W912P5-16-R-0002-0008.pdf
PDF 42 KB Posted
- Solicitation number
- W912P5-16-R-0002
About this file
Amendment 0008
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING DIVISION (RK)
RAY.KENDRICK@USACE.ARMY.MIL
NASHVILLE TN 37203
W38XDD50719840
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Administrative modification:
1.Revises Technical Specifications Section 48 13 13.06, Paragraph 3.7.
2. Extend Government acceptance period by 90 days for a total of 210 days from date of proposal due date of 31-August-2016.
3. Incorporate Wage Determinations revisions: TN138 revision 1 w as issued 11/11/2016 and TN107 revision 4 w as issued 12/16/2016.
4. Update Clause 52.252-3 ///////////////Nothing Follow s/////////////
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-R-0002
X 9B. DATED (SEE ITEM 11)
06-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Dec-2016
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-16-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ACCEPTANCE DATE CHANGE
By acknowledging this amendment, offerors agree to extend the Government acceptance period by 90 additional days (for a total of 210 days) from the date offers were originally due (31 August 2016). Accordingly, the acceptance period will be extended to 1 March 2017.
What to Submit:
(1) Offerors must acknowledge this amendment. Failure to timely acknowledge this amendment may result in the rejection of an offeror’s proposal.
How to Submit:
The above-referenced documentation should be submitted via email to ray.kendrick@usace.army.mil no later than 9:00 AM CT on 10 January 2017.
Only Acknowledgment will be considered. Accordingly, other documents, if submitted, will not be considered.
AMEND 0008 TECHNICAL CHANGES
RFP No. W912P5-16-R-0002 Amendment No. 0008
Unit 4 Rehabilitation Old Hickory Powerhouse
Sumner County, Tennessee
I. CHANGES TO TECHNICAL SPECIFICATIONS
A. Section 48 13 13.06 GENERATOR THRUST BEARING INSPECTION AND
REFURBISHMENT
1. Remove Section 48 13 13.06 page 15, and replace with revised Section 48 13 13 06 page 15.
--- END OF AMENDMENT NO. 0008 TECHNICAL CHANGES---
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 31-Aug-2016 01:00 PM to 10-Jan-2017 09:00 AM.
The Issued By organization has changed from
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
to
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37203
The offeror acceptance period has increased by 90 from 120 to 210.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001: The purpose of this amendment is to:
1. Change the site visit date;
2. Answer questions regarding the site visit;
3. Revise 52.252-3; and
4. Revise 52.236-27 Alt I
Amendment 0002: The purpose of this amendment is to:
1. Update Specifications (Sections 01 11 10, 26 11 15.00, 48 13 16.00, and Appendix A)
2. Replace drawings (Q15-79/1021 and Q15-79/1022)
3. Add drawings (Q15-79/772, 162D132, 162D598, and T-5139635)
4. Post Set Two Q&A
5. Change Section 00115, 2.2.2.1 Subfactor 3A "42,000 kVA" changed to "45,000 kVA"
6. Update clauses 52.252-3 and 252.236-7001.
Amendment 0003: The purpose of the amendment is to:
1.Post Set Three Q&A and
2. Update FAR Clause 52.252-3.
Amendment 0004: The purpose of this amendment is to:
1.Post Set Four Q&A and
2. Update FAR Clause 52.252-3.
Amendment 0005: The purpose of this amendment is to:
1. Post Set Five Q&A,
2. Replace all references of "00010" with "00100"; Revise Section 00115, Paragraph 2.3; and Revise Section 00130, Paragraphs 4.1, 4.6 and 4.7;
3. Revise Technical Specifications;
4. Update Price Schedule and Price Schedule Information;
5. Include PDF editable version of PPQ;
6. FAR clause 52.209-7 made full text;
7. Revise DFARS clause 252.236-7001 and FAR clause52.252-3; and
8. Change proposal due date to August 31, 2016 at 1:00 PM CDT.
Amendment 0006: The purpose of this amendment is to:
1. Post Set Six Q&A;
2. Revise Price Schedule;
3. Update/Add drawings;
4. Update technical specifications;
5. Add Paragraph 6, Failure to Meet Performance Guarantees in Special Instructions;
6. Section 00115 Proposal Content Paragraph 2.1.1: Update similar in magnitude language;
7. Section 00115 Paragraph 2.2.3.1 and 00130 Paragraph 4.4.1: Add joint venture language;
8. Update Section 00130 Paragraph 4.7;
9. Add "Building" wage determination; and
10. Update clauses 52.252-3 and 252.236-7001.
Amendment 0007: The purpose of this modification is to:
1. Revise the technical specifications and
2. Update clauses 52.252-3 and 252.236-7001.
Amendment 0008: The purpose of this modification is to:
1. Revise the technical specifications- Section 48 13 13.06, Paragraph 3.7.
2. Extend Government acceptance period by 90 days
3. Update Davis Bacon Wage Rates TN138 revision 1 was issued 11/11/2016 and TN107 revision 4 was issued 12/16/2016
4. Update clauses 52.252-3.
(End of Provision)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
REVISED WAGE DETERMINATIONS
General Decision Number: TN160138 11/11/2016 TN138
Superseded General Decision Number: TN20150138
State: Tennessee
Construction Type: Heavy Including Water and Sewer Line Construction
County: Sumner County in Tennessee.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 11/11/2016
* ELEC0429-007 06/01/2016
Rates Fringes
Electrician.....................$ 25.42 12.17
ENGI0369-012 05/01/2013
Rates Fringes
Operating Engineers:
Bulldozer, Crane, and Forklift....................$ 24.47 10.85
SUTN2009-136 12/02/2009
Rates Fringes
LABORER: Common or General......$ 10.25 0.00
LABORER: Flagger................$ 8.73 0.00
LABORER: Pipelayer..............$ 11.71 0.00
OPERATOR: Backhoe...............$ 17.35 0.00
OPERATOR: Loader................$ 13.50 0.00
TRUCK DRIVER: Dump Truck........$ 10.76 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: TN160107 12/16/2016 TN107
Superseded General Decision Number: TN20150107
State: Tennessee
Construction Type: Building
County: Sumner County in Tennessee.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 03/11/2016 2 05/13/2016 3 09/16/2016 4 12/16/2016
BOIL0455-001 01/01/2013
Rates Fringes
Boilermaker....................$ 24.91 20.03
* BRTN0005-009 05/01/2016
Rates Fringes
BRICKLAYER.......................$ 23.62 2.07
* CARP0223-002 04/24/2016
Rates Fringes
CARPENTER (Cabinet Installation and Scaffold Builder Only)....................$ 23.95 11.36
CARP1544-007 05/01/2015
Rates Fringes
MILLWRIGHT.......................$ 26.02 12.11
ENGI0369-008 05/01/2013
Rates Fringes
OPERATOR: Forklift..............$ 24.47 10.85 OPERATOR: Grader/Blade..........$ 19.46 10.85
IRON0492-008 05/01/2016
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 24.35 13.35
LABO0386-003 05/01/2015
Rates Fringes
LABORER: Form Work Only Form Erectors...............$ 17.87 6.05 Form Strippers..............$ 18.30 6.05
PLUM0572-006 05/01/2016
Rates Fringes
PIPEFITTER, Includes HVAC Pipe Installation................$ 36.55 16.42
SHEE0177-004 05/01/2013
Rates Fringes
SHEET METAL WORKER, Includes HVAC Duct and Metal Roof Installation.....................$ 24.50 11.85
SUTN2009-105 09/21/2009
Rates Fringes
CARPENTER, Includes Drywall Hanging (Excludes Cabinet Installation, and Scaffold Building)........................$ 15.63 1.65
CEMENT MASON/CONCRETE FINISHER...$ 16.68 2.75
ELECTRICIAN, Includes Installation of Alarms...........$ 18.70 5.59
LABORER: Asphalt Raker..........$ 12.85 0.00
LABORER: Common or General......$ 13.07 1.72
LABORER: Landscape..............$ 9.60 0.80
LABORER: Mason Tender - Brick...$ 12.87 0.00
LABORER: Roof Tearoff...........$ 9.75 0.49
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.00 3.54
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 17.68 0.00
OPERATOR: Bulldozer.............$ 15.47 3.33
OPERATOR: Crane.................$ 18.80 3.28
OPERATOR: Mechanic..............$ 18.66 3.39
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 14.25 0.00
OPERATOR: Roller................$ 12.83 0.00
PAINTER: Brush, Roller and Spray............................$ 13.10 0.00
PLUMBER, Excludes HVAC Pipe Installation.....................$ 20.03 9.00
ROOFER: Built up Roof...........$ 12.74 0.00
ROOFER: Rubber Roof.............$ 16.82 4.77
ROOFER: Single Ply Roof.........$ 16.50 0.32
TILE FINISHER....................$ 10.00 0.74
TRUCK DRIVER: Dump Truck........$ 12.16 0.00
TRUCK DRIVER: Material Truck....$ 12.16 1.66
TRUCK DRIVER: Pickup Truck......$ 11.70 3.92
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .