CHICAGO DISTRICT

LEADERS IN CUSTOMER CARE

CHICAGO SANITARY AND SHIP CANAL (CSSC)

PERMANENT BARRIER I

PULSE GENERATING SYSTEM

SUPPLY & INSTALLATION FY18

Appendix D - PB1 In-Water Structures As-Built Drawings

SOLICITATION NO: W912P6-18- R-0005

Certified Final: Ready to Advertise

JUNE 14, 2018

ST LOUIS

SPRINGFIELD

CHICAGO

INDIANA

WISCONSIN

MICHIGAN

LAKE

IL

L I N

OI

S W

A

TE

RWAY

M I

S S

I

S

S I

P P I

R I V

E R

LOCATION

SITE

INDIANAPOLIS

ILLINOIS

CANAL FISH BARRIER 1

CHICAGO SANITARY AND SHIP

40 0 40 80

SCALE IN MILESVICINITY MAP

LOCALITY MAP

SCALE: NTS

SITE LOCATION

SCALE: 1" = 80’-0"

20" 0 20’40’60’

FISH BARRIER 2A

ROMEOVILLE, ILLINOIS

FISH BARRIER 2B

PROPOSED BARRIER 1

LOCATION

SITE

F L O

W

N

S O

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

G01

C O

V E

R S

H E

E T

D M L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

G

AWARD DATE: 31 JULY 2013

AS-AWARDED CERTIFIED FINAL - W912P6-13-C-0009

J

U L

Y

R

E V

IS

E D I

N W

A T

E R S

T R

U C

T U

R E L

O C

A T

IO

N /R

E M

O V

A L

OCTOBER 2014

RECORD DRAWINGS PREPARED BY: VIATECHNIK

CONSTRUCTED BY: E.P. DOYLE & SON, LLC.

RECORD DRAWINGS / AS-BUILTS

RECORD

STRUCTURAL

S01 ELECTRODE & PARASITIC SLEEPER LAYOUT

S02 ELECTRODE & PARASITIC CONCRETE SLEEPERS

S03

BURIED CONDUIT

PARASITIC CONTROL CABINET SLAB &

SHEET INDEX

CONSTRUCTION CONTRACT

SHEET TITLE

ELECTRICAL

E07

POWER DISTRIBUTION (ONE LINE DIAGRAM)

GENERAL ROOM LAYOUT &

E08 CONTROL / MONITORING ROOM LAYOUT

E09 CONTROL / MONITORING ROOM SECTIONS

E10 CONTROL ROOM SENSOR & CONTROLLER BOX

E11 CONTROL BLOCK DIAGRAM (ONE LINE DIAGRAM)

E12 SPANG / PULSER ROOM #1 EQUIPMENT LAYOUT

E13a

LAYOUT SECTIONS

SPANG / PULSER ROOM #1 EQUIPMENT

E13b

LAYOUT SECTIONS

SPANG / PULSER ROOM #1 EQUIPMENT

E14 SPANG / PULSER ROOM #2 EQUIPMENT LAYOUT

E15a

LAYOUT SECTIONS

SPANG / PULSER ROOM #2 EQUIPMENT

E15b

LAYOUT SECTIONS

SPANG / PULSER ROOM #2 EQUIPMENT

E16 SPANG / PULSER ROOM #3 EQUIPMENT LAYOUT

E17a

LAYOUT SECTIONS

SPANG / PULSER ROOM #3 EQUIPMENT

E17b

LAYOUT SECTIONS

SPANG / PULSER ROOM #3 EQUIPMENT

E18 EQUIPMENT SCHEDULE

E19 PULSER CONNECTION DETAILS

E20 EQUIPMENT CONNECTION DETAILS

E21 CONDUIT SCHEDULE

E22

CONDUIT LAYOUT

SPANG / PULSER ROOM #1

E23a

CONDUIT LAYOUT SECTIONS

SPANG / PULSER ROOM #1

E23b

CONDUIT LAYOUT SECTIONS

SPANG / PULSER ROOM #1

E24

CONDUIT LAYOUT

SPANG / PULSER ROOM #2

E25a

CONDUIT LAYOUT SECTIONS

SPANG / PULSER ROOM #2

E25b

CONDUIT LAYOUT SECTIONS

SPANG / PULSER ROOM #2

E26

CONDUIT LAYOUT

SPANG / PULSER ROOM #3

E27a

CONDUIT LAYOUT SECTIONS

SPANG / PULSER ROOM #3

E27b

CONDUIT LAYOUT SECTIONS

SPANG / PULSER ROOM #3

E28 CONDUIT CONNECTION DETAILS

E29

SENSOR & CONTROL BOX

SPANG / PULSER ROOM #1

E30

SENSOR & CONTROL BOX

SPANG / PULSER ROOM #2

E31

SENSOR & CONTROL BOX

SPANG / PULSER ROOM #3

E32

(ONE LINE DIAGRAM)

PARASITIC POWER DISTRIBUTION

E33

POLARITY SWITCH (ONE LINE DIAGRAM)

ELECTRODE ELEMENT POWER DISTRIBUTION &

E34

CONTROL DIAGRAM

PATENTED ELEMENTS INTERCONNECTION

E35

(LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35a

(CONTROL ROOM & MECHANICAL ROOM LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35b

(POD ROOM #1 LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35c

(POD ROOM #1 COOLING LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35d

(POD ROOM #2 LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35e

(POD ROOM #2 COOLING LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35f

(POD ROOM #3 LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E35g

(POD ROOM #3 COOLING LAYOUT)

INTER-ROOM COMMUNICATION CONDUITS

E36

BLOCK DIAGRAM (POD ROOMS #1 THRU #3)

ELECTRODE CURRENT MONITOR

E37

EMF SHIELDING LAYOUT

SPANG / PULSER ROOM #1

E38

EMF SHIELDING LAYOUT

SPANG / PULSER ROOM #2

E39

EMF SHIELDING LAYOUT

SPANG / PULSER ROOM #3

E40 EQUIPMENT GROUNDING LAYOUT & DETAILS

E41 a-d DESIGN LOADS & CALCULATIONS

N.I.C. NOT IN CONTRACT

ABBREVIATIONS

UNAUTHORIZED PERSONNEL IS PREVENTED.

AND FENCE WITHIN THE PROJECT WORK LIMITS AS LONG AS SITE ACCESS BY

11. THE CONTRACTOR MAY TEMPORARILY RELOCATE THE PRECAST BARRIER WALL

PROJECT DURATION.

TEMPORARY AND PERMANENT ROADWAY WILL BE USED BY OTHERS DURING THE

TRAFFIC DURING THE CONSTRUCTION DURATION OF THE PROJECT. BOTH

CONTRACTOR SHALL PROVIDE AT LEAST ONE OPEN LANE FOR TWO WAY TRUCK 10.

ALLOWED TO BE SHUT DOWN DURING CONSTRUCTION.

CONTRACTOR SHALL NOTE THAT THE ROAD ADJACENT TO THE BARRIERS IS NOT 9.

WORK LIMITS AND FENCE LINE.

SERVICES OF A REGISTERED LAND SURVEYOR ARE REQUIRED FOR LAYOUT OF 8.

EXISTING AT THAT TIME. ACTUAL CONDITIONS MAY VARY.

THE TOPOGRAPHIC AND PLANIMETRIC INFORMATION REPRESENTS CONDITIONS 7.

AND AROUND THE CANAL.

DURING CONSTRUCTION AND SHOULD PROCEED WITH CAUTION WHILE WORKING IN

CONTRACTOR SHALL BE AWARE THAT THE ELECTRIC BARRIER WILL BE ACTIVE 6.

MANUFACTURERS RECOMMENDATIONS AND AS APPROVED BY THE GOVERNMENT.

ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH 5.

WORK LIMITS AND FENCE LINE.

SERVICES OF A REGISTERED LAND SURVEYOR ARE REQUIRED FOR LAYOUT OF 4.

THE CONTRACTOR SHALL PERFORM ALL WORK WITHIN THE SPECIFIED WORK LIMITS.3.

VERTICAL DATUMS.

SEE SHEET G-03 FOR MORE INFORMATION ABOUT SURVEY HORIZONTAL AND 2.

DOCUMENT "CHICAGO SANITARY AND SHIP CANAL FISH BARRIER 1: SPECIFICATIONS".

FOR MATERIAL AND INSTALLATION SPECIFICATIONS REFER TO THE SEPARATE 1.

GENERAL NOTES

SHEET INDEX

IN-WATER CONTRACT

SHEET TITLE

GENERAL

G01 COVER SHEET

G02

G03 GENERAL SITE LAYOUT

CIVIL

C01 BORING LOCATIONS

C02 BORE HOLE SECTION

C03 BORE HOLE SECTION

ELECTRICAL

E01 ELECTRODES & PARASITICS LAYOUT

E02

ACTIVE ELECTRODES

CROSS SECTIONS @ PARASITICS &

E03

WIRING CONNECTION

ACTIVE / PARASITIC ELECTRODE

E04

ELECTRODE WIRING LAYOUT (BH01 THRU BH03)

TEMPORARY WIRING SUPPORT &

E05

ELECTRODE SECTIONS

BORE HOLE (BH01) THRU (BH03)

E06

PARASITIC SECTIONS

BORE HOLE (BH04) & (BH05)

G04 SURVEY CONTROL AND BENCHMARKS

SHEET INDEX & GENERAL NOTES

SO4 SLEEPER SCOUR PROTECTION

S O

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

G02

S H

E E

T I

N D

E X

G E

N E

R A

L N

O T

S

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

G

J

U L

Y

S

H E

E T G

A

D D

E D T

O S

H E

E T I

N D

E X

RECORDRECORD RECORDREVISED RECORD

O

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

EXISTING POWER POLES

EXISTING SERVICE ROAD

SITE LOCATION (N.I.C.)

PROPOSED BUILDING

FACE OF CANAL

N

GENERAL SITE LAYOUT

SCALE: 1" = 30’-0"

10’ 0 10’ 20’ 30’

FISH BARRIER 2A & 2B

BARRIER

DEMONSTRATION

WESTERN EDGE OF CANAL

EASTERN EDGE OF CANAL

SEE SHEET S02 (N.I.C.-FUTURE)

PARASITIC CONDUIT RACEWAY

SEE SHEET E01 FOR LAYOUT

STEEL ACTIVE ELECTRODE

SEE SHEET E01 FOR LAYOUT

STEEL PARASITIC ELECTRODE

SEE SHEET E01 FOR LAYOUT

STEEL PARASITIC ELECTRODE

SEE SHEET S03 (N.I.C.-FUTURE)

PARASITIC CONTROL CABINET SLAB

(N.I.C.-FUTURE)

SEE DETAIL 4/S02

PARASITIC ACCESS VAULT

SEE SHEET C01

EXISTING BOREHOLE

WL01 WL02

WL03 WL04

/ STAGING AREA

EXTENT OF WORK LIMITS

FACE OF CANAL

90’

REMOVED

HAVE BEEN

ELECTRODES

WIDE ARRAY

EXTENT OF WORK LIMITS

MARK

IL. EAST NAD83 STATEPLANE COORDINATES

NORTHING EASTING

WL01 N 1,812,733.02’ E 1,058,695.74’

WL02 N 1,813,204.98’ E 1,058,728.90’

WL03 N 1,812,701.13’ E 1,059,148.82’

WL04 N 1,813,173.09’ E 1,059,181.98’

57’ 2 13/16"

42’ 4 1/2"

(N.I.C.-FUTURE)

SEE DETAIL 1/S03

PARASITIC CONTROL CABINET

SEE SHEET C01

EXISTING BOREHOLE

SEE SHEET C01

EXISTING BORE HOLE

SEE SHEET C01

EXISTING BORE HOLE

DEMONSTRATION BARRIER

G03

G E

N E

R A

L S

IT

E L

A Y

O U

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

G

J

U L

Y

R

E V

IS

E D I

N W

A T

E R S

T R

U C

T U

R E L

O C

A T

IO

N /R

E M

O V

A L

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

NAVD88

IL EAST NAD83 STATEPLANE COORDINATES

HORIZONTAL & VERTICAL CONTROL POINTS

POINT

NORTHING (Y) EASTING (X)

DESCRIPTION

ELEV. ELEV.

GENERAL NOTES

MONUMENTS AE2554 AND AE2535.

ALL HORIZONTAL CONTROL POINTS ARE REFERENCED TO NGS 4.

VERTICAL DATUM (NAVD) OF 1988 (U.S. FEET).

ALL ELEVATIONS SHOWN ARE REFERENCED TO THE NORTH AMERICAN3.

(NAD) 1983 (U.S. FEET).

PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM

ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS STATE2.

COST ACCORDINGLY IN THE BID.

THE EXISTING CONDITIONS AT THE TIME OF BIDDING, AND INCLUDE

THE CONTRACTOR SHALL TAKE ALL NECESSARY ACTIONS TO ASSESS

DURING CONSTRUCTION MAY VARY AND DIFFER FROM THOSE SHOWN.

REPRESENTS CONDITIONS EXISTING AT THAT TIME. EXISTING CONDITIONS

2004 SURVEY PERFORMED BY BOLLINGER LACH & ASSOCIATES AND

THE SURVEY CONDITIONS SHOWN ON THESE DRAWINGS ARE FROM A1.

PT NO. 15

PT NO. 20

PT NO. 22

1813786.14 1059164.98 582.84

1813034.85 1059094.23 588.00

1811810.63 1058019.67 600.36

BRASS USACE DISK

BRASS USACE DISK

BRASS USACE DISK

G04

S

H E

E T A

D D

E D T

O P

L A

N S

E T

REVISED RECORD

Elev. 600.36 E 1058019.67 N 1811810.63

BRASS DISK

PT. No. 22

Elev. 588.00 E 1059094.23 N 1813034.85

BRASS DISK

PT. No. 20

RAILROAD

2B BUILDING

EXISTING

DEMONSTRATION EXISTING BUILDING

Elev. 582.84 E 1059164.98 N 1813786.14

BRASS DISK

PT. No. 15

E

R

M

R

A D

2A BUILDING

EXISTING

NN

AND NO LONGER EXISTS.

A SEPARATE CONTRACT

PT.20 WAS REMOVED UNDER

NOTE:

A N

D B

E N

C H

M A

R K

S S

U R

V E

Y C

O N

T R

N

BORING LOCATIONS

SCALE: 1" = 20’-0"

10’ 0 10’ 20’ 30’

SITE LOCATION (N.I.C.)

PROPOSED BUILDING

BH01

WESTERN EDGE OF CANAL

EASTERN EDGE OF CANAL

C03

C02

* MEASURED AT THE BOTTOM OF ACCESS PITS (SEE SHEET C02 & C03)

BH04

SEE SHEET S02 (N.I.C.-FUTURE)

PARASITIC CONDUIT RACEWAY

SITE LOCATIONS

MARK

IL. EAST NAD83 STATEPLANE COORDINATES

GRADE

FINISHED

DESCRIPTION NOTES

NORTHING EASTING

BH01 -

BH02 -

BH04 N 1,812,823.82’ E 1,058,881.42’ -

BH05 N 1,813,137.45’ E 1,058,905.30’ -

(PARASITIC ELECTRODE WIRING)

SLEEVED 8" ID BORE HOLE

SEPARATE CONTRACT

(NIC) TO BE COMPLETED PREVIOUSLY IN

(PARASITIC ELECTRODE WIRING)

SLEEVED 8" ID BORE HOLE

SEPARATE CONTRACT

(NIC) TO BE COMPLETED PREVIOUSLY IN

BH03 -- - -

SEPARATE CONTRACT

(NIC) REMOVED FROM PREVIOUS

19’-0 1/2"

19’-0 1/2 "

N 1,812,906.9631’

N 1,813,024.8387’

E 1,059,086.0147’

E 1,059,095.2685’

(ACTIVE ELECTRODE WIRING)

SLEEVED 30.0" ID BORE HOLE

(ACTIVE ELECTRODE WIRING)

SLEEVED 30.0" ID BORE HOLE

VIA CHANGE ORDER

COMPLETED IN CONTRACT

VIA CHANGE ORDER

COMPLETED IN CONTRACT

BH05

SEE DETAIL 1/S03 (N.I.C.-FUTURE)

PARASITIC CONTROL CABINET

/8

/8 " 551

(N.I.C.-FUTURE)

VAULT SEE DETAIL 4/S02

PARASITIC ACCESS

BH02

S O

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

REVISED RECORD

TOPOGRAPHIC EXHIBIT OF USACE FISH BARRIER 1 BORE HOLES

TOPOGRAPHIC SURVEY BY CEMCON, LTD. DATED 7-7-14.

E L E

C T

R O

D E P

A R

A S

IT

IC

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

S

J

U L

Y

R

E V

IS

E D I

N W

A T

E R S

T R

U T

U R

E L

O C

A T

IO

N /R

E M

O V

A

C01

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

ELEV: 550’

WORK POINT

(ELEV: 585.25’ APPROX.)

TOP OF SLAB (N.I.C. - FUTURE)

(BH04 & BH05)PARASITIC BORE HOLE SECTION

SCALE: 3/8" = 1’-0"

BOREHOLE (8" ID)

EXISTING SLEEVED

MINIMUM WATER (ELEV: 569’)

ORDINARY (HIGH) WATER (ELEV: 579’)

33 D

EG.

BORE HOLE

CENTER OF

(ELEV: 585.25’ APPROX.)

TOP OF SLAB

(N.I.C.-FUTURE)

PARASITIC CONTROL CABINET

(ELEV: 583.75’ APPROX.)

TOP OF CANAL BANK

12" 0 1’ 2’ 3’

19’-0" APPROX.

C02

B O

R E H

O L E S

E C

T

IO

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

C

J

U L

Y

REVISED RECORD

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

ELEV: 550’

WORK POINT

EXISTING GRADE

THAT IT VARIES FROM SOFT SILT TO ROCK.

MATERIAL IS UNKNOWN AND ITS ASSUMED

IN SPECIFICATIONS (FINAL ELEV: 550’)

RELOCATE OBSTRUCTIONS AS NOTED

(BH01 THRU BH02)ELECTRODE BORE HOLE SECTION

SCALE: 3/8" = 1’-0"

MINIMUM WATER (ELEV: 569’)

ORDINARY (HIGH) WATER (ELEV: 579’)

12" 0 1’ 2’ 3’

32 DEG.

OF SLAB AND PATCH FLUSH.

OF WIRES TO EQUIPMENT, CUT OFF THE RACKS TWO INCHES BELOW THE TOP

AFTER COMPLETION OF THE BUILDING, AND IN COORDINATION WITH CONNECTION9.

OF THE RACKS, INCORPORATING BLOCKOUTS FOR FUTURE CUTTING & PATCHING.

PROTECT THE WIRES & POUR THE BUILDING SLAB, EMBEDDING THE BOTTOM PART8.

CONSTRUCTION CONTRACT

TO THE RACKS IN SEQUENCE (AS SHOWN ON SHEET E04).

PULL THE WIRES AS ELECTRODES ARE INSTALLED, AND FASTEN THEM7.

CONSTRUCT TEMPORARY WIRE SUPPORT RACKS (SEE SHEET E04)6.

BEFORE PULLING ELECTRICAL WIRES, REMOVE THE VAULT COVER.5.

INSTALL VAULT COVER TO PROTECT BOREHOLE.4.

INSTALL ACCESS VAULT.3.

IN-WATER CONTRACT

. (COMPLETED BY OTHERS)

NON-CONDUCTIVE PLASTIC AND SEAMLESS INSIDE.

DRILL BOREHOLE AND INSTALL LINER, THE LINER WILL BE 2.

GRADE SURFACE TO ELEV. 586.5’ (COMPLETED BY OTHERS).1.

BOREHOLE CONTRACT

SEQUENCE

BY U.S. ARMY CORPS OF ENGINEERS

PROPOSED CONTROL BUILDING (N.I.C.)

BORE HOLE

CENTER OF FUTURE

EXISTINT GROUND

BORING MEETS

CENTERLINE OF

SLAB N.I.C-FUTURE

(ELEV: 587.0’ APPROX.)

TOP OF SLAB

SIDE OF THIS SHEET)

(SEE DIAGRAMS LEFT

HOLE ACCESS VAULT

ELECTRODE BORE

(30" ID)

BOREHOLE

SLEEVED

(N.I.C-FUTURE)

30" I.D. HDPE VERTICAL RISER

587.0

#6 @ 12" O.C.

584.25

30" I.D. HDPE CASING (EXISTING)

APPROX. 4" THICK MUD SLAB

45 12 74 12

25"

(BH02 LOOKING NORTH)

(BH01 LOOKING NORTH)

BOREHOLE VAULT SECTION

BOREHOLE VAULT SECTION

12"

30" I.D. HDPE VERTICAL RISER

587.0

#6 @ 12" O.C.

584.25

30" I.D. HDPE CASING (EXISTING)

APPROX. 4" THICK MUD SLAB

3.5" SCH 40 PVC TYP.

2 " "

12"

47 72

24"

3.5" SCH 40 PVC TYP.

3" CL.

3" CL.

3" CL.

3" CL.

(N.I.C-FUTURE)

TERMINATIONS

BUNDLE

ELECTRODE CABLE

EQUIPMENT AND

BARRIER ELECRICAL

PULLING

FACILITATE ELECTRODE CABLE

TEMPORARY CABLE RACK AND TO

CONSTRUCTED TO SUPPORT

PORTION OF SLAB WAS

C03

B O

R E H

O L E S

E C

T

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

C

J

U L

Y

C

H A

N G

E I

N B

O L E

H O

L E S

L E

E V

ELECTRODES & PARASITICS LAYOUT

SCALE: 1" = 20’-0"

10’ 0 10’ 20’ 30’

BOREHOLE (BH04)

EXISTING

E02

E02

E05

E05

E06

WESTERN EDGE OF CANAL

EASTERN EDGE OF CANAL

CENTER LINE OF BORE HOLES AS SHOWN ON E04 & E05.

ELECTRODE LOCATIONS ARE DIMENSIONED FROM THE 2.

EACH OTHER & PERPENDICULAR TO EASTERN CANAL WALL.

ALL ELECTRODE (ACTIVE & PARASITIC) ARE PARALLEL TO 1.

NOTES:

E06

(N.I.C.-FUTURE)

PARASITIC CONDUIT RACEWAY

BOREHOLE (BH05)

EXISTING

BORE HOLE (BH02)

EXISTING

BORE HOLE (BH01)

EXISTING

S O

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

E01

E L E

C T

R O

D E

S P

A R

A S

IT

IC

S L

A Y

O

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

E

J

U L

Y

1 REMOVED

HAVE BEEN

ELECTRODES

WIDE ARRAY

R E

V

IS

E D I

N W

A T

E R S

T R

U T

U R

E L

O C

A T

IO

N /R

E M

O V

A

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

IN SPECIFICATIONS (FINAL ELEV: 550’)

RELOCATE OBSTRUCTIONS AS NOTED

CROSS SECTION @ PARASITIC ELECTRODES

SCALE: 1/8" = 1’-0"

ELEV: 550’ APPROX.

BOTTOM OF CANAL

(SEE S01 FOR LAYOUT)

PARASITIC SLEEPER

SEE 1/E05 FOR LAYOUT

PARASITIC ELECTRODE

CROSS SECTION @ ACTIVE ELECTRODES

SCALE: 1/8" = 1’-0"

WATER (ELEV: 579’)

ORDINARY (HIGH)

(ELEV: 588.5’ APPROX.)

TOP OF SLAB

BY U.S. ARMY CORPS OF ENGINEERS

PROPOSED CONTROL BUILDING (N.I.C.)

(SEE 1/E03)

NEAR WALL CONNECTION

PARASITIC WIRE

(N.I.C.-FUTURE)

PARASITIC CONTROL CABINET

(ELEV: 583.75’ APPROX.)

TOP OF CANAL

ELEV: 550’ APPROX.

BOTTOM OF CANAL(SEE S01 FOR LAYOUT)

ELECTRODE SLEEPER

SEE 1/E04 FOR LAYOUT

ACTIVE ELECTRODE

(SEE 1/E03)

NEAR WALL CONNECTION

ELECTRODE WIRE

BY U.S. ARMY CORPS OF ENGINEERS

PROPOSED CONTROL BUILDING (N.I.C.)

WATER (ELEV: 579’)

ORDINARY (HIGH)

(ELEV: 583.75’ APPROX.)

TOP OF CANAL

(ACTIVE ELECTRODES)

8’ PIGTAIL

(PARASITIC)

3’ PIGTAIL

10’ 0 10’ 20’

10’ 0 10’ 20’

(SEE 1/E03)

FAR WALL CONNECTION

PARASITIC WIRE

LABELS RETROACTIVELY.)

IN-WATER SURVEY BY CONTRACTOR TO GENERATE ACCURATE

NEAR WALL / FAR WALL DESIGNATION WILL REQUIRE AN

(FAILURE TO PROPERLY LABEL EACH CABLE INCLUSIVE OF

END (NEAR WALL / FAR WALL) THE CABLE IS CONNECTED.

MANNER DESIGNATING TO WHICH ELECTRODE AND TO WHICH

EACH CABLE MUST BE UNIQUELY LABELED IN A PERMANENT

ELECTRODE PIGTAILS NOTE:

(SEE 1/E03)

FAR WALL CONNECTION

ELECTRODE WIRE

(ELEV: 587.0’ APPROX.)

TOP OF SLAB

E02

C R

O S

S S

E C

T

IO

N S P

A R

A S

IT

IC

A C

T

IV

E E

L E

C T

R O

D

C D

M

S L

M c

J P

K M

A S S

H O

W N

/1

/2

E

J

U L

Y

REVISED RECORD

NOTE: PORTION OF SLAB

WAS CONSTRUCTED TO

SUPPORT TEMPORARY

CABLE RACK AND TO

FACILITATE ELECTRODE

CABLE PULLING. REFER

TO BOREHOLE COLLAR

DIAGRAMS SHEET CO3

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

ACTIVE / PARASITIC ELECTRODE CABLE CONNECTION

SCALE: 2" = 1’-0"

ACTIVE / PARASITIC ELECTRODE THREADED HOLE PATTERN AT CABLE CONNECTIONS

SCALE: 2" = 1’-0"

CONNECTION AT FAR END CONNECTION AT NEAR END

(4) 1/4-20 UNC 3/4"

7/16" DIA. X 90 DEG.

(10) 3/8-16 UNC 3/4"(2) 3/8-16 UNC 5/8"

5/8"

2 3/8"

5 3/4"

11 1/2"

1’-2 1/2"

1’-6 1/2"

2’-2"

2’-3 1/2"3’-1"

/4

/4

HEX CAP S.S.

(4)-SCREW,1/4-20 x 3"

(BASE PLATE)

1.25"x4"x21.5"

1.25" UHMWP.

(CLAMP PLATE)

1/4" GFRP 4 HOLES

(CLAMP BLOCK)

1.25"x4"x8"

1.25" UHMWP.

(SEE SHEET E01 FOR LAYOUT)

ELECTRODE / PARASITIC

(2) HOLE ILSCO CLND-250-38-134

COMPRESSION LUG 250MCM

AND LOCK WASHER 318 S.S.

(2) 3/8-16 x 1" BOLT, WASHER

DP 5 W5 S.S.

(2)-COVER PLATE STAUFF,

VENT

FILL

3/4"4 11/16"

(SEE SHEET E01 FOR LAYOUT)

ELECTRODE / PARASITIC

(4) 1/4-20 UNC 3/4"

7/16" DIA. X 90 DEG.

(10) 3/8-16 UNC 3/4"(2) 3/8-16 UNC 5/8"

5/8"

2 3/8"

5 3/4"

11 1/2"

1’-2 1/2"

1’-6 1/2"

2’-2"

2’-3 1/2"

/4

/4

5’-3"

CABLE TO ELECTRODE ATTACHMENT PROCEDURE

OPERATIONS 2-4 MAY BE COMPLETED PRIOR TO DELIVERY OF ELECTRODE MATERIAL AND FLASH WELDING OF1.

COMPLETE ELECTRODE

DRILL AND TAP 10 LOCATIONS FOR 3/8-16 SS CAP SCREWS. SEE SH3.2.

DRILL AND TAP 2 LOCATIONS FOR 3/8-16 BOLTS THAT ATTACH COMPRESSION LUG. SEE SH3.3.

DRILL AND TAP 4 LOCATIONS FOR 1/4-20 BOLTS THAT ATTACH CABLE CLAMPS. SEE SH3.4.

FOLLOWING OPERATIONS MUST BE PERFORMED IN AN ENCLOSED WEATHERPROOF AREA WHICH MAINTAINS5.

ADHESIVE, WORKPIECE AND WORKAREA AMBIENT TEMPERATURE OF 60 DEGREES F OR HIGHER UNTIL ASSEMBLY IS

COMPLETE.

STRIP CABLE INSULATION APPROX 6 7/8IN AND CRIMP COMPRESSION LUG SECURELY TO END OF CONDUCTOR. BEAD6.

BLAST EXPOSED CONDUCTOR AND LUG WITH #100ALOX OR EQUIVALENT. THOROUGHLY SCUFF END OF CABLE

INSULATION FOR 20IN WITH 100GRIT SANDPAPER. THOROUGHLY CLEAN EXPOSED CONDUCTOR, COMPRESSION LUG

AND ABRADED AREA OF INSULATION WITH ALCOHOL

VERIFY THAT WORK AREA OF ELECTRODE IS LEVEL WITHIN 2 DEGREES. GRIND ELECTRODE SURFACE AREA THAT WILL7.

RECEIVE BASE PLATE AND CABLE CLAMPS TO REMOVE ANY EXISTING FINISH. THOROUGHLY CLEAN AND DEGREASE

ANY OIL, DIRT AND RUST FROM THIS AREA OF ELECTRODE. CLEAN WITH ALCOHOL.

ENSURE THAT BASE PLATE,TOP PLATE,CLAMP BLOCK,ALL FASTENERS, CABLE CLAMPS AND CLAMP COVER PLATES8.

HAVE BEEN BEAD BLASTED WITH #100ALOX OR EQUIVALENT AND THOROUGHLY CLEANED. DEGREASE WITH

ALCOHOL.

INSTALL BASE PLATE, CABLE, TOP PLATE, CLAMP BLOCK, CABLE CLAMPS AND ALL FASTENERS. DO NOT TIGHTEN9.

FASTENERS. ENSURE THAT CABLE JACKET OVERHANGS INTERNAL EDGE OF BASE PLATE BY AT LEAST 1/2IN.

KEEP INTERNAL CAVITY FORMED BY BASE PLATE AND TOP PLATE FREE OF ANY DEBRIS AND MOISTURE DURING THE10.

ENTIRE PROCESS. ENSURE THAT ALL TOOLS WHICH CONTACT FASTENERS ARE THOROUGHLY CLEANED AND

DEGREASED AND DO NOT CONTAMINATE FASTENERS.

TIGHTEN (2) 3/8 BOLTS AT COMPRESSION LUG TO 18FTLB. MAINTAIN LUG ALIGNMENT WITH ELECTRODE.11.

TIGHTEN (6) 3/8-16 SOCKET HEAD CAP SCREWS AT TOP PLATE 10-12FTLB FOLLOWED BY (4) 3/8-16 SOCKET HEAD CAP12.

SCREWS AT CLAMP BLOCK 10-12FTLB. MAINTAIN ALIGNMENT OF COMPONENTS WITH ELECTRODE

TIGHTEN (4) 1/4-20 BOLTS AT CABLE CLAMPS 4-5 FTLB.13.

SEAL ALL EXTERNAL JOINTS BETWEEN ELECTRODE,BASE PLATE,TOP PLATE,CLAMP BLOCK AND CABLE WITH SILICONE14.

ADHESIVE SUFFICIENT TO RETAIN ANY LEAKAGE DURING FILLING OF INTERNAL CAVITIES. DO NOT ALLOW SILICONE TO

INTRUDE INTO GAPS FARTHER THAN 1/4". ALLOW SILICONE TO CURE COMPLETELY PER MANUFACTURER’S

INSTRUCTIONS.

CLEAN ALL EXPOSED FASTENER HEADS, TOP PLATE, CLAMP BLOCK, CAVITY, COMPRESSION LUG, EXPOSED CABLE15.

AND CABLE CLAMP ASSEMBLIES WITH ALCOHOL AND ALLOW TO DRY. KEEP ASSEMBLY FREE OF MOISTURE AND

CONDENSATION PRIOR TO AND DURING ADDITION OF ADHESIVE

FOLLOWING MANUFACTURERS INSTRUCTIONS FOR PREPARATION AND APPLICATION MIX TWO PART RELTEK B-482TH16.

EPOXY USING BEST PRACTICES TO MINIMIZE GAS ENTRAPMENT IN ADHESIVE. APPROXIMATELY ONE QUART OF

ADHESIVE WILL BE REQUIRED PER ASSEMBLY INCLUDING COVERAGE OF CABLE CLAMPS.

POURING SLOWLY TO AVOID GAS ENTRAPMENT, FILL INTERNAL CAVITY, ALL FASTENER COUNTERBORES AT TOP PLATE17.

AND CLAMP BLOCK INCLUDING A 1 INCH DIAMETER SURROUNDING AREA AND FILL HOLES AT CLAMP BLOCK WITH

RELTEK EPOXY UNTIL INTERNAL CAVITY IS COMPLETELY FILLED AND EPOXY IS VISIBLE AT VENT AND FILL HOLES. VERIFY

THAT NO LEAKS ARE PRESENT AT ANY EXTERNAL JOINTS. BRUSH ON OR OTHERWISE COMPLETELY COAT CABLE

CLAMPS, TOP PLATES AND FASTENERS WITH EPOXY ENSURING SEALING BETWEEN CLAMP BLOCK HALVES. CONTINUE

TO ADD EPOXY ADHESIVE AS NECESSARY TO MAINTAIN FULL LEVEL AT CAVITY WHILE EPOXY REMAINS LIQUID.

ALLOW COMPLETED ASSEMBLY TO REMAIN UNDISTURBED UNTIL EPOXY HAS CURED FOR 24 HOURS.18.

(TOP PLATE)

1.25"x4"x13.5"

1.25" UHMWP.

McMASTER PART 92185A635 or EQUIV.

SOCKET HEAD CAP S.S.

(10)-SCREW, 3/8-16 x 2 3/4"

STAUFF 5 35PP

(2)-CABLE CLAMP

3’-0"

NEAR END

1 1/2"

3’-7"1’-9 1/2"

FAR END

3’-0" 1’-9 1/2" 5 1/2" 1 1/2"

CENTER OF ELECTRODE

E03

A C

T

IV

E P

A R

A S

IT

IC

E

L E

C T

R O

D E

W

IR

IN

G C

O N

N E

C T

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

E

J

U L

Y

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

TEMPORARY WIRING SUPPORT RACK (EXAMPLE)

SCALE: NTS

ELECTRODE WIRING LAYOUT & INSTALLATION PROCEDURES

SCALE: NTS

e18CF (REF.)

e01CF (REF.)

e09AN (REF.)

e10AN (REF.)

e0 9D

F e0 9D

N e0 9C

F e0 9C

N e0 9B

F e0 9B

N e0 9A

F e0 9A

N e1

0D F e1 0D

N e1 0C

F e1 0C

N e1 0B

F e1 0B

N e1 0A

F e1 0A

N e0 2N e0 2F e0 1A

N e0 1A

F e0 1B

N e0 1B

F e0 1C

N e0 1C

F e14A F e14A Ne13Fe13Ne12Fe12Ne11Fe11N e05A F e05A N e06Fe06Ne07Fe07Ne08Fe08N e10HF e10HN e10GF e10GN e10FF e10FN e10EF e10EN e09HF e09HN e09GF e09GN e09FF e09FN e09EF e09EN e

B N e

B F e

C N e

C F e

N e F e

N e F e

B N e

B F e

C N e

C F e

N e F e

N e F e1

7N e1 7F e1 8A

N e1 8A

F e1 8B

N e1 8B

F e1 8C

N e1 8C

F

IN

N E R R

IN

G O

U T E R R

IN

G

TEMPORARY WIRING SUPPORT RACK w/ ELECTRODE WIRING

SCALE: NTS

(SEE SEQUENCE ON SHEET C03)

SUPPORT WILL BE EMBEDDED INTO FUTURE BUILDING SLAB. 7.

PROVIDE 8FT OF CABLE ABOVE FINISHED FLOOR.

CABLES TO BE SECURELY TIED OFF IN ORDER SHOWN. CABLES TO BE CUT TO 6.

OF SUFFICIENT STRENGTH TO ENSURE THAT CABLES ARE SECURED IN PLACE.

INSTALLER TO CREATE TEMPORARY SUPPORT RACK SIMILAR TO THAT SHOWN AND 5.

WORKING SOUTH/CLOCKWISE RESPECTIVELY UP TO E01 ELECTRODES/CABLES.

INSTALL INNER RING OF ELECTRODES/CABLES SECOND STARTING WITH E09 AND 4.

WORKING NORTH/ CLOCKWISE RESPECTIVELY UP TO E18 ELECTRODES/CABLES.

INSTALL OUTER RING OF ELECTRODES/CABLES FIRST STARTING WITH E10 AND 3.

THE EQUIVALENT SEQUENCE APPLIES.

THE FOLLOWING SEQUENCE IS FOR BORE HOLE 1 (BH01). AT OTHER BORE HOLES 2.

SIDE (EAST) CABLE. SUFFIX "F" INDICATES FAR SIDE (WEST) CABLE.

WITHSTAND HANDLING THROUGH THE BORE HOLE. SUFFIX "N" INDICATES NEAR

ALL CABLES SHALL BE TAGGED WITH A SYSTEM SUFFICIENTLY ROBUST TO 1.

PROCEDURE NOTES:

e2 7D

F e2 7D

N e2 7C

F e2 7C

N e2 7B

F e2 7B

N e2 7A

F e2 7A

N e2

8D F e2 8D

N e2 8C

F e2 8C

N e2 8B

F e2 8B

N e2 8A

F e2 8A

N e2 0N e2 0F e1 9A

N e1 9A

F e1 9B

N e1 9B

F e1 9C

N e1 9C

F e32A F e32A Ne31Fe31Ne30Fe30Ne29Fe29N e23A F e23A N e24Fe24Ne25Fe25Ne26Fe26N e

B N e

B F e

C N e

C F e

N e F e

N e F e

B N e

B F e

C N e

C F e

N e F e

N e F e3

5N e3 5F e3 6A

N e3 6A

F e3 6B

N e3 6B

F e3 6C

N e3 6C

F

IN

N E R R

IN

G O

U T E R R

IN

G e4 5D

F e4 5D

N e4 5C

F e4 5C

N e4 5B

F e4 5B

N e4 5A

F e4 5A

N e4

6D F e4 6D

N e4 6C

F e4 6C

N e4 6B

F e4 6B

N e4 6A

F e4 6A

N e3 8N e3 8F e3 7A

N e3 7A

F e3 7B

N e3 7B

F e3 7C

N e3 7C

F e50A F e50A Ne49Fe49Ne48Fe48Ne47Fe47N e41A F e41A N e42Fe42Ne43Fe43Ne44Fe44N e

B N e

B F e

C N e

C F e

N e F e

N e F e

B N e

B F e

C N e

C F e

N e F e

N e F e5

3N e5 3F e5 4A

N e5 4A

F e5 4B

N e5 4B

F e5 4C

N e5 4C

F

IN

N E R R

IN

G O

U T E R R

IN

G

BORE HOLE 1 (BH01) BORE HOLE 2 (BH02) BORE HOLE 3 (BH03)

e28HF e28HN e28GF e28GN e28FF e28FN e28EF e28EN e27HF e27HN e27GF e27GN e27FF e27FN e27EF e27EN e46HF e46HN e46GF e46GN e46FF e46FN e46EF e46EN e45HF e45HN e45GF e45GN e45FF e45FN e45EF e45EN

5’ -1 1"

E04

T E

M P

O R

A R

Y W

IR

E S

U P

P O

R T

E L E

C T

R O

D E W

IR

IN

G L

A Y

O U

T

(B H

T

H R

U B

H

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

E

J

U L

Y

REVISED RECORD

N e0 1A

F

N

BH03 NOT IN CONTRACT

WERE CONSTRUCTED WITH 1-1/2" UNISTRUT.

NOTE: THE TEMPORARY WIRING SUPPORT RACKS

**NOTE: E10 ETECTRODES WERE INSTALLED IN REVERSE ORDER, REFER TO E05 FOR INSATALLED LOCATIONS

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

BORE HOLE (BH01)

CENTERLINE OF

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

BORE HOLE (BH01) ELECTRODE SECTION

SCALE: NTS

(ELEV: 550’ APPROX.)

BOTTOM OF CANAL

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

BORE HOLE (BH02)

CENTERLINE OF

BORE HOLE (BH02) ELECTRODE SECTION

SCALE: NTS

(ELEV: 550’ APPROX.)

BOTTOM OF CANAL

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

BORE HOLE (BH03)

CENTERLINE OF

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

BORE HOLE (BH03) ELECTRODE SECTION

SCALE: NTS

(ELEV: 550’ APPROX.)

BOTTOM OF CANAL

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

e01 e02 e03 e04 e05 e06 e07 e08 e09 e10 e11 e12 e13 e14 e15 e16 e17 e18 e19 e20 e21 e22 e23 e24 e25 e26 e27 e28 e29 e30 e31 e32 e33 e34 e35 e36 e37 e38 e39 e40 e41 e42 e43 e44 e45 e46 e47 e48 e49 e50 e51 e52 e53 e54

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

/4

ELECTRODE TABLE

MARK LAYOUT LENGTH WEIGHT (TONS)

e01 B-B 156’-0" 19.89 e02 A-A 156’-0" 6.63 e03 A-A 156’-0" 6.63 e04 A-A 156’-0" 6.63 e05 B-B 156’-0" 19.89 e06 A-A 156’-0" 6.63 e07 A-A 156’-0" 6.63 e08 A-A 156’-0" 6.63 e09 C-C 156’-0" 53.04 e10 C-C 156’-0" 53.04 e11 A-A 156’-0" 6.63 e12 A-A 156’-0" 6.63 e13 A-A 156’-0" 6.63 e14 B-B 156’-0" 19.89 e15 A-A 156’-0" 6.63 e16 A-A 156’-0" 6.63 e17 A-A 156’-0" 6.63 e18 B-B 156’-0" 19.89

5"

5" 5" 5"

5" 5" 5"

1’-8"

5"

LAYOUT A-A

ELECTRODE TABLE

MARK LAYOUT LENGTH WEIGHT (TONS)

e19 B-B 156’-0" 19.89 e20 A-A 156’-0" 6.63 e21 A-A 156’-0" 6.63 e22 A-A 156’-0" 6.63 e23 B-B 156’-0" 19.89 e24 A-A 156’-0" 6.63 e25 A-A 156’-0" 6.63 e26 A-A 156’-0" 6.63 e27 C-C 156’-0" 53.04 e28 C-C 156’-0" 53.04 e29 A-A 156’-0" 6.63 e30 A-A 156’-0" 6.63 e31 A-A 156’-0" 6.63 e32 B-B 156’-0" 19.89 e33 A-A 156’-0" 6.63 e34 A-A 156’-0" 6.63 e35 A-A 156’-0" 6.63 e36 B-B 156’-0" 19.89

ELECTRODE TABLE

MARK LAYOUT LENGTH WEIGHT (TONS)

e37 B-B 156’-0" 19.89 e38 A-A 156’-0" 6.63 e39 A-A 156’-0" 6.63 e40 A-A 156’-0" 6.63 e41 B-B 156’-0" 19.89 e42 A-A 156’-0" 6.63 e43 A-A 156’-0" 6.63 e44 A-A 156’-0" 6.63 e45 C-C 156’-0" 53.04 e46 C-C 156’-0" 53.04 e47 A-A 156’-0" 6.63 e48 A-A 156’-0" 6.63 e49 A-A 156’-0" 6.63 e50 B-B 156’-0" 19.89 e51 A-A 156’-0" 6.63 e52 A-A 156’-0" 6.63 e53 A-A 156’-0" 6.63 e54 B-B 156’-0" 19.89

- SEE SPECIFICATIONS

ELECTRODES ARE 5"x5" WELDABLE STEEL

NOTE:

A A B C

A B C D

E F G H

1’-3"

LAYOUT C-C *

LAYOUT B-B*

**SIGNIFIES SPECIAL "NON-TYPICAL" LAYOUT

*TYPICAL LAYOUT ARE SHOWN

NOTE:

E05

B O

R E H

O L E

B H

T H

R U

B H

E L E

C T

R O

D E S

E C

T

IO

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

E

J

U L

Y

REVISED RECORD

BH03 NOT IN CONTRACT

BH03 NOT IN CONTRACT

FACING WEST

FACING WEST

** SEE BELOW

D C B A

H G F E e10

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

BORE HOLE (BH04) PARASITIC SECTION

SCALE: NTS

ELECTRODE TABLE

MARK LAYOUT LENGTH WEIGHT (TONS)

p01 A-A 156’-0" 13.26 p02 A-A 156’-0" 13.26 p03 A-A 156’-0" 13.26 p04 A-A 156’-0" 13.26 p05 A-A 156’-0" 13.26 p06 A-A 156’-0" 13.26

5"

LAYOUT A-A

p01 p02 p03

BORE HOLE (BH04)

CENTERLINE OF

BORE HOLE (BH05) PARASITIC SECTION

SCALE: NTS

p04 p05 p06

BORE HOLE (BH05)

CENTERLINE OF

(ELEV: 550’ APPROX.)

BOTTOM OF CANAL

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

(ELEV: 550’ APPROX.)

BOTTOM OF CANAL

(ELEV: 552.50’ APPROX.)

BOTTOM OF ELECTRODES

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

" 5"

A B

ELECTRODES ARE 5"x5" WELDABLE STEEL - SEE SPECIFICATIONS

NOTE:

10"

FACING WEST

FACING WEST

** NOTE: ALL PARASITIC ELECTRODES WERE INSTALLED WITH A & B ELECTODES REVESED. B A

E06

B O

R E H

O L E

B H

B H

P A

R A

S

IT

IC

S

E C

T

IO

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

/1

/2

E

ELECTRODE & PARASITIC SLEEPER LAYOUT

SCALE: 1/16" = 1’-0"

10’ 0 10’ 20’ 30’

BOREHOLE (BH03)

EXISTING

ELECTRODE ARRAY & CANAL

CENTERLINE OF

SEE DETAIL 1/S02

PARASITIC SLEEPER

SEE DETAIL 2/S02

ELECTRODE SLEEPER

(N.I.C.-FUTURE)

CABINET SLAB SEE DETAIL 1/S03

PARASITIC CONTROL

(N.I.C.-FUTURE)

PARASITIC CONDUIT RACEWAY

EXTENT OF WORK LIMITS

MARK

IL. EAST NAD83 STATEPLANE COORDINATES

NORTHING EASTING

SL01 N 1,812,796.71’ E 1,059,042.65’

SL02 N 1,812,798.99’

SL03 N 1,812,801.28’ E 1,058,982.82’

SL04 N 1,812,803.57’

SL05 N 1,812,805.85’ E 1,058,922.99’

SL06 N 1,812,818.32’ E 1,058,923.95’’

SL07 N 1,812,816.03’ E 1,058,953.86’

SL08 N 1,812,813.75’ E 1,058,983.77’

SL09 N 1,812,811.46’ E 1,059,013.69’

SL10 N 1,812,809.17’ E 1,059,043.60’

SL11 N 1,812,821.64’ E 1,059,044.55’

SL12 N 1,812,823.92’ E 1,059,014.64’

N 1,812,830.78’ E 1,058,924.90’

N 1,812,877.47’ E 1,059,048.82’

N 1,812,879.76’ E 1,059,018.91’

N 1,812,882.05’ E 1,058,988.99’

N 1,812,884.33’ E 1,058,959.08’

N 1,812,886.62’ E 1,058,929.17’

N 1,812,933.48’ E 1,058,932.75’

N 1,812,931.20’ E 1,058,962.67’

N 1,812,928.91’ E 1,058,992.58’

N 1,812,926.62’ E 1,059,022.49’SL24

SL23

SL22

SL21

SL20

SL19

SL18

SL17

SL16

SL15

N 1,813,001.99’ E 1,058,968.08’

N 1,813,004.28’ E 1,058,938.16’

N 1,813,051.14’ E 1,058,941.75’

N 1,813,048.85’ E 1,058,971.66’

N 1,813,046.57’ E 1,059,001.57’

N 1,813,044.28’ E 1,059,031.48’

N 1,813,041.99’ E 1,059,061.39’

N 1,813,110.38’ E 1,059,066.62’

N 1,813,112.66’ E 1,059,036.71’SL37

SL36

SL35

SL34

SL33

SL32

SL31

SL30

SL29

SL14 N 1,812,828.49’ E 1,058,954.81’

SL28 N 1,812,999.70’ E 1,058,997.99’

SL13 N 1,812,826.21’ E 1,058,984.72’

NORTHING EASTING NORTHING EASTING

N 1,813,127.41’ E 1,059,007.75’

N 1,813,125.13’ E 1,059,037.66’

N 1,813,122.84’ E 1,059,067.58’

E 1,059,068.53’

N 1,813,137.59’ E 1,059,038.62’

N 1,813,139.88’ E 1,059,008.70’

N 1,813,142.16’ E 1,058,978.79’

N 1,813,144.45’ E 1,058,948.88’SL50

SL49

SL48

SL47

SL46

SL45

SL44

SL43

SL42 N 1,813,129.70’ E 1,058,977.84’

NORTHING EASTING

SL41 N 1,813,131.99’ E 1,058,947.93’

SL40 N 1,813,119.52’ E 1,058,946.97’

SL39 N 1,813,117.24’ E 1,058,976.89’

SL38 N 1,813,114.95’ E 1,059,006.80’

SL27 N 1,812,997.41’ E 1,059,027.90’

SL26 N 1,812,995.12’ E 1,059,057.81’

SL25 N 1,812,924.34’ E 1,059,052.40’

E 1,059,012.73

E 1,058,952.91

N 1,813,135.30

BOREHOLE (BH04)

EXISTING

(N.I.C.-FUTURE)

CABINET SLAB SEE DETAIL 1/S03

PARASITIC CONTROL

SEE DETAIL 4/S02 (N.I.C.-FUTURE)

PARASITIC ACCESS VAULT

BORE HOLE (BH02)

EXISTING

BORE HOLE (BH01)

EXISTING

SL01

SL02

SL03

SL04

SL05 SL06 SL15

SL07 SL14

SL08 SL13

SL09 SL12

SL10 SL11 SL16

SL17

SL18

SL19

SL20 SL21

SL22

SL23

SL24

SL25 SL26

SL27

SL28

SL29

SL30 SL31

SL32

SL33

SL34

SL35 SL36

SL37

SL38

SL39

SL40 SL41

SL42

SL43

SL44

SL45 SL46

SL47

SL48

SL49

SL50

S O

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

S01

E L E

C T

R O

D E P

A R

A S

IT

IC

S L E

E P

E R L

A Y

O

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

S

J

U L

Y

REMOVED

HAVE BEEN

ELECTRODES

WIDE ARRAY

R E

V

IS

E D I

N W

A T

E R S

T R

U T

U R

E L

O C

A T

IO

N /R

E M

O V

A

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

PARASITIC CONCRETE SLEEPER

SCALE: 3/4" = 1’-0"

3" SCH. 80 PVC PIPE

(T Y

P

C L

R

ELECTRODE CONCRETE SLEEPER

SCALE: 3/4" = 1’-0"

(1)-#5 EA. SIDE

(3)-#5 TOP & BOTTOM

(18)-#4 STIRRUPS @ 12" O.C.

(T Y

P

C L

R

(2)-3" SCH. 80 PVC PIPE

PLAN VIEW

ELEVATION VIEW

SECTION VIEW ELEVATION VIEW

PLAN VIEW

12" DIA. HOLE FOR ELECTRICAL CABLES

3/4" CDX PLYWOOD WITH

26" DIA. TEMPORARY COVER

16" (2" COVER)

AND (3)-#4 HOOPS LAPPED

(8)- #4 Gr.60 VERTICAL

F’c = 5000 psi

CONCRETE VAULT

ELECTRODE BORE HOLE ACCESS VAULT

SCALE: 3/4" = 1’-0" 4

ELECTRODE ACCESS VAULT (N.I.C.-FUTURE)

SCALE: 3/4" = 1’-0"

A A

B B

S02

(3)-#4 HOOPS LAPPED 16" MIN. 2" COVER

(3)-#4 Gr.60 VERTICAL (EA. SIDE)

F’c = 5000 psi

CONCRETE VAULT

5 SCALE: 1 1/2" = 1’-0"

SECTION A-A SECTION B-B

WITH LIFTING HOLE.

1/4" CHECKER PLATE LID (GALVANIZED)

BUILDING SLAB

TOP OF

FOR PARASITIC CONDUITS

CUTOUT OPENING

RACEWAY EACH SIDE

EXTENT OF CONCRETE

TOP OF GRADE

C L

R

C L

R

4’-5"

1’-7 1/2" 1’-2" 1’-7 1/2"

17’-0"

10" 1’-7" 9 5/8" 9" 7 3/8" 9" 7 1/8" 9" 10 5/8" 1’-7" 8 7/8" 9" 7 1/8" 9" 7 3/8" 9" 9 3/4" 2’-0" 10"

/4

3’-6" 10’-0" 3’-6"

2’-8" DIA.

3’-0" DIA.

3’-8" DIA.

4’-4"

1’-1 3/8" 1’-3" 1’-11 5/8"

EA. SIDE

(1)-#5 EPOXY COATED

STIRRUPS

(4)-#4 EPOXY COATED

TOP & BOTTOM

(3)-#5 EPOXY COATED

CONCRETE RACEWAY (N.I.C.-FUTURE)

/4

TOP OF GRADE

6" SCH. 40 PVC CONDUIT 2" SCH. 40 PVC CONDUIT

F’c: 3000 psi (MIN.)

CONCRETE

#4 HOOPS @ 12" O.C.

(8)- #4 Gr.60

ALL AROUND

3" COVER

1’-9"

8 5/8" 6" 6 3/8"

S02

P A

R A

S

IT

IC

E

L E

C T

R O

D E

C O

N C

R E

T E S

L E

E P

E R

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

S

J

U L

Y

C H

A N

G E T

O T

E X

T L

A B

DIAGRAMS SHEET C03

WAS REVISED - SEE AS-BUILT

BOREHOLE ACCESS VAULT

REFER TO SHEET FOR S04 SCOUR PROTECTION REFER TO SHEET FOR S04 SCOUR PROTECTION

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

PARASITIC CONTROL CABINET SLAB & BURIED CONDUIT (N.I.C.-FUTURE)

SCALE: 1" = 1’-0"

6"

/2

/2

C L

R

3’-0" 1’-0"3’-0"1’-0"

(WITH SWEEPING BENDS)

2" SCH. 40 PVC CONDUIT

PVC CONDUIT

1 1/2" SCH. 40

2/0 AWG GROUNDING WIRE

TOP OF SLAB

CUT SLEEVE FLUSH WITH

PARASITIC BORE HOLE

INSTALLING GROUNDING WIRE

TO BE BACKFIELD AFTER

12"W x 30" DP TRENCH

CONC. FOOTING

4’-11"x8’-11"x18" DP.

INTO CABINET

36" LONG PIGTAIL

12" 0 1’ 2’ 3’

(LOCATIONS TO BE DETEMINED)

(4)-5/8"DIA. ANCHOR BOLTS EMBEDDED 9"

CONNECT TO CONCRETE SLAB WITH

FOR PARASITIC CONTROL

1200A (SINGLE), OUTDOOR

GE BREAKMASTER LOAD INTERRUPTER SWITCH SKV,

/2

2’-3"1’-2"3’-0" 1’-0"

(WITH SWEEPING BENDS)

6" SCH. 40 PVC CONDUIT

3"

A

A

SECTION A-A

/2

C L

R

BY OTHERS

CONTROL CABINET

(TOP AND BOTTOM)

#5 @ 12" O.C. EACH WAY

S02

CONCRETE RACEWAY

/2

PER PLAN

P E

R P

L A

N

/2

C L

R

S03

P A

R A

S

IT

IC

C

O N

T R

O L C

A B

IN

E T S

L A

B

B

U R

IE

D C

O N

D

IT

L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

/1

/2

S

REVISED RECORD

ON THIS SHEET.

IN CONTRACT. NO UPDATES

BY OTHERS OR FUTURE, NOT

ALL WORK ON THIS SHEET IS

L

IC

IT

A T

IO

N N o

F

IL

E N

A M

E

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N o

IDENTIFICATION

SHEET

D A

T E

A P

P R fiof Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O D

IS

T R

IC

T

C H

IC

A G

O

IL

L

IN

O

IS

of Engineers

US Army Corps

Chicago District

A Q

U A

T

IC

N

U

IS

A N

C E D

IS

P E

R S

A L B

A R

R

IE

R I

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

W P -1

-C -0

P R

E P

A R

E D B

Y

V A

N C

O U

V E

R

W A

N .E S

A L

M O

N C

R E

E K A

V E

P L

O T D

A T

E

W P -1

-R -0

A N

S I

D

C K

D B

Y

R E

C O

R D D

R A

W

IN

G S A

S -B

U

IL

T C

O N

D

IT

IO

N S

RECORD

/3

/1

1 SCALE: 3/4" = 1’-0" 2 SCALE: 3/4" = 1’-0"

PARASITIC CONCRETE SLEEPER (SCOUR PROTECTION) ELECTRODE CONCRETE SLEEPER (SCOUR PROTECTION)

ELEVATION

UNDER SLEEPERS TO ACHIEVE PROPER

GRAVEL LEVELING MATERIAL PLACED

SECTION VIEW

ELEVATION VIEW

PLAN VIEW

PLAN VIEW

ELEVATION VIEW

VARIES BY LOCATION DUE TO THE VARYING CANAL BOTTOM CONDITIONS.

TYPICAL PLACEMENT IS SHOWN. QUANTITY AND CONFIGURATION OF BAGS

PLACED TO PROTECT SLEEPERS AND LEVELING GRAVEL FROM SCOUR.

SLING BAGS BY QUIKRETE (60LB. EACH, 3-1 SAND & CEMENT, 14"X21"X3")

S04

D M L

C

S L

M c

J P

K M

A S S

H O

W N

/1

/2

S

J

U L

Y

REVISED RECORD

S L E

E P

E R S

C O

U R P

R O

T E

C T

G01
G02
G03
G04
C01
C02
C03
E01
E02
E03
E04
E05
E06
S01
S02
S03
S04