W912P5-16-R-0002-0003.pdf
PDF 23 KB Posted
- Solicitation number
- W912P5-16-R-0002
About this file
Amendment 0003 The purpose of the amendment is to 1.Post Set Three Q A and 2. Update FAR Clause 52.252-3.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING DIVISION (JD9)
JAMIE.DAVIES@USACE.ARMY.MIL
(615) 736-7921
(615) 736-7124
NASHVILLE TN 37202-1070
W38XDD50719840
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of the amendment is to:
1.Post Set Three Q&A and
2. Update FAR Clause 52.252-3.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-16-R-0002
X 9B. DATED (SEE ITEM 11)
06-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jun-2016
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37202-1070
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912P5
FACILITY CODECODE
EMAIL:TEL:
W912P5-16-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
Q&A SET THREE
Old Hickory Unit #4 Rehabilitation Solicitation Number: W912P5-16-R-0002
Questions and Answers Set Three
7. Question: As per SECTION 01 10 10 1.32c, the Government will provide Original lifting eyes and miscellaneous wrenches/ tools supplied by the turbine manufacturer. Can the Government confirm that the lifting device and all lifting hardware as per reference drawing 38688 and 38689 will be made available?
Answer: All lifting devices and hardware on drawings 38688 and 38689 will be made available to the contractor.
8. Question: Can USACE confirm that units G1 and G4 were identical before the uprate of G1?
Answer: All four units were procured in one contract, under the same requirements, manufactured at the same facilities, by the same vendors. The units are essentially alike allowing for minor differences due to the manufacturing techniques used at the time of construction.
9. Question: Will the Freight Elevator be available for use during construction?
Answer: The freight elevator may be used by the Contractor during construction. However, the Government makes no guarantee the elevator will be functioning and available throughout the contract duration. Accordingly, if the elevator fails before or during performance of the contract, such failure will not constitute the basis for a claim by the contractor.
10. Question: Can you give us the extent of the floor protection required?
Answer: Floor protection is required on the assembly bay and generator floor.
11. Question: Will we be allowed to use a lift truck to move material inside the powerhouse?
Answer: Load handling equipment used inside the powerhouse must be submitted for approval. Lift trucks may be allowable provided that they do not exceed the floor loading requirements.
12. Question: Please provide drawings of the CO2 system as installed to understand the allowances given for winding placement.
Answer: Original drawing, 162D598, of CO2 system was added in Amendment 0002.
13. Question: Section 01 45 01 article 3.4.2 CQC System Manager: The solicitation requires, "The CQC System Manager shall be a graduate engineer or a graduate of construction management, with a minimum of 10 years construction experience on construction similar to the contract." Respectfully request that this requirement read, "The CQC System Manager must either be a graduate engineer with at least 5 years of experience in a verifiable CQC role on jobs of similar complexity to this contract, or have at least 10 years of experience in verifiable CQC roles on jobs of similar complexity to this contract."
Answer: Specification section 01 45 01, Paragraph 3.4.2 remains unchanged.
14. Question: Was there any asbestos in the spare windings we measured and received samples of at the visit?
Answer: Asbestos survey results are included in Appendix A. The interior of the coils have not been tested for asbestos.
15. Question: Question volume 2 time schedule. Can you submit to us expected date for end of the evaluation of the bids and expected date for NTP. This question is for us to evaluate our bid bond validity.
Answer: The contract is expected to be awarded in late 2016 with NTP in early 2017.
16. Question: In Factor 1, Page 21 of 89, it is stated that offeror shall provide description of at least 3 and no more than 5 projects. If a past contract had multiple units, would the contract be considered a project or would each unit be considered a project?
Answer: A past contract with multiple units would be considered one project for the purposes of the solicitation.
17. Question: Respectfully request a limitation/ cap on FAR 52.211-12 to 10% of the contract value. Respectfully request that FAR 52.242-17 be added to the solicitation.
Answer: Limitation of Liability included in Section 00800 Special Contract Requirements, Special Instructions, Part 5 remains unchanged. FAR clause 52.242-17 is for use in a supply contract not construction.
18. Question: We respectfully request that you extend the submittal date for this bid by 2 weeks till August 31st 2016.
Answer: The proposal due date remains unchanged.
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 0001: The purpose of this amendment is to:
1. Change the site visit date;
2. Answer questions regarding the site visit;
3. Revise 52.252-3; and
4. Revise 52.236-27 Alt I
Amendment 0002: The purpose of this amendment is to:
1. Update Specifications (Sections 01 11 10, 26 11 15.00, 48 13 16.00, and Appendix A)
2. Replace drawings (Q15-79/1021 and Q15-79/1022)
3. Add drawings (Q15-79/772, 162D132, 162D598, and T-5139635)
4. Post Set Two Q&A
5. Change Section 00115, 2.2.2.1 Subfactor 3A "42,000 kVA" changed to "45,000 kVA"
6. Update clauses 52.252-3 and 252.236-7001.
Amendment 0003: The purpose of the amendment is to:
1.Post Set Three Q&A and
2. Update FAR Clause 52.252-3.
(End of Provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .