Rehabilitation of Unit #4 turbine generator, Old Hickory Powerhouse
Solicitation number
W912P5-16-R-0002
Issued by

About this file

Amendment 0006 Technical Specification Pages

View the file

Other files

File Type Posted
W912P5-16-R-0002-0008.pdf PDF
W912P5-16-R-0002TSpecsAm8Page.pdf PDF
W912P5-16-R-0002TSpecsAm7Pages.pdf PDF
W912P5-16-R-0002-0007.pdf PDF
W912P5-16-R-0002ContDrawsAm6Sheets.pdf PDF
W912P5-16-R-0002RefDrawsAm6Sheets.pdf PDF
W912P5-16-R-0002-0006.pdf PDF
W912P5-16-R-0002_Price_Schedule-Am6_protected.xlsx XLSX spreadsheet
W912P5-16-R-0002TSpecsAm5Pages.pdf PDF
W912P5-16-R-0002-0005.pdf PDF
PPQ_Editable_protected.pdf PDF
W912P5-16-R-0002_Price_Schedule-Am5.xlsx XLSX spreadsheet
W912P5-16-R-0002-0004.pdf PDF
W912P5-16-R-0002-0003.pdf PDF
W912P5-16-R-0002-0002.pdf PDF
W912P5-16-R-0002ContDrawsAm2Sheets.pdf PDF
W912P5-16-R-0002RefDrawsAm2Sheets.pdf PDF
W912P5-16-R-0002TSpecsAm2Pages.pdf PDF
Pre-Proposal_Site_Visit_Minutes.pdf PDF
Pre-Proposal_Site_Visit_Sign-In_Sheet.pdf PDF
W912P5-16-R-0002-0001.pdf PDF
W912P5-16-R-0002_TSpecs.pdf PDF
Foreign_National_Pre-Proposal_Meeting_Request_Form.pdf PDF
GeneratorCommissioningReport-1957.pdf PDF
W912P5-16-R-0002_Contract_Drawings_D_Size.pdf PDF
W912P5-16-R-0002.pdf PDF
W912P5-16-R-0002_Reference_Dwgs.pdf PDF
Pre-Proposal_Meeting_and_Site_Visit_Request_Form.pdf PDF
W912P5-16-R-0002_AppA.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit 4 Rehabilitation Old Hickory Powerhouse W912P5-16-R-0002 Amendment No. 0006 Sumner County, Tennessee

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 10 CONTRACTOR'S SITE OPERATIONS

01 11 10 SUMMARY OF WORK

01 22 00.00 MEASUREMENT AND PAYMENT

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 QUALITY CONTROL

01 45 02 QUALITY CONTROL SYSTEM (QCS)

01 57 20 ENVIRONMENTAL PROTECTION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATIONS AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 83 20 LEAD BASE PAINT (LBP) ABATEMENT, REMOVAL, AND DISPOSAL

DIVISION 03 - CONCRETE

03 60 00.01 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND

MAJOR EQUIPMENT FOUNDATION REPAIR

03 64 23.00 EPOXY INJECTION OF THE DISCHARGE RING/LINER

DIVISION 05 - METALS

05 05 23.20 WELDING

05 05 33.20 NON-DESTRUCTIVE TESTING

05 14 00.13 WELDING STRUCTURAL ALUMINUM FRAMING

05 50 03.20 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS

PROVISIONS

05 50 14.00 TURBINE MAINTENANCE PLATFORM

DIVISION 09 - FINISHES

09 97 02.23 PAINTING

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 00.00 BASIC ELECTRICAL EQUIPMENT AND AUXILIARY ELECTRICAL

EQUIPMENT

26 11 15.00 HIGH RESISTANCE GROUNDING SYSTEM (HRG)-MEDIUM VOLTAGE

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13.00 PIPING AND EQUIPMENT

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

42 13 19.00 THRUST BEARING COOLERS

DIVISION 48 - ELECTRICAL POWER GENERATION

PROJECT TABLE OF CONTENTS Page 1

48 13 13.01 DISASSEMBLY, REPAIR, AND REASSEMBLY OF TURBINE RUNNER,

Unit 4

48 13 13.02 DISASSEMBLY AND REASSEMBLY OF HYDRAULIC TURBINE GENERATOR

UNIT

48 13 13.03 GENERATOR THRUST BEARING HIGH PRESSURE LIFT SYSTEM

48 13 13.04 EXISTING TURBINE COMPONENT, REFURBISHMENT AND REPLACEMENT

48 13 13.06 GENERATOR THRUST BEARING INSPECTION AND REFURBISHMENT

48 13 13.07 GUIDE BEARING INSPECTION AND REFURBISHMENT

48 13 13.08 CAVITATION AND CRACK REPAIR

48 13 13.11 MISCELLANEOUS PARTS, MATERIALS, EQUIPMENT RENTAL,

TRANSPORTATION SERVICES & HIRE

48 13 13.25 GENERATOR BRAKE SYSTEM REFURBISHMENT

48 13 13.26 TURBINE GUIDE BEARING LUBRICATION SYSTEM REHABILITATION

48 13 16.00 GENERATOR REWIND AND REFURBISHMENT

48 13 16.01 MACHINE CONDITION MONITORING OF HYDRAULIC TURBINE

GENERATOR UNIT

48 13 16.02 GENERATOR THRUST BEARING HIGH PRESSURE LIFT PUMP SYSTEM

(ELECTRICAL)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 10

CONTRACTOR'S SITE OPERATIONS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

1.2 REFERENCES

1.3 SUBMITTALS

1.4 SCHEDULE FOR CONSTRUCTION

1.4.1 Time of Delivery

1.4.1.1 Mechanical Items

1.4.1.2 Electrical Items

1.5 COORDINATION MEETINGS

1.6 CONTRACTOR EMPLOYEES

1.6.1 Project Superintendent

1.6.2 Contractor's Commissioning Representative

1.6.3 Contractor Employees Roles Matrix

1.7 PROJECT SIGNS

1.8 PROJECT SAFE CLEARANCE PROCEDURE

1.8.1 General

1.8.2 Safe Clearance Procedure System

1.9 CONTRACTOR WORK AREAS, STAGING AREAS, AND ACCESS TO WORK AREA

1.9.1 Access Agreements

1.9.2 Outdoor Contractor's Storage and Staging Areas

1.9.3 Indoor Work and Storage Areas

1.9.4 Employee Access and Parking

1.9.5 Access Roads and Road Restrictions

1.9.6 Public Access

1.10 TRAFFIC CONTROL AND PUBLIC ACCESS

1.11 DISPOSAL OF ELECTRICAL AND MECHANICAL EQUIPMENT AND MISCELLANEOUS

MATERIALS

1.11.1 Disposal of Material and Equipment

1.11.2 Salvage

1.12 PROJECT SITE SECURITY REQUIREMENTS

1.12.1 Pre-Screening Contractor's On-Site Employee Candidates

1.12.2 Identification of Employees

1.12.3 Vehicle Access

1.12.4 Delivery of Equipment

1.12.5 Use of Private Vehicles

1.13 UTILITIES

1.13.1 General

1.13.2 Sanitary Facilities

1.13.3 Electrical Power

1.13.3.1 General

1.13.3.2 Temporary Electrical Wiring

1.13.4 Telephone

1.13.5 Water

1.13.6 Compressed Air

1.14 GAS, VAPOR, FUME, DUST, AND MIST IN THE POWERHOUSE

1.14.1 General

1.14.2 Additional Provisions

1.15 PROTECTION OF EXISTING UTILITIES

1.16 DISPOSITION OF MATERIALS

SECTION 01 10 10 Page 1

1.16.1 General

1.16.2 Daily Cleanup and Disposal

1.16.3 Disposal and Salvage of Equipment and Miscellaneous Materials

1.17 CONTRACTOR'S EQUIPMENT

1.17.1 Plant and Equipment List

1.17.2 Movement of Equipment by the Contractor

1.18 CONTRACTOR USE OF POWERHOUSE BRIDGE CRANES

1.18.1 General

1.18.2 Contractor Crane Operator

1.18.3 Use of the Crane

1.18.4 Contractor's Riggers

1.18.5 Lifting Devices

1.19 CRANES AND HEAVY EQUIPMENT

1.19.1 Contractor Crane Safety

1.19.2 Contractor Crane Testing

1.19.3 Contractor's Cranes and Heavy Equipment

1.20 INCLEMENT WEATHER CONSTRUCTION

1.21 PERMITS AND RESPONSIBILITIES

1.22 RESTORATION OF PROJECT ROADS

1.23 USE OF EXPLOSIVES

1.24 UNIT AVAILABILITY

1.24.1 General

1.24.2 Contractor Request for Unit Availability

1.24.3 Notice to Water-up Unit

1.24.4 Scheduling Operational Testing

1.25 PARTNERING

1.26 PROTECTION OF MATERIAL AND WORK

1.27 PROTECTION AND RESTORATION OF EXISTING FACILITIES

1.28 CARE OF DRAINS

1.29 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

1.30 RECORD OF PARTS REMOVED FROM THE SITE

1.31 NOTIFICATION OF DAMAGED EQUIPMENT

1.32 SCAFFOLDING AND SPECIAL TOOLS

1.33 EVALUATION OF CONTRACTOR PERFORMANCE

1.34 SAFE CLEARANCE (LOCKOUT) PROCEDURES

1.35 FIRE CONTROL

1.36 GOVERNMENT FURNISHED TOOLS AND MISCELLANEOUS SITE EQUIPMENT

1.36.1 General

1.36.2 Government Furnished Tools

1.36.3 Damage to Tools

1.36.4 Protective Coatings

1.37 WORK SCHEDULES

1.37.1 Contractor's Working Hours Schedule

1.37.2 Government's Schedule

1.38 TESTING OF EQUIPMENT

1.39 PROTECTION OF POWERHOUSE FLOORS

1.40 DISPOSITION OF REMOVED EQUIPMENT

1.41 WARRANTIES

1.42 TOOLS AND PARTS CONTROL AND ACCOUNTABILITY PROCEDURE

1.42.1 General

1.42.2 Inspections

1.42.3 Tools, Parts, and Personal Items Control and Accountability

1.42.4 Responsibility and Records

1.43 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS

1.44 NOISE CONTROL

1.45 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.46 PAYMENT

SECTION 01 10 10 Page 2

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 10 10 Page 3

SECTION 01 10 10

CONTRACTOR'S SITE OPERATIONS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This section covers general requirements applicable to specific Contractor's operations or equipment. The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

EP 310-1-6a (2006) Sign Standards Manual, VOL 1

EP 310-1-6b (2006) Sign Standards Manual, VOL 2, Appendices

ER 385-1-31 (2009) The Control of Hazardous Energy

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Verified/Eligible On-Site Employee Candidates

Employee Identification and Control Procedure; G

Investigation Package

Foreign Nationals

SECTION 01 10 10 Page 4

Submittal requirements for site security are detailed in the Nashville District Public Website and as described in paragraph

PROJECT SITE SECURITY REQUIREMENTS.

Access Agreements and Work Areas; G

Temporary Electrical Wiring Plan; G

Gas, Vapor, Fume, Dust, Slurry, and Mist Control in Powerhouse; G

Gas, Vapor, Fume, Dust, Slurry, and Mist Control program shall be submitted at least 10 working days prior to commencement of work in the powerhouse, paragraph GAS, VAPOR, FUME, DUST, AND MIST

IN THE POWERHOUSE.

Disassembly and Reassembly Procedure; G

Disposal Plan; G

Contractor's Planned Equipment Methods; G

Loading Plan for Cranes and Heavy Equipment; G

Plant and Equipment List; G

Loading Diagram; G

Scaffolding and Special Tools; G

Contractor Work Area, Staging Area, and Access to Work Area; G

Layout of Contractor work areas, staging areas, storage areas, access roads, and disposal areas shall be submitted within 21 calendar days of the notice to proceed, paragraph CONTRACTOR WORK

AREA, STAGING AREA, AND ACCESS TO WORK AREA.

Lifting Diagram; G

Record of Parts Removed from the Site

Notification of Damaged Equipment

Hazardous Energy Control Plan; G, The hazardous energy control plan shall be submitted within 21 calendar days of the notice to proceed, paragraph SAFE CLEARANCE

(LOCKOUT) PROCEDURES.

Schedule of Working Hours; G, The schedule of working hours shall be submitted within 21 calendar days after the notice to proceed, paragraph WORK

SCHEDULES.

Schedule Change Notification; G

The Schedule change notification shall be submitted a minimum of 48 hours prior to any schedule change, paragraph WORK SCHEDULES.

SECTION 01 10 10 Page 5

SD-06 Test Reports

Contractor Crane Test

Commissioning Representative's Daily Report

SD-07 Certificates

Crane Operator Qualifications; G

Crane operator qualifications shall be submitted a minimum of 14 calendar days prior to the start of site work, paragraph Contractor Crane Operator.

Crane Rigger Qualifications; G

Crane rigger qualifications shall be submitted a minimum of 14 calendar days prior to the start of site work, paragraph Contractor's Riggers.

Project Superintendent's Qualifications; G

Project superintendent's qualifications shall be submitted within 21 calendar days of the notice to proceed, paragraph Project Superintendent.

Contractor's Commissioning Representative

Qualifications of the Contractor's commissioning representative shall be submitted a minimum of 90 calendar days prior to the unit commissioning.

1.4 SCHEDULE FOR CONSTRUCTION

The Contractor shall submit a detailed schedule for accomplishing the work in this contract as required in Section 00700 CONTRACT CLAUSES, Contract Clause 52.236-15, "SCHEDULES FOR CONSTRUCTION CONTRACTS", and as specified in Section 01 32 01 PROJECT SCHEDULE. The schedule shall be consistent with the completion dates as specified in Section 00700 CONTRACT CLAUSES, Contract Clause 52.211-10, "COMMENCEMENT, PROSECUTION AND COMPLETION OF

WORK".

1.4.1 Time of Delivery

The Contractor shall commence work under this contract within 10 calendar days after date of receipt of written notice to proceed and make delivery of all materials and equipment and perform the work specified herein in accordance with Contractor's provided schedule. The schedule shall at a minimum include the following turbine refurbishment and generator rewind milestones:

1.4.1.1 Mechanical Items

a. Electrical/Mechanical pre-disassembly submittals

b. Unit Disassembly

c. Establish Unit Centerline

d. Runner Field Disassembly

e. Runner, Turbine and Intermediate Shaft Shipment to/from Contractor's

Shop

SECTION 01 10 10 Page 6

f. Runner, Turbine and Intermediate Shaft Shop Work

g. Field Mechanical Machining

h. Discharge Ring Rehab

i. Runner Reassembly at Project

j. Unit Reassembly

k. Unit Alignment

l. Unit Commissioning

1.4.1.2 Electrical Items

a. Accelerated Life Test

b. Thermal Cycling Test

c. Stator Winding Manufacturing

d. Production Run Accelerated Life Tests

e. Stator Core Manufacturing

f. Rotor Pole Re-insulation

g. Winding/Core/Poles Delivery

h. Rotor Pole Installation

i. Stator Core Installation

j. Stator Coil Installation

k. Generator Special Field tests

1.5 COORDINATION MEETINGS

Weekly coordination meetings will be held between the Contractor and the Government. This meeting will be used to discuss the Contractor's proposed schedule, actual progress in the last week and work planned in the upcoming two weeks. The Contractor shall make particular note of any work requiring Project support or potential impacts to Project operations or maintenance.

A meeting time and place shall be mutually agreed upon for the same time each week. The Contractor shall distribute the coordination meeting notes with changes to the Government no later than the close of business the workday following the weekly meeting.

1.6 CONTRACTOR EMPLOYEES

The Contractor shall insure that all employees are capable of demonstrating adequate knowledge of tools, supplies, equipment and techniques necessary to competently perform the work. Safety staffing requirements are specified in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. Quality control staffing requirements are specified in Section 01 45 01 QUALITY CONTROL. See Contractor Employees Roles Matrix in Appendix A - FORMS AND ATTACHMENTS. The Government may require the Contractor to discontinue using any employee in the performance of the work specified in this contract determined by the Government to be unsatisfactory. Contractor employees will not be permitted to bring guests, family members or non-employees to the job site at any time.

1.6.1 Project Superintendent

At least one full-time employee of the Contractor shall be available at the work site anytime Contractor or subcontractor personnel are working on the site to supervise and direct the work specified herein, as required by Contract Clause 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR. The Superintendent shall be fluent in the spoken and written English language and shall have the authority to act on behalf of the contractor. The superintendent shall be technically qualified to supervise the unit disassembly, turbine-generator rehabilitation; unit reassembly;

commissioning and all other aspects related to completing this work. The

SECTION 01 10 10 Page 7 superintendent shall keep all as-built drawings to current standards. The superintendent shall report immediately in writing to the Government any work not in accordance with the manufacture's recommendation, or any special conditions which may result in an unsatisfactory job. The superintendent shall have been engaged in similar field work, as is specified herein, for a minimum of 5 years, and shall have performed this work at a minimum of four different powerhouses. The Contractor's project superintendent's qualifications, including work experience, roles performed, a verifying contact with name and phone number, shall be submitted for at least three such facilities. The project superintendent shall perform no other roles while serving as project superintendent.

1.6.2 Contractor's Commissioning Representative

A commissioning engineer representing the Contractor shall be provided during the commissioning of the unit. The engineer representative shall coordinate with the government commissioning team during the commissioning of the unit. The commissioning engineer shall have five years experience in the startup of new or rehabilitated turbine/generators. The engineer representative shall be competent and fluent in English. The engineer representative shall keep a record in a bound book of the work covered each day; all checks and measurements shall be included. The book is to be made available to the Corps of Engineers at their request and shall be delivered to the Contracting Officer upon completion of the installation. The commissioning representative shall provide a daily report of the work covered each day (Commissioning Representative's Daily Report.) The qualifications of the Contractor's commissioning representative shall be submitted a minimum of 90 calendar days prior to the unit commissioning.

1.6.3 Contractor Employees Roles Matrix

The Contractor shall utilize the Contractor Employees Roles Matrix, provided in Appendix A - FORMS AND ATTACHMENTS, in assigning multiple roles to key employees. Contractor may request the allowance of other roles to overlap. The Contracting Officer will judge the requests and evaluate them on a case by case basis, taking into account safety and quality concerns.

The Contracting Officer will respond to such requests within 14 calendar days. The matrix applies equally to each work shift.

1.7 PROJECT SIGNS

a. General. The Contractor shall furnish and erect within 30 days after issue of the Notice to Proceed at the location directed, a PROJECT IDENTIFICATION SIGN and a SAFETY PERFORMANCE SIGN. The signs shall be lettered on one side only and shall conform to EP 310-1-6a, EP 310-1-6b, and to the details and colors shown on the sketches includded in Appendix A - FORMS AND ATTACHMENTS. The name of the project shall be as follows:

OLD HICKORY POWERHOUSE UNIT 4 REHABILITATION

b. Materials. The sign shall be constructed with a face sheet of 3/4 inch exterior grade plywood mounted on a substantial framework of treated 4-inch by 4-inch material. Screws shall be commercial quality and of sizes shown.

c. Painting. The signs and posts shall be given one prime coat and two finish coats of exterior oil paint before lettering. Letters and trim shall be applied to one side only using one coat of enamel of color, SECTION 01 10 10 Page 8 style, and size shown.

d. Erection and Maintenance. The signs shall be erected at the designated locations. Signs shall be plumb and backfill of post holes shall be well tamped to properly support the signs for the life of the contract.

The signs shall be maintained in good condition until completion of the contract, shall remain the property of the Contractor, and shall be removed from the site upon final acceptance of the contract work.

1.8 PROJECT SAFE CLEARANCE PROCEDURE

1.8.1 General

Safe clearance procedure in EM 385-1-1, ER 385-1-31 and Project Specific Safe Clearance Procedures, as practiced by the U.S. Army Corps of Engineers, Nashville District, will be Government-furnished to the Contractor. The Project will be responsible for providing instruction and training to personnel that have any involvement with electrical equipment or lines; mechanical equipment; pressure systems; and vessels and lines containing dangerous or hazardous material which can be energized, pressurized, activated, or released remotely or inadvertently. This requirement also applies to any interface of ongoing Project operations.

All work requiring a clearance under EM 385-1-1 and Project Specific Safe Clearance Procedures shall be coordinated with the Government at least 24 hours in advance. No work shall proceed until the proper clearances have been obtained from the Government for the work . Where the requirements of this specification and referenced documents vary, the most stringent requirements shall apply.

1.8.2 Safe Clearance Procedure System

A safe clearance system is used by Project Personnel to insure continuity of service and safety to personnel and equipment. Any work, service or delivery performed which requires taking project operating equipment out of service will be done only after a formal clearance is obtained through the COR. Clearance shall not be violated by Contractor personnel. Any violation of Safe Clearance Procedures will be grounds for removal of the offender(s) from the project. The use of personal locks for each individual working under the safe clearance is required in the Project's Safe Clearance Procedure. The Contractor shall provide the necessary personal padlocks as there are a limited number of guest locks.

1.9 CONTRACTOR WORK AREAS, STAGING AREAS, AND ACCESS TO WORK AREA

The Government will not be responsible for providing security for stored equipment, supplies, and materials either inside or outside the powerhouse.

The Contractor shall provide all necessary security. Drawings showing the layout of areas proposed for use shall be submitted for review and approval and comply with Contract Clause 52.236-10 "Operations And Storage Areas".

The drawing(s) shall show the location of the principal components:

offices, access roads, parking, Outdoor Storage, Indoor Storage Locations for Equipment and Materials and disposal areas.

1.9.1 Access Agreements

Access Roads to and from the work site shall be submitted after the Contractor, the Contract Officer's Representative and the Project's Representative have coordinated and determined the most advantageous access to, and staging of, the Contractor's assets deployed to the work site. The

SECTION 01 10 10 Page 9 existing access roadway and any associated access roads on the project, shall not be closed as a result of construction or delivery activities associated with this contract unless previously coordinated and approved by the Government. Traffic delays will only be permitted in accordance with the provisions of this section. In accordance with Section 00700 CONTRACT CLAUSES, Contract Clause 52.236-13, ACCIDENT PREVENTION including ALT. 1 and the referenced EM 385-1-1, when necessary for equipment to operate on or to cross access roads, arterial roads or highways, flaggers, signs, lights, and/or other necessary safeguards shall be furnished to safely control and direct the flow of traffic. When necessary to operate on or to cross existing highways or roads, all necessary permits shall be obtained from the appropriate private or public authority. Spillage on the project roads and state or county roads will not be permitted, and the spillage shall be immediately cleaned up at the expense of the Contractor. No cleated or crawler-type equipment shall be operated on paved surfaces.

Damage to all roads caused by the Contractor's operations shall be repaired to preexisting conditions at the expense of the Contractor. The right-of-way for the work (or delivery site) and access thereto will be furnished as stated in this paragraph subject to mutual agreement between the Contractor and the Government concerning the specific route the Contractor is to use. Such mutual agreement must be reached prior to initiation, construction or delivery.

1.9.2 Outdoor Contractor's Storage and Staging Areas

Two areas adjacent to the powerhouse have been designated for Contractor use, as shown in Contract Drawing G-401. Contractor prepared drawings showing the proposed layout of the designated areas shall be submitted for review and approval and comply with Section 00700 CONTRACT CLAUSES, Contract Clause 52.236-10, OPERATIONS AND STORAGE AREAS. The drawing(s) shall show the location of the principal components: offices, access roads, parking, outdoor storage, indoor storage locations for equipment and materials facilities, disposal areas, and content and location of signage, which the Contractor proposes to construct within the designated limits.

Only Contractor and subcontractor parts trailers and lunch trailers may be allowed in the Contractor work areas and these shall be subject to COR and Project approval. All Contractor and subcontractor trailers shall be required to be adequately physically anchored to prevent overturning due to high winds.

The Contractor may construct a building(s) for on-site indoor storage within an area designated by the COR. Any such structures must have the capability of being enclosed for security purposes. Building plans shall be approved by the Contracting Officer prior to performing any work within the area designated for office/storage. The building(s) shall meet state and local building codes. The building(s) shall be kept in good physical and operating condition throughout the life of the contract. At conclusion of the contract, at the option of the Government, the building(s) will become the property of the Government or will be required to be removed and the site restored to its original condition. Any building(s) erected and permanently affixed to the property shall be considered as incidental to the work and no separate payment will be made. Should additional working space or lands within the Government right-of-way be required for material yards, job offices, or other purposes they can be obtained through agreement with the Government approved in writing. When directed at any time during the progress of the work when space is needed within the right-of-way for other purposes, any part of the grounds that have been in use shall be promptly vacated and cleaned up. However, it is not the intent to require the Contractor's plant or material to be removed from an

SECTION 01 10 10 Page 10 area while such plant, material, or area is still being actively used. The project staff will brief the Contractor on security procedures. Any such procedures will not be the basis for claims for additional money or time.

The project areas off limits to Contractor personnel will also be designated. Salespersons or personnel seeking employment will not be permitted inside the project security fences without prior Government approval.

The Contractor may place a small office trailer within the area designated by the COR.

Temporary security fencing may be installed in a manner approved by the Contracting Officer. Security fencing may not be installed in a manner that damages existing facilities, such as punching post holes in existing pavement.

1.9.3 Indoor Work and Storage Areas

Work and storage areas within the powerhouse will be available for the Contractor. These areas will be confined to the powerhouse generator floor, El. 428 and the Service Bay Erection Area at El. 447. The Government on-site representative will designate the actual locations for work and storage areas on these floors. All other stairways, doorways, and floor drainage gutters shall remain open and accessible. Temporary storage of equipment and materials in the powerhouse shall be limited to those items required for performance of the work.

1.9.4 Employee Access and Parking

Access into the powerhouse will only be available during normal business hours, unless otherwise approved by the COR. At no time will any doors be blocked open upon entering or leaving the building.

The Contractor's employee private vehicle parking areas shall be developed by the Contractor in the area designated by the COR. The Contractor shall keep the "Contractor Office/Storage Area" area free of litter and debris.

An adequate number and size of trash receptacles shall be provided and emptied as necessary to avoid overflowing. Trash receptacles shall be adequately secured to provide protection from wind and animals. Access to the Contractor's work areas will be available from the powerhouse access road. The Contractor may park no more than 4 vehicles within the gated secure powerhouse parking area at one time.

1.9.5 Access Roads and Road Restrictions

No new access roads are required for this work. Any damage to existing roadways that are used for access purposes shall be repaired and the surface shall be restored to its "as found" condition. The Contractor shall comply with any special requirements of the State, County, Local authorities and Corps of Engineers for use of existing roadways. These special requirements include, but are not limited to, traffic regulations and load limits. The Contractor is responsible for investigating and understanding these restrictions. No time extensions or cost claims will be allowed due to road restrictions. Any agreements negotiated with the State or County for road use will be furnished to the Government before use of roadways begin. Both lanes of roads shall not be blocked by the Contractor. If one lane is blocked the Contractor shall provide the necessary flaggers, based on the visibility, to control traffic.

SECTION 01 10 10 Page 11

1.9.6 Public Access

The public shall have permanent walking access behind the locked pipe gate on the main access road which leads to the powerhouse. Barricades or temporary fencing shall be provided to prevent the public from entering the Contractor's work areas as applicable. Signs shall also be installed and maintained to inform the public of the work being performed. A brief description of the project and start/finish dates should be included.

1.10 TRAFFIC CONTROL AND PUBLIC ACCESS

Existing public roads and access roads shall be kept open to vehicle traffic at all times. The Contractor shall conduct his work in such a manner as will obstruct and inconvenience traffic as little as possible.

When necessary for the Contractor to operate on or cross existing highways or roads, the Contractor shall furnish signs lights, and /or other necessary safe guards to safely control and direct the flow of traffic.

The Contractor shall obtain any and all required permits for such operations from the appropriate private or public authority at no additional cost to the Government.

1.11 DISPOSAL OF ELECTRICAL AND MECHANICAL EQUIPMENT AND MISCELLANEOUS

MATERIALS

1.11.1 Disposal of Material and Equipment

Title to all materials and equipment to be disposed of, excepting salvage items and hazardous waste, is vested in the Contractor upon receipt of signed contract and such materials and equipment are designated scrap only as directed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed. The Contractor may retain these items in usable form and take possession of them providing that there is no subsequent cost or inconvenience to the Government. The Government does not guarantee that these items are complete or in working order, and the Contractor shall assume responsibility for any damages caused by their use immediately upon taking possession of them. Scrap materials shall be removed from the Government's property within 14 days of removal from their original locations.

1.11.2 Salvage

Salvage shall include removal of the material, equipment, etc., from its present location and transporting, bundling, protecting, cleaning, and storing it onsite as directed. Salvage items will be those specified.

These items shall remain the property of the Government. Adequate property control records shall be maintained for all materials or equipment specified to be salvaged. These records may be in accordance with the Contractor's system of property control. The Contractor shall be responsible for the adequate storage and protection of all salvaged materials and equipment and shall replace all salvage materials and equipment which are stolen, broken, or damaged during the salvage operations as the result of his negligence, or while in his care.

1.12 PROJECT SITE SECURITY REQUIREMENTS

The project site is a secured area and access onto the project is restricted. The security measures affect all of the Contractor's vehicles and personnel. There will be delays when entering the site due to locked gates, vehicle inspections, and personnel checks. Inspections and checks

SECTION 01 10 10 Page 12 may include inspection of tool boxes, brief cases, lunch boxes, and other containers.

Depending upon the level of security threat, some Project areas may or may not be open to the Contractor and Contractor employees. The security of the Contractor's property and items furnished under this contract, until items are accepted by the Government, are the Contractor's responsibility whether stored inside or outside the site.

Guidance and forms for project site security requirements are available on the Nashville District Public Website:

http://www.lrn.usace.army.mil/BusinessWithUs/ContractSecurityRequirements.aspx

1.12.1 Pre-Screening Contractor's On-Site Employee Candidates

The Contractor must pre-screen on-site employee candidates using the E-verify Program website (http://www.dhs.gov/E-Verify) to meet the established employment eligibility requirements. The Contractor must ensure that each on-site employee candidate has two valid forms of Government issued identification prior to ensuring the correct information is entered into the E-verify system. An initial list of verified/eligible on-site employee candidates must be provided to the COR no later than 3 business days after the initial contract award.

1.12.2 Identification of Employees

An employee identification and control procedure shall be submitted for approval for identification and control of employees entering or leaving the project site. The Contractor shall be responsible for furnishing identification and other information to the Government's on-site representative for each employee, prior to the employee's work on the project site, and for requiring each employee on the project site to display identification at all times. Identification shall include photo identification, company name, and the individual's name and company identification number as a minimum. Badges will be laminated plastic type. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon the release of the employee. If required by the Contracting Officer, employees will be photographed by the Government. Employees who fail to submit to photographing will not be allowed on the project site.

1.12.3 Vehicle Access

Project access roads are secured with locked gates. All vehicles that pass thru the locked gates will be subject to being searched. No privately owned vehicles (POV's) will be allowed thru locked gates. Only Contractor's work vehicles and equipment that are essential to the conduct of the work will be allowed in the work areas. All Contractor vehicles shall display suitable permanent or temporary identification.

1.12.4 Delivery of Equipment

Delivery of equipment and materials to the project site shall arrive during the normal working hours of the project maintenance crews described in paragraph WORK SCHEDULES. All deliveries shall be made to the Contractor's work area.

SECTION 01 10 10 Page 13

1.12.5 Use of Private Vehicles

Private vehicles of the Contractor and Contractor's employees shall be restricted to designated areas agreed to at the pre-work meeting. Parking of private vehicles shall be restricted to the areas designated.

1.13 UTILITIES

1.13.1 General

The Contractor shall furnish utilities required for the performance of work under this contract, except Government-furnished electrical power, water, and compressed air, within the powerhouse, as described below.

1.13.2 Sanitary Facilities

The Government's restrooms inside the powerhouse will not be available for use by Contractor personnel. The Contractor shall furnish sanitation facilities in accordance with EM 385-1-1. All facilities shall be located outside the powerhouse. The location of all facilities will be subject to Government's on-site representative approval.

1.13.3 Electrical Power

1.13.3.1 General

Electric power will be made available to the Contractor from the existing electrical systems within the powerhouse and will be supplied without cost to the Contractor. The Contractor shall be allowed to use existing electrical outlets for work performed within the powerhouse. Government personnel will have priority use of the electrical receptacles. Power is available from existing 120 volt, 1 phase, 15 ampere receptacles, and 480 volt, 3 phase, 30 ampere receptacles. The Government receptacles are located at various sites throughout the powerhouse. Contractor shall take special care not to overload receptacle circuits. Contractor shall be responsible for all accessories, such as extension cords, adapters, and raceways for road crossings. Extension cords shall not be allowed to cross crane rails. Continuous power availability cannot be guaranteed. The Contractor shall ensure adequate and reliable power for this contract. The Contractor is responsible for providing all electrical power beyond the limits of the powerhouse, including but not limited to the Contractor's office and any storage areas.

1.13.3.2 Temporary Electrical Wiring

Care shall be exercised in conserving all utilities. The location of all temporary power lines and connections will be subject to Contracting Officer approval. The Contractor shall submit a Temporary Electrical Wiring Plan for temporary electrical wiring. All temporary electrical wiring shall be installed in accordance with EM 385-1-1 and as approved.

All temporary circuits, wire, extension cords, and devices shall be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner, and shall be removed by the Contractor in like manner prior to final acceptance by the Government. All electric power required outside the powerhouse shall be Contractor-furnished. Ground fault protection shall be provided for all circuits used, inside and outside, and shall be Contractor-furnished. Temporary panels shall conform to current NEC standards and EM 385-1-1. All temporary electrical lines and appurtenances shall be furnished and installed at no additional cost to the

SECTION 01 10 10 Page 14

Government.

1.13.4 Telephone

The Contractor shall be responsible for having the telephone company furnish all telephone service needed by him on the job site. The project telephone system will not be available to the Contractor. Cellular phones are acceptable.

1.13.5 Water

All reasonable amounts of non-potable water will be made available from existing outlets and supplies. No charge will be made for the water. The Contractor shall supply potable water for drinking, hand washing, and other sanitary needs. The existing water systems within the powerhouse are available for use by the Contractor for construction and domestic purposes. Old Hickory's water supply is not potable. Temporary piping, if required, shall be installed by the Contractor, and shall be removed prior to final acceptance of the work. All temporary piping connected to the Government's potable water system shall have a backflow preventer installed at the point of connection to the system to prevent contamination of the Government's potable water system. All temporary piping and connections will be subject to Contracting Officer's approval.

1.13.6 Compressed Air

Compressed air at 100 psi up to 100 SCFM will be made available for Contractor use from existing designated outlets. Government personnel will also use the compressed air at times for routine and emergency maintenance operations. Government personnel will have priority for use of the compressed air.

1.14 GAS, VAPOR, FUME, DUST, AND MIST IN THE POWERHOUSE

1.14.1 General

The Contractor shall take such measures as are necessary to effect maximum control, and prevent escape into the powerhouse, of all gases, vapors, fumes, dusts, slurries, and mists created by operations under this contract. To the maximum extent possible, all dust and dirt shall be removed by vacuum cleaning. At least 10 working days prior to commencement of work in the powerhouse, the Contractor shall submit for approval, in writing, his proposed Gas, Vapor, Fume, Dust, Slurry, and Mist Control in Powerhouse. Part of the program shall include, but not necessarily be limited to, the following:

a. Adequate isolation and ventilation of air arcing, welding, burning, and grinding operations.

b. Provision of exhaust ducts that shall discharge outside the powerhouse structure where mechanical ventilation is used. Ventilation systems shall comply with requirements of 29 CFR 1910.94 and 29 CFR 1926.57.

c. Controlled operation of power driven tools.

d. Furnishing and removing of oiled sawdust or other dust preventatives in areas that cannot be properly rendered free from excessive dusting by vacuum cleaning or other methods.

SECTION 01 10 10 Page 15

e. Vacuum cleaning (or other approved method) of spaces within the work areas where dust accumulates.

f. Only air, electrical, propane, or battery-driven equipment may be used inside the powerhouse.

g. The powerhouse is pressurized to prevent dust infiltration from the outside. All doors shall be kept closed when not being used.

h. Method to prevent exposure of employees to inhalation, ingestion, skin absorption, or contact with any material or substance at concentration above specified in 29 CFR 1910.1000 and 29 CFR 1926.56,.58, and .62.

i. Internal-combustion engine powered equipment will not be permitted to operate inside the powerhouse unless exhausted to the exterior except for short periods of time to unload materials and equipment.

1.14.2 Additional Provisions

Ventilation systems shall not interfere with traffic inside or outside the powerhouse. Depending upon the Contractor's plant and equipment and methods of operation, additional provisions for satisfactory gas, vapor, fumes, dusts, slurry, and mists control will be required and shall be included in the proposed Gas, Vapor, Fume, Dust, Slurry, and Mist Control Program. Decisions of the Government as to the adequacy and extent of the Gas, Vapor, Fume, Dust, Slurry, and Mist Control Program and prosecution of the work shall be final. The gas, vapor, fume, dust, slurry, and mist control in the powerhouse shall be considered as incidental to the work and no separate payment will be made therefore.

1.15 PROTECTION OF EXISTING UTILITIES

The existing utilities shall be protected in accordance with Section 00700 CONTRACT CLAUSES, Contract Clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Repairs shall be made immediately and at Contractor's expense.

1.16 DISPOSITION OF MATERIALS

1.16.1 General

The location of the Contractor's off site disposal area and a plan for safe disposal of material shall be submitted in the Disposal Plan. All demolished material and miscellaneous materials shall be disposed of off-site in conjunction with Section 01 57 20 ENVIRONMENTAL PROTECTION, and in accordance with all local, State, and Federal rules and regulations.

1.16.2 Daily Cleanup and Disposal

Work areas shall be kept reasonably neat on a daily basis. All debris resulting from the work, such as waste metalwork, packing cases, scrap lumber, oil and grease spills, and other debris shall be collected, removed, and disposed of off-site at least once per week. The Government's trash cans, dump boxes and other containers shall not be used. Liquid waste shall not be disposed of in Project drains. All costs of removing debris shall be incidental to the work, and, therefore, no separate payment shall be made.

SECTION 01 10 10 Page 16

1.16.3 Disposal and Salvage of Equipment and Miscellaneous Materials

The Government's asbestos contractor will dispose of stator winding coils and other asbestos containing materials. Title to all other materials and equipment to be disposed of, except materials salvaged for the Government will be vested in the Contractor when beginning disassembly work or when such materials and equipment are designated as scrap. The Government will not be responsible for the condition, loss or damage to such property after title transfer. The asbestos contractor may retain these items in usable form and take possession of them providing that there is no subsequent cost or inconvenience to the Government. The Government does not guarantee that these items are complete or in working order and the Contractor shall assume responsibility for any damages caused by their use immediately upon taking possession of them.

1.17 CONTRACTOR'S EQUIPMENT

1.17.1 Plant and Equipment List

Provide a complete list of all plant and equipment, exclusive of shop equipment, to be used on the project at least 15 days prior to commencing site operations. An up to date list of plant and equipment shall be maintained daily in QCS throughout the life of the contract. The lists shall include rented equipment as well as lease purchase or sale leaseback equipment. Contractor shall record dates equipment is assigned to or removed from the project, dates deadlined for repairs and returned for use, and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.17.2 Movement of Equipment by the Contractor

All cranes, rigging, lifts, operators, and other necessary means to move equipment or items shall be Contractor-furnished as required to pursue and complete the work, and shall meet the requirements of EM 385-1-1 and Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. For mobile cranes a loading diagram may need to be submitted for review and approval showing the wheel loads and wheel spacing. The Contractor shall provide a Crane Critical Lift Plan as required in Section 01 35 26 and detailed in EM 385-1-1, paragraph 16.H. The loading diagram and critical lift plan shall address large component (generator and turbine parts) laydown on the powerhouse floor.

1.18 CONTRACTOR USE OF POWERHOUSE BRIDGE CRANES

1.18.1 General

There is a powerhouse bridge crane which will be needed for major lifts in the disassembly and reassemble of the generator and turbine. The bridge crane at the powerhouse will be available for work within the working load and movement limits of the crane. The cranes capacities and speeds are as follows:

There are two trolleys. Each trolley has a main hoist and an auxiliary hoist,

(a) Main Hoist, Rated Capacity, tons 275

(b) Rated Capacity per Trolley, 137.5 tons at 4.5 fpm

SECTION 01 10 10 Page 17

(c) Main Hoist Hook Travel, approx. ftmsl 399-470

(d) Aux.Hoist, Rated Capacity per Trolley 25 tons at 21.4 fpm

(e) Aux. Hoist Hook Travel, approx. ftmsl 394-472

(f) Total Bridge Travel, approx. feet 341.5

(g) Rated Bridge Travel speed, fpm 81.6

(h) Rated Trolley Travel Speed, fpm 25

(i) Bridge Span, approx. feet 70

The Government will furnish electric power, lubrication, and normal maintenance including adjustments without cost. The Contractor shall operate the crane in strict accordance with ANSI B 30.2 and OSHA 29 CFR

1910.179. The Government will perform the initial crane inspection as required by the codes. The Contractor shall perform all additional inspections as required by the codes. The Contractor will be held liable for all damages incurred as the result of the negligent operation or use of the crane. The Contractor shall request use of the crane from the Contracting Officer's Representative (COR) 24 hours prior (48 hours prior for weekends and holidays). Load on the powerhouse floor shall not exceed 1,000 lbs. per sq. foot.

1.18.2 Contractor Crane Operator

Qualified Contractor bridge crane operators shall be furnished for the operations. In addition to meeting the requirements of EM 385-1-1, each crane operator shall have had at least 1-year's experience on a bridge crane with similar characteristics and equal or greater capacity. Crane Operator Qualifications, for each operator in the form of an affidavit signed by the operator and the Contractor shall be submitted. The affidavit shall include a complete record of all related work with particular emphasis on experience directly related to operation of a counterpart crane handling comparable loads. Before any operator is approved they shall spend at least 1 hour being checked out on the crane under the direct surveillance of the Government. The operator may be retested at any time.

The crane operators shall have current (within the previous 12 months) medical examinations with emphasis on hearing, eyesight, and cardiovascular conditions. The medical exams shall be submitted with the affidavit.

1.18.3 Use of the Crane

The crane facilities at the project must be shared with the Corps project forces and other contractors as directed. The Contractor will be liable for all damage, due to fault or negligence, incurred while the crane is operated by the Contractor's crane operator. Allocation of crane time between the primary Contractor and other contractors will be made by the Government, and the decision will be final in any dispute arising relative thereto. The Government remains the primary user and the Contractor is to schedule use of the crane by written request. Advance notice and request for approval shall be made each time the use of the crane is required. The Government retains the right to withdraw the availability of the crane at any time it is required for loading and unloading trucks, emergency use, normally or for coordination with other contractors, or scheduled project maintenance.

1.18.4 Contractor's Riggers

Qualified riggers shall be furnished for lifting and in attaching such loads to the crane. An affidavit stating the Crane Rigger Qualifications shall be submitted. The affidavit shall include a complete record of all related experience and be signed by the rigger and the Contractor.

SECTION 01 10 10 Page 18

Knowledge of hand signals of the riggers and verification shall be the responsibility of the Contractor.

1.18.5 Lifting Devices

Existing lifting beams may be used, but must be returned to the Government in the condition in which they were received from the Government. These existing lifting devices are available "as is" and "where is". Contractor assumes all risk of their use. The existing lifting devices have undergone NDT and no issues were found. The NDT test reports will be provided to the Contractor post award. All slings used shall be provided new by the Contractor. Slings shall be used for direct inline pulls or loading, and not used for wrapping around a load and lifting that load.

1.19 CRANES AND HEAVY EQUIPMENT

1.19.1 Contractor Crane Safety

Contractor's cranes and equipment furnished for this work shall conform with all applicable OSHA requirements and referenced EM 385-1-1 in Section 00700 CONTRACT CLAUSES, Contract Clause 52.236-13 Alt I, ACCIDENT PREVENTION and Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. Contractor shall submit a lifting diagram addressing such issues as lift, trim, maximum load, maximum wind speed, lifting radius, crane operator(s) qualifications and current medical exam, crane rigger(s) qualifications, and all other applicable information required by EM 385-1-1 and OSHA. The lifting diagram shall be submitted 30-days prior to site work.

1.19.2 Contractor Crane Testing

All Contractor cranes shall be tested in accordance with EM 385-1-1 prior to use on the project and the tests shall be witnessed by the COR.

Forty-eight hours notice of the test, excluding weekends and federal holidays, shall be given by the Contractor.

1.19.3 Contractor's Cranes and Heavy Equipment

The planned method of transportation and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .