W81G6681511726
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: REVISION TO PERFORMANCE WORK STATEMENT, REQUEST FOR PROPOSAL NUMBER W912P618R0005, "CSSC PB1 PULSE
GENERATING SYSTEM SUPPLY AND INSTALLATION"
A. By this Amendment 0001, the government makes a revision to the Performance Work Statement (PWS) to clarify the size of the capacitor bank at Section 3.3.1d of the PWS. The relevant change is hereby captured under the enclosed “REVISED Page #14” of the PWS.
B. This Amendment does not extend the response due date or time; therefore, proposal packages shall be submitted no later than 4:30p.m.
(Central Time) on July 25, 2018. Detailed proposal instructions are provided in the Solicitation document at Section L.
CONTINUES ON THE FOLLOWING PAGE—
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P618R0005
X 9B. DATED (SEE ITEM 11)
20-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2018
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P618R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
C. In consideration of the aforementioned revision, offerors shall replace Page 14 of the PWS with the relevant REVISED page enclosed hereunder. The exact revised PARAGRAPH of Section 3.3.1d is as follows (Note, the Revised page demonstrates the change via language lined out and underlined):
Changed from:
(d) The capacitance shall be capable of delivering energy to allow for pulsing device supporting equipment to meet prescribed requirements in addition to limiting the flattop peak to peak voltages to less than a 3% voltage drop across a maximum of a 2.3mS pulse width and a maximum 45Hz pulse frequency not to exceed a 15% duty cycle;
Changed to:
(d) The capacitance shall be capable of delivering energy to allow for pulsing device supporting equipment to meet prescribed requirements in addition to limiting the flattop peak to peak voltages to less than a 3% voltage drop across a maximum of a 2.3mS pulse width and a maximum 45Hz pulse frequency with peak voltage of 3500V and peak current of 10,000A;
D. Questions regarding this Amendment may be addressed by contacting Regina Blair at 312-846-5371 or Ericka Hillard at 312-846-5378 or by emailing to regina.g.blair@usace.army.mil (Ms. Blair) or Ericka.d.hillard@usace.army.mil (Ms. Hillard).
W912P618R0005
REVISED PAGE –PROVIDED VIA AMENDMENT 0001
Permanent Barrier I ‐ Pulse Generating System Supply and Installation
Performance Work Statement efficiently at the full range of voltage operating parameters to include any voltage between 1,000- 6,000V with an AC input supply of 5.5MVA at 4,160V. If a rectifier is not used, the power supply equipment must meet the same requirements stated in the Contract.
(d) The capacitance shall be capable of delivering energy to allow for pulsing device supporting equipment to meet prescribed requirements in addition to limiting the flattop peak to peak voltages to less than a 3% voltage drop across a maximum of a 2.3mS pulse width and a maximum 45Hz pulse frequency not to exceed a 15% duty cycle with peak voltage of 3,500V and peak current of 10,000A;
(e) The polarity switch shall be a no load break switch with a total of four positions; with one position to isolate the electrode cables from the Pulse Generating Unit equipment, one position to isolate the electrode cables from the Pulse Generating Unit equipment and tie the electrode cables to the site grounding grid and the last two positions to reverse polarity of the DC pulses to the underwater electrodes. There may be induced power onto the PB1 polarity switches introduced by neighboring electrical barriers that may be operating. The Contractor shall analyze these potential power sources for the effect to the PB1 Pulse Generating System and incorporate this into the design of the polarity switch or any other Pulse Generating Unit equipment that could potentially be affected. The existing barriers have been known to have 300V potential and 20A current flow during similar situations. The Contractor shall provide adequate isolation provisions in place that will separate personnel from hazardous areas such as charged capacitors and potentially energized conductors during maintenance periods when personnel are present in the room;
(f) Any components required for a fully functional, complete, and working Pulse Generating Control System (PGCS)(see additional information below and in Specifications Section 4);
(g) Any components required for a fully functional, complete, and working Power Monitoring Control System (PMCS) (see additional information below and in Specifications Section 4);
(h) Any components required for a fully functional, complete, and working Cooling Control System (CCS) (see additional information below and in Specifications Section 4).
(i) Any components required for a fully functional, complete, and working cooling equipment for the PGS to allow the system to adequately support the Pulse Generating Units (see additional information below);
(j) Any components required for a fully functional, complete, and working Engineering Terminal (see addition information below);
(k) Any components required for a fully functional, complete, and working Control System Database (see additional information below);
(l) Any components required for controlling a heavy short circuit fault at the pulsing device, electrically downstream or electrically upstream of the pulsing device prior to the Government supplied AC switchgear and limits this failure to sacrificial components such as fuses, circuit breakers or other low cost components in an effort to reduce equipment damage and potential personnel injuries. The Contractor shall provide information to verify and demonstrate compliance with this requirement;