AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: REVISIONS TO THE SOLICITATION DOCUMENT & PERFORMANCE WORK STATEMENT, RE: REQUEST FOR PROPOSAL NUMBER

W912P618R0005, "CSSC PB1 PULSE GENERATING SYSTEM SUPPLY AND INSTALLATION"

A. By this Amendment 0002, the government makes revisions described herein, w hich are related to the Solicitation document and Performance Work Statement. Chiefly, the bonding provisions are hereunder deleted as the resulting Contract (“Supply”) is not applicable to the Miller Act and requires Milestone Event Payments per paragraph 3.8 (Payment) of the Performance Work Statement.

B. This Amendment does not extend the response due date or time; therefore, proposal packages shall be submitted no later than 4:30p.m.

(Central Time) on July 25, 2018. Detailed proposal instructions are provided at Section L of the Solicitation document.

CONTINUES ON THE FOLLOWING PAGE—

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P618R0005

X 9B. DATED (SEE ITEM 11)

20-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2018

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P618R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT PARTICULARS

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES to the Solicitation document and Performance Work Statement have been modified based upon the reasons set forth at the above paragraph A (refer to page 1 of this Amendment):

C. SECTION B - SUPPLIES OR SERVICES AND PRICES: A revised Bid schedule is contained hereunder reflecting the below revisions.

(1) Contract Line Item Number (Parent Item) 0001 The extended description has changed to indicate that the applicable Sub-Line Items are now 0001AA through 0001AC, which therefore eliminates Sub-Line Item 0001AD (Payment & Performance Bond)

(2) Contract Line Item Number (Parent Item) 0002 The extended description has changed to indicate that the Sub-Line Item is 0002AA, which therefore eliminates Sub-Line Item 0002AB (Payment & Performance Bond)

(3) Based upon the aforementioned removal of the respective Sub-Line Items, the SUMMATION OF PRICES now read as follows:

BASE ITEMS (SUBITEMS 0001AA AND 0001AC): $________________________

OPTION ITEM (SUBITEM 0002AA):$__________________

TOTAL OVERALL PROPOSED PRICE (ALL AFOREMENTIONED SUBITEMS): $_________________

D. SECTION F - DELIVERIES OR PERFORMANCE: The following Clause now includes an amount for liquidated damages.

52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $2,692.32 per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.

(End of clause)

E. SECTION I - CONTRACT CLAUSES:

(1) The DUPLICATED Clause Number 52.211-11 “LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT” has been deleted from this Section as it is contained in Section F of the Solicitation document.

(2) The DUPLICATED Clause Number 52.215-14 “INTEGRITY OF UNIT PRICES” has been deleted from this Section as it is already contained in this Section I.

(3) Based upon the deletion of the bonding provisions, the following Clauses are hereby deleted in their entirety:

52.228-14 IRREVOCABLE LETTER OF CREDIT

52.228-16 PERFORMANCE AND PAYMENT BONDS--OTHER THAN CONSTRUCTION

F. SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS:

(1) The following Clause No. 52.228-1 has been deleted as a result of the deletion of the bonding provisions/clauses:

52.228-1 BID GUARANTEE

(2) The PROPOSAL INSTRUCTIONS “PROCEDURES FOR SUBMITTAL OF OFFERS” have been modified to remove the submission of the bid guarantee; therefore, a REVISED SECTION is enclosed hereunder and replaces the instructions provided under the Solicitation document issued on June 20, 2018.

G. PERFORMANCE WORK STATEMENT: As discussed herein, the bonding provisions and clauses have been eliminated. Resultantly, at Division 01 (GENERAL REQUIREMENTS), SECTION 01 22 00.00 10 (PRICE AND PAYMENT PROCEDURES), the relevant Paragraph Section 1.2.5 – Performance & Payment Bond (CLIN 0001AD & 0002AB) and all corresponding sub paragraphs have been deleted. A replacement of this Section is enclosed hereunder this Amendment Number 0002 and replaces the previously issued Section issued with the Solicitation on June 20, 2018.

H. The Points of Contact for this Amendment are Regina Blair at regina.g.blair@usace.army.mil and Ericka Hillard at ericka.d.hillard@usace.army.mil.

END OF AMENDMENT NUMBER 0002

-NOTE, THE AFOREMENTIONED REVISED SECTIONS FOLLOW; THEREFORE, OFFERORS

SHALL REPLACE THE REVISED SECTIONS WITH THE PREVIOUSLY ISSUED SECTIONS (ISSUED

ON JUNE 20, 2018)-

REVISED BID SCHEDULE VIA AMENDMENT 0002 –

OFFERORS SHALL USE THE BELOW BID SCHEDULE TO APPLY ITS PRICING; THIS SECTION

WILL SERVE AS ITS PRICE PROPOSAL (REFERENCE SECTION L OF THE SOLICITATION)

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE WORK

FFP

The Contractor shall complete the Base Work within 1,095 calendar days from the date of Contract award.

The requirements associated with this Parent Contract Line Item 0001 is described at its Sub-Line Items 0001AA and 0001AC, which constitute the Base requirements of the Contract. In the performance of the work required by the Sub- Items, the Contractor shall comply with all terms and conditions delineated in the contract documents.

Accordingly, this Contact Line Item 0001 identifies information that relates directly to Sub-Items 0001AA through 0001AC. In that regard, the Offeror shall set forth pricing at Sub-Items 0001AA through 0001AC. This Line Item 0001 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Line Item 0001 is not to be priced separately for payment purposes.

PURCHASE REQUEST NUMBER: W81G6681511726

NET AMT

0001AA 1 Job Pre-Installation Technical Data Packages

FFP

(SERVICE CONTRACT ACT APPLIES)

By this Contract Line Item 0001AA, the Contractor shall not purchase or install components for the PGS, PGS Control System, Cooling System or the Power Monitoring System prior to providing, and receiving Government approval on the pre-installation submittals as required by the PWS. The price for this line item shall include all costs incurred for this work as required by PWS to complete any work associated with creating the pre-installation Technical Data Packages, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

0001AB 1 Job Supply Pulse Generating Unit (PB1 North)

FFP

(High Value Item) SUPPLY PULSE GENERATING UNIT (Barrier 1 North)

This line items includes the Supply of a Pulse Generating Unit at Barrier 1 North.

Incidental to supplying this item, the contractor is required to install, test and commission one (1) complete, functional, and working Pulse Generating Unit as required by the PWS, and further defined by the government approved submittals in Technical Data Package 3. The price for this line item shall include all costs incurred for procuring, delivering, storing, inventorying, and maintaining the equipment, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

0001AC 1 Job

POST-INSTALLATION TECHNICAL DATA PACKAGE

FFP

(SERVICE CONTRACT ACT APPLIES)

By this line item 0001AC, the Contractor shall provide all Post-Installation Technical Data Package components as required by the PWS. The price for this line item shall include all costs incurred for this work as required by PWS to complete any work associated with creating the Post-Installation Technical Data Package, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

OPTION OPTION WORK

FFP

The work associated with this Parent Contract Line Item 0002 is described at Sub- Line Item 0002AA

At the discretion of the government, the Sub-Item 0002AA may be awarded within 365 CALENDAR DAYS prior to the ending date of the aforementioned Base timeframe (re: Contract Line Item 0001). If or when exercised the Option Work is awarded, no additional time will be added to the contract performance period. In addition, if or when the option is awarded, the Sub-Item will be awarded via a formal Modification to the Contract.

Accordingly, this Contact Line Item 0002 identifies information that relates directly to Sub-Item 0002AA. In that regard, the Offeror shall set forth pricing at Sub-Item 0002AA.

This Line Item 0002 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, item 0002 is not to be priced separately for payment purposes.

In the performance of the work required by the Sub-Item, the Contractor shall comply with all terms and conditions delineated in the contract documents.

0002AA 1 Job OPTION SUPPLY PULSE GENERATING UNIT (PB1 South)

FFP

(High Value Item) SUPPLY PULSE GENERATING UNIT (Barrier 1 South)

This line items includes the Supply of a Pulse Generating Unit at Barrier 1 South.

Incidental to supplying this item, the contractor is required to install, test and commission one (1) complete, functional, and working Pulse Generating Unit as required by the PWS, and further defined by the government approved submittals in Technical Data Package 3. The price for this line item shall include all costs incurred for procuring, delivering, storing, inventorying, and maintaining the equipment, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

SUMMATION OF PRICES

BASE ITEMS (SUBITEMS 0001AA AND 0001AC): $________________________

OPTION ITEM (SUBITEM 0002AA):$__________________

TOTAL OVERALL PROPOSED PRICE (ALL AFOREMENTIONED SUBITEMS): $_________________

END OF REVISED BID SCHEDULE

REVISED SECTION L – AMENDMENT NUMBER 0002

The following have been modified:

PROPOSAL INSTRUCTIONS

(PROCEDURES FOR SUBMITTAL OF OFFERS)

NOTE: IN THIS RFP, BID OR BIDDER MEAN "OFFER AND "OFFEROR"

PART 1 GENERAL

The procedures for the submission of all proposals shall be furnished as specified in this Section and in accordance with the additional procedures listed below.

1.0 ACQUISITION METHOD.

Through use of the best value method of contracting, using the source selection trade off process, the USACE- Chicago District, seeks to acquire the services described in this solicitation and its accompanying documents. This particular acquisition method considers award to other than the lowest priced offeror or other than the highest technically rated offeror. In addition, this process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal.

1.1 WHO MAY SUBMIT.

Competition for this acquisition is unrestricted to business size. The applicable North American Industry Classification System (NAICS) code for this procurement is 334419. The intent of this Solicitation is to select one contractor to SUPPLY & INSTALL A PULSE GENERATING SYSTEM FOR THE PERMANENT BARRIER 1, LOCATED AT THE CHICAGO SANITARY AND SHIP CANAL (CSSC) IN ROMEOVILLE, IL. Firms organized as construction contractors that have associated specifically for this project, or other interested parties, may submit proposals. In the latter case, the association may be a joint venture or a subcontractor. If submitting as a joint venture, ensure that the joint venture business name is registered in like manners in the System for Award Management (SAM) database (visit: http://www.sam.gov/); Note: As mandated by the law, this Agency cannot award a contract to a contractor who is not registered in the SAM database. Also note that if joint venturing with a mentor protégé relationship in place, the mentor protégé agreement must be pre-approved by the SBA prior to the joint venture submitting its proposal to this Agency.

1.2 SUBMISSION DEADLINE.

Proposals shall be received by the Corps of Engineers, Chicago District Office no later than the time and date specified in Block 9 of the SF 33 (Page 1) of this Solicitation. – ELECTRONIC OR FAXED PROPOSALS WILL

NOT BE ACCEPTED.

1.3 SUBMISSION FORMAT AND NUMBER OF SUBMITTALS.

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offeror’s should provide sufficient detail and clearly define all items required in this section.

Offerors are cautioned that “parroting” of the Technical requirements contained in the contract specifications/plan sheets a statement of intent to perform does not reflect an understanding of the requirement or capability to perform.

Proprietary information shall be clearly marked.

The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).

The Offeror shall submit all proposal materials in binders with a table of contents and tabbed Section dividers. Each Section submitted must be parallel with the submission requirements identified below. The documents required by

Section 5 shall be submitted in originals only and shall be placed in a clearly marked envelope. All information requested for Sections 1 through 5 must be submitted for the proposal to be considered for award.

Offerors should limit submissions to the data essential for evaluation so that a minimum of time and funds are spent in preparing the information.

Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

Submission Format Requirements Number of Submittals

Section 1 (Tab 1)

FACTOR 1: PAST PERFORMANCE

Original & 5 copies

Section 2 (Tab 2)

FACTOR 2: TECHNICAL APPROACH AND

MANAGEMENT FACTOR

Section 3 (Tab 3)

FACTOR 3: PERSONNEL QUALIFICATION

AND EXPERIENCE

Original & 5 copies

Section 4 (Tab 4) FACTOR 4: SMALL BUSINESS PARTICIPATION

PLAN

Section 5

CONTRACT DOCUMENTS

Originals Only and shall be placed in an envelope

A. SF 33 1 Original B. Bid Schedule (will serve as the Offeror’s PRICE

PROPOSAL)

1 Original

C. Representations & Certificates 1 Original

D. AMENDMENTS (if any)

1 acknowledged copy for each amendment when issued

2.0 GENERAL PROPOSAL INFORMATION.

Offerors should limit submissions to the data essential for evaluation so that a minimum of time and funds are spent in preparing the information. However, in order to be effectively and equitably evaluated, Offerors must include information that is sufficiently detailed to describe the Offeror's qualifications and experience, equipment features of the proposal, and management capabilities to successfully complete the project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals that meet or exceed these requirements are encouraged and shall directly correlate to the information asked for without irrelevancies.

The Government will not be liable for any costs incurred by the Offeror submitting an offer in response to this Solicitation.

The criteria specified in this RFP are binding contract criteria and in cases of any conflict, subsequent to award, between RFP criteria and contractor's submittals, the RFP criteria shall govern unless there is a written agreement between the Contracting Officer and the contractor on the waiving of a specific requirement.

Clarification of the Provisions of this Request for Proposal. Any explanation desired by an Offeror regarding the meaning or interpretation of the RFP shall be requested in writing to the Contracting Branch, Attention: Contract Specialist is Ericka Hillard at 312-846-5378/Email to: ericka.d.hillard@usace.army.mil. (PLEASE INCLUDE

THE SOLICITATION NUMBER AND/OR PROJECT TITLE IN THE SUBJECT LINE OF YOUR EMAIL.

2.1 PROPOSAL REQUIREMENTS.

2.1.1 FACTOR 1: PAST PERFORMANCE (TAB 1):

The Offeror shall submit with their proposal up to a maximum of ten (10) Past Performance Questionnaire’s (PPQ) in its proposal for Factor 1, whose form is provided in this Solicitation as Attachment A.

DEPARTMENT OF DEFENSE (DOD) PROJECTS:

Offerors should submit a copy of the Government’s Contractor Performance Assessment Reporting System (CPARS) Evaluations or, for older projects, a copy of the Government’s Construction Contract Performance Evaluations (CCASS). If unable to provide the printed CPARS or CCASS evaluations, provide written notification that current ratings are available so that the Government may obtain the printed evaluation.

Offerors should not request PPQs on projects that have final CPARS or CCASS evaluations. If a PPQ is received on a project where a final CPARS evaluation exists, the CPARS evaluation will serve as the official rating of record for evaluation purposes.

PROJECTS THAT DO NOT HAVE A CPARS EVALUATION:

Offerors shall forward a copy of the Past Performance Questionnaire (PPQ) to the points of contact (POC) responsible for monitoring performance under those contracts.

Completed PPQs should be included with the proposal if at all possible. However, if necessary, they can be submitted directly to Contract Specialist by emailing completed documents to both of the following email address: ericka.d.hillard@usace.army.mil

The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1

– Past Performance. Ensure correct phone numbers and email addresses are provided for the client point of contact.

Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s).

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact prior to proposal closing date.

(Ericka Hillard at 312-846-5378)

Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Also offerors may include performance recognition documents received within the last 5 years of the issuance date of this solicitation, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources will include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier (formerly known as DUNS numbers) of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information Sysems (FAPIIS), Electronic Subcontract Reporting System (eSARS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

The intent of Section 2 of the PPQ is for the Offeror to identify self-performed work that is relevant to this Solicitation. The self-performed work shall be expressed as a percentage of the total contract when compared to the “Final Contract Price.”

The intent of Section 4 of the PPQ is for the Offeror to describe in detail how the self-performed work is relevant to this Solicitation. Such detail should help establish the magnitude and complexity of the past performance and may include, but not be limited to, such items as quantities installed and/or constructed, equipment used, site constraints, and environmental conditions.

If the Offeror is a joint venture (JV), each firm shall only provide information on the PPQ that is relevant to their role on this solicitation. Also, if the JV previously performed work together on a project, the PPQ shall provide information demonstrating relevant experience in the role as a JV and shall indicate the percentage of work the JV completed.

If the Offeror intends to subcontract a particular feature of work, the Offeror is encouraged to submit a PPQ(s) for said subcontractor and specifically identify their role in this Solicitation.

Preferably, only complete PPQs will be included in the proposal and Offerors should follow-up with clients/references prior to the proposal closing date to ensure timely submittal of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror should complete and submit with the proposal the entire PPQ (with the unfilled evaluation section), which will provide contract and client information for the respective project(s). The Government may choose to, but is not obligated to, contact the client during review of the proposal, so the Offeror should ensure that phone numbers and email addresses are current.

New entities without past performance history shall include a letter with the proposal, stating that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the Offeror’s responsibility to ensure that sufficient reference documentation is provided to substantiate the statement, as the Government may or may not make additional requests for past performance information from persons familiar with the Offeror’s performance history.

The Government may contact references provided as part of the Factor for Experience for information regarding past performance on the project and for assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.

2.1.2 2.1.2 FACTOR 2 – TECHNICAL APPROACH AND MANAGEMENT FACTOR (TAB 2)

The technical proposal must demonstrate an ability to comply with all requirements in the solicitation. General statements that the Offeror can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or paraphrases of the RFP’s Statement of Work/Specification in whole or in part, will not constitute compliance. Failure to conform to any of the requirements of the RFP may form the basis for rejection of the proposal.

Offerors shall submit a proposal describing the materials, equipment, methods, concepts, labor, and plans to be used to ensure successful completion of the specified work in accordance with the requirements in the RFP. Specifically, the Offeror shall include, with the proposal, a Preliminary Concept Technical Package. The Preliminary Concept Technical Package shall be in compliance with the requirements and specifications in the contract. The Offeror’s proposal shall not include or assume the Government shall furnish equipment not already installed at the project site.

The government reserves the right to incorporate the winning offeror’s proposal for the Pulse Generating System into the contract requirements. Upon award, the Preliminary Concept Technical Package shall not waive or supersede any of the technical requirements or specifications in the RFP. In cases of any conflict, subsequent to award, between RFP criteria and contractor's submittals, the RFP criteria shall govern unless there is a written agreement between the Contracting Officer and the contractor on the waiving of a specific requirement.

The Preliminary Concept Technical Package shall include the following information, at a minimum, and be submitted in the following fashion:

Tab 2A. Plan Description. The Offeror shall include a plan detailing the Offeror’s proposed technical approach and management to provide a fully functional, complete, and working Pulse Generating System that meets the requirements set forth in the RFP. The plan shall describe the equipment, method, and sequence of work for accomplishing the objective in a timely fashion in accordance with the RFP.

Tab 2B. Schedule. The Offeror shall include a preliminary schedule as described in the PWS Section 3.2.2.

Proposals that include a schedule with the completion of the contract activities in less than three years, or the completion of the installation, Contractor’s Field Testing, and Performance Verification Testing activities in less than two years may receive a higher rating.

Tab 2C. Equipment Arrangement. A plan that depicts the arrangement and physical size of the major components of the Pulse Generating System equipment, such as pulsing device, pulsing device support equipment, the Computer Hardware Resources, Controller, local process panels, and current sensors in the existing PB1 facility floor plan. The plan should also identify the equipment and estimate the material quantities. The Offeror shall use the government provided CAD file of the building layout as a basis of development for the Equipment Arrangement Plan. The plan shall depict any required changes to the existing facility. The arrangement in the plan should enable and depict access to equipment for maintenance purposes.

Tab 2D. Power Diagram. A conceptual-level power one-line diagram depicting the power cable sizes and arrangement, the pulsing device, the pulsing device supporting equipment, and the existing facility raceways. The diagram should depict the use of the existing conduit, the cable run paths, and any bends.

Tab 2E. Equipment Description. A detailed description of the major components of the Pulse Generating System, including the pulsing device, pulsing device support equipment, Computer Hardware Resources, Controller(s), local process panels, and current sensors. The description shall include the component’s name, specification, manufacturer, manufacturer part number and function. For each piece of equipment, include a description of any testing, verifications, validations, inspections, audits, certifications, standards or similar processes from a nationally or internationally recognized organization, such as UL, CSA, NSF, SGS, etc. Where applicable, provide copies of certifications. For each piece of equipment, include a description of any maintenance requirements, including, any manufacturer’s maintenance schedules, equipment lifecycle, the extent that specialized contractor support is required for maintenance activities, and the extent to which government personnel could perform maintenance requirements. The Offeror may include, if available, current prices for replacement parts. Proposals shall describe whether they include components that are commercially available from more than one supplier, utilize current industry standards, and are serviced or maintained by more than one entity may receive a higher rating.

Tab 2F. PGS Equipment Capabilities. A detailed description of the capabilities of the Pulse Generating System equipment, including the available pulsed output waveforms, pulse waveform voltage droop, pulse waveform duration, pulse frequency ranges, pulsed power, pulse voltage ranges and pulse current ranges or any other capabilities. The Offeror shall provide calculations that illustrate the sizing, selection and configuration of the pulsing device and pulsing device support equipment.

Tab 2G. PGS Equipment Requirements. A detailed description of the Pulse Generating System equipment input power requirements, equipment cooling requirements and safety requirements pertaining to physical environment or space, and any other equipment requirements. The plan should include an analysis of the Pulse Generating System equipment as it relates to the existing site conditions pertaining to provided power, cooling and space available. The plan should describe any changes to the existing facility and facility equipment that is required.

Tab 2H. PGS Shop Tests. A detailed list of shop tests, if any, that will be performed on the major components of the PGS System and the PGS System as a whole.

Tab 2I. Safety Features. The proposal shall include a description of the proposed safety features of the PGS system, such as the ability to clear electrical faults with minimal damage to equipment and prevention of personnel injury. The proposal should also describe any safety features for personnel with regard to operation and maintenance activities.

Tab 2J. Cooling System Diagram. A conceptual-level diagram, depicting the Contractor’s approach to connecting the PGS system to the existing cooling system. The diagram shall depict any required changes to the existing cooling system.

Tab 2K. Network Diagram. A conceptual-level control system one-line network diagram depicting the major control equipment for the PGS System (PGS Control System, Power Monitoring System, Cooling Control System and Control System Database). The diagram shall depict the number and types of components utilized and the communication schemes.

Tab 2L. Computer Hardware Resources and Software. A detailed description of the Computer Hardware Resources and Application Software that will be used for the PGS Control system, Power Monitoring System, Cooling Control System, and the Control System Database. The description shall include the standard industrial control language, narrative description of programming language, program structure and industry standard communication protocols that will be used. The description will also indicate the availability of licenses for the software. The description shall indicate whether the Computer Hardware Resources and Application Software are commercially available from more than one supplier. The description shall also indicate whether the programming languages, program structure, and communication protocols are widely used by numerous entities. The proposal shall also describe the level of accuracy and precision of the monitoring and recording of the power monitoring data.

Tab 2M. Cybersecurity. The contractor shall provide a narrative description in their proposal on how they plan to meet the cybersecurity requirements set forth in the PWS.

The Offerors shall organize the Factor 2 (Tab 2) requirements by sub tabs, sequentially, as stated above.

2.1.3 FACTOR 3: PERSONNEL QUALIFICATION AND EXPERIENCE (TAB 3)

The offeror shall provide the resumes of the key personnel that will oversee and execute the work that may be awarded under this contract. The purpose of this submittal is to identify the personnel possessing relevant expertise available to this contract. The Offeror shall provide an organization chart that lists all key personnel deemed, by the Offeror, critical to the successful completion of the project requirements. The resumes should clearly display proposed job title, education, special qualifications, and experience record. Experience record should include title, specific duties, and level of responsibility of assignments for at least the last 5 years prior to the issuance date of the solicitation. The offerors must include resumes of the following key personnel:

• Project Manager

• Systems and Control Engineer(s)

• Any other personnel deemed critical to performance of the work as identified on the organization chart.

If other key management personnel are required to perform any work under this contract, the contractor will be required to submit their resumes. Key personnel obtained through a subcontract arrangement should be clearly annotated as such.

The resumes shall include the personnel education, licenses, certifications and any relevant training. The resumes shall describe the experience that qualifies the relevant personnel for the Solicitation work and specifically identify particular experience of the individuals on the projects listed in Factor 1.

The identified personnel must be used on the project. Any substitution of these persons will not be permitted without prior approval of the Contracting Officer’s Representative and shall meet the equivalent experience to the original personnel.

The Government will evaluate the qualifications of the following key personnel: Project Manager and Systems and Control Engineer(s). The minimum qualifications for each personnel is listed below. Personnel exceeding the minimum qualifications may be considered a strength and may result in a higher adjectival rating:

Project Manager:

The Project Manager shall have at least 3 years of experience managing the development, installation and testing of electrical pulsing system projects, or similar projects.

System and Control Engineer(s):

The System and Control Engineer shall have at least 3 years of experience developing electrical pulsing system projects. The Offeror may have one individual or multiple individuals fulfill this role, but each individual must meet these criteria.

2.1.4 FACTOR 4: SMALL BUSINESS PARTICIPATION PLAN (SBPP) (TAB 4): All offerors (both large and small businesses) will be evaluated on the level of proposed participation of small businesses in the performance of the proposed acquisition. SBPP will be rated independently using an adjectival-based system as described herein this Solicitation. Offerors shall prepare a Small Business Participation Plan using the below content and format.

The SBPP shall be in accordance with Defense Federal Acquisition Supplement (DFARS) 215.304. The SBPP will be incorporated into any resultant prime contract as the basis for a formal Small Business Subcontracting Plan the successful Offeror (if a large business) will be required to submit prior to contract award.

The Small Business Participation Plan shall be based on the Offeror’s best effort; however, it must meet the minimum total Small Business Participation goal of 34.5% of the total contract value. Offerors unable to meet the minimum overall small business goal of 34.5% shall provide an explanation of why this target cannot be met with their proposal.

Address each of the following areas individually:

The extent in which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;

The extent of participation of such firms in terms of the value of the total acquisition in percentages; the extent of commitment to use such firms (for example, enforceable commitments, i.e. teaming agreements signed, are to be considered more heavily than non-enforceable ones);

The complexity and variety of the work small firms are to perform on this acquisition; and, The realism of the Small Business Participation Plan, i.e. aggressive goals.

The intent of the Offeror’s Small Business Participation Plan is for the Offeror to articulate how small businesses will participate in this award performance through small business subcontracting. The SBPP shall be organized as follows:

(1) Prime Contractor type of business (check all that apply):

( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business

( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business

(2) Percentage of your participation as a prime contractor :

(3) Total contract value and percentage of total contract value of subcontracts planned for:

Total Contract Value by Percentage*

Total Contract Value

Large % $

Total Small % $

Small Non-Disadvantaged % $

Small Disadvantaged % $

Small Woman Owned % $

Small HUB Zone % $

Small Veteran Owned % $

Small Service Disabled Veteran Owned

*Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments. Please ensure the percentage of contract value corresponds to the total contract value.

NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.

(4) List principal supplies/services (be specific) to be subcontracted to:

Company Name Type of Service/Supply

Large

Small Non-Disadvantaged

Small Disadvantaged

Small Woman Owned

Small HUB Zone

Small Veteran Owned

Small Service Disabled Veteran Owned

(5) Prior Performance Information: Provide any information substantiating the Offeror’s track record of utilizing small business on past contracts.

(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.

(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.

NOTE: A Small Business Subcontracting Plan will be required if the proposal deemed the best value is submitted by a Large Business. The Small Business Subcontracting Plan must contain all of the elements required by FAR Clause 52.219-9, “SMALL BUSINESS SUBCONTRACTING PLAN (DEVIATION 2018-O0013) (APR 2018).” This Plan is submitted separately from the aforementioned Small Business Participation Plan; thus, it shall not be submitted with any offeror’s proposal package. The Subcontracting Plan is not a requirement for evaluation in this source selection but, rather a requirement for award to a Large Business. Once approved, the Small Business Subcontracting Plan will be incorporated into any resultant contract.

2.1.5 SECTION 5: (SIGNED PROPOSAL; PROPOSED PRICE, REPRESENTATIONS & CERTIFICATIONS;

AND any AMENDMENTS)

All Documents required by this Section Number 5 shall be submitted in original form to the address specified above.

The original bid bond shall be submitted in original form and enclosed in an envelope that is clearly marked as “Section 4 Documents.”

Required documents: SF 33 shall be completed by an authorized person from the company or joint venture. (Not rated, only reviewed for compliance)

Section B of the Solicitation document (Bid Schedule): The Bid Schedule is contained in Section B of this Solicitation and shall serve as the Offeror's Price Proposal.

Section K the Solicitation document (Representations and Certifications): The offeror must complete and submit the Representations and Certifications contained in Section K of this Solicitation or be located in the On-Line Representations & Certifications Application (ORCA). (Not rated, only reviewed for compliance)

Amendments: Any Amendments issued against this Solicitation, shall be acknowledged on a copy of the issued Amendment or on the SF 33 itself. (Not rated, only reviewed for compliance)

- END OF REVISED INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS -

(PROCEDURES FOR SUBMITTAL OF OFFERS)

CSSC Dispersal Barriers, Permanent Barrier 1, PGS FY18 W912P6-18-R-0005

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

PRICE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1.1 SUBMITTALS

1.2 SINGLE JOB PAYMENT ITEMS

1.2.1 PRE-INSTALLATION TECHNICAL DATA PACKAGES (CLIN 0001AA)

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Supply Pulse Generating Unit (Barrier 1 North) (CLIN 0001AB)

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Supply Pulse Generating Unit (Barrier 1 South) (CLIN 0002AA)

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.4 Post-Installation Technical Data Package (CLIN 0001AC

1.2.4.1 Payment

1.2.4.2 Unit of Measure

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 1

AMD - 0002

REVISED SECTION OF THE PERFORMANCE WORK STATEMENT - AMENDMENT 0002

SECTION 01 22 00.00 10

PRICE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with the Performance Work Statement:

1.2 SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE as Contract Item Line Numbers (CLINs) and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided. Payment will be made as described in the Performance Work Statement Payment Section.

1.2.1 PRE-INSTALLATION TECHNICAL DATA PACKAGES (CLIN 0001AA)

1.2.1.1 Payment

Payment will be made for costs associated with creating the Pre-installation Technical Data Packages, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1.2 Unit of Measure

Unit of measure: JOB

1.2.2 Supply Pulse Generating Unit (Barrier 1 North) (CLIN 0001AB)

1.2.2.1 Payment

Payment will be made for costs associated with supply of all equipment and components as required by PWS to support 1 Pulse Generating Unit, and further defined by the government approved submittals in Technical Data Package 3. The price for this line item shall include all costs incurred for procuring, delivering, storing, inventorying, and maintaining the equpment, including the Contractor’s costs for coordination with others, SECTION 01 22 00.00 10 Page 2 furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.2.2 Unit of Measure

Unit of measure: JOB

1.2.3 Supply Pulse Generating Unit (Barrier 1 South) (CLIN 0002AA)

1.2.3.1 Payment

Payment will be made for costs associated with supply of all equipment and components as required by PWS to support 1 Pulse Generating Unit, and further defined by the government approved submittals in Technical Data Package 3. The price for this line item shall include all costs incurred for procuring, delivering, storing, inventorying, and maintaining the equpment, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.3.2 Unit of Measure

Unit of measure: JOB

1.2.4 Post-Installation Technical Data Package (CLIN 0001AC )

1.2.4.1 Payment

Payment will be made for costs associated with all Post-Installation Technical Data Package compnents as required by the PWS. The price for this line item shall include all costs incurred for this work as required by PWS to complete any work associated with creating the Post-Installation Technical Data Package, including the Contractor’s costs for coordination with others, furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.4.2 Unit of Measure

Unit of measure: JOB

1.2.5 Performance & Payment Bond( (CLIN 001AD and CLIN 002AB)

1.2.5.1 Payment

Payment will be made for the performance and payment bonds that are required as part of this contract. The Government will pay the actual cost of the bonds or the Contractor's bid price, whichever is less.

1.2.5.2 Unit of Measure

Unit of measure: LOT

SECTION 01 22 00.00 10 Page 3

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

SECTION 01 22 00.00 10 Page 4

END OF REVISED SECTION 01 22 00.00 10