THIS AMENDMENT CONTAINS THE USACE'S RESPONSES TO CONTRACTOR'S INQUIRIES

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6681511726

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: USACE RESPONSES TO INTERESTED VENDOR’S INQUIRIES; RE: REQUEST FOR PROPOSAL NUMBER W912P618R0005, "CSSC

PB1 PULSE GENERATING SYSTEM SUPPLY AND INSTALLATION"

AMENDMENT PARTICULARS

A. By w ay of this Amendment, the proposal due date remains unchanged; therefore, proposal packages shall be submitted to the Chicago District no later than August 22, 2018 by 4:30pm (Central Time). Detailed instructions for the submittal of proposals is located at Section L of the Solicitation document.

B. Provided hereunder are the government’s responses to inquiries received, w hich relate to the technical aspects of the subject project – Please refer to the follow ing page. THIS AMENDMENT CONTINUES ON THE NEXT PAGE

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P618R0005

X 9B. DATED (SEE ITEM 11)

20-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2018

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P618R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

RESPONSES TO INQUIRIES

Question No.

INQUIRY USACE RESPONSE

1 General RFP. & PWS Section 2.1.2 2.1.2 - Will a two-week extension to the RFP due date be considred? Considering the level of detail requested in the requirments for the RFP in TAB 2; we are struggling to complie all content. We are also currently sourcing multiple bids from subcontractors who are still reviewing the appendicies: we want to ensure the most complete submittal as well as the best value in the final RFP submittal.

In accordance with the recently issued Amendment No. 0003, proposal packages are now due no later than 4:30p.m. (Central time) on August 22, 2018.

2 What is the minimum number of voltage settings required between 1 kV and 6 kV?

PWS Section 1 states "...provide for peak pulse voltages of any value from 1,000-6,000V..." This is interpreted to mean the system can operate at any whole number value between 1000 and 6000 volts.

3 Has there been an officail classification for the C-I-A impact level for the control system? The UFC directed is for "Control systems assigned LOW or MODERATE"

PWS Section 3.3.17 requires the use of UFC 4-010-06, the UFC is for control systems assigned low and moderate impact levels. The system will be classified as low or moderate so this is the correct UFC to use.

The C-I-A impact level for the control system is anticipated to be Low-Low-Low.

4 Is there an authorizing official or authorization procedure for testing determined for this system? The UFC specifices the KO rep and CIO rep.

Yes, per PWS Section 3.3.17 specifies the use of UFC 4- 010-06 and states the Risk Management Framework (RMF) process will be used for accreditation. The Authorizing Official for USACE Civilworks is Chief Information Officer Mr. Gregory Garcia. The UFC requires components must be compliant with Security Technical Implementation Guides (STIG)s if applicable.

5 Are alternate manufacturers allowed for the cooling and HVAC equipment as long as they meet the same performance as the basis of design?

Per PWS Section 3.3.4. "Any added equipment such as control sensors, valves, pumps, etc. must be compatible and of similar make and model with the Government provided Cooling System as currently constructed." Use/adapation of exisitng equipment is perferable to the government.

6 Are their seismic requirements for the piping and duct work on this project and what sizes would it apply to?

Seismic requirments for the Cooling System Equipment are shown in Appendix B Specification Division 23.

7 Is there an existing BAS contractor that we need to use or is it open to all BAS contractors that can meet the specifications?

The contract does not specify the use of an existing BAS contractor.

W912P618R0005

C. Points of Contact: Regina Blair at 312-846-5371 or Ericka Hillard at 312-846-5378 or by emailing to regina.g.blair@usace.army.mil (Ms. Blair) or Ericka.d.hillard@usace.army.mil (Ms. Hillard).