Appendix_F_-_PB1_Electrode_Cable_Details.pdf
PDF 1 MB Posted
- Solicitation number
- W912P6-18-R-0005
About this file
THIS FILE CONTAINS APPENDIX F
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICAGO DISTRICT
LEADERS IN CUSTOMER CARE
CHICAGO SANITARY AND SHIP CANAL (CSSC)
PERMANENT BARRIER I
PULSE GENERATING SYSTEM
SUPPLY & INSTALLATION FY18
Appendix F - PB1 Electrode Cable Details
SOLICITATION NO: W912P6-18- R-0005
Certified Final: Ready to Advertise
JUNE 14, 2018
h6tcnrdh Typewritten Text .1
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
(Read instructions on the reverse side prior to initiating this form)
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
DATE TRANSMITTAL NO.
TO: FROM: CONTRACT NO. CHECK ONE:
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL ___________
SPECIFICATION SEC. NO. (Cover only one section with each transmittal)
PROJECT TITLE AND LOCATION 01-Main Register CHECK ONE: THIS TRANSMITTAL IS
FOR FIO GA DA CR
ITEM
NO.
a.
DESCRIPTION OF ITEM SUBMITTED
(Type size, model number/etc.)
b.
MFG OR CONTR.
CAT., CURVE
DRAWING OR
BROCHURE NO.
(See instruction no. 8) c.
NO.
OF
COPIES
d.
CONTRACT REFERENCE
DOCUMENT
SPEC.
PARA. NO.
e.
DRAWING
SHEET NO.
f.
FOR
CONTRACTOR
USE CODE
g.
VARIATION
(See
Instruction No. 6) h.
FOR
CE
USE
CODE
i.
REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in the strict conformance with the contract drawings and specifications except as otherwise stated.
NAME AND SIGNATURE OF CONTRACTOR
SECTION II - APPROVAL ACTION
ENCLOSURES RETURNED (List by item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE
ENG FORM 4025, MAR 95 (ER 415-1-10) EDITION OF SEP 93 IS OBSOLETE. (Proponent: CEMP-CE)
03/17/2014 26 05 19.00 10-3
26 05 19.00 10
W912P6-13-C-0009 NA
Northern Area Office 620 Barry Road, Building 158 Great Lakes, IL 60088
E.P. Doyle & Son, LLC 1100 Wheaton Oaks Court Wheaton, IL 60187
CSSC Barrier 1, Water Structures Romeoville, IL
X
X
Factory cable test reports.
3 Tests, Inspections, and Verifications TEST REPORTS 2 3.2 A N
SHEET 1 OF 1
rwennerstrom RW Sig
Phone 708-588-6800 Fax 708-588-6825
Chicago Fish Barrier #1 -
C4716 herewith under separate cover
CONSTRUCTION DRAWINGS X
X
X
1.
2.
3.
LYONS PINNER MAIN OFFICE Copies to:
Please Return White Copy To Lyons Pinner Electric: LYONS & PINNER ELECTRIC COMPANIES c/o ( Job Location Address) By: Scott Morris
Title: Project Manager
PLEASE RETURN WITH YOUR STAMPED APPROVAL
REMARKS:
FOR APPROVAL APPROVED AS NOTED
APPROVED SUBJECT TO DRAWINGS & SPECIFICATIONS FOR YOUR FILES
FOR YOUR INFORMATION PLEASE SUBMIT CORRECTED PRINTS FOR DISTRIBUTION
COPIES TRACING DATE OF
LAST REVISION DESCRIPTION
1 Factory Cable Test Results
X We are transmitting
INFORMATION Via Email
DRAWINGS Via Messenger
1100 Wheaton Oaks Court Description:
Wheaton, IL 60187 Electrode installation
Attn: Mr. Russ Wennerstrom L&P Job #:
LYONS & PINNER ELECTRIC COMPANIES
650 E. Elm Avenue
P.O. Box #749 LaGrange, Illinois 60525
To: E.P. Doyle Date: 3/3/2014 rwennerstrom Shop Drawing Stamp rwennerstrom Text Box 26 05 19.00 10-3 rwennerstrom Text Box 3/17/14 rwennerstrom Text Box 3/17/14 rwennerstrom Text Box
RW
rwennerstrom Text Box
CEFB1R
| Appendix F title sheet |
| PB1_Electrode_Cable_Details |
| Trans 26_05_19_00_10-1.1_Submarine Cable R1 |
| Trans_26 05 19 00 10-3_Factory Cable Test Reports_2014 03 17 |
File details come from the government source that posted it.