W912P520R0004-0003 REV Bid Schedule Amendment .pdf

PDF 190 KB Posted

Attached to
Kentucky Lock-Downstream Lock Monolith Construction Federal contract opportunity
Solicitation number
W912P520R0004
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This document provides details for a federal construction contract solicitation for the Kentucky Lock-Downstream Lock Monolith project. The U.S. Army Corps of Engineers Nashville District intends to issue a Request for Proposal for a firm-fixed price construction contract to build the downstream monoliths for the Kentucky Lock in Grand Rivers, Kentucky. The pre-proposal site visit will include a video conference presentation on May 4, 2021 and an organized in-person site visit on May 6, 2021. Interested contractors must register by April 30 by providing attendee information to the points of contact. The solicitation is expected to be released on or around April 16, 2021 and the intended start date for the project is approximately 30 days after contract award.

View the file

Other files for this federal contract opportunity

Other files attached to Kentucky Lock-Downstream Lock Monolith Construction, newest first.
File Type Posted
W912P520R0004-0003 TSpecs Amendment.pdf PDF
W912P520R0004-0003.pdf PDF
W912P520R0004-0003 TechChanges Amendment.pdf PDF
W912P520R0004-0003 TPlans Amendment.pdf PDF
W912P520R0004-0003 KYL DS Cofferdam Grouting Amendment.pdf PDF
W912P520R0004-0003 KY Lock Project_Water Testing Data_ Sep2020 Amendment.pdf PDF
W912P520R0004-0002.pdf PDF
KYL_Lock DSLM_4May2021_Contractor List.pdf PDF
KYL_Lock DSLM_6May2021_Site Visit Contractor Sign In Sheets.pdf PDF
KYL_Lock DSLM_4May2021 PreBid Presentation.pdf PDF
W912P520R0004-0001.pdf PDF
W912P520R0004_TSpecs_App A_Amendment 0001.pdf PDF
W912P520R0004_TSpecs_Amendment 0001.pdf PDF
W912P520R0004_TSpecs_App B_Amendment 0001_Part2.pdf PDF
W912P520R0004_TSpecs_App B_Amendment 0001_Part3.pdf PDF
W912P520R0004_Price Schedule_Amendment 0001.xlsx XLSX spreadsheet
W912P520R0004_TSpecs_App B_Amendment 0001_Part1.pdf PDF
W912P520R0004 TSpecs App A - RTA.pdf PDF
W912P520R0004 TPlans Folio 3 of 4 - RTA.pdf PDF
W912P520R0004 TPlans Folio 4 of 4 - RTA_Part1.pdf PDF
W912P520R0004 Price Schedule.xlsx XLSX spreadsheet
WD KY20210061 dated 19 Feb 2021.pdf PDF
W912P520R0004 TPlans Folio 4 of 4 - RTA_Part4.pdf PDF
W912P520R0004 TPlans Folio 1 of 4 - RTA.pdf PDF
W912P520R0004 TPlans Folio 2 of 4 - RTA.pdf PDF
W912P520R0004 TPlans Folio 4 of 4 - RTA_Part2.pdf PDF
W912P520R0004 TPlans Folio 4 of 4 - RTA_Part3.pdf PDF
W912P520R0004 TPlans Folio 4 of 4 - RTA_Part5.pdf PDF
W912P520R0004_Kentucky Lock Downstream Monolith.pdf PDF
W912P520R0004 TSpecs RTA.pdf PDF
Directions to USACE West Kentucky Resident Office.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ITEM DESCRIPTION

SPECIFICATION

NUMBER

EST. QTY. UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0101-00 Mobilization and Demobilization - Batch Plant 01 22 00 1 Job $ $ 0102-00 Mobilization and Demobilization - Conveyor 01 22 00 1 Job $ $ 0103-00 Mobilization and Demobilization - QA Testing Lab and Core Storag 01 22 00 1 Job $ $ 0104-00 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-00 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0106-00 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0107-00 Maintain Testing Lab and COE Field Offices 01 50 00 60 MO $ $ 0108-00 Diversion and Care of Water 01 57 24 51 MO $ $ 0109-00 Data Management 01 31 00 60 MO $ $ 0110-00 LiDAR and Orthoimagery - Monolith Foundations 01 32 23 50 EA $ $ 0111-00 LiDAR and Orthoimagery - Lock Chamber 01 32 23 1 Job $ $ 0112-00 Advanced Modeling Package (BIM) 01 78 00 1 Job $ $

02 Div 02; Existing Conditions 0201-00 Core Drilling in Rock (HQ) 02 32 00 1,805 LF $ $ 0202-00 Drilling in Soil 02 32 00 142 LF $ $ 0203-00 Optical Televiewer Logging 02 32 00 625 LF $ $ 0204-00 Soil Index Testing 02 32 00 24 EA $ $ 0205-00 Unconfined Compression Test 02 32 00 6 EA $ $ 0206-00 CU Triaxial Test 02 32 00 3 EA $ $

03 Div 03; Concrete 0301-00 Waterstop 03 15 14 1 Job $ $ 0302-00 Reinforcing Steel - Material 03 20 02 2,212 TON $ $ 0303-00 Place Rebar for Monolith, Structural, Mass, Second Stage and Misce 03 20 02 2,212 TON $ $ 0304-00 Cement, Type II, MH - Low Alkali 03 30 01 18,020 TON $ $ 0305-00 Class F Fly Ash 03 30 01 13,560 TON $ $ 0306-00 Structural Concrete (4ksi) 03 70 00 35,730 CY $ $ 0307-00 Mass Concrete (3ksi) 03 70 00 94,500 CY $ $ 0308-00 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 670 CY $ $ 0309-00 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 100 CY $ $ 0310-00 Mud Mat Concrete (4ksi) 03 70 01 4,500 CY $ $

05 Div 05; Metals 0501-00 Miscellaneous Metal (10" Discharge Ports) 05 50 15 1 Job $ $ 0502-00 Wall Armor 05 50 15 1 Job $ $ 0503-00 Culvert Liners 05 50 15 1 Job $ $ 0504-00 Miscellaneous Metal (Check Post, Ladder, Line Hook) 05 50 15 1 Job $ $

13 Div 13; Special Construction 1301-00 Instrumentation Program 13 50 00 51 MO $ $

22 Div 22; Plumbing 2201-00 Embedded Piping 22 00 02 1 Job $ $

26 Div 26; Electrical 2601-00 Embedded Electrical Conduits 26 20 01 1 Job $ $ 2602-00 Grounding and Bonding for Electrical System 26 05 26 1 Job $ $ 2603-00 Cathodic Protection 26 42 14 1 Job $ $ 2604-00 High Mast Lights 26 56 00 1 Job $ $

31 Div 31; Earthwork

EXCAVATION

3101-00 Dental Excavation 31 23 05 4,500.0 CY $ $ 3102-00 Dental Concrete 31 23 05 4,500.0 CY $ $ 3103-00 Rock Excavation 31 23 05 42,000 CY $ $ 3104-00 Overburden Excavation 31 23 05 28,000 CY $ $ 3105-00 Pre-Splitting 31 23 06 3,270 SY $ $ 3106-00 Line Drilling (6" spacing) 31 23 06 2,630 SY $ $ 3107-00 Preliminary Clean-Ups 31 60 00 40,500 SY $ $ 3108-00 Foundation Preparation and Final Clean Up 31 60 00 30,900 SY $ $ 3109-00 60 Inch Drilled Shaft 31 63 23 606 LF $ $

35 Div 35; Waterway & Marine Const 3501-00 Fabricate Miter Gates Embedded Metals 35 20 16.33 1 Job $ $ 3502-00 Fabricate Miter Gates 35 20 16.33 1 Job $ $ 3503-00 Caisson Embedded Metals and Fillers (US) 1 Job $ $ 3504-00 Culvert Bulkhead Slot Embedded Metals (US) 1 Job $ $ 3505-00 Trunnion Anchors and Embedded Metals 1 Job $ $ 3506-00 Floating Mooring Bitt Tracks and Embedded Metals 35 59 29 1 Job $ $ 3507-00 Caisson Embedded Metals and Fillers (DS) 1 Job $ $ 3508-00 Culvert Bulkhead Slot Embedded Metals (DS) 1 Job $ $

BASE ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004 Base Bid Schedule

C1A, C1B, C4B, C4C

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-01 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-01 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

03 Div 03; Concrete 0301-01 Waterstop 03 15 14 1 Job $ $ 0302-01 Reinforcing Steel - Material 03 20 02 215 TON $ $ 0303-01 Place Rebar for Monolith, Structural, Mass, Second Stage and Miscellaneous 03 20 02 215 TON $ $ 0304-01 Cement, Type II, MH - Low Alkali 03 30 01 3,326 TON $ $ 0305-01 Class F Fly Ash 03 30 01 2,503 TON $ $ 0306-01 Structural Concrete (4ksi) 03 70 00 3,979 CY $ $ 0307-01 Mass Concrete (3ksi) 03 70 00 19,470 CY $ $ 0308-01 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 636 CY $ $ 0309-01 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 100 CY $ $

OPTION 1 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 1 Bid Schedule

C2A

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-02 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-02 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

03 Div 03; Concrete 0301-02 Waterstop 03 15 14 1 Job $ $ 0302-02 Reinforcing Steel - Material 03 20 02 298 TON $ $ 0303-02 Place Rebar for Monolith, Structural, Mass, Second Stage and Miscellaneous 03 20 02 298 TON $ $ 0304-02 Cement, Type II, MH - Low Alkali 03 30 01 2,760 TON $ $ 0305-02 Class F Fly Ash 03 30 01 2,077 TON $ $ 0306-02 Structural Concrete (4ksi) 03 70 00 3,660 CY $ $ 0307-02 Mass Concrete (3ksi) 03 70 00 16,290 CY $ $ 0308-02 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 70 CY $ $ 0309-02 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 50 CY $ $

OPTION 2 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 2 Bid Schedule C5B

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-03 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-03 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

03 Div 03; Concrete 0301-03 Waterstop 03 15 14 1 Job $ $ 0302-03 Reinforcing Steel - Material 03 20 02 802 TON $ $ 0303-03 Place Rebar for Monolith, Structural, Mass, Second Stage and Miscellaneous 03 20 02 802 TON $ $ 0304-03 Cement, Type II, MH - Low Alkali 03 30 01 3,755 TON $ $ 0305-03 Class F Fly Ash 03 30 01 2,826 TON $ $ 0306-03 Structural Concrete (4ksi) 03 70 00 7,846 CY $ $ 0307-03 Mass Concrete (3ksi) 03 70 00 18,582 CY $ $ 0308-03 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 77 CY $ $ 0309-03 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 100 CY $ $

35 Div 35; Waterway & Marine Const 3509-03 Install Miter Gates Embedded Metals 35 20 17 1 Job $ $ 3510-03 Install Miter Gates 35 20 16.33 1 Job $ $

OPTION 3 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 3 Bid Schedule C3A

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-04 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-04 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

03 Div 03; Concrete 0301-04 Waterstop 03 15 14 1 Job $ $ 0302-04 Reinforcing Steel - Material 03 20 02 1,180 TON $ $ 0303-04 Place Rebar for Monolith, Structural, Mass, Second Stage and Miscellaneous 03 20 02 1,180 TON $ $ 0304-04 Cement, Type II, MH - Low Alkali 03 30 01 11,003 TON $ $ 0305-04 Class F Fly Ash 03 30 01 8,281 TON $ $ 0306-04 Structural Concrete (4ksi) 03 70 00 9,252 CY $ $ 0307-04 Mass Concrete (3ksi) 03 70 00 70,178 CY $ $ 0308-04 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 458 CY $ $ 0309-04 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 100 CY $ $

OPTION 4 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 4 Bid Schedule C1C, C2B, C2C, C3C

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-05 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-05 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

03 Div 03; Concrete 0301-05 Waterstop 03 15 14 1 Job $ $ 0302-05 Reinforcing Steel - Material 03 20 02 1,298 TON $ $ 0303-05 Place Rebar for Monolith, Structural, Mass, Second Stage and Miscellaneous 03 20 02 1,298 TON $ $ 0304-05 Cement, Type II, MH - Low Alkali 03 30 01 9,924 TON $ $ 0305-05 Class F Fly Ash 03 30 01 7,469 TON $ $ 0306-05 Structural Concrete (4ksi) 03 70 00 11,556 CY $ $ 0307-05 Mass Concrete (3ksi) 03 70 00 60,052 CY $ $ 0308-05 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 429 CY $ $ 0309-05 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 100 CY $ $

OPTION 5 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 5 Bid Schedule C5C, C6A, C6B

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-06 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-06 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

31 Div 31; Earthwork

GROUTING

3133 Drill Grout Holes in Rock 3133A-06 First 18,370 Linear Feet 31 32 23 18,370 LF $ $ 3133B-06 Over 18,370 Linear Feet 31 32 23 2,041 LF $ $

3134 Drill Grout Holes in Rock, Alternate Method 3134A-06 First 2,564 Linear Feet 31 32 23 2,564 LF $ $ 3134B-06 Over 2,564 Linear Feet 31 32 23 285 LF $ $ 3135-06 Pressure Washing (Hydraulic) 31 32 23 212 HR $ $ 3136-06 Pressure Testing (Hydraulic) 31 32 23 2,620 EA $ $ 3137-06 Portland Cement in Grout 31 32 23 21,354 CF $ $ 3138-06 Grouting Connections 31 32 23 2,620 EA $ $

3139 Placing Grout 3139A-06 First 348,100 Gallons 32 32 23 348,100 GAL $ $ 3139B-06 Over 348,100 Gallons 33 32 23 38,678 GAL $ $ 3140-06 Government Requested Standby - Grouting 31 32 23 70 HR $ $ 3141-06 Verification Core Drilling in Rock (HQ) 31 32 23 3,540 LF $ $ 3142-06 Re-Drill Grout Holes in Rock 31 32 23 2,620 LF $ $

BACKFILL

3121-06 Lock Soil Backfill - Tuscaloosa Material 31 00 00 65,100 CY $ $ 3122-06 Lock Rock Backfill - 8-inch Minus Material 31 00 00 34,500 CY $ $

Div 31; Geotextiles for Earthwork 3123-06 Nonwoven Geotextile Fabric 31 05 19.13 600 SF $ $

33 Div 33; Storm Drainage Utilities

CORRUGATED METAL PIPE

3301-06 12-inch Perforated Corrugated Metal Pipe 33 40 00 450 LF $ $ 35 Div 35; Stone, Channel, Shoreline/Coastal Protection for Structures

BEDDING MATERIAL

3501-06 Natural Sand Material (Bedding Material) 35 31 19 46 TON $ $ 3502-06 No. 57 Stone (Bedding Material) 35 31 19 38 CY $ $ 3503-06 3/4-inch Graded Stone 35 31 19 10 CY $ $

OPTION 6 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 6 Bid Schedule Grouting perimeter of lock chamber (GR)

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0104-07 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0105-07 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $

02 Div 02; Existing Conditions 0209-07 Core Drilling in Rock (PQ) 02 32 00 126 LF $ $ 0210-07 Drilling in Soil 02 32 00 161 LF $ $ 0211-07 Optical Televiewer Logging 02 32 00 126 LF $ $ 0212-07 Piezometer Installed 02 32 00 287 LF $ $

03 Div 03; Concrete 0301-07 Waterstop 03 15 14 1 Job $ $ 0302-07 Reinforcing Steel - Material 03 20 02 355 TON $ $ 0303-07 Place Rebar for Monolith, Structural, Mass, Second Stage and Miscellaneous 03 20 02 355 TON $ $ 0304-07 Cement, Type II, MH - Low Alkali 03 30 01 2,036 TON $ $ 0305-07 Class F Fly Ash 03 30 01 1,532 TON $ $ 0306-07 Structural Concrete (4ksi) 03 70 00 4,310 CY $ $ 0307-07 Mass Concrete (3ksi) 03 70 00 10,124 CY $ $ 0308-07 Second Pour and Miscellaneous Concrete (5ksi) 03 80 00 290 CY $ $ 0309-07 Congested Second Pour / Repair Concrete (4ksi) 03 80 00 75 CY $ $

22 Div 22; Plumbing 2201-07 Embedded Piping 22 00 02 1 Job $ $

31 Div 31; Earthwork

BACKFILL

3121-07 Lock Soil Backfill - Tuscaloosa Material 31 00 00 151,900 CY $ $ 3122-07 Lock Rock Backfill - 8-inch Minus Material 31 00 00 80,500 CY $ $

Div 31; Geotextiles for Earthwork 3123-07 Nonwoven Geotextile Fabric 31 05 19.13 1,400 SF $ $

32 Div 32; Exterior Improvements 3201-07 18" Class IV RCP 33 40 00 124 LF $ $ 3202-07 24" Class IV RCP 33 40 00 322 LF $ $ 3203-07 30" Class IV RCP 33 40 00 448 LF $ $ 3204-07 36" Class IV RCP 33 40 00 117 LF $ $

3205-07 18" HDPE 33 40 00 42 LF $ $

3206-07 24" HDPE 33 40 00 127 LF $ $

3207-07 36" HDPE 33 40 00 520 LF $ $

3208-07 Drop Box Inlet (Type 1) 33 40 00 1 EA $ $ 3209-07 Drop Box Inlet (Type 2) 33 40 00 2 EA $ $ 3210-07 Manhole (Type A) 33 40 00 1 EA $ $ 3211-07 Manhole (Type B) 33 40 00 3 EA $ $ 3212-07 Sloped & Flared Box In/Out 18" 33 40 00 6 EA $ $ 3213-07 Sloped & Flared Box In/Out 24" 33 40 00 2 EA $ $ 3214-07 Sloped & Flared Box In/Out 36" 33 40 00 1 EA $ $ 3215-07 KYTC Class II Channel Lining (18-36" drainage pipe) 35 31 19 55 TON $ $

ROADWAY

3218-07 Crushed Stone Base 32 11 23 2,475 TON $ $ 3219-07 Clearing, Grubbing, and Site Demolition 32 92 19 1 Job $ $ 3222-07 Asphalt Sawcut 32 11 23 33 LF $ $ 3223-07 Seeding and Mulching 32 92 19 63,929 SY $ $

33 Div 33; Storm Drainage Utilities

CORRUGATED METAL PIPE

3301-07 12-inch Perforated Corrugated Metal Pipe 33 40 00 1,050 LF $ $ 35 Div 35; Stone, Channel, Shoreline/Coastal Protection for Structures

BEDDING MATERIAL

3501-07 Natural Sand Material (Bedding Material) 35 31 19 106 TON $ $ 3502-07 No. 57 Stone (Bedding Material) 35 31 19 88 CY $ $ 3503-06 3/4-inch Graded Stone 35 31 19 23 CY $ $

OPTION 7 ESTIMATED AMOUNT $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Option 7 Bid Schedule C3B

NUMBER

EST.

QTY.

UNIT

UNIT

PRICE

ESTIMATED

AMOUNT

BASE ESTIMATED AMOUNT $

OPTION 1 ESTIMATED AMOUNT $

OPTION 2 ESTIMATED AMOUNT $

OPTION 3 ESTIMATED AMOUNT $

OPTION 4 ESTIMATED AMOUNT $

OPTION 5 ESTIMATED AMOUNT $

OPTION 6 ESTIMATED AMOUNT $

OPTION 7 ESTIMATED AMOUNT $

TOTAL ESTIMATED AMOUNT (BASE+ALL OPTIONS) $

Kentucky Lock Addition, Downstream Lock Monoliths, W912P5-20-R-0004

Bid Schedule Summary

BASE
OPT 1-7

File details come from the government source that posted it. Updated .