPLACED ONE AT A TIME. THE FIRST
BOILER SHALL BE REMOVED, REPLACED AND FULLY OPERATIONAL PRIOR
TO REMOVAL OF THE SECOND BOILER. THE BOILER REPLACEMENT WORK
SHALL BE PERFORMED BETWEEN APRIL 1 AND JUNE 30.
1.
GENERAL NOTES:
PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB
CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:
· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE
· UNIT RETURN AIR FLOW AND INLET PRESSURE
· UNIT OUTSIDE AIR FLOW
2.
DEMOLITION NOTES:
MECHANICAL ROOM
RX CONCRETE PAD
RX RS & RL
18x16 x x x
SD
S
ATC PANEL
S
SD
x
18x16
M
10x10
CU-1
DOMESTIC
WATER
HEATER
RX HEAT
PUMP AHU
EX CONCRETE
PAD
RX CONDENSING UNIT
OFFICE 1
CORR
MEN'S TOILET
WOMEN'S TOILET
CLASS "A" VAULT
DIS OPERATIONS
RX AC
UNIT AHU
RX AC
UNIT AHU
6Ø
6Ø
8Ø
8Ø
6Ø
6Ø
Ø
Ø
Ø
Ø
18Ø
24x12
RX RS & RL
RX RS & RL
RX AC UNIT CU
RX AC UNIT CU
CONCRETE PAD
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
WPL REP DLH WPL
MD-106
HVAC DEMOLITION PART PLANS
FAC#1147, 1163
1/4"=1'-0"
1/4" = 1'-0"
MD-106
A
BLDG 1147 - MECHANICAL ROOM 112
1/4" = 1'-0"
MD-106
B
BLDG 1163 - PART PLAN A
DEMOLITION NOTES:
REMOVE, STORE, AND PROTECT ACOUSTICAL CEILING TILES, AND GRID FOR ACCESS
TO EQUIPMENT, DUCTWORK AND PIPING ABOVE CEILING.
REMOVE WALL AS REQUIRED FOR ACCESS AND REMOVAL OF HVAC ABOVE THE
GYPSUM BOARD CEILING.
REMOVE CONDENSATE DRAIN PIPING.
DISCONNECT CONDENSATE DRAIN PIPING FROM AC UNIT AHU.
GENERAL NOTES:
PRIOR TO REMOVAL OF AIR CONDITIONING UNITS, THE TAB
CONTRACTOR SHALL MEASURE AND RECORD THE FOLLOWING:
· UNIT SUPPLY AIR FLOW AND DISCHARGE PRESSURE
· UNIT RETURN AIR FLOW AND INLET PRESSURE
1.
LOW ROOF
HIGH ROOF
LOW ROOF
HIGH ROOF
14x14 SA BELOW HIGH
ROOF TO REMAIN
14x14 RA BELOW HIGH
ROOF TO REMAIN
AC-157-1
SHEET METAL
DUCT COVER
14x14 SA ABOVE
LOW ROOF
14x14 RA ABOVE
LOW ROOF
AC-157-1
EQUIPMENT
CURB
EX 14x14 RA
(FIELD VERIFY SIZE)
EX BUILT UP ROOF
W/2" OF INSULATION
MECHANICAL ROOM
STORAGE
MECHANICAL ROOM
STORAGE
MAIN ELECTRICAL
DISTRIBUTION PANEL
CANTEEN ELECTRIC METER
CLUB ELECTRIC METER
AC UNIT
1-1/2" HWS & HWR
GAS METER
ET-157-1
CONCRETE PAD. EXTEND
4" BEYOND EQUIPMENT
OUTLINE ON ALL SIDES
CHEMICAL
FEEDER
3/4" G
B-157-1
1/2" HWS & HWR
HWP-157-1
6Ø FLUE
EMCS GATEWAY IN
CABINET
ELECTRICAL ROOM 113
MAIN ELECTRICAL
DISTRIBUTION
PANEL PP1
MAIN ELECTRICAL
DISTRIBUTION
PANEL PP1
ELECTRIC METER
RS & RL
RA PLENUM - FULL SIZE
OF UNIT RA OPENING
RS & RL TO AC-200-1
CU-200-1
CU-200-2
CU-200-3
AC-200-3
CONCRETE PAD - EXTEND 4" BEYOND
EQUIPMENT ALL SIDES
WORK BAY #2
EX CU
Ø
Ø
Ø
Ø
Ø
Ø
SA PLENUM - FULL SIZE
OF UNIT SA OPENING
3/4" CONDENSATE DRAIN
AC-200-2
RS & RL
EMCS GATEWAY IN CABINET
FEMALE TOILET 107
MALE TOILET 110
MALE VESTIBULE 109
MALE LOCKERS 108
FEMALE LOCKERS 108
FEMALE VESTIBULE 106
FEMALE TOILET 107
MALE TOILET 110
MALE VESTIBULE 109
MALE LOCKERS 108
FEMALE LOCKERS 108
FEMALE VESTIBULE 106
2" DOMESTIC
WATER SERVICE
M
MECHANICAL ROOM 112
GAS METER
1-1/2" G DN
TO OUTDOOR
AC UNIT
2" G TO DOMESTIC
WATER HEATERS
MECHANICAL ROOM 112
2-1/2" G
2-1/2" G
26x46 x
Ø x
2-1/2" G
G
AC-200-1
RS & RL DN
PROFESSIONAL SEAL
I n c h e s
Rev. Date Description By Chk'd App'd
Date
DesignedScale
Drawing Title
Project Title
Drawing Status
Drawn Checked Authorized
Client
Original Size
Suitability
Drawing Number Revision www.atkinsglobal.com
Copyright © Atkins Limited (2016)
+1 703 535 3008
+1 703 535 1031
Tel:
Fax:
2318 Mill Road Suite 1040
Alexandria
VA 22314
Client Project Number PSTE152605
McEntire JNGB HVAC REPAIR
HVAC SYSTEMS BASE WIDE
02/06/2019
TYPE B-3
South Carolina Air National Guard
169th Civil Engineer Squadron, McEntire JNGB
TRUE
NORTH
1/4" = 1'-0" M-101
A
BLDG 157 - PART ROOF PLAN
1/4" = 1'-0" M-101
B
BLDG 157 - PART PLAN
WPL REP DLH WPL
M-101
1/4"=1'-0"
1/4" = 1'-0"
M-101
C
BLDG 200 - WORK BAY #2 MEZZANINE PART PLAN
1/4" = 1'-0"
M-101
E
BLDG 243 - ELECTRICAL ROOM 113
1/4" = 1'-0"
M-101
F
BLDG 243 - MECHANICAL ROOM 112
1/4" = 1'-0" M-101
D
BLDG 243 - TOILET/LOCKER ROOMS
KEY NOTES:
PROVIDE ELECTRIC METER & INTEGRATE WITH BASE EMS.
PROVIDE WATER METER & INTEGRATE WITH BASE EMS.
PROVIDE NATURAL GAS METER & INTEGRATE WITH BASE EMS.
RE-INSTALL AND/OR REPLACE ACOUSTICAL CEILING TILES & GRID.
RE-INSTALL LIGHT FIXTURES.
NOT USED.
REPAIR ROOFING AND FLASH AT EQUIPMENT ROOF CURB.
3/4" CONDENSATE DRAIN. PROVIDE FIBERGLASS SPLASH BLOCK AT
GRADE AND TERMINATE CONDENSATE DRAIN OVER SPLASH BLOCK.
GENERAL NOTES:
THE BOILER REPLACEMENT WORK SHALL
BE PERFORMED BETWEEN APRIL 1, 2019
AND JUNE 28, 2019.
1.
1/4" = 1'-0"
M-101
A1
BLDG 157 - ROOF SECTION
1/8" = 1'-0"
M-101
C1
BLDG 200 - SECOND FLOOR PART PLAN
HVAC PART PLANS
FAC#157, 200, 243
| MD-102 - HVAC DEMOLITION PART PLANS FAC#258 |
| MD-103 - HVAC DEMOLITION PART PLANS FAC#310 |
| MD-104 - HVAC DEMOLITION PART PLANS FAC#878 |
| MD-105 - HVAC DEMOLITION PART PLANS FAC#958, 984, 1060 |
| MD-106 - HVAC DEMOLITION PART PLANS FAC#1147, 1163 |
| M-101 - HVAC PART PLANS FAC#157, 200, 243 |
File details come from the government source that posted it.